Risk, Safety, Sustainability and GovernanceIntroductionWarehousing and distribution systems are exposed to a broad range of risks: vehicle collisions, falls, fires, theft, cyber-attacks, hazardous-material releases, labour-rights violations, regulatory penalties, environmental damage and disruptions caused by extreme weather or infrastructure failure. These risks are interconnected. A poorly controlled storage process may create both a safety incident and a customer-service failure; weak supplier governance may create reputational, legal and continuity risks; and an unplanned technology outage may compromise inventory accuracy, security and emergency response. Risk management in warehousing is therefore not limited to insurance or compliance inspections. It is a management system through which an organisation identifies uncertainty, evaluates consequences, applies controls, monitors performance and learns from events. Safety, sustainability and governance provide complementary perspectives: safety protects people, sustainability protects long-term social and environmental value, and governance establishes accountability, decision rights and evidence of control. This chapter develops an integrated framework for warehouse and distribution operations. It addresses workplace safety, physical security, hazardous goods, business continuity, cyber risk, regulatory compliance, data governance, labour ethics, emissions, waste and responsible sourcing. Learning ObjectivesBy the end of this chapter, the learner should be able to: - Explain the relationship between operational risk, safety, sustainability and governance.
- Identify major warehouse and distribution hazards and select appropriate controls.
- Apply risk assessment, hierarchy-of-controls and business-continuity principles.
- Design controls for hazardous goods, physical security and cyber risk.
- Evaluate labour, environmental and responsible-sourcing performance using suitable metrics.
- Construct a governance system based on accountability, assurance, reporting and continual improvement.
- Critically assess the limitations of compliance-led approaches.
1. An Integrated View of Risk1.1 Risk, hazard, incident and controlA hazard is a source or situation with the potential to cause harm. Examples include moving forklifts, unstable racking, flammable liquids, exposed electrical equipment and unsafe work pressure. Risk is the effect of uncertainty on objectives, including the possibility of injury, loss, delay, non-compliance or reputational damage. An incident is an event that results in, or could have resulted in, harm or loss. A near miss is an incident without actual injury or damage but with credible potential for it. A useful qualitative risk model is: Risk rating = Likelihood × Consequence Likelihood and consequence are usually scored on ordinal scales, such as 1–5. The product is a prioritisation aid, not a physical probability. It assumes that the scales are defined consistently and that a multiplicative score is appropriate for the organisation’s decision process. It should not be interpreted as an exact percentage chance of loss. Controls should be selected using the hierarchy of controls, from most reliable to least reliable: - Elimination – remove the hazard, such as removing a manual lifting step.
- Substitution – replace it with a safer alternative, such as a less hazardous cleaning agent.
- Engineering controls – isolate people from the hazard through guarding, barriers, interlocks or automated handling.
- Administrative controls – procedures, training, scheduling, permits and supervision.
- Personal protective equipment (PPE) – gloves, footwear, eye protection, respiratory protection and high-visibility clothing.
PPE is essential in many situations but is the least reliable layer when used alone because its effectiveness depends on selection, fit, maintenance and human behaviour. 1.2 Layers of protectionEffective operations use multiple, partially independent barriers. For example, pedestrian–vehicle risk may be controlled by traffic separation, speed limits, one-way routes, physical barriers, operator authorisation, alarms, visibility checks and incident reporting. A single procedure is not a robust control if a foreseeable failure can defeat the whole system. A bow-tie analysis is a useful method. The central event might be “forklift strikes pedestrian.” Threats appear on the left, preventive controls sit between threats and the central event, consequences appear on the right, and mitigative controls reduce the consequences. The analysis encourages managers to distinguish prevention from emergency response. 2. Workplace Safety in Warehouses and Distribution2.1 Common hazardsThe principal hazards include: - vehicle and pedestrian interaction;
- falls from docks, ladders, mezzanines and elevated platforms;
- falling loads, racking collapse and poor pallet condition;
- manual handling, repetitive work and awkward postures;
- conveyors, compactors, stretch wrappers and automated equipment;
- slips, trips, inadequate lighting and poor housekeeping;
- fire, smoke, heat, cold and inadequate emergency exits;
- fatigue, excessive work intensity, violence and psychosocial stress; and
- contractor and visitor exposure to unfamiliar environments.
Safety assessment must consider routine, non-routine and emergency work. Maintenance, cleaning, jam clearance and battery charging often create greater exposure than normal production. 2.2 Safe system designA mature safety system combines physical design and management discipline. Important practices include: - segregated pedestrian walkways and controlled crossing points;
- speed management, vehicle inspection and operator competence verification;
- racking design appropriate to load, seismic and impact conditions;
- visible load limits and controls against overloading or damaged pallets;
- dock restraints, wheel chocks and procedures preventing premature trailer departure;
- machine guarding, lockout/tagout or equivalent energy-isolation procedures;
- ergonomic assessment of lifting frequency, load weight, reach and posture;
- emergency lighting, unobstructed exits, fire detection and suitable extinguishers;
- permit-to-work systems for hot work, confined spaces and electrical work; and
- worker consultation, near-miss reporting and corrective-action follow-up.
A safety procedure is credible only when it is compatible with operational targets. If workers are rewarded solely for speed, a formal rule requiring safe checks may be bypassed. Governance must therefore align incentives, staffing and performance measures with safe behaviour. 2.3 Safety performance indicatorsLagging indicators include recordable injuries, lost-time cases, vehicle collisions and lost workdays. Leading indicators include hazard observations, corrective-action closure, training completion, equipment inspections, near-miss quality and worker participation. A low injury count does not necessarily indicate safety; it may reflect under-reporting, low exposure or inadequate investigation. Indicators should therefore be triangulated and reviewed by workforce representatives. 3. Hazardous Goods ManagementHazardous goods may be flammable, explosive, toxic, corrosive, oxidising, infectious, radioactive or environmentally hazardous. Classification, packaging, labelling, segregation, documentation and emergency response must follow the applicable national and international rules for the mode of transport and location. Requirements vary by jurisdiction, so organisations must maintain a legal register rather than rely on generic internet guidance. A practical hazardous-goods control cycle is: - classify the substance using the supplier’s current safety data and legal classification;
- verify approved packaging, labels, marks and documentation;
- define compatible storage zones and segregation rules;
- control quantities, ignition sources, ventilation and access;
- train workers and contractors in handling and emergency procedures;
- inspect containers, spill kits, fire systems and storage conditions;
- plan notification, isolation, evacuation and recovery; and
- investigate deviations and update the risk assessment.
Incompatible substances must not be stored together merely because they are in separate cartons. Segregation should consider chemical compatibility, package integrity, drainage, fire loading and emergency access. Safety data sheets should be accessible in the language and format workers can use. 4. Physical Security and Loss PreventionWarehouse security protects people, inventory, information and continuity. Threats include burglary, organised cargo theft, internal theft, fraud, tampering, unauthorised access and counterfeit substitution. A risk-based security design commonly includes perimeter protection, controlled gates, visitor management, identification badges, CCTV with lawful retention, lighting, alarm monitoring, seal controls, secure high-value areas, cycle counts and separation of duties. Security measures must be proportionate and respect privacy, labour law and non-discrimination principles. The control objective is not simply to install cameras. It is to ensure that an event is detected, investigated and resolved. For example, a camera without time synchronisation, retention controls or an investigation process has limited evidential value. Access rights should be reviewed after transfers, termination and changes in responsibility. High-risk processes such as returns, disposal and inventory adjustments require documented authorisation and independent review. 5. Business Continuity and ResilienceBusiness continuity concerns the ability to continue or recover critical activities at an acceptable level after disruption. Hazards include fire, flood, earthquake, epidemic, labour disruption, utility failure, supplier insolvency, transport interruption, ransomware and loss of a key distribution centre. A continuity programme normally includes: - a business impact analysis (BIA) identifying critical processes and dependencies;
- a risk assessment of plausible disruptive events;
- recovery objectives and minimum acceptable service levels;
- preventive and recovery strategies;
- documented response plans and communication trees;
- alternate facilities, carriers, suppliers, inventory or manual workarounds;
- backups and restoration procedures; and
- exercises, lessons learned and plan revision.
Two important measures are the recovery time objective (RTO) and recovery point objective (RPO). RTO is the target time within which a process or system should be restored. RPO is the maximum tolerable period of data loss, expressed in time. If a warehouse system has an RPO of four hours, backups or replicated data should limit recoverable data loss to no more than four hours under the defined scenario. These are management requirements, not guarantees. Continuity planning must address dependencies. A backup warehouse is ineffective if it lacks labour, network connectivity, inventory visibility, power, transport capacity or regulatory permission. Exercises should test realistic decisions, including allocation of scarce stock and communication with customers. 6. Cybersecurity and Data GovernanceWarehouses increasingly depend on warehouse-management systems, transport-management systems, handheld terminals, robotics, scanners, cloud services, APIs and connected sensors. This creates cyber risks including credential theft, ransomware, malicious manipulation of inventory, denial of service, data leakage and unsafe interference with operational technology. Core controls include least-privilege access, multi-factor authentication, network segmentation, secure configuration, patch management, vulnerability monitoring, tested backups, endpoint protection, supplier assurance, logging and incident-response procedures. Operational technology should not be connected to corporate or public networks without a justified architecture and controlled access. Data governance defines ownership, quality requirements, permitted use, retention, access, classification and disposal. Important warehouse data includes stock records, customer addresses, employee information, security footage, supplier data and hazardous-goods documentation. The principles of accuracy, purpose limitation, confidentiality, availability and accountability should guide processing. A data owner is accountable for business meaning and access decisions; a data steward manages quality and operational rules; and an information-security function establishes technical safeguards. Privacy requirements differ by jurisdiction, so organisations must identify applicable personal-data laws and cross-border transfer requirements. Artificial intelligence can support demand sensing, anomaly detection, route planning and image-based damage inspection. However, it can also amplify poor master data, discriminate in workforce decisions, expose confidential information or create opaque recommendations. AI use should include data validation, human oversight, access controls, performance monitoring, explainability appropriate to the decision and a process for challenging harmful outcomes. 7. Regulatory Compliance and GovernanceCompliance is the conformity of activities with laws, permits, standards, contractual obligations and internal policies. Governance is broader: it specifies who decides, who is accountable, how performance is challenged and how evidence is reported. A practical compliance-management system contains: - a current legal and obligation register;
- assigned owners for each obligation;
- documented procedures and competence requirements;
- inspection, testing and monitoring schedules;
- records demonstrating performance;
- internal audits independent of the activity being audited;
- corrective and preventive action; and
- escalation for material breaches.
A “three lines” arrangement is useful. The first line owns and manages operational risk. The second line provides risk, compliance and specialist oversight. The third line, usually internal audit, provides independent assurance to senior governance bodies. External auditors, regulators and certification bodies provide additional but not substitute assurance. Compliance should not be reduced to passing an audit. Audits sample evidence and may miss latent conditions. Managers should ask whether controls work during peak demand, staff absence, system failure and contractor turnover. 8. Labour Ethics and Human RightsWarehousing often involves temporary, migrant, agency, subcontracted and gig workers. Ethical risks include forced labour, child labour, discrimination, harassment, wage violations, excessive working time, unsafe quotas, retaliation for reporting concerns and restrictions on freedom of association. Responsible labour governance requires clear employment terms, lawful pay and working time, safe conditions, non-discrimination, access to grievance mechanisms, protection from retaliation and due diligence over labour providers. Procurement contracts should not impose unrealistic delivery or productivity expectations that encourage unsafe conduct. Worker voice is stronger when representatives can participate in risk assessments and investigations. Social audits alone are insufficient. They may be announced, document-focused or influenced by fear. A stronger approach combines worker interviews, payroll and time-record analysis, grievance trends, unannounced checks where lawful, supplier engagement and remediation. The objective should be prevention and remedy, not simply supplier exclusion, unless continued engagement would create unacceptable harm. 9. Environmental Sustainability9.1 Emissions and energyWarehouse emissions arise from purchased electricity, heating and cooling, material-handling equipment, refrigerants, on-site fuel and transport. Organisations should establish a boundary, collect reliable activity data, apply appropriate emission factors and document assumptions. A basic activity-based estimate is: Emissions = Activity data × Emission factor Activity data may be kilowatt-hours of electricity, litres of diesel or tonne-kilometres of freight. The emission factor converts the activity into kilograms or tonnes of carbon-dioxide equivalent. The result is valid only when the factor matches the fuel, geography, reporting boundary and accounting method. For a performance indicator: Carbon intensity = Total emissions ÷ Relevant activity The denominator may be pallets handled, orders shipped, tonnes delivered, square metres used or revenue. Comparisons are meaningful only when boundaries, service levels, product mix and measurement methods are consistent. Reducing emissions per order while total orders and total emissions rise is an intensity improvement, not an absolute reduction. Energy measures include efficient lighting, insulation, door management, heat recovery, right-sized refrigeration, battery charging optimisation, renewable electricity and efficient equipment. Transport measures include load consolidation, route optimisation, modal shift, vehicle efficiency and appropriate use of alternative fuels. Claims about “zero emissions” must define whether they refer to tailpipe, operational or life-cycle emissions. 9.2 Waste and circularityThe waste hierarchy prioritises prevention, reduction, reuse, repair, recycling, recovery and disposal. Warehouse actions include right-sized packaging, reusable pallets and totes, packaging return systems, segregation at source, inventory controls that prevent expiry, repair of handling equipment and verified recycling contractors. Waste data should distinguish hazardous and non-hazardous streams and track destination, not merely collection volume. Recycling claims require evidence that material reached an appropriate facility. Destruction of obsolete or counterfeit goods should be authorised, documented and environmentally compliant. 10. Responsible Sourcing and Supplier GovernanceA responsible-sourcing programme integrates commercial, operational, social, environmental and integrity criteria into supplier decisions. Supplier qualification should examine financial resilience, capacity, quality, safety, environmental permits, labour practices, information security, business continuity and beneficial ownership where relevant. Risk-based due diligence prioritises suppliers according to geography, commodity, labour model, spend, substitutability, incident history and potential severity. Contracts should define standards, reporting rights, audit access, incident notification, subcontracting controls, remediation and termination provisions. However, contract language without purchasing practices is weak governance. Buyers must allow realistic lead times, fair prices and feasible specifications. Supplier scorecards should avoid excessive aggregation. A supplier with excellent delivery but unsafe labour practices should not receive a high overall rating that hides the critical failure. Use threshold conditions for non-negotiable requirements and separate views for cost, service, risk and sustainability. 11. Risk Prioritisation and MetricsA risk register should record the risk statement, cause, event, consequence, owner, existing controls, inherent rating, residual rating, treatment, due date and evidence. Inherent risk is assessed before controls; residual risk is assessed after controls. Ratings should be reviewed after incidents, process changes, new equipment, new substances, regulatory changes or significant supplier changes. A compact control dashboard may include: | Domain | Leading measures | Outcome measures |
|---|
| Safety | inspections, near-miss quality, action closure | injuries, collisions, lost days | | Security | access reviews, seal checks, cycle counts | theft, fraud, tampering | | Continuity | exercise completion, backup tests | downtime, recovery performance | | Cyber | patching, MFA coverage, phishing tests | incidents, data loss | | Environment | energy intensity, waste segregation | emissions, landfill quantity | | Labour | worker interviews, grievance closure | verified violations, turnover | | Suppliers | due diligence coverage, corrective-action closure | disruptions, serious non-conformities |
Metrics should have an owner, definition, boundary, frequency, data source and escalation rule. Gaming is reduced when measures are balanced and independently checked. 12. Illustrative Case: NorthRiver Distribution CentreBackgroundNorthRiver, a fictional regional distributor of food-service and cleaning products, operated a 30,000-square-metre facility. It used forklifts, conveyor systems, refrigerated rooms and a cloud warehouse-management system. A significant proportion of labour was supplied through agencies. The facility had experienced two minor pedestrian–forklift collisions, rising energy costs, a failed refrigeration alarm and a customer complaint concerning a leaking chemical container. ProblemManagement treated each issue separately. Safety inspections focused on housekeeping, the IT team managed cyber controls independently, and procurement selected labour agencies mainly on hourly price. There was no integrated risk register, no tested continuity plan and no consistent supplier due diligence. AnalysisA cross-functional workshop mapped threats, consequences and controls. It found that pedestrian routes crossed forklift aisles during peak picking; agency induction varied by shift; chemical segregation depended on local knowledge; refrigeration alarms were not included in the emergency call tree; and several privileged system accounts belonged to former employees. Energy data were available but not linked to operating hours or refrigeration load. ApproachNorthRiver introduced physical pedestrian barriers and controlled crossings, revised traffic rules, and used observed competence checks rather than attendance-only training. It established a hazardous-goods register, compatibility map, spill response drills and documented escalation. Access rights were reviewed monthly, multi-factor authentication was expanded, and offline restoration of critical data was tested. The BIA classified refrigeration monitoring, order release and customer communication as critical processes. A continuity exercise tested a 12-hour power outage combined with loss of network connectivity. Procurement added labour and safety criteria to agency evaluation and required evidence of lawful pay and grievance access. Energy projects were assessed using measured consumption per operating hour and refrigeration tonne-hour rather than total consumption alone. OutcomeAfter six months, the facility had clearer accountability, faster corrective-action closure, improved worker reporting and a tested manual dispatch procedure. Management did not claim that risk had been eliminated. Instead, it documented residual risks, funded additional dock engineering and scheduled a follow-up exercise during the seasonal peak. Learning points- Separate incidents may share a systemic cause.
- Controls must be designed around real work, peak conditions and contractor practices.
- Cybersecurity and continuity are operational issues, not solely IT issues.
- Supplier and labour governance must be integrated into purchasing decisions.
- Sustainability metrics require meaningful boundaries and denominators.
- Assurance is stronger when workers, operations, specialists and independent reviewers participate.
13. Implementation Road MapAn organisation beginning this programme can proceed in stages: Stage 1: establish governance. Appoint executive sponsorship, define scope, assign risk owners and create the legal and obligation register. Stage 2: understand exposure. Map processes, people, equipment, substances, data, suppliers and environmental impacts. Conduct worker consultation and baseline measurement. Stage 3: control critical risks. Address high-severity hazards first, prioritising elimination and engineering controls. Secure hazardous goods, privileged accounts, emergency systems and essential suppliers. Stage 4: test resilience. Conduct drills for fire, spill, cyber outage, power failure, extreme weather and labour disruption. Record decisions, not merely attendance. Stage 5: measure and assure. Use leading and lagging indicators, internal audits, management review and independent assurance. Investigate weak signals and repeated deviations. Stage 6: improve and disclose responsibly. Close actions, revise standards, engage suppliers and communicate performance without unsupported claims or selective reporting. Challenges and LimitationsRisk scoring can create false precision, particularly when ordinal numbers are multiplied. Audits can encourage document production rather than real control. Sustainability indicators can be manipulated through boundary changes or shifting emissions to suppliers. Technology may improve visibility while increasing dependence and cyber exposure. Automation can reduce physical strain but introduce new risks involving maintenance, system failure and job quality. Global supply chains also face conflicting legal requirements and uneven enforcement. Managers should therefore combine quantitative indicators with qualitative judgement, worker knowledge, scenario analysis and independent challenge. The correct question is not “Are we compliant?” but “Can we demonstrate that our controls prevent harm, respond effectively when controls fail and learn when conditions change?” Chapter SummaryWarehousing risk management is an integrated discipline covering people, assets, information, environment and continuity. Effective control begins with hazard identification and risk assessment, but it depends on the hierarchy of controls, competent work design, worker participation and reliable assurance. Hazardous goods require classification, compatibility-based storage, documentation and emergency preparedness. Physical security must connect prevention, detection and investigation. Business continuity requires a business impact analysis, recovery objectives, tested alternatives and attention to dependencies. Cybersecurity and data governance are now central to distribution operations because warehouse systems, automation and connected devices affect both information and physical work. Compliance systems need legal registers, accountable owners, evidence, audits and corrective action. Labour ethics and responsible sourcing extend governance beyond the facility. Environmental management requires defensible boundaries, activity data, suitable emission factors, waste hierarchy and avoidance of misleading claims. Strong governance aligns incentives, purchasing practices, operational controls and independent assurance. The strategic objective is resilient value creation that protects people, complies with obligations and reduces environmental and social harm. Key TermsBusiness continuity: Capability to continue or recover critical activities after disruption. Business impact analysis: Assessment of process consequences, dependencies and recovery needs after disruption. Control: A measure that prevents, detects, reduces or responds to risk. Cyber risk: Risk arising from compromise or failure of digital systems, data or connected equipment. Emission factor: A factor converting activity data into estimated emissions. Governance: Structures and processes for direction, accountability, oversight and assurance. Hazard: A source or situation with potential to cause harm. Hazardous goods: Materials presenting physical, health or environmental dangers during handling or transport. Hierarchy of controls: Ordered preference for elimination, substitution, engineering, administrative controls and PPE. Leading indicator: A measure of preventive activity or control health. Near miss: An incident that could have caused harm but did not. RPO: Maximum tolerable period of data loss measured in time. RTO: Target time for restoring a process or system. Residual risk: Risk remaining after controls are applied. Responsible sourcing: Procurement that considers legal, ethical, social, environmental and operational impacts. Risk: Effect of uncertainty on objectives. Risk register: Structured record of risks, controls, owners, ratings and treatments. Three lines model: Allocation of risk ownership, specialist oversight and independent assurance. Waste hierarchy: Preference for prevention, reduction, reuse, recycling, recovery and disposal. Review QuestionsShort Answer Questions- Distinguish between a hazard, risk and incident.
- List the five levels in the hierarchy of controls.
- What is the difference between RTO and RPO?
- Why should safety performance use both leading and lagging indicators?
- State two requirements of responsible hazardous-goods storage.
Long Answer Questions- Explain how workplace safety, business continuity and cyber risk are interconnected in a modern distribution centre.
- Discuss the strengths and limitations of a risk matrix as a management tool.
- Design a governance system for a warehouse employing agency labour and multiple logistics contractors.
- Explain how a warehouse can reduce emissions while avoiding misleading sustainability claims.
- Evaluate why compliance audits alone cannot establish that operational risks are adequately controlled.
Analytical / Application Questions- A warehouse reports no lost-time injuries for one year, but near-miss reporting has declined and overtime has increased. Analyse possible explanations and recommend an investigation and corrective-action plan.
- A ransomware attack disables the warehouse-management system during a seasonal peak. Develop a response and recovery approach using critical processes, RTO, RPO, manual workarounds and stakeholder communication.
- A supplier offers the lowest transport price but has repeated labour violations and weak emergency preparedness. Construct a decision framework that weighs service, cost, human rights, continuity and remediation options.
Multiple Choice Questions with AnswersQuestion 1Which control is highest in the hierarchy of controls? A. Personal protective equipment B. Administrative instruction C. Elimination of the hazard D. Worker warning sign Correct Answer: C. Elimination of the hazard Question 2What does an RPO primarily specify? A. The target time to restore a process B. The maximum acceptable period of data loss C. The number of backup operators required D. The maximum warehouse recovery cost Correct Answer: B. The maximum acceptable period of data loss Question 3Which is a leading safety indicator? A. Lost-time injury count B. Workers’ compensation cost C. Number of completed hazard inspections D. Number of days absent after injury Correct Answer: C. Number of completed hazard inspections Question 4Which formula is appropriate for a basic activity-based emissions estimate? A. Emissions = Activity data × Emission factor B. Emissions = Activity data ÷ Emission factor C. Emissions = Emission factor − Activity data D. Emissions = Activity data + Emission factor Correct Answer: A. Emissions = Activity data × Emission factor Question 5Why is chemical compatibility important in hazardous-goods storage? A. It determines employee payroll rates B. Incompatible substances may react dangerously if containers fail C. It eliminates the need for labels D. It guarantees that no spill response is needed Correct Answer: B. Incompatible substances may react dangerously if containers fail Question 6In the three-lines model, which function normally provides independent assurance? A. The operational picking team B. The procurement buyer C. Internal audit D. The warehouse visitor coordinator Correct Answer: C. Internal audit Question 7Which practice best supports cyber resilience in a warehouse? A. Sharing administrator passwords across shifts B. Removing all system logs C. Using least privilege, tested backups and multifactor authentication D. Connecting operational equipment directly to public networks Correct Answer: C. Using least privilege, tested backups and multifactor authentication Question 8What is a limitation of multiplying ordinal likelihood and consequence scores? A. It always produces a probability percentage B. It can create false precision because the scales are judgement-based C. It cannot rank any risks D. It measures emissions directly Correct Answer: B. It can create false precision because the scales are judgement-based Question 9Which action best follows the waste hierarchy? A. Preventing unnecessary packaging at source B. Sending all waste to landfill C. Mixing hazardous and non-hazardous waste D. Destroying reusable pallets Correct Answer: A. Preventing unnecessary packaging at source Question 10Why should supplier sustainability ratings avoid hiding serious failures in an overall average score? A. A high average can conceal a critical non-conformity B. Averages are prohibited in all procurement systems C. Delivery performance is never relevant D. Supplier data cannot be reviewed Correct Answer: A. A high average can conceal a critical non-conformity
|