Introduction

Modern supply chains generate large volumes of transactional, operational and market data. Orders, shipments, inventory movements, production schedules, supplier performance, customer complaints and financial transactions all provide evidence about how a supply chain is functioning. Supply chain analytics converts this evidence into information for decisions. Performance management then uses agreed measures, targets and corrective actions to ensure that decisions improve organisational results.

Analytics is not simply the production of charts. It involves defining a decision problem, obtaining reliable data, selecting an appropriate analytical method, interpreting results and implementing action. A sophisticated dashboard based on inaccurate master data may be less useful than a simple report based on trustworthy information. Similarly, a forecast does not create value unless planners use it to adjust replenishment, capacity or transport decisions.

For production managers, supply chain analytics supports decisions such as:

  • how much raw material to order and when;
  • which suppliers require corrective action;
  • whether production capacity is sufficient;
  • how to allocate scarce inventory among customers;
  • whether a delivery problem is caused by production, transport or order processing;
  • how operational decisions affect working capital and cash flow.

This chapter develops descriptive, predictive and prescriptive analytics for logistics decisions. It also explains key performance indicators (KPIs), dashboard design, SCOR-based measurement, benchmarking, governance and the limitations of performance measurement.

Learning Objectives

By the end of this chapter, the learner should be able to:

  1. distinguish descriptive, diagnostic, predictive and prescriptive analytics;
  2. calculate and interpret important cost, service, quality, inventory, capacity and cash-to-cash measures;
  3. design a balanced supply chain KPI framework and management dashboard;
  4. apply basic forecasting, inventory and capacity analytics to logistics decisions;
  5. explain how SCOR can structure supply chain processes and measures;
  6. distinguish internal, competitive and best-practice benchmarking;
  7. evaluate data quality, governance, ethical risks and limitations of analytics;
  8. recommend practical performance-improvement actions from analytical evidence.

1. The Meaning and Role of Supply Chain Analytics

Supply chain analytics is the systematic use of data, statistical methods, models and managerial judgement to understand and improve the flow of materials, information and cash. It connects operational events with business outcomes. For example, a high inventory level may appear positive if viewed alone, but it may conceal poor forecast accuracy, obsolete stock, excessive purchasing or slow production changeovers.

A useful analytical cycle contains five stages:

  1. Frame the decision. State the decision, time horizon, constraints and success criteria.
  2. Acquire and prepare data. Integrate enterprise resource planning (ERP), warehouse management, transport, production, purchasing and customer data.
  3. Analyse. Identify patterns, causes, forecasts, scenarios or recommended actions.
  4. Decide and implement. Assign responsibility and authority for action.
  5. Learn and control. Monitor results, investigate variance and revise assumptions.

Analytics should be connected to a decision owner. A dashboard that no manager uses is a reporting product, not a management system.

1.1 Levels of analytics

LevelMain questionTypical methodsSupply chain example
DescriptiveWhat happened?Aggregation, ratios, charts, variance reportsOn-time delivery last month
DiagnosticWhy did it happen?Drill-down, segmentation, root-cause analysisLate deliveries by plant and carrier
PredictiveWhat is likely to happen?Forecasting, regression, classification, simulationExpected demand next month
PrescriptiveWhat should be done?Optimisation, scenarios, rules, digital twinsBest allocation of limited stock
Cognitive/automatedCan the system learn and act?Machine learning, agents and exception managementAutomatic replenishment subject to controls

The levels are complementary rather than sequential substitutes. A predictive model is unreliable when descriptive data definitions are inconsistent. Prescriptive analytics also requires an explicit objective function and constraints.

1.2 Data architecture and the single version of truth

Important data categories include master data, transaction data, event data and reference data. Master data describes products, locations, suppliers, customers, units of measure and lead times. Transaction data records orders, receipts, issues, invoices and shipments. Event data records timestamps such as order entry, pick completion, loading and delivery. Reference data includes calendars, transport zones and product classifications.

A “single version of truth” does not necessarily mean one physical database. It means that the organisation uses consistent definitions, ownership, time periods, units and calculation rules. For example, “on-time delivery” must specify the promised date, delivery date, tolerance, partial-delivery treatment and population included.

Data quality is commonly assessed through accuracy, completeness, consistency, timeliness, uniqueness and validity. A practical data-quality register should identify the field, owner, quality problem, business impact and corrective action.

2. KPI Design and Performance Architecture

A KPI is a defined measure used to evaluate progress toward an important objective. A metric becomes a KPI when it has strategic relevance, an owner, a target, a reporting frequency and a decision response. An organisation should avoid measuring everything. Excessive measures create administrative effort and encourage attention to what is easy to count rather than what matters.

A strong KPI has the following characteristics:

  • relevance: it reflects a meaningful business objective;
  • controllability: the responsible team can influence it;
  • clarity: numerator, denominator, scope and time period are defined;
  • comparability: results can be compared over time or across units;
  • balance: it does not encourage harmful local optimisation;
  • actionability: a defined threshold triggers investigation or action.

2.1 Leading and lagging indicators

Lagging indicators measure outcomes, such as total logistics cost or customer service. Leading indicators signal future outcomes, such as schedule adherence, forecast bias, supplier confirmation reliability or overdue preventive maintenance. A balanced scorecard uses both. For example, rising changeover losses may be a leading indicator of future production delays, while missed customer deliveries are a lagging indicator.

2.2 KPI hierarchy

A useful hierarchy links strategic outcomes to process measures:

  • Strategic: profitability, customer retention, resilience and cash-to-cash cycle time.
  • Tactical: inventory turns, forecast accuracy, supplier reliability and capacity utilisation.
  • Operational: picking accuracy, schedule adherence, dock-to-stock time and order cycle time.

The hierarchy prevents a department from improving its own measure while damaging overall performance. Purchasing may reduce unit price by buying large quantities, but this can increase inventory, obsolescence and cash tied up in stock.

3. Core Supply Chain Performance Measures

3.1 Cost measures

Total supply chain cost may include purchasing, production, inventory carrying, warehousing, transport, information processing, returns and expediting. A general expression is:

TSC = Cp + Cm + Ci + Cw + Ct + Co + Cr

where TSC is total supply chain cost; Cp purchasing cost; Cm manufacturing or conversion cost; Ci inventory carrying cost; Cw warehousing cost; Ct transport cost; Co order and information-processing cost; and Cr returns and recovery cost. The categories must be defined to avoid double counting. Monetary values should use a consistent period and currency.

Cost per order is:

Cost ext{-}per ext{-}order = \frac{Total\ relevant\ cost}{Number\ of\ completed\ orders}

The measure is meaningful only when order complexity is reasonably comparable. A pallet order and a customised export order should not necessarily be treated as equivalent units.

3.2 Service measures

On-time delivery (OTD) measures the percentage of eligible deliveries made by the promised date, subject to a stated tolerance:

OTD\% = \frac{Number\ of\ deliveries\ on\ time}{Total\ eligible\ deliveries} × 100

In-full delivery measures whether the requested quantity was supplied. Perfect order fulfilment generally requires the order to be delivered on time, in full, without damage and with accurate documentation:

POF\% = \frac{Orders\ meeting\ all\ specified\ conditions}{Total\ eligible\ orders} × 100

The conditions must be explicitly defined. Measuring lines rather than orders produces a different result, so reports must identify the unit of analysis.

Order cycle time is the elapsed time between defined start and end events. If an order is received at time t0 and delivered at t1, then:

Cycle\ time = t1 - t0

Business calendars, time zones, partial shipments and customer-requested delays must be treated consistently.

3.3 Quality measures

Common quality KPIs include supplier defect rate, incoming rejection rate, production first-pass yield, customer complaint rate, damage rate and return rate. Defects per million opportunities can be expressed as:

DPMO = \frac{Number\ of\ defects}{Number\ of\ units × Opportunities\ per\ unit} × 1,000,000

The opportunities must be defined consistently. DPMO is not identical to defective units per million when one unit can contain multiple defect opportunities.

Quality analytics should distinguish internal failure costs, external failure costs, appraisal costs and prevention costs. A low inspection-failure rate may reflect good quality, but it may also reflect weak inspection.

3.4 Inventory measures

Average inventory is often estimated as the average of opening and closing inventory:

Average\ inventory = \frac{Opening\ inventory + Closing\ inventory}{2}

This approximation is less reliable where inventory fluctuates sharply; daily or weekly averages are preferable.

Inventory turnover is:

Inventory\ turnover = \frac{Cost\ of\ goods\ sold}{Average\ inventory\ at\ cost}

Both numerator and denominator must use the same period and valuation basis. Days of inventory on hand is:

DIO = \frac{Average\ inventory}{Cost\ of\ goods\ sold} × Days\ in\ period

For a 365-day convention, annual cost of goods sold is used and the result is in days. Turnover and DIO should not be compared across firms using different valuation methods without adjustment.

For a continuous-review item with average demand d per day and lead time L days, expected lead-time demand is:

Lead ext{-}time\ demand = dL

If demand during lead time has standard deviation σLT and the desired cycle-service factor is z, safety stock is commonly estimated as:

Safety\ stock = zσLT

This simplified formula assumes that lead-time demand is approximately normally distributed, the chosen z corresponds to the desired service probability, and replenishment and demand assumptions are stable. If lead time is variable, demand and lead-time variability should be combined rather than ignored.

3.5 Capacity and productivity measures

Capacity analytics distinguishes theoretical, practical and available capacity. Utilisation is:

Utilisation\% = \frac{Actual\ output\ or\ time\ used}{Available\ capacity} × 100

For equipment, overall equipment effectiveness (OEE) is commonly defined as:

OEE = Availability × Performance × Quality

where availability is run time divided by planned production time; performance compares actual output rate with ideal output rate; and quality is good units divided by total units. Each component is expressed as a proportion between 0 and 1, or as a percentage consistently. OEE is useful for diagnosing losses but should not be used as the sole measure of plant performance. Producing unnecessary inventory can increase OEE while reducing customer and financial performance.

3.6 Cash-to-cash performance

The cash-to-cash cycle time estimates how long operating cash is committed between paying suppliers and collecting customer receipts:

C2C = DIO + DSO - DPO

where DIO is days inventory outstanding, DSO is days sales outstanding and DPO is days payable outstanding. DSO is usually calculated as receivables divided by credit sales multiplied by days; DPO requires a clearly defined purchases or payables basis. The identity is an analytical approximation and depends on accounting definitions. A lower C2C is not automatically better if it results from damaging supplier relationships, stockouts or poor customer service.

Worked example. A company reports average inventory of $1.20 million, annual cost of goods sold of $7.30 million, annual credit sales of $10.95 million, average receivables of $1.50 million and average payables of $0.90 million. Using 365 days:

DIO = (1.20 ÷ 7.30) × 365 = 60.0 days

DSO = (1.50 ÷ 10.95) × 365 = 50.0 days

If annual purchases are $6.57 million:

DPO = (0.90 ÷ 6.57) × 365 = 50.0 days

Therefore:

C2C = 60 + 50 - 50 = 60 days

The organisation has approximately 60 days of cash tied up in the operating cycle. Managers should investigate whether this is caused by slow-moving stock, customer credit terms or supplier payment policy.

4. Descriptive and Diagnostic Analytics

Descriptive analysis summarises what happened using trend charts, Pareto charts, heat maps, control charts and variance reports. Diagnostic analysis investigates why. Useful techniques include segmentation by product, customer, supplier, location, shift, route and time; drill-down from aggregate results; and the five-whys method.

A Pareto analysis may reveal that a small number of stock-keeping units cause most stockouts or that a few carriers cause most delivery failures. However, Pareto patterns are descriptive rather than causal. Managers should test alternative explanations, including volume mix, unusual events and data errors.

Control charts can distinguish common-cause variation from special-cause variation. A process should not be treated as unstable merely because one result is below target; the time sequence and process limits must be considered. Targets and statistical control limits are different: a process can be statistically stable but consistently fail a customer requirement.

5. Predictive Analytics for Logistics Decisions

Predictive analytics estimates future demand, lead times, delays, failures or risks. It does not guarantee an outcome. Forecasts should be accompanied by a horizon, confidence or prediction interval where possible, assumptions and a process for updating the forecast.

5.1 Forecast accuracy

For actual demand At and forecast Ft, forecast error is:

et = At - Ft

Mean absolute error is:

MAE = \frac{1}{n}∑t=1n|et|

Mean absolute percentage error is:

MAPE = \frac{100}{n}∑t=1n\left|\frac{At-Ft}{At}\right|

MAPE is undefined when actual demand is zero and becomes unstable when actual demand is close to zero. Weighted or scaled measures may be preferable for intermittent demand.

Forecast bias can be measured as mean error:

Bias = \frac{1}{n}∑t=1n(At-Ft)

A positive result indicates that actual demand has exceeded forecasts on average; a negative result indicates over-forecasting. Accuracy and bias are different: errors can be large but cancel out, producing low average bias.

A simple moving-average forecast for the next period is:

Ft+1 = \frac{1}{k}∑i=0k-1At-i

where k is the number of recent observations. This method assumes that recent history is informative and does not explicitly model trend, seasonality or causal factors.

5.2 Predicting logistics risk

Classification models can estimate the probability that an order will be late, a supplier will miss a delivery, or an item will become obsolete. Useful explanatory variables may include historical reliability, distance, order size, congestion, weather, production load and lead-time variance. Models must be validated on data not used for training. A model with high apparent accuracy may simply memorise historical patterns or reflect data leakage.

Prediction should support human judgement rather than eliminate accountability. A planner should be able to see the principal drivers of a risk alert and challenge an implausible recommendation.

6. Prescriptive Analytics and Optimisation

Prescriptive analytics evaluates possible actions against an objective and constraints. A general linear optimisation model can be written as:

Maximise\ or\ minimise\ Z = ∑j=1ncjxj

subject to:

∑j=1naijxj ≤ bi,\quad i=1,2,...,m

and:

xj ≥ 0

Here, xj is a decision variable; cj is its contribution or cost; aij is the amount of resource i used by decision j; and bi is the available resource or requirement. The model is applicable when relationships are suitably linear and data, constraints and objective are adequately specified.

Supply chain applications include production mix, transport mode selection, warehouse assignment, vehicle routing, supplier allocation and inventory positioning. Integer or mixed-integer models are needed when decisions involve whole vehicles, setup choices or yes/no decisions.

Scenario analysis is often more practical than a supposedly precise optimum. Managers can compare a base case, a demand surge, a supplier disruption and a transport-capacity reduction. Sensitivity analysis identifies which assumptions most affect the result.

7. SCOR-Based Measurement

The Supply Chain Operations Reference (SCOR) framework provides a process-oriented vocabulary for analysing supply chains. Its widely used process categories include Plan, Source, Make, Deliver and Return; contemporary applications may also address enable, orchestration and sustainability-related capabilities depending on the adopted version and organisational design.

SCOR is valuable because it links processes, attributes, metrics and practices. For example:

Process areaExample performance concernPossible measures
PlanBalance demand and supplyForecast accuracy, planning cycle time
SourceReliable and economical supplySupplier on-time delivery, incoming defects
MakeEfficient and responsive productionSchedule adherence, OEE, first-pass yield
DeliverCustomer service and distributionOTD, perfect order fulfilment, freight cost
ReturnRecovery and customer resolutionReturn cycle time, recovery rate, return defects

SCOR should not be treated as a universal answer or as a certification substitute. Organisations must map their actual processes, define metric formulas and establish data ownership. Benchmark results are meaningful only when definitions, scope, product mix and service conditions are comparable.

8. Benchmarking and Dashboard Design

Benchmarking compares performance with a reference. Internal benchmarking compares plants, warehouses or periods within the same organisation. Competitive benchmarking compares direct competitors, often using carefully normalised data. Functional benchmarking compares similar processes in different industries. Best-practice benchmarking seeks evidence of superior methods, not merely superior numerical results.

A benchmarking study should define the population, period, currency, volume basis, service level, accounting treatment and exclusions. A lower cost may reflect lower service, cheaper labour, different geography or outsourcing rather than superior management.

8.1 Dashboard principles

An effective dashboard should present a small number of critical measures, show trends and targets, identify exceptions and enable drill-down to causes. Each KPI definition should include:

  • name and purpose;
  • formula and unit;
  • numerator and denominator;
  • data source and refresh frequency;
  • owner and accountable manager;
  • target, tolerance and escalation rule;
  • segmentation dimensions;
  • required action when performance is off target.

A recommended executive dashboard covers six perspectives: cost, service, quality, inventory, capacity and cash. A daily operating dashboard may focus on orders at risk, shortages, production schedule adherence and transport exceptions, while a monthly strategic dashboard may focus on total cost, customer profitability, resilience and C2C.

RAG colours should not replace numbers or explanations. Red indicates an exception requiring attention, not necessarily individual blame. Dashboards should show whether performance is improving, deteriorating or merely fluctuating.

9. Applied Case: Meridian Components (Illustrative)

Background

Meridian Components is an illustrative manufacturer of industrial control panels. It operates one assembly plant, two regional warehouses and a network of 85 suppliers. Sales have grown, but customers report late deliveries and incomplete orders. Finance reports increasing working capital.

Problem

The monthly dashboard shows 93% on-time delivery, 8.2 inventory turns and 78% average capacity utilisation. Management initially concludes that performance is acceptable. A cross-functional review finds that the measures use different populations: OTD excludes partial deliveries, inventory turns use closing rather than average inventory, and capacity utilisation includes planned downtime inconsistently.

Analysis

Diagnostic analysis segments service by customer and product family. It identifies that 12 high-volume components create most shortages because supplier lead times are variable. Forecast bias is negative for these items, meaning demand has been systematically under-forecast. The plant also schedules large batches to improve utilisation, increasing finished-goods inventory while delaying urgent customer orders.

The team redesigns the KPI dictionary. Perfect order fulfilment is introduced, with on-time, in-full, damage-free and document-accurate conditions. Inventory is analysed by ABC-XYZ classification, where ABC represents value contribution and XYZ represents demand variability. Supplier risk is scored using late-delivery frequency, lead-time variability, defect rate and substitutability.

Approach and solution

Meridian implements four actions:

  1. revise forecasts using recent demand, sales promotions and planner review;
  2. set differentiated safety stocks for high-value and high-variability items;
  3. reserve weekly capacity for urgent, high-margin customer orders;
  4. create a dashboard linking supplier reliability, shortages, production adherence, POF, inventory and C2C.

A scenario model compares the current batch policy with smaller batches and an alternative supplier for two critical components. The alternative supplier has a higher unit price but lower lead-time variability. The decision is approved because the total cost, including shortages and expediting, is lower under the risk-adjusted scenario.

Outcome

After three reporting cycles, management observes improved POF, fewer emergency shipments and lower shortages. Inventory value does not immediately fall because safety stock is initially increased for critical items, but the dashboard shows improved segmentation and declining obsolete stock. The case demonstrates that a single high-level KPI can conceal trade-offs and that analytics must connect operational, financial and customer measures.

Learning points

  • KPI definitions must be consistent before comparisons are made.
  • High utilisation is not equivalent to high supply chain effectiveness.
  • Forecast bias can be more useful than accuracy alone.
  • Risk-adjusted total cost is superior to unit price alone.
  • Cross-functional ownership is necessary because supply chain outcomes cross departmental boundaries.

10. Governance, Ethics and Limitations

Analytics creates governance responsibilities. Access to customer, supplier, employee and financial data should follow least-privilege principles. Data should be retained only as long as justified, protected against unauthorised access and processed in accordance with applicable privacy, employment and commercial regulations.

Algorithmic decisions may reproduce historical bias. For example, a supplier-risk model trained on past purchasing decisions may penalise small suppliers because they previously received fewer orders, rather than because they are objectively unreliable. Important automated decisions should be explainable, auditable and subject to human review.

Common technical limitations include missing data, inconsistent timestamps, survivorship bias, seasonality, changes in product mix, forecast uncertainty and correlation being mistaken for causation. KPI gaming is another risk: a team may split orders, delay recording a problem or reject difficult work to improve its reported result. Balanced measures, audit trails and outcome-based review reduce this risk.

Artificial intelligence and machine learning can improve demand sensing, anomaly detection, document processing, route prediction and predictive maintenance. However, implementation requires clean data, monitoring for model drift, cybersecurity, human accountability and clear fall-back procedures. Generative AI can assist explanation and scenario preparation, but it should not invent performance data or make uncontrolled procurement and customer-service commitments.

11. Best-Practice Implementation Road Map

A practical implementation can proceed as follows:

  1. identify strategic objectives and major supply chain decisions;
  2. map end-to-end processes using a common framework such as SCOR;
  3. create a KPI dictionary with formulas, owners and data sources;
  4. audit master data, timestamps and historical records;
  5. build a basic descriptive dashboard before advanced modelling;
  6. establish review meetings and escalation rules;
  7. add forecasting, risk scoring and scenario analysis where decisions justify the effort;
  8. validate models, monitor errors and document assumptions;
  9. benchmark only after definitions and populations are normalised;
  10. review KPIs periodically to remove obsolete or counterproductive measures.

The principle is progressive maturity: reliable measurement first, diagnosis second, prediction third and optimisation fourth.

Chapter Summary

Supply chain analytics transforms operational, financial and market data into decisions. Descriptive and diagnostic analytics explain current and past performance; predictive analytics estimates future demand, delays and risks; prescriptive analytics evaluates actions under objectives and constraints. Effective performance management requires clearly defined KPIs covering cost, service, quality, inventory, capacity and cash-to-cash performance.

Measures such as OTD, perfect order fulfilment, inventory turnover, OEE, forecast error and C2C are useful only when their definitions, units, populations and assumptions are explicit. SCOR provides a process vocabulary for linking planning, sourcing, making, delivery and returns to performance attributes. Benchmarking requires comparable definitions and should examine methods as well as results.

Dashboards should be concise, balanced, trend-oriented and connected to owners and corrective actions. Data quality, privacy, cybersecurity, algorithmic fairness and human accountability are essential governance concerns. The best organisations develop analytics progressively, beginning with trustworthy descriptive information and advancing toward predictive and prescriptive decision support.

Key Terms

Supply chain analytics: Use of data, models and judgement to improve supply chain decisions.

Descriptive analytics: Analysis that reports what has happened.

Diagnostic analytics: Analysis that investigates why an outcome occurred.

Predictive analytics: Analysis that estimates future outcomes or probabilities.

Prescriptive analytics: Analysis that recommends actions under objectives and constraints.

Key performance indicator: A strategically important, defined and actionable performance measure.

Perfect order fulfilment: Percentage of orders meeting specified on-time, in-full, damage-free and documentation requirements.

Inventory turnover: Cost of goods sold divided by average inventory at cost.

Safety stock: Inventory held to protect against uncertainty in demand or replenishment.

Forecast bias: Average signed difference between actual and forecast demand.

Mean absolute error: Average absolute forecast error in the measurement unit of demand.

Capacity utilisation: Actual output or time used as a proportion of available capacity.

Overall equipment effectiveness: Product of availability, performance and quality.

Cash-to-cash cycle time: Approximate time between paying suppliers and collecting customer cash.

SCOR: A process reference framework for analysing and improving supply chain operations.

Benchmarking: Structured comparison with internal, competitive, functional or best-practice references.

Data governance: Policies and responsibilities controlling data quality, access, use and protection.

Master data: Stable descriptive data about products, locations, suppliers and customers.

KPI gaming: Behaviour that improves a reported measure without improving genuine performance.

Review Questions

Short Answer Questions

  1. Distinguish descriptive, predictive and prescriptive analytics.
  2. What conditions should be specified when calculating on-time delivery?
  3. Define inventory turnover and state the valuation consistency required.
  4. What are the three components of OEE?
  5. Explain the purpose of a KPI dictionary.

Long Answer Questions

  1. Explain how a supply chain organisation can progress from descriptive reporting to prescriptive analytics.
  2. Discuss the advantages and limitations of using SCOR for supply chain performance management.
  3. Explain the cash-to-cash cycle time and analyse how inventory, receivables and payables influence it.
  4. Design a balanced dashboard for a manufacturing supply chain covering cost, service, quality, inventory, capacity and cash.
  5. Discuss data governance, ethical risks and human accountability in AI-supported supply chain decisions.

Analytical / Application Questions

  1. A distributor has annual cost of goods sold of $4.8 million and average inventory of $0.8 million. Calculate inventory turnover and DIO using 365 days. Interpret both results.
  2. A plant has planned production time of 420 hours, operating time of 378 hours, actual output of 7,182 units, ideal output rate of 20 units per hour and 6,900 good units. Calculate availability, performance, quality and OEE. State any assumptions.
  3. A company is considering a cheaper supplier with high lead-time variability versus a more expensive reliable supplier. Design an analytical approach that incorporates service risk, safety stock, expediting cost and total supply chain cost rather than unit price alone.

Multiple Choice Questions with Answers

Question 1

Which type of analytics recommends the best action subject to constraints?

A. Descriptive analytics

B. Diagnostic analytics

C. Predictive analytics

D. Prescriptive analytics

Correct Answer: D. Prescriptive analytics

Question 2

A company delivers 920 of 1,000 eligible orders by the promised date. What is its on-time delivery percentage?

A. 8%

B. 92%

C. 108%

D. 920%

Correct Answer: B. 92%

Question 3

Which measure combines availability, performance and quality?

A. Inventory turnover

B. Perfect order fulfilment

C. Overall equipment effectiveness

D. Cash-to-cash cycle time

Correct Answer: C. Overall equipment effectiveness

Question 4

If annual cost of goods sold is $6 million and average inventory is $1 million, inventory turnover is:

A. 0.17 turns

B. 5 turns

C. 6 turns

D. 7 turns

Correct Answer: C. 6 turns

Question 5

In the cash-to-cash equation C2C = DIO + DSO - DPO, which component represents the time taken to collect customer receivables?

A. DIO

B. DSO

C. DPO

D. OEE

Correct Answer: B. DSO

Question 6

Which statement about MAPE is correct?

A. It is unaffected by zero actual demand

B. It measures only signed bias

C. It can become unstable when actual demand is close to zero

D. It must always be expressed in currency

Correct Answer: C. It can become unstable when actual demand is close to zero

Question 7

Which SCOR process category primarily concerns obtaining materials from suppliers?

A. Source

B. Make

C. Deliver

D. Return

Correct Answer: A. Source

Question 8

A positive forecast bias defined as actual demand minus forecast demand indicates that the organisation has generally:

A. Over-forecast demand

B. Under-forecast demand

C. Eliminated all forecast error

D. Measured inventory incorrectly

Correct Answer: B. Under-forecast demand

Question 9

What is the main purpose of safety stock?

A. To increase purchase price

B. To protect against demand or replenishment uncertainty

C. To eliminate all warehouse costs

D. To replace cycle counting

Correct Answer: B. To protect against demand or replenishment uncertainty

Question 10

Which practice best reduces KPI gaming?

A. Using one departmental KPI only

B. Removing all performance targets

C. Using balanced measures with clear definitions and audit trails

D. Reporting only favourable results

Correct Answer: C. Using balanced measures with clear definitions and audit trails