Systems Engineering and Product Development ManagementIntroduction and ContextMechatronic products combine mechanical structures, sensors, actuators, electronics, embedded software, communications, and human interaction. Their performance is therefore not determined by one discipline alone. A mechanically robust machine may still fail because its control algorithm is unstable; accurate sensors may be ineffective if the system architecture introduces excessive latency; and a technically excellent prototype may become an unsuccessful product if it cannot be manufactured, maintained, certified, or economically supported. Systems engineering provides an organized way to manage this interdependence. It translates stakeholder needs into verifiable requirements, allocates those requirements to system elements, coordinates architecture and interfaces, and maintains evidence that the delivered product satisfies its intended purpose. Product development management provides the planning, coordination, governance, and decision-making needed to move from concept to production and life-cycle support. For mechatronics engineers, these disciplines are not administrative additions to design. They are methods for controlling technical complexity, reducing late changes, and ensuring that engineering decisions remain connected to customer value and organizational strategy. Learning ObjectivesBy the end of this chapter, students should be able to: - Explain the purpose, principles, and life-cycle logic of systems engineering.
- Convert stakeholder needs into well-formed, testable requirements.
- Compare functional, logical, and physical architectures for mechatronic systems.
- Describe the roles of modeling, simulation, integration, verification, and validation.
- Apply configuration management and traceability to control product change.
- Explain the digital thread and its value in product development.
- Use structured decision-making in a mechatronic product-development case.
- Recognize technical, organizational, ethical, cybersecurity, and regulatory risks.
1. Systems Engineering as an Integrating DisciplineSystems engineering is an interdisciplinary approach to defining, developing, deploying, operating, maintaining, and retiring a system. It considers the complete life cycle rather than focusing only on design or manufacture. The system boundary includes not only the product but also users, operators, maintenance personnel, manufacturing equipment, software tools, infrastructure, suppliers, regulations, and disposal processes when these influence performance. A system may be described through several complementary views: - Stakeholder view: who has an interest in the system and what outcomes they need.
- Operational view: how the system is used in real operating conditions.
- Functional view: what functions the system must perform.
- Logical view: how functions interact and exchange information or energy.
- Physical view: which hardware, software, people, and facilities implement those functions.
- Life-cycle view: how the product is developed, produced, operated, maintained, upgraded, and retired.
A central systems-engineering principle is that the whole system must be optimized, not merely its parts. Local optimization can produce global failure. For example, reducing the mass of a robot arm may improve dynamic performance but increase vibration, control difficulty, calibration requirements, and safety risk. 1.1 The Systems-Engineering V ModelThe V model is a commonly used representation of development logic. On the descending left side, needs are progressively decomposed into requirements, architecture, and detailed designs. At the bottom, implementation occurs. On the ascending right side, components and subsystems are integrated and evaluated at progressively higher levels. The left and right sides are linked: | Definition activity | Corresponding evaluation activity |
|---|
| Stakeholder needs | System validation | | System requirements | System verification | | Architecture and allocated requirements | Subsystem verification | | Detailed design | Unit or component verification | | Implementation | Inspection, analysis, and test |
The V model is not necessarily a rigid waterfall process. Modern organizations often use iterative, agile, incremental, or hybrid development. The important idea is the bidirectional relationship between definition and evidence: every important requirement should have a planned method of verification, and every verification activity should be connected to a defined requirement. 2. Stakeholders, Needs, and the Concept of OperationsStakeholders include customers, end users, operators, maintenance technicians, production staff, regulators, suppliers, owners, communities, and people potentially affected by system failure. Their interests may conflict. A customer may seek low purchase price, an operator may seek ease of use, a maintainer may seek accessibility, and a regulator may require conservative safety margins. Stakeholder analysis identifies: - the stakeholder or stakeholder group;
- desired outcomes and concerns;
- operating context;
- influence and decision authority;
- potential conflicts;
- means of engaging and obtaining feedback.
A concept of operations, or ConOps, describes how the system is expected to be used. It should explain users, operating modes, environments, external systems, normal sequences, abnormal events, maintenance activities, and end-of-life conditions. A ConOps is especially useful in mechatronics because performance requirements often depend on context. For example, the required positioning accuracy of a robotic gripper may differ between laboratory calibration and a dusty production environment. A need is expressed in stakeholder language, whereas a requirement is a precise statement suitable for design and verification. The transition should preserve intent without prematurely selecting a solution. Poor need: “The inspection robot must be very safe and fast.” Improved need: “The robot should inspect assembled products without exposing operators to unacceptable collision or electrical hazards and should support the planned production rate.” Candidate requirements can then be developed, for example: “During automatic operation, the robot shall stop motion within the specified safe stopping distance after detection of a protective-zone intrusion.” The numerical value must be established from risk assessment, system dynamics, applicable standards, and verification capability rather than invented for convenience. 3. Requirements EngineeringRequirements engineering includes elicitation, analysis, specification, validation, allocation, traceability, change control, and verification planning. 3.1 Characteristics of a Good RequirementA good requirement is: - Necessary: its removal would reduce required value or compliance.
- Unambiguous: it has one reasonable interpretation.
- Singular: it states one principal obligation.
- Feasible: it can be achieved within technical, economic, and schedule constraints.
- Verifiable: inspection, analysis, demonstration, or test can establish compliance.
- Traceable: its origin and derived design elements are recorded.
- Consistent: it does not conflict with other requirements.
- Bounded: relevant conditions, modes, and interfaces are identified.
Terms such as “user-friendly,” “rapid,” “adequate,” and “robust” should not appear without measurable interpretation. A requirement should normally identify an actor or system, an action or capability, a condition, and a measurable criterion. 3.2 Requirement Categories| Category | Example |
|---|
| Functional | The controller shall detect an encoder fault. | | Performance | The positioning error shall not exceed a specified tolerance under stated conditions. | | Interface | The drive shall exchange specified data with the controller using the defined protocol. | | Environmental | The enclosure shall operate over the defined temperature and humidity range. | | Safety | The system shall enter a defined safe state following a specified hazardous condition. | | Reliability and maintainability | A replaceable sensor shall be accessible without removing the main frame. | | Regulatory | The product shall satisfy applicable machinery, electrical, and electromagnetic-compatibility requirements. | | Manufacturing | The assembly shall support the specified production and inspection process. |
3.3 Requirements Quality and VerificationEach requirement should have an associated verification method: - Inspection: visual, documentary, or dimensional examination.
- Analysis: calculation, simulation, modeling, or engineering evaluation.
- Demonstration: operation observed under defined conditions.
- Test: controlled measurement using an agreed procedure.
A verification statement should specify the item, configuration, conditions, procedure, measurements, acceptance criteria, and evidence to be retained. Verification asks, “Was the product built according to its specified requirements?” Validation asks, “Does the product meet the real stakeholder need in its intended context?” 3.4 Example of Requirement TraceabilityConsider an automated guided vehicle (AGV). A stakeholder need is dependable transport of material without collisions. A system requirement may state that the AGV shall detect an obstacle within its defined path and transition to a safe stopped state under specified speed, surface, and lighting conditions. This requirement can be allocated to a lidar sensor, control software, braking actuator, power system, and safety controller. Verification may include sensor tests, software tests, stopping-distance tests, and integrated tests. Validation occurs when representative operators use the AGV in the actual facility and confirm that transport is safe and practical. 4. Architecture and AllocationArchitecture defines the arrangement of system elements, their relationships, interfaces, and responsibilities. Architecture decisions influence performance, cost, manufacturability, safety, maintainability, and future upgradeability. 4.1 Functional and Physical ArchitectureA functional architecture decomposes the system into activities such as: - sense position;
- estimate state;
- compare commanded and measured state;
- calculate control action;
- drive actuator;
- transmit status to the operator;
- detect faults and enter a safe state.
A physical architecture assigns these functions to actual elements: encoder, embedded processor, control software, motor drive, motor, network, human-machine interface, and safety relay or controller. Good decomposition seeks high cohesion and controlled coupling. A highly cohesive element performs closely related functions. Low coupling reduces the number and complexity of dependencies between elements. However, excessive decomposition can increase interfaces, documentation, and integration effort. 4.2 Interface DefinitionInterfaces may transfer: - mechanical loads and motion;
- electrical power;
- signals and data;
- heat;
- fluids or gases;
- human actions;
- safety information;
- timing and synchronization.
An interface control document should define physical connection, ownership, data or energy characteristics, timing, tolerances, failure behavior, and verification responsibility. Many integration failures occur not because individual components are defective but because interface assumptions differ. 4.3 Architecture Trade-OffsArchitecture alternatives should be compared against weighted criteria such as performance, cost, risk, safety, schedule, energy use, scalability, and maintainability. A simple weighted decision score can be written as: Sj = ∑_(i=1)n wi r_(ij) where Sj is the score of alternative j, wi is the normalized importance weight of criterion i, rij is the rating of alternative j on criterion i, and n is the number of criteria. The usual assumption is that weights sum to 1 and ratings use a consistent scale. This method supports discussion; it does not replace engineering judgment, risk analysis, or sensitivity testing. 5. Modeling and SimulationModels represent selected aspects of a system for understanding, prediction, communication, or decision-making. A model is useful only within its assumptions and intended purpose. Mechatronic development may use: - block diagrams and state machines for behavior;
- CAD and finite-element models for mechanical structure;
- multibody dynamics for motion and loads;
- electrical and thermal models;
- control-system models;
- software and data-flow models;
- discrete-event models for production and logistics;
- reliability and fault models;
- human and operational models.
Simulation can reveal instability, saturation, resonance, thermal overload, timing conflicts, or insufficient energy capacity before hardware exists. It can also mislead when parameters are inaccurate, boundary conditions are unrealistic, or model fidelity is mistaken for truth. For a simple first-order thermal model, the temperature response of a body may be approximated by: Cth dT/dt = Pin − (T − Ta)/Rth where Cth is thermal capacitance in J/K, T is body temperature in °C or K for temperature differences, Pin is input power in W, Ta is ambient temperature, and Rth is thermal resistance in K/W. This lumped model assumes approximately uniform body temperature and constant parameters. It is useful for preliminary estimates but may be inadequate when internal temperature gradients, radiation, airflow changes, or nonlinear material properties dominate. Model credibility should be established through verification of model equations and implementation, validation against measured data, sensitivity analysis, and explicit documentation of assumptions. 6. Integration, Verification, and ValidationIntegration combines elements and exposes interactions that may not appear in isolated tests. A sensible strategy is incremental integration, in which interfaces are exercised progressively rather than waiting until every component is complete. A typical sequence is: - verify individual components;
- integrate mechanical interfaces;
- integrate power and electrical interfaces;
- integrate communication and timing;
- integrate control software with simulated or physical hardware;
- conduct subsystem tests;
- conduct system tests;
- validate in representative operational conditions.
The integration environment should control configuration, test data, instrumentation, and anomaly reporting. Fault insertion can be valuable for safety and resilience assessment, but it must be planned and controlled. Verification evidence should answer four questions: - What requirement is being evaluated?
- What product configuration is under evaluation?
- What method and conditions were used?
- What result and acceptance decision were obtained?
Validation should include realistic users, tasks, environmental conditions, maintenance procedures, and organizational constraints. A system may pass laboratory verification but fail validation because operators cannot interpret alarms, maintenance takes too long, or the product disrupts the production workflow. 7. Configuration Management and Change ControlConfiguration management maintains the identity, status, and consistency of product information throughout its life cycle. Configuration items may include CAD models, drawings, bills of materials, source code, firmware, requirements, test procedures, calibration files, safety analyses, and manufacturing instructions. Core activities include: - Configuration identification: defining items, versions, and baselines.
- Change control: assessing, approving, implementing, and verifying changes.
- Configuration status accounting: recording what version exists, where it is used, and what changes are pending or complete.
- Configuration audits: checking that the physical and functional product agrees with approved documentation.
A baseline is a formally reviewed version that serves as a reference for further work. Change control should assess technical effect, safety, regulatory implications, cost, schedule, supply chain, cybersecurity, training, and service consequences. A useful change record includes the reason for change, affected requirements and interfaces, risk assessment, approvals, implementation tasks, verification evidence, and updated documentation. Informal changes made directly to drawings, code, or settings are a major source of configuration drift. 8. Digital Thread and Digital EngineeringA digital thread is a connected flow of authoritative information linking life-cycle artifacts and decisions. It may connect stakeholder needs, requirements, architecture models, CAD, simulation results, software repositories, test data, manufacturing records, field data, and service history. The value of a digital thread is not simply the existence of many digital tools. It depends on semantic consistency, identifiers, ownership, access control, versioning, and reliable links. For example, a change to a motor specification should reveal affected requirements, simulations, drawings, software parameters, test procedures, spare parts, and maintenance instructions. A digital thread supports: - faster impact analysis;
- reduced duplicate data entry;
- improved traceability;
- more consistent configuration control;
- reuse of verified models and components;
- feedback from field performance into design;
- evidence for compliance and audits.
Implementation challenges include incompatible tools, weak data governance, excessive manual integration, proprietary formats, poor metadata, cybersecurity threats, and uncertain ownership. Organizations should begin with high-value use cases and establish common naming, versioning, access, and archival rules. Digital twins are related but distinct. A digital twin is a digital representation connected to a specific physical asset or process, often using operational data. A simulation model used during design is not automatically a digital twin. The distinction matters because claims about real-time prediction and decision support require validated models, trustworthy data, and defined update mechanisms. 9. Product Development ManagementProduct development management coordinates technical work with business and organizational objectives. The manager or technical leader must balance scope, schedule, cost, risk, quality, resources, supplier capability, and customer value. Important management practices include: - establishing a product vision and measurable success criteria;
- defining work packages and technical responsibilities;
- maintaining a requirements and verification baseline;
- planning reviews and decision gates;
- managing technical risks and opportunities;
- coordinating suppliers and interfaces;
- controlling changes;
- communicating evidence-based status;
- planning production, service, training, and retirement early.
A stage-gate approach may use concept, feasibility, preliminary design, detailed design, prototype, qualification, production readiness, and launch reviews. Agile methods may deliver software and selected hardware capabilities in increments. A hybrid approach is often suitable: stable safety and mechanical interfaces may require formal baselines, while user-interface software can evolve through controlled iterations. Technical reviews should be decision-oriented. A review is effective when entry criteria, required evidence, responsible participants, decision authority, and follow-up actions are explicit. Passing a review should not mean that every issue has disappeared; it should mean that residual issues are understood and accepted at the appropriate authority level. 10. Applied Case: Development of an Automated Packaging CellThe following is an illustrative case. BackgroundA food manufacturer seeks an automated cell that picks cartons from a conveyor, places them into cases, verifies orientation, and reports production data. The cell includes a robot, vision system, conveyor, pneumatic gripper, safety system, controller, and operator interface. ProblemAn initial prototype achieves the required pick rate in a laboratory but fails during a pilot run. Cartons vary in stiffness, reflective packaging confuses the camera, operators cannot quickly recover from jams, and the safety circuit has not been evaluated with the final robot program. AnalysisThe team discovers that the original project treated the robot as the main product and did not define the complete system. Stakeholder needs from operators and maintenance staff were not documented. The camera supplier specified image accuracy under controlled lighting, while the production team expected reliable performance under changing ambient light. There was no formal interface definition between the conveyor speed signal and robot timing. The team creates a ConOps covering normal production, product changeover, cleaning, jam recovery, maintenance, emergency stop, and restart. Requirements are rewritten with conditions and verification methods. A representative example is: “The cell shall correctly classify carton orientation for the defined product range under the specified lighting and conveyor-speed conditions.” The exact acceptance rate is established with the customer and quality group rather than assumed by the design team. Approach and SolutionThe architecture is decomposed into sensing, material transport, robot motion, gripping, quality decision, safety monitoring, operator interaction, and production-data functions. Interface control documents define conveyor encoder signals, robot coordinates, vision data, pneumatic pressure, safety zones, and restart logic. Simulation is used to study robot reach, cycle time, collision clearance, and gripper forces. A lighting prototype is tested with representative packaging. Integration occurs first with emulated vision results, then with the actual camera and conveyor. Fault tests include lost encoder signals, low pneumatic pressure, rejected images, communication loss, and protective-door opening. Configuration management establishes controlled versions of robot programs, vision recipes, CAD layouts, electrical drawings, safety logic, and operating instructions. A change to carton dimensions is assessed for effects on gripper design, camera field of view, robot path, cycle time, and inspection criteria. OutcomeThe redesigned cell meets the agreed production and quality targets in a representative pilot environment. Operators can identify faults and perform guided recovery. The project still records residual risks, including dependence on periodic camera cleaning and sensitivity to a future packaging material. These risks are assigned owners and monitoring actions rather than hidden in the final report. Learning PointsThe case demonstrates that system performance emerges from interactions. Early stakeholder engagement, explicit interfaces, realistic validation, configuration control, and incremental integration prevent a technically impressive subsystem from becoming an ineffective product. 11. Risk, Safety, Ethics, and GovernanceRisk management identifies hazards, causes, consequences, controls, and residual risk. In a mechatronic product, hazards may arise from unexpected motion, stored energy, electrical faults, software defects, sensor failure, cybersecurity compromise, human misunderstanding, or maintenance errors. Safety requirements should be derived from hazard analysis and applicable regulations or standards. Safety functions should not depend on undocumented assumptions, and safety-related software and hardware require appropriate development discipline and evidence. The precise standard depends on the product and jurisdiction; engineers must consult current authoritative requirements rather than rely on generic checklists. Ethical responsibilities include protecting users and bystanders, communicating limitations honestly, preserving privacy, avoiding discriminatory automated decisions, and escalating unacceptable risk. If an autonomous inspection system records worker behavior, data collection, retention, access, and purpose require governance. If AI is used to detect defects, performance must be evaluated across relevant product variation, and human responsibility for release decisions must remain clear. Cybersecurity is part of systems engineering because connected sensors, controllers, engineering workstations, and cloud services expand the attack surface. Threat modeling, secure configuration, least-privilege access, authenticated updates, vulnerability management, logging, and recovery planning should be considered from the architecture stage. 12. Contemporary Developments and Best PracticesCurrent product-development organizations increasingly combine model-based systems engineering, cloud collaboration, automated testing, virtual commissioning, additive manufacturing, industrial analytics, and AI-assisted engineering. These technologies can improve speed and insight, but automation does not remove the need for engineering judgment. AI tools may assist with requirements classification, design-space exploration, anomaly detection, code generation, and document search. Their outputs require review because generated requirements may be ambiguous, training data may be incomplete, and suggested designs may violate hidden constraints. Proprietary data, intellectual property, traceability, and accountability must be controlled. Practical best practices include: - Start with operational needs and measurable outcomes.
- Define system boundaries and external interfaces early.
- Write requirements so that each can be verified.
- Maintain bidirectional traceability from needs to evidence.
- Use models to expose assumptions, not to create false precision.
- Integrate early with representative interfaces and data.
- Validate with real users and realistic environments.
- Treat configuration management as an engineering activity.
- Record decisions, alternatives, assumptions, and residual risks.
- Design for manufacture, maintenance, cybersecurity, safety, and retirement from the beginning.
Chapter SummarySystems engineering integrates stakeholder needs, requirements, architecture, modeling, implementation, integration, verification, validation, and life-cycle support. In mechatronic products, system behavior emerges from the interaction of mechanical, electrical, software, control, human, and organizational elements. Requirements should be necessary, unambiguous, feasible, verifiable, consistent, and traceable. Functional architecture explains what the system must do, while physical architecture assigns functions to real elements. Interface definition and architecture trade-offs are essential because many failures occur at boundaries between disciplines. Modeling and simulation support prediction and early decision-making but require clear assumptions and validation against evidence. Verification demonstrates conformance to requirements; validation demonstrates suitability for intended use. Configuration management controls versions, baselines, changes, and evidence. A digital thread connects life-cycle information and enables impact analysis, reuse, and feedback, provided that data governance and cybersecurity are effective. Product development management coordinates technical and business decisions through planning, reviews, risk management, supplier coordination, and controlled change. Ethical and regulatory responsibilities require attention to safety, privacy, cybersecurity, transparency, and human accountability. The central professional lesson is that successful mechatronic products are developed as complete systems rather than as collections of independently optimized components. Key TermsSystems engineering: An interdisciplinary approach to developing and managing complete systems across their life cycle. Stakeholder: A person, organization, or group that affects or is affected by a system. Concept of operations: A description of how a system will be used in its operational context. Requirement: A documented obligation or capability that a system, element, or process must satisfy. Traceability: The ability to follow a requirement or decision through related artifacts and evidence. Functional architecture: A structure describing the functions a system performs and their relationships. Physical architecture: The allocation of functions to hardware, software, people, and facilities. Interface: A boundary through which matter, energy, information, or human action is exchanged. Model: A representation of selected aspects of a real or proposed system. Simulation: Execution or use of a model to study system behavior under specified conditions. Integration: Combining system elements and evaluating their interactions. Verification: Evidence that a product satisfies specified requirements. Validation: Evidence that a product meets stakeholder needs in its intended context. Configuration management: Control of product identities, versions, baselines, and changes. Baseline: An approved reference configuration used for controlled development or evaluation. Digital thread: Connected, traceable life-cycle information linking engineering and operational artifacts. Digital twin: A digital representation linked to a particular physical asset or process. Technical review: A structured evaluation used to make evidence-based development decisions. Residual risk: Risk remaining after controls have been implemented. Model-based systems engineering: Use of structured digital models to support systems-engineering activities. Review Questions5 Short Answer Questions- What is the difference between a stakeholder need and an engineering requirement?
- Name four characteristics of a well-formed requirement.
- Distinguish verification from validation.
- What are the principal activities of configuration management?
- Why are interfaces especially important in mechatronic systems?
5 Long Answer Questions- Explain how the V model links system definition activities with evaluation activities. Discuss how the logic can be used in an iterative development process.
- Describe the transition from stakeholder analysis and a concept of operations to a traceable system requirements baseline.
- Compare functional, logical, and physical architecture, using an automated machine as an example.
- Explain the role and limitations of modeling and simulation in mechatronic product development.
- Discuss how digital-thread practices can improve product development while introducing new governance and cybersecurity challenges.
3 Analytical / Application Questions- A robotic assembly cell passes component-level tests but fails when the vision system, conveyor, and robot operate together. Analyze likely systems-engineering causes and propose an integration and verification plan.
- Propose a requirements and configuration-management approach for a battery-powered autonomous vehicle used in a warehouse. Include stakeholders, critical interfaces, verification methods, and change-control considerations.
- An engineering team wants to use an AI tool to generate control software and safety requirements. Evaluate the potential benefits, technical risks, ethical concerns, and governance controls that should be applied.
Multiple Choice Questions with AnswersQuestion 1Which statement best distinguishes verification from validation? A. Verification confirms stakeholder satisfaction, while validation checks document formatting. B. Verification checks conformance to specified requirements, while validation checks suitability for intended use. C. Verification occurs only after production, while validation occurs only before design. D. Verification concerns cost, while validation concerns schedule. Correct Answer: B. Verification checks conformance to specified requirements, while validation checks suitability for intended use. Question 2Which characteristic means that a requirement can be evaluated by inspection, analysis, demonstration, or test? A. Traceable B. Singular C. Verifiable D. Feasible Correct Answer: C. Verifiable Question 3Which artifact primarily describes how users and operators are expected to use a system? A. Concept of operations B. Bill of materials C. Source-code repository D. Configuration audit report Correct Answer: A. Concept of operations Question 4A physical architecture primarily answers which question? A. Who owns the project budget? B. Which real elements implement the system functions? C. What statistical distribution describes failures? D. When will the product be advertised? Correct Answer: B. Which real elements implement the system functions? Question 5If a system requirement is changed, which practice identifies affected drawings, software, tests, and suppliers? A. Configuration status accounting and change-impact analysis B. Randomized prototyping C. Uncontrolled document replacement D. Operator retraining only Correct Answer: A. Configuration status accounting and change-impact analysis Question 6In the weighted decision expression Sj = ∑_(i=1)n wi r_(ij), what does wi represent? A. The rating of alternative j B. The number of alternatives C. The importance weight of criterion i D. The total project cost Correct Answer: C. The importance weight of criterion i Question 7Which situation is an example of validation rather than component verification? A. Measuring a resistor value against its specification B. Checking whether source code compiles C. Operating the complete machine with representative users in the production environment D. Inspecting a machined hole diameter Correct Answer: C. Operating the complete machine with representative users in the production environment Question 8What is a major purpose of incremental integration? A. To postpone interface testing until product launch B. To expose interaction and interface problems progressively C. To eliminate the need for requirements D. To ensure every subsystem uses identical hardware Correct Answer: B. To expose interaction and interface problems progressively Question 9Which statement about a digital twin is most accurate? A. Every CAD model is automatically a digital twin. B. A digital twin is a representation connected to a particular physical asset or process. C. A digital twin cannot use operational data. D. A digital twin removes the need for model validation. Correct Answer: B. A digital twin is a representation connected to a particular physical asset or process. Question 10Which activity is part of configuration management? A. Changing released software without recording the change B. Defining baselines and controlling approved product changes C. Replacing all engineering reviews with simulation D. Optimizing one subsystem without considering interfaces Correct Answer: B. Defining baselines and controlling approved product changes
|