Resource-Efficient Construction MethodsIntroduction and ContextConstruction is essential to economic and social development, but it is also a major consumer of raw materials, energy and water. It generates waste, dust, noise, greenhouse-gas emissions and disturbance to surrounding communities and ecosystems. Resource-efficient construction seeks to deliver the required functionality, safety, durability and quality while using fewer virgin materials, less energy and water, producing less waste and causing less pollution and site disruption. Resource efficiency is broader than selecting a low-carbon material. It concerns the entire delivery system: design decisions, procurement, logistics, construction processes, labour organisation, equipment, quality control, operation and eventual disassembly. A technically efficient product can be environmentally inefficient if it is transported over long distances, frequently replaced, or installed with high levels of rework. Four related approaches are particularly important: - Lean construction, which reduces process waste and improves workflow reliability.
- Prefabrication, in which components are manufactured away from the final site.
- Modular construction, in which three-dimensional units or modules are produced and assembled, often with a high degree of completion.
- Modern methods of construction (MMC), an umbrella term covering industrialised, digital, off-site and innovative construction systems.
These methods do not automatically guarantee sustainability. Their performance depends on design standardisation, transport distances, factory energy sources, material choices, site conditions, project scale, durability, adaptability and end-of-life recovery. Professional selection therefore requires life-cycle thinking rather than reliance on labels or isolated claims. Learning ObjectivesAfter studying this chapter, the learner should be able to: 1. Explain the principles and terminology of resource-efficient construction. 2. Distinguish lean construction, prefabrication, modular construction and MMC. 3. Analyse how construction methods affect energy, water, materials, waste, pollution and site disturbance. 4. Apply lean planning and performance-measurement techniques to construction projects. 5. Evaluate off-site and modular alternatives using technical, economic, environmental and social criteria. 6. Identify implementation risks, governance requirements and ethical responsibilities. 7. Recommend an appropriate resource-efficient method for a project context. 1. Resource Efficiency as a Construction-System Concept1.1 Resource categoriesConstruction resources include more than physical materials. The principal categories are: - Materials: aggregates, cement, steel, timber, masonry, polymers, finishes and temporary works.
- Energy: fuel for extraction, manufacturing, transport, equipment, heating, cooling and site services.
- Water: concrete production, curing, dust suppression, cutting, cleaning, worker facilities and testing.
- Land and ecological capacity: land occupation, soil, vegetation, drainage systems and biodiversity.
- Time and labour: working hours, supervision, coordination and rework.
- Information: drawings, specifications, approvals, digital models and production data.
A resource-efficient project protects value by preventing avoidable consumption. Examples include eliminating unnecessary design features, reducing dimensional offcuts, preventing defects, using accurate quantities, optimising deliveries and designing for maintenance and disassembly. 1.2 Construction waste and process wasteMaterial waste is visible, but lean construction also recognises less visible process waste. Common categories include overproduction, waiting, unnecessary transport, excessive movement, over-processing, inventory, defects and underused human capability. For example, a crew waiting for a delayed hoist consumes time and energy even though no material is discarded. The distinction is important. Recycling a defective component treats the consequence of poor process control; preventing the defect is normally more resource-efficient. Waste hierarchy therefore prioritises avoidance and reduction, followed by reuse, remanufacture and recycling. Disposal is the least preferred option. 1.3 Functional and life-cycle performanceResource efficiency must not reduce safety, serviceability, durability or health. A method that uses less material but causes premature failure may increase total life-cycle consumption. Evaluation should consider: - embodied energy and greenhouse-gas emissions;
- construction energy and fuel use;
- water demand and water quality impacts;
- waste and recovery potential;
- transport and logistics;
- durability, maintenance and replacement;
- adaptability and end-of-life disassembly;
- worker safety and community effects; and
- cost, schedule and quality.
A useful conceptual indicator is resource intensity: Resource intensity = resource consumed / functional output The functional output must be defined, such as square metres of usable floor area, hospital bed capacity, or years of service. The indicator is meaningful only when projects provide comparable functional performance, boundaries and measurement units. 2. Lean Construction2.1 Conceptual foundationLean construction adapts lean production principles to the uncertainty, uniqueness and temporary organisation of construction. Its central idea is to maximise customer value while minimising activities that consume resources without creating value. Value is defined by the client, users, regulators and other legitimate stakeholders; it is not simply the lowest initial cost. Construction is both a conversion system and a flow system. The conversion view focuses on transforming inputs into outputs, such as placing concrete or installing a façade. The flow view examines movement, waiting, inspection, storage and coordination between activities. Improving only individual task productivity can worsen overall performance if it creates queues, congestion or excess inventory. 2.2 The five principles of lean thinkingA practical interpretation of lean thinking involves: 1. Specify value: identify required functions, performance and user outcomes. 2. Map the value stream: trace design, procurement and construction activities to identify delays and waste. 3. Create flow: organise work so that materials, information and crews move with minimal interruption. 4. Establish pull: release work and materials in response to reliable downstream demand rather than speculative production. 5. Pursue perfection: continuously improve through measurement, learning and problem solving. 2.3 Planning and control tools#### Last Planner System The Last Planner System (LPS) integrates master scheduling, phase planning, look-ahead planning, weekly commitments and learning from constraints. The “last planners” are supervisors and trade leaders who understand the immediate work conditions. The system does not replace the baseline schedule; it supplements it with collaborative, short-term control. Typical steps are: - establish project and phase milestones;
- identify activities and handoffs;
- examine upcoming work, commonly over a several-week look-ahead period;
- remove constraints such as incomplete design, unavailable materials, access restrictions or unapproved inspections;
- make realistic weekly commitments; and
- record reasons for non-completion and implement corrective action.
A common reliability measure is Percent Plan Complete (PPC): \[ \text{PPC} = \frac{\text{number of planned tasks completed as promised}}{\text{total number of planned tasks}} \times 100 \] PPC is a planning-reliability indicator, not a direct measure of productivity, sustainability or project success. Its interpretation assumes that tasks are clearly defined, commitments are recorded consistently and completion is objectively verified. A high PPC with poorly defined tasks can be misleading. #### Value-stream mapping and process mapping A process map records activity sequence, movement, waiting, information transfers and decision points. Value-stream mapping can reveal that a short installation task is surrounded by long periods of waiting for approvals, materials or access. The map should include both physical and information flows. #### Visual management and standard work Visual boards, location plans, colour coding, status indicators and standard work instructions make deviations visible. Standardisation does not mean eliminating professional judgement; it establishes a reliable normal condition from which improvement can be measured. #### 5S The 5S approach—sort, set in order, shine, standardise and sustain—organises workplaces, reduces searching and improves safety. It should not be treated as cosmetic housekeeping. Its value arises when it reduces movement, damage, delays and unsafe conditions. #### Root-cause analysis The five-whys technique, fishbone diagrams and Pareto analysis help teams move beyond symptoms. For example, repeated material damage may result not from careless handling alone, but from premature delivery, inadequate weather protection or congested storage. 2.4 Lean and sustainabilityLean and sustainability reinforce one another when they reduce rework, over-ordering, unnecessary transport, idle equipment and defective outputs. However, conflicts can arise. Just-in-time delivery may reduce inventory but increase transport frequency and vulnerability to disruption. A highly standardised solution may reduce production waste but limit local employment or adaptability. Decisions must therefore consider the whole system and not optimise a single indicator. 3. Prefabrication and Off-Site Production3.1 Definition and formsPrefabrication is the manufacture or assembly of building components away from their final installed location. It includes simple elements such as reinforcement cages, bathroom pods, roof trusses and façade panels, as well as complex assemblies incorporating mechanical, electrical and plumbing services. Prefabrication can be: - Component-based: individual beams, columns, panels or service assemblies.
- Panelised: wall, floor or roof panels manufactured in controlled conditions.
- Volumetric: three-dimensional units produced off site.
- Hybrid: a combination of conventional site construction and manufactured elements.
Prefabrication is not synonymous with modular construction. Modular construction usually refers to volumetric units, whereas prefabrication includes both two-dimensional and three-dimensional products. 3.2 Resource-efficiency mechanismsOff-site production can improve efficiency through: - controlled cutting and batching, reducing offcuts;
- repeatable processes and improved quality control;
- reduced weather-related damage and rework;
- efficient factory material storage;
- safer and more ergonomic working conditions;
- reduced site congestion and shorter site duration;
- simultaneous foundation works and component manufacture; and
- improved recovery of factory offcuts.
Water consumption may be lower because controlled processes can use closed-loop cleaning or more precise batching. Site water demand can also fall when wet trades are reduced. Nevertheless, total water use must include factory processes, cleaning, curing and transport-related activities. 3.3 Design requirementsPrefabrication requires earlier and more coordinated design. Connection details, tolerances, lifting points, transport dimensions, service routes, fire performance, acoustic separation and maintenance access must be resolved before production. Late design change can be expensive because it affects procurement, moulds, production schedules and logistics. Design for Manufacture and Assembly (DfMA) asks how a product can be manufactured efficiently and assembled with minimal site effort. Design decisions should address: - standard dimensions and repetition;
- component weight and lifting capacity;
- tolerance accumulation;
- accessible and reversible connections;
- protection during transport;
- inspection and testing points; and
- future repair, replacement and disassembly.
3.4 LimitationsPrefabrication can involve additional transport, lifting energy, factory capital and packaging. It may be unsuitable where access is restricted, quantities are small, designs change frequently or local manufacturing capability is limited. Large elements can create abnormal-load traffic, road damage and community disturbance. These limitations must be assessed rather than assumed away. 4. Modular Construction4.1 CharacteristicsModular construction uses volumetric units manufactured partly or largely in a factory and assembled on site. Modules may be structural steel, reinforced concrete, timber, or hybrid systems. They can contain finishes, fixtures, services and equipment before delivery. The main sustainability advantage is the transfer of labour-intensive work from a variable site environment to a controlled production environment. Site activities may be reduced to foundations, connections, commissioning and external works. 4.2 Technical considerationsSuccessful modular design requires attention to: - structural stacking and load transfer;
- lateral stability and diaphragm action;
- fire resistance and compartmentation;
- acoustic and thermal performance;
- moisture management and weather sealing;
- crane reach, lifting sequence and temporary stability;
- transport envelope and route constraints;
- interface tolerances; and
- inspection, commissioning and handover.
The building should be treated as an integrated system. Adding modules without resolving interfaces can create thermal bridges, water ingress, poor acoustics or inaccessible services. 4.3 Adaptability and circularityModular buildings can support adaptability when modules or internal partitions can be reconfigured, relocated or replaced. This potential is not automatic. Permanent adhesives, inaccessible service connections and non-standard interfaces may make disassembly difficult. Design for circularity should include material identification, reversible fasteners, accessible connections, component passports and a planned recovery route. 5. Modern Methods of ConstructionMMC is a broad classification rather than a single technology. Depending on the national framework, it may include off-site manufacturing, panel systems, volumetric modules, additive manufacturing, robotics, automated production, engineered timber, digital fabrication and standardised subassemblies. 5.1 Digital integrationBuilding Information Modelling (BIM) can connect design, quantities, fabrication and installation. A coordinated model may reduce clashes, improve quantity take-off and support manufacturing data. However, a model is useful only when information is accurate, responsibilities are defined and data exchange standards are agreed. Digital twins can combine a model with operational and sensor data. In construction, their use may support progress monitoring, quality verification, material tracking and predictive maintenance. Artificial intelligence can assist with image-based defect detection, schedule-risk analysis, quantity estimation and logistics optimisation. Human review remains essential because AI outputs may reflect biased training data, misclassify defects or lack engineering context. 5.2 Automation and roboticsRobotic fabrication, automated cutting, prefabricated reinforcement and machine-controlled excavation can improve precision and reduce hazardous manual work. The benefits depend on suitable production volumes, reliable digital information, maintenance capability and worker training. Automation should augment decent work and safety, not be used to transfer risk without consultation. 5.3 Additive constructionThree-dimensional concrete printing and other additive methods can reduce formwork and enable geometric optimisation. Current constraints include reinforcement integration, material qualification, anisotropy, durability evidence, print continuity, quality assurance and regulatory acceptance. Claims of material saving require comparison with a functionally equivalent, code-compliant alternative. 6. A Framework for Selecting a Construction MethodMethod selection should follow a structured, multi-criteria process. Step 1: Define project requirementsIdentify functional brief, performance standards, site constraints, programme, budget, labour availability, local supply chains, regulatory conditions and community sensitivities. Determine whether repetition, standardisation and early design certainty are present. Step 2: Establish system boundariesState whether the assessment covers manufacture, transport, site works, operation, maintenance and end-of-life. Excluding significant stages can reverse the apparent ranking of alternatives. Step 3: Develop feasible alternativesCompare conventional, prefabricated, modular and hybrid solutions. Include changes in structural system, foundations, logistics, temporary works and commissioning—not merely the factory component. Step 4: Measure performanceRelevant indicators include: - material use per square metre or functional unit;
- percentage of recycled or responsibly sourced content;
- construction waste per functional unit;
- water consumption and proportion reused;
- fuel and electricity consumption;
- greenhouse-gas emissions;
- transport distance and load efficiency;
- construction duration and rework;
- site noise, dust and traffic;
- worker injury exposure; and
- cost, quality and whole-life value.
Indicators must have clear definitions. For example, “waste diverted from landfill” does not mean “waste avoided,” and recycled content does not by itself demonstrate low life-cycle impact. Step 5: Assess risk and resilienceConsider supply-chain interruption, factory failure, single-source dependency, transport restrictions, inflation, skill shortages, fire and moisture risks, and the capacity to repair components locally. Step 6: Make and document the decisionA weighted decision matrix can support transparency. If criterion scores are standardised between 0 and 1, a simple weighted score is: \[ S = \sum_{i=1}^{n} w_i s_i \] where \(S\) is the total score, \(w_i\) is the weight assigned to criterion \(i\), and \(s_i\) is the normalised score for that criterion. The weights should sum to 1. This method assumes criteria are sufficiently defined, scoring is evidence-based and trade-offs are acceptable. It does not remove judgement and should be accompanied by sensitivity testing. If a small change in weights reverses the decision, the result is not robust. Illustrative selection exampleA university accommodation project compares a conventional solution with a volumetric modular solution. The project team assigns weights of 0.30 to whole-life cost, 0.25 to environmental performance, 0.20 to programme, 0.15 to quality and 0.10 to supply-chain resilience. Scores are normalised from 0 to 1. The conventional option scores 0.80, 0.55, 0.50, 0.65 and 0.75 respectively. Its total score is: \[ S_c=(0.30)(0.80)+(0.25)(0.55)+(0.20)(0.50)+(0.15)(0.65)+(0.10)(0.75)=0.66 \] The modular option scores 0.68, 0.82, 0.90, 0.85 and 0.55. Its total is: \[ S_m=(0.30)(0.68)+(0.25)(0.82)+(0.20)(0.90)+(0.15)(0.85)+(0.10)(0.55)=0.77 \] The modular option ranks higher under these assumptions, mainly because of programme and environmental performance. The result is not proof that modular construction is universally superior. The lower resilience score may indicate dependence on a distant factory, and sensitivity analysis is required before approval. 7. Applied Case: Illustrative Regional Health CentreBackgroundA regional health authority plans a 12,000 m² outpatient health centre on a constrained urban site. The project must maintain access to an operating clinic, minimise dust and noise, and open before a fixed public-service date. The design includes repeated consultation rooms, sanitary areas and service risers. ProblemA conventional in-situ approach is familiar to local contractors but involves extensive wet trades, high site congestion and a long programme. Previous projects in the region experienced material damage, rework at service interfaces and significant water use for cleaning and curing. AnalysisThe project team maps the value stream and identifies late design information, multiple small deliveries, waiting for inspection and repeated service coordination failures. It also assesses a hybrid solution comprising prefabricated bathroom and mechanical-service pods, panelised façade elements and conventional foundations and primary structure. A logistics study confirms that modules can be delivered during off-peak hours, but route surveys identify a low bridge that limits pod height. The design is revised to use transportable units with protected, accessible service connections. A factory audit examines quality procedures, worker safety, energy sources, waste segregation and evidence supporting environmental claims. Approach and solutionThe team adopts: - collaborative phase planning using the Last Planner System;
- a design freeze for manufactured components before procurement;
- BIM-based clash detection and fabrication information;
- standardised service pods with tested connections;
- just-in-time delivery coordinated with site readiness;
- returnable transport frames rather than disposable packaging;
- water metering and reuse for selected site activities; and
- inspection and commissioning protocols covering factory and site interfaces.
The project establishes baseline measures for fuel, water, waste, rework, delivery reliability and PPC. Factory and site teams share non-conformance data rather than treating defects as the responsibility of only one organisation. OutcomeThe hybrid method reduces wet-trade activity and site storage, shortens the installation sequence and improves service coordination. The principal environmental gains arise from reduced rework, fewer site deliveries and controlled material cutting rather than from prefabrication alone. The project also discovers that factory electricity comes partly from a carbon-intensive source; this leads to a procurement requirement for verified energy data and a renewable-electricity improvement plan. Learning points1. Repetition and constrained site access supported prefabrication. 2. Route and lifting studies were essential before design commitment. 3. Early design coordination created benefits but reduced tolerance for late change. 4. Factory performance had to be evaluated within the project life cycle. 5. Lean planning was necessary to realise the potential of off-site production. 6. Transparent measurement prevented unsupported sustainability claims. 8. Implementation, Governance and Professional ResponsibilityProcurement and contractsTraditional procurement can discourage early collaboration because designers, manufacturers and contractors are appointed sequentially. Early contractor and manufacturer involvement, alliance arrangements, design responsibility matrices and integrated project delivery can improve coordination. Contracts should define responsibility for tolerances, data, defects, transport damage, testing, changes and end-of-life information. Quality and complianceOff-site production does not eliminate inspection; it changes its location and timing. Inspection and test plans should cover raw materials, factory assembly, dimensional tolerances, welds or fasteners, fire stopping, moisture protection, lifting, site connections and commissioning. Regulatory approval should be obtained for the complete system, not inferred from individual components. Ethical and social issuesResource-efficient construction must protect workers and communities. Relevant issues include fair employment, safe factory conditions, community traffic impacts, noise, dust, accessibility, displacement of local trades and truthful environmental communication. Automation and off-site production may change employment patterns; responsible organisations should provide training and consultation rather than treating labour as a disposable input. Greenwashing can occur when a project advertises recycled content or reduced site waste while ignoring transport, factory energy, durability or replacement. Environmental claims should be specific, verifiable, comparable and based on documented boundaries. Measurement and verificationA credible project establishes a baseline and records actual performance. Data should be attributable, time-stamped and subject to quality checks. Useful evidence includes weighbridge records, utility meters, delivery manifests, digital production records, non-conformance logs and commissioning reports. Environmental product declarations may support material comparisons, but their scope, assumptions and declared unit must be examined. 9. Challenges, Limitations and Contemporary DevelopmentsResource-efficient methods face several persistent challenges: - high initial design and coordination effort;
- dependence on accurate information and early decisions;
- limited local manufacturing capacity;
- transport and lifting constraints;
- difficulty comparing novel systems with established benchmarks;
- fragmented supply chains and contractual boundaries;
- risk of standardisation reducing architectural or functional flexibility;
- uncertain end-of-life markets; and
- inadequate evidence for emerging technologies.
Contemporary developments include product-platform design, mass customisation, engineered timber and hybrid structural systems, digital material passports, automated quantity tracking, low-carbon manufacturing energy, design for disassembly and circular procurement. These developments should be judged by verified performance and whole-life outcomes, not novelty. Best-Practice ChecklistBefore selecting or implementing a resource-efficient method, the project team should: 1. Define functional requirements and life-cycle boundaries. 2. Identify repetition, standardisation and site constraints. 3. Involve manufacturers, logistics specialists and installers early. 4. Coordinate geometry, services, tolerances and connections digitally and physically. 5. Compare alternatives using consistent environmental, technical, social and economic data. 6. Plan transport, lifting, storage, weather protection and site sequencing. 7. Use lean planning to remove constraints and stabilise workflow. 8. Measure material, energy, water, waste, rework and delivery performance. 9. Verify environmental claims and factory conditions. 10. Design for repair, adaptation, disassembly and recovery. 11. Train workers and protect safety, dignity and meaningful participation. 12. Review actual outcomes and transfer lessons to future projects. Chapter SummaryResource-efficient construction reduces avoidable consumption while maintaining safety, quality, durability and user value. Lean construction focuses on value, flow, pull and continuous improvement, using tools such as value-stream mapping, standard work and the Last Planner System. Prefabrication transfers component manufacture to controlled environments, while modular construction extends this principle to volumetric units. MMC includes these approaches together with digital fabrication, automation, engineered systems and other industrialised methods. The sustainability benefits of these methods may include lower material waste, reduced rework, less site water use, shorter construction duration, improved safety and reduced site disturbance. They are not automatic: transport, factory energy, packaging, design rigidity, supply-chain dependence and end-of-life performance must be included in the assessment. A structured selection framework combines life-cycle boundaries, measurable indicators, risk analysis and transparent multi-criteria decision-making. BIM, AI and robotics can improve coordination and control, but professional judgement, data quality and human oversight remain essential. Successful implementation depends on early collaboration, DfMA, reliable logistics, robust quality assurance, ethical procurement and verified performance data. Key TermsResource efficiency: Delivering required function with reduced material, energy, water, waste and environmental burden. Lean construction: A production and management approach that maximises value and minimises process waste. Value stream: The complete sequence of activities and information needed to deliver a product or service. Last Planner System: Collaborative planning and control based on reliable short-term commitments. Percent Plan Complete: The percentage of promised tasks completed as planned in a defined period. Prefabrication: Manufacture or assembly of components away from their final installation location. Panelised construction: Construction using factory-produced two-dimensional panels. Volumetric modular construction: Construction using three-dimensional factory-produced units. Modern methods of construction: A broad group of industrialised, off-site, digital and innovative construction approaches. DfMA: Design for Manufacture and Assembly; designing products for efficient production and installation. Standard work: A defined, repeatable method for performing a task under specified conditions. Pull planning: Releasing work in response to downstream requirements and reliable capacity. Rework: Repetition or correction of work that was not correctly completed initially. Life-cycle assessment: Systematic evaluation of environmental impacts across defined life-cycle stages. Resource intensity: Resource consumption divided by a defined functional output. Building Information Modelling: Digital representation and management of building information across project stages. Design for disassembly: Designing components and connections to support separation, reuse and recovery. Value engineering: Structured analysis of functions to improve value while maintaining required performance. Supply-chain resilience: The capacity of a supply network to withstand and recover from disruption. Greenwashing: Misleading presentation of environmental performance or benefits. Review QuestionsShort Answer Questions1. Define resource-efficient construction and explain why it requires life-cycle thinking. 2. Distinguish prefabrication from modular construction. 3. What is the purpose of the Last Planner System? 4. State two potential environmental benefits and two limitations of off-site production. 5. Why must transport and factory energy be included when evaluating modular construction? Long Answer Questions1. Explain lean construction as both a conversion-system and flow-system approach. 2. Discuss how DfMA affects design, procurement, logistics, quality and end-of-life performance. 3. Compare conventional, prefabricated, panelised and volumetric construction methods. 4. Explain how BIM, automation and AI can support resource efficiency, including their limitations. 5. Develop a governance and measurement framework for a large resource-efficient construction project. Analytical / Application Questions1. A project has repeated room layouts, a congested urban site and a fixed completion date. Recommend a construction strategy and justify it using technical, environmental, logistical and social criteria. 2. Construct a weighted decision matrix comparing conventional and modular construction for a hypothetical project. State your criteria, weights, scores, assumptions and sensitivity concerns. 3. A project reports high waste diversion but also frequent rework and long-distance deliveries. Analyse why its sustainability claim may be incomplete and propose corrective actions. Multiple Choice Questions with AnswersQuestion 1Which statement best describes resource-efficient construction? A. Using the cheapest available material regardless of durability B. Delivering required function while reducing avoidable resource consumption and environmental burden C. Maximising factory production in every project D. Eliminating all use of virgin materials Correct Answer: B. Delivering required function while reducing avoidable resource consumption and environmental burden Question 2What does Percent Plan Complete primarily measure? A. Embodied carbon of completed work B. Worker productivity per hour C. Reliability of promised task completion D. Percentage of recycled materials Correct Answer: C. Reliability of promised task completion Question 3Which activity is generally considered process waste in lean construction? A. Completing a required structural connection B. Waiting for unavailable information or materials C. Testing a safety-critical component D. Installing a specified durable finish Correct Answer: B. Waiting for unavailable information or materials Question 4Which statement correctly distinguishes prefabrication and modular construction? A. Prefabrication always occurs on site, while modular construction occurs off site B. Prefabrication includes manufactured components, while modular construction commonly uses three-dimensional units C. They are identical terms in all contexts D. Modular construction excludes factory production Correct Answer: B. Prefabrication includes manufactured components, while modular construction commonly uses three-dimensional units Question 5In a weighted decision matrix, if weights are normalised, their total should equal: A. 0 B. 0.5 C. 1 D. 100 Correct Answer: C. 1 Question 6Which design issue is especially important for volumetric modular construction? A. Ignoring transport routes until after manufacture B. Eliminating all connections between modules C. Coordinating lifting, transport dimensions and interface tolerances D. Using only wet trades on site Correct Answer: C. Coordinating lifting, transport dimensions and interface tolerances Question 7A project has 20 planned tasks and completes 15 as promised. What is its PPC? A. 25% B. 50% C. 75% D. 80% Correct Answer: C. 75% Question 8Which is the least preferred option in the waste hierarchy described in the chapter? A. Avoidance B. Reuse C. Recycling D. Disposal Correct Answer: D. Disposal Question 9Why is a high PPC value not by itself proof of project sustainability? A. PPC measures planning reliability rather than all environmental and social outcomes B. PPC can only be calculated in factories C. PPC measures only concrete strength D. PPC is unrelated to task completion Correct Answer: A. PPC measures planning reliability rather than all environmental and social outcomes Question 10Which practice best supports circularity in modular construction? A. Using inaccessible permanent adhesives everywhere B. Designing reversible connections and documenting component information C. Increasing packaging for every delivery D. Avoiding maintenance access Correct Answer: B. Designing reversible connections and documenting component information
|