Surveying & Levelling

Chapter 9
Traversing, Coordinates and Survey Control

Diploma of Civil Draftsman
Surveying & Levelling   •   Diploma

Traversing, Coordinates and Survey Control

Introduction

Traversing is one of the principal methods of establishing horizontal control in surveying. A traverse consists of a connected sequence of survey lines whose lengths and directions are measured. The lines may form an open route, such as a road or pipeline alignment, or a closed figure surrounding a site or connecting known control points. From the observations, the surveyor determines the position of stations, checks the quality of the work, and supplies reliable control for mapping, construction and setting out.

A traverse is more than a collection of field measurements. It is a controlled geometric network. Every measured distance and direction contributes to the position of later stations, so an error in an early observation can affect the whole survey. For this reason, traversing requires suitable station selection, careful observation, independent checks, mathematical adjustment and clear documentation.

Learning Objectives

After studying this chapter, you should be able to:

  • distinguish open and closed traverses and select suitable applications;
  • explain bearings, azimuths, latitudes and departures;
  • calculate coordinates from measured lengths and directions;
  • determine angular and linear misclosure;
  • apply the Bowditch and transit rules under appropriate assumptions;
  • establish and use horizontal and vertical control networks;
  • assess survey quality and identify sources of error; and
  • prepare a professional traverse computation and control record.

1. Traverse Concepts and Classification

A traverse station is a point at which observations are made and a traverse line begins or ends. The line joining two consecutive stations is a traverse leg. A traverse may be classified as follows:

TypeDescriptionTypical application
Open traverseDoes not return to its starting point or another known pointRoads, canals, transmission routes
Closed-loop traverseReturns to its starting stationProperty boundaries, site surveys
Closed-link traverseBegins and ends at separate known control pointsExtension of a control network
Free or independent traverseHas insufficient known control for a complete absolute checkPreliminary reconnaissance

An open traverse is geometrically weaker because a final closure check is usually unavailable. It should therefore include frequent ties to existing control, redundant observations, or independent checks. A closed traverse permits both angular and coordinate closure checks and is preferred for boundary and site control.

A traverse is well conditioned when its stations are stable, intervisible where required, suitably distributed, and located so that the network covers the area without unnecessary long sights or very acute angles. Stations should not be placed on unstable ground, in locations likely to be disturbed by construction, or where centring and sighting are difficult.

2. Directions, Bearings and Azimuths

A horizontal direction may be expressed as a whole-circle bearing, also called an azimuth, measured clockwise from north from 0° to less than 360°. Alternatively, a reduced or quadrantal bearing is measured from north or south toward east or west and is written, for example, N 35°20′ E.

For a line with whole-circle bearing θ:

  • 0° ≤ θ < 90° lies in the NE quadrant;
  • 90° ≤ θ < 180° lies in the SE quadrant;
  • 180° ≤ θ < 270° lies in the SW quadrant; and
  • 270° ≤ θ < 360° lies in the NW quadrant.

The fore bearing is the direction observed from the first station to the second. The back bearing is the reverse direction. In a consistent meridian system:

Back bearing = Fore bearing ± 180°

The plus sign is used when the fore bearing is less than 180°, and the minus sign when it is 180° or greater. In quadrantal notation, the cardinal letters are reversed; for example, the back bearing of N 35° E is S 35° W.

Bearings may refer to true north, magnetic north, grid north or an assumed north. The reference must be recorded. Magnetic bearings require attention to declination, which varies with location and time. Grid convergence may also be important when transferring between ground and map coordinates.

3. Latitudes, Departures and Coordinates

For a traverse leg of length L and whole-circle bearing θ, the latitude is its north–south component and the departure is its east–west component. Taking north and east as positive:

Latitude = L cos θ
Departure = L sin θ

Here L is the horizontal distance in metres and θ is measured clockwise from north. The signs are determined by the quadrant:

QuadrantLatitudeDeparture
NE++
SE−+
SW−−
NW+−

The formulas assume that the distance is horizontal and that θ is a whole-circle bearing measured from north. If a slope distance is used, it must first be reduced to horizontal distance. Angles must be evaluated in degrees or radians consistently with the calculator setting; surveying calculators commonly accept degrees for bearings.

For a known point with coordinates (E₁, N₁), the next point is obtained from:

E₂ = E₁ + Departure
N₂ = N₁ + Latitude

Equivalently, for a sequence of traverse legs:

Ej = E0 + ∑(Li sin θi)
Nj = N0 + ∑(Li cos θi)

where E and N are eastings and northings, i identifies each leg, and the summation includes all legs from the initial station to station j. Eastings and northings use the same linear unit as the distances.

Worked Example 1: Coordinates from a Traverse Leg

A line AB is 125.00 m long and has bearing 063°20′. Point A has coordinates E = 2500.000 m and N = 1800.000 m. Find the coordinates of B.

Convert the bearing to decimal degrees:

θ = 63° + 20′/60 = 63.3333°

The components are:

Latitude = 125.00 cos 63.3333° = 55.67 m

Departure = 125.00 sin 63.3333° = 111.93 m

The bearing lies in the NE quadrant, so both components are positive:

EB = 2500.000 + 111.93 = 2611.930 m

NB = 1800.000 + 55.67 = 1855.670 m

Thus B is approximately (2611.930 m, 1855.670 m). Rounding should be postponed until the final reported precision.

4. Angular Closure

For an n-sided closed traverse, the theoretical sum of interior angles is:

Σβtheoretical = (n − 2) × 180°

where β represents an interior angle and n is the number of sides. The observed angular misclosure is:

f_β = Σβobserved − (n − 2) × 180°

The sign indicates whether the observed sum is too large or too small. The magnitude should be compared with the specified tolerance of the survey, instrument and method. A commonly used field tolerance is expressed in the form:

|f_β| ≤ k√n

where k is a specification constant in angular units and n is the number of angles. This is not a universal rule; the governing survey standard or project specification controls acceptance.

If the observations have similar precision and no evidence suggests that one angle is poorer than another, an equal correction is:

c_β = −f_β / n

The corrected angle is β′ = β + c_β. Weighted adjustment is preferable when observations have different standard deviations or different observation methods.

For a traverse recorded as deflection angles, the closure condition differs from the interior-angle condition. The sign convention and turning direction must be established before applying a check. Confusing interior angles with deflections is a common source of erroneous closure calculations.

5. Linear Closure

After directions have been corrected or accepted, calculate the latitude and departure of every leg. For a closed traverse, the algebraic sums should be zero:

ΣLatitude = 0
ΣDeparture = 0

The coordinate misclosures are therefore:

fN = ΣLatitude
fE = ΣDeparture

The absolute linear misclosure is:

e = √(fN² + fE²)

If the total traverse length is P = ΣL, the relative precision is commonly written as:

Relative precision = P / e

and reported as 1 : (P/e), provided e is non-zero. For example, e = 0.025 m over P = 2500 m gives a precision of 1:100,000. Acceptance must be based on the project specification, terrain, equipment and purpose; relative precision alone does not diagnose the source of an error.

A large angular misclosure generally indicates direction or angle problems. A satisfactory angular closure followed by a poor linear closure may indicate distance errors, incorrect bearings, instrument centring, prism or target errors, scale problems, or a blunder in recording. Closure checks identify that a problem exists, but do not by themselves identify its cause.

6. Traverse Adjustment

Adjustment distributes measured discrepancies so that the final coordinates satisfy the geometric conditions of the network. Adjustment does not remove uncertainty by magic; it produces the most defensible set of values under stated assumptions. A blunder must be found and corrected before routine adjustment. Distributing a blunder among all lines can conceal poor fieldwork.

6.1 Bowditch Rule

The Bowditch, or compass, rule assumes that the errors in latitude and departure are proportional to the lengths of the respective traverse lines. It is suitable when angular and distance observations are of approximately comparable relative precision and no stronger error model is available.

For line i of length L_i and total perimeter P:

Correction to latitudei = −fN(Li/P)
Correction to departurei = −fE(Li/P)

The adjusted components are the observed components plus their respective corrections. The corrections sum exactly to −f_N and −f_E, subject to rounding.

6.2 Transit Rule

The transit rule assumes that angular measurements are more reliable than distance measurements. Corrections are proportional to the absolute observed component rather than the line length:

Correction to latitudei = −fN(|Latitudei| / Σ|Latitude|)
Correction to departurei = −fE(|Departurei| / Σ|Departure|)

The use of absolute values ensures that the correction shares are positive weights; the sign comes from the total misclosure. The rule is appropriate only when its underlying assumption is reasonable. It is not automatically superior to Bowditch.

Worked Example 2: Bowditch Adjustment

A closed traverse has four legs. The observed latitudes and departures are shown below. The total perimeter is 400 m, and the sums are ΣLatitude = +0.08 m and ΣDeparture = −0.12 m.

LegLength (m)Latitude (m)Departure (m)
AB100+60.00+80.00
BC120+40.00−110.00
CD90−70.00−50.00
DA90−29.92+79.88
Sum400+0.08−0.12

For AB, the Bowditch corrections are:

cN = −0.08(100/400) = −0.020 m

cE = −(−0.12)(100/400) = +0.030 m

The adjusted components of AB are therefore +59.980 m latitude and +80.030 m departure. For BC, the corrections are −0.024 m and +0.036 m. For CD they are −0.018 m and +0.027 m; for DA, −0.018 m and +0.027 m. The corrected sums are zero, apart from displayed rounding. The same process is applied to each component and then accumulated to obtain adjusted coordinates.

7. Field Procedure and Computation Workflow

A professional traverse normally follows this sequence:

  1. Reconnaissance: inspect the area, identify existing control, locate stable and accessible stations, and plan intervisibility.
  2. Station marking: use durable monuments or witness marks and record descriptions, sketches and photographs where appropriate.
  3. Instrument setup: centre and level the total station or theodolite carefully; measure or verify instrument and target heights.
  4. Orientation: establish the reference bearing from known control, astronomical observation, GNSS control or an approved assumed datum.
  5. Observation: measure angles in appropriate sets and distances in both directions where practical. Record face, station, target, weather and instrument information.
  6. Independent checks: observe closing directions, repeat critical distances, use face-left and face-right observations, and close on known control.
  7. Reduction: correct or reduce distances, convert directions to a consistent reference, and calculate latitudes and departures.
  8. Closure testing: evaluate angular and linear closure before adjustment.
  9. Adjustment: reject or investigate blunders; then apply a justified adjustment method.
  10. Reporting: provide field notes, raw observations, computations, adjusted coordinates, precision, datum, units and limitations.

Electronic data collectors reduce transcription errors but do not guarantee correct observations. A wrong prism constant, incorrect target height, wrong station occupied or misidentified point can produce a mathematically neat but physically false survey.

8. Horizontal and Vertical Control Networks

Horizontal control consists of points with known plan coordinates, commonly eastings and northings, referenced to a stated datum and projection. Traverse stations can densify this network and provide control for topographic mapping, cadastral work and construction setting out.

A control network should contain redundancy. A single chain of points is vulnerable because one error propagates without an independent route for detection. Loops, ties to known points and repeated observations permit consistency checks. Network design should consider geometry, line-of-sight obstruction, expected accuracy, monument stability and future access.

Vertical control consists of points with known elevations or reduced levels. It is commonly established by differential levelling, precise GNSS methods with a geoid model, or a combination of methods. Traverse bearings and distances establish horizontal position; they do not, by themselves, establish reliable elevations.

For a differential levelling run:

ΣBS − ΣFS = RLfinal − RLinitial

where BS is a backsight, FS is a foresight, and RL is reduced level. The arithmetic check is necessary but does not detect every systematic error. A closed levelling loop should satisfy:

fh = ΣBS − ΣFS

because the final and initial reduced levels are the same. A correction may be distributed according to distance or number of setups, subject to the applicable specification. Collimation checks, balanced sights, stable turning points and closing on known benchmarks are essential.

Horizontal and vertical control are often combined in a three-dimensional control network. Total stations provide angles and distances, while GNSS provides coordinates in a geocentric or projected reference system. The surveyor must reconcile datums, epochs, geoid models, projection scale and units before combining results.

9. Coordinates, Datums and Professional Records

Coordinates are meaningful only when their reference system is known. A coordinate record should state:

  • datum and realization or epoch, where applicable;
  • map projection and zone;
  • units and coordinate order;
  • bearing reference and meridian definition;
  • vertical datum and geoid model, if elevations are supplied;
  • instrument, observation method and adjustment method; and
  • precision, tolerances and any rejected or substituted observations.

Grid distances and ground distances are not always identical. A projection scale factor and elevation factor may be required when converting between them. Applying a factor twice, or failing to apply it when required, creates systematic discrepancies in traverse closure and setting out.

Coordinates should be stored with more internal precision than is displayed on a drawing. However, extra decimal places do not imply extra accuracy. The reported precision should reflect the survey specification and the uncertainty of the observations.

10. Illustrative Case: Site Control for a Small Building Project

Background. A civil drafting team must prepare a topographic base and set out a small community building on a 1.2-hectare site. Two existing control points are available at the southern boundary, and a benchmark is located near the access road.

Problem. Directly traversing around the entire site is difficult because of vegetation and vehicle movement. The team must establish stable control points that support both mapping and construction.

Analysis. The surveyor selects four new stations around the building area, forming a closed loop linked to the two existing horizontal control points. Stations are placed outside the excavation zone and near permanent features. A separate differential levelling loop connects the benchmark to two temporary benchmarks near the proposed building.

Approach. The total station is centred over each station, and horizontal directions are observed on both faces. Distances are measured with the correct prism constant and checked on selected lines. The traverse closes on known control. After reduction, the angular misclosure is within the project tolerance. The latitude and departure misclosures give a relative precision of 1:72,000, exceeding the specified minimum of 1:50,000. A Bowditch adjustment is accepted because the angle and distance observations have similar stated precision. The levelling loop is checked by balancing backsights and foresights and is adjusted according to the project levelling specification.

Outcome. The adjusted coordinates are used to generate the CAD base plan, locate the building grid and establish offset points outside the construction area. Elevations are transferred to a protected benchmark. The final survey package includes raw data, adjustment tables, control descriptions, coordinate system information and a diagram showing ties to the original control.

Learning points. Control must be designed for the work that follows, not merely for mathematical closure. Stable monuments, redundancy, datum information and independent checks are as important as the computation itself. A precise-looking CAD drawing is not reliable if its control framework is poorly defined.

11. Errors, Limitations and Best Practice

Errors are commonly classified as blunders, systematic errors and random errors. Blunders include occupied-station mistakes, wrong point codes and incorrect readings. Systematic errors include incorrect prism constants, uncorrected atmospheric effects, tape calibration errors and projection-scale effects. Random errors arise from unavoidable limitations in pointing, centring, reading and measurement.

Important limitations include:

  • an open traverse may not provide a complete closure test;
  • adjustment can distribute errors but cannot validate a wrong datum or a blunder;
  • Bowditch and transit rules are approximations, not full statistical least-squares adjustments;
  • poor geometry can make coordinates sensitive to small angular errors; and
  • GNSS may be unreliable under canopy, near structures or where multipath is severe.

Best practice includes checking instrument calibration, using redundant observations, protecting monuments, keeping raw data unchanged, recording metadata, checking units and coordinate order, and obtaining an independent review before construction decisions are based on the control. Where high accuracy or mixed observation types are involved, a least-squares network adjustment with observation weights and statistical tests is preferable to a simple rule adjustment.

Survey data also have governance and ethical implications. A surveyor must not alter raw observations to force closure, conceal poor results, or report unsupported precision. Work should comply with relevant national surveying regulations, cadastral requirements, occupational safety rules and client specifications. Personal or sensitive site information in digital survey files should be protected through appropriate access control and version management.

12. Contemporary Technology

Modern total stations, robotic instruments, digital levels, GNSS receivers, laser scanners and unmanned aerial systems can accelerate control establishment. Building information modelling and geographic information systems allow adjusted control to be integrated with design and construction data. Software can calculate coordinates and perform least-squares adjustment, but the professional remains responsible for field design, datum selection, quality assurance and interpretation.

Artificial intelligence may assist with anomaly detection, point-cloud classification and field-record checking. It should be treated as a support tool rather than an authority. Automated processing can repeat a wrong coordinate system or accept a blunder if the input and quality-control rules are incorrect. Every automated result requires traceable settings, independent checks and professional approval.

Chapter Summary

Traversing establishes horizontal control through connected measured lines. Open traverses are useful for routes but have limited closure checks; closed-loop and closed-link traverses provide stronger quality control. Whole-circle bearings are converted into latitudes and departures using Latitude = L cos θ and Departure = L sin θ, with signs determined by quadrant. Coordinates are obtained by accumulating departures into eastings and latitudes into northings.

Closed traverses are checked by comparing observed and theoretical angle sums and by calculating latitude and departure misclosures. Linear misclosure is the vector magnitude of these component errors, and relative precision compares total traverse length with that misclosure. After blunders are investigated, Bowditch or transit adjustment may distribute discrepancies under stated assumptions. Horizontal control must be tied to a defined datum and projection, while vertical control is normally established and checked through levelling. Reliable professional practice depends on redundancy, documentation, appropriate tolerances, datum awareness and ethical reporting.

Key Terms

Traverse: A connected sequence of measured survey lines.

Traverse station: A point at which one or more traverse observations are made.

Open traverse: A traverse that does not return to its starting point or another known control point.

Closed-loop traverse: A traverse that returns to its starting station.

Closed-link traverse: A traverse connecting two separate known control points.

Bearing: The direction of a line expressed relative to a specified meridian.

Azimuth: A whole-circle direction measured clockwise from north.

Fore bearing: Direction from the first station toward the next station.

Back bearing: Direction of the same line viewed in reverse.

Latitude: North–south component of a traverse line.

Departure: East–west component of a traverse line.

Easting: Coordinate representing position in the east–west direction.

Northing: Coordinate representing position in the north–south direction.

Angular misclosure: Difference between observed and theoretical angular sums.

Linear misclosure: Resultant positional discrepancy from latitude and departure sums.

Bowditch rule: Adjustment rule distributing component errors in proportion to line lengths.

Transit rule: Adjustment rule distributing component errors in proportion to absolute components.

Horizontal control: Network of points with known plan coordinates.

Vertical control: Network of points with known elevations.

Reduced level: Elevation of a point relative to a stated vertical datum.

Review Questions

Short Answer Questions

  1. Distinguish between an open traverse and a closed-loop traverse.
  2. What are latitude and departure in traverse computation?
  3. State the theoretical sum of the interior angles of an n-sided closed traverse.
  4. Why must the coordinate datum and map projection be recorded with survey coordinates?
  5. What is the purpose of a backsight and a foresight in differential levelling?

Long Answer Questions

  1. Explain the complete field-to-office workflow for establishing and adjusting a closed traverse.
  2. Derive the latitude and departure relationships for a line whose bearing is measured clockwise from north, and explain the sign convention.
  3. Describe angular closure, linear closure and relative precision, including their limitations as quality indicators.
  4. Compare the Bowditch and transit rules, including their assumptions and appropriate applications.
  5. Explain how horizontal and vertical control networks support topographic surveying and construction setting out.

Analytical / Application Questions

  1. A 200 m traverse line has a whole-circle bearing of 240°. Calculate its latitude and departure, including signs, and explain the quadrant used.
  2. A closed traverse has total length 3200 m, latitude misclosure −0.040 m and departure misclosure +0.030 m. Calculate the linear misclosure and relative precision.
  3. A project has a poor open-traverse closure opportunity and obstructed GNSS conditions. Design a control strategy using redundant observations, ties or loops, monumentation and independent checks. Justify each decision.

Multiple Choice Questions with Answers

Question 1

For a line of length L with whole-circle bearing θ measured clockwise from north, which expressions give latitude and departure?

A. Latitude = L sin θ; departure = L cos θ

B. Latitude = L cos θ; departure = L sin θ

C. Latitude = L tan θ; departure = L cos θ

D. Latitude = L cos θ; departure = L tan θ

Correct Answer: B. Latitude = L cos θ; departure = L sin θ

Question 2

What is the theoretical sum of the interior angles of a five-sided closed traverse?

A. 360°

B. 540°

C. 720°

D. 900°

Correct Answer: B. 540°

Question 3

A line with a whole-circle bearing of 225° has which signs for latitude and departure?

A. Positive latitude and positive departure

B. Positive latitude and negative departure

C. Negative latitude and positive departure

D. Negative latitude and negative departure

Correct Answer: D. Negative latitude and negative departure

Question 4

If a closed traverse has ΣLatitude = +0.06 m and ΣDeparture = −0.08 m, what is its linear misclosure?

A. 0.02 m

B. 0.07 m

C. 0.10 m

D. 0.14 m

Correct Answer: C. 0.10 m

Question 5

Which adjustment rule distributes corrections in proportion to the lengths of the traverse legs?

A. Transit rule

B. Bowditch rule

C. Equal-angle rule

D. Height-of-instrument rule

Correct Answer: B. Bowditch rule

Question 6

The back bearing of 72°30′ is:

A. 107°30′

B. 252°30′

C. 287°30′

D. 352°30′

Correct Answer: B. 252°30′

Question 7

Which observation provides the strongest routine check for a closed-loop traverse?

A. Only the first distance measurement

B. Only the instrument height

C. Angular and coordinate closure

D. The number of stations alone

Correct Answer: C. Angular and coordinate closure

Question 8

The transit rule is based primarily on the assumption that which observations are more reliable?

A. Angular observations

B. Distance observations

C. Levelling observations

D. Target-height observations

Correct Answer: A. Angular observations

Question 9

In differential levelling, the difference between the final and initial reduced levels equals:

A. ΣFS − ΣBS

B. ΣBS + ΣFS

C. ΣBS − ΣFS

D. ΣBS × ΣFS

Correct Answer: C. ΣBS − ΣFS

Question 10

A traverse has total length 2500 m and linear misclosure 0.025 m. Its relative precision is:

A. 1:100

B. 1:1,000

C. 1:10,000

D. 1:100,000

Correct Answer: D. 1:100,000

Surveying & Levelling
Chapter 9 of 15