Introduction

Supplier quality management has traditionally concentrated on conformance: whether supplied material, components, software or services meet specified requirements. Contemporary supply networks require a broader perspective. A supplier may deliver conforming product yet remain strategically dangerous if it is financially unstable, exposed to geopolitical disruption, dependent on a vulnerable sub-tier supplier, susceptible to cyberattack, or unable to recover after a natural disaster.

Supplier risk management therefore concerns the systematic identification, assessment, treatment and monitoring of events that may impair quality, continuity, compliance, cost, safety or reputation. Resilience is the capability of the supply network to absorb disruption, adapt while disruption is occurring and recover acceptable performance. Crisis management is the leadership and coordination process through which an organisation responds to a serious event whose consequences exceed routine operating controls.

The central managerial challenge is not to eliminate every risk. Complete elimination is normally impossible and may be uneconomic. The objective is to make risk visible, determine which exposures are unacceptable, allocate proportionate controls and preserve critical customer and stakeholder outcomes.

Learning Objectives

By the end of this chapter, the reader should be able to:

  1. Distinguish supplier risk, vulnerability, resilience, continuity and crisis management.
  2. Classify quality, continuity, geopolitical, financial, cybersecurity, counterfeit and sub-tier risks.
  3. Construct and maintain a supplier risk register.
  4. Apply FMEA, scenario analysis and business impact assessment to supplier decisions.
  5. Evaluate single-sourcing, dual-sourcing, inventory, substitution and recovery strategies.
  6. Design governance, escalation and communication arrangements for supplier crises.
  7. Critically assess the limitations, ethical implications and unintended effects of risk controls.

1. The Strategic Nature of Supplier Risk

A supply network is a system of interconnected organisations rather than a simple chain. A focal organisation may depend on contract manufacturers, logistics providers, raw-material producers, software vendors, cloud platforms, testing laboratories and sub-tier suppliers. A disruption at a distant node can therefore affect the focal organisation even when its direct supplier appears healthy.

Supplier risk has at least five dimensions:

  • Probability: how likely an adverse event is within a defined period.
  • Exposure: the organisation’s dependence on the supplier, component, location or process.
  • Consequence: the effect on customers, safety, quality, delivery, finance, compliance and reputation.
  • Detectability or warning time: the extent to which deterioration can be identified before impact.
  • Recoverability: the time and resources required to restore acceptable performance.

Risk is not identical to uncertainty. Risk usually refers to uncertainty that can be characterised sufficiently to support decisions; uncertainty may include poorly understood or unknowable conditions. A low historical failure rate does not prove low future risk when the operating environment has changed.

Important distinctions

ConceptMeaningManagement question
Supplier riskPossibility that supplier-related events produce harmful outcomesWhat could go wrong?
VulnerabilitySusceptibility of a system to disruptionWhy would this network be affected?
ResilienceAbility to absorb, adapt and recoverHow well can it continue and recover?
Business continuityPlanned capability to maintain critical operationsWhich essential activities must continue?
Crisis managementDirection and coordination during a severe eventWho decides and communicates under pressure?
ContingencyPrearranged alternative actionWhat will we do if the primary plan fails?
RecoveryRestoration of performance after disruptionHow will normal or acceptable operations resume?

A strategic approach links supplier risk to enterprise risk appetite, product safety, customer commitments, regulatory duties and competitive strategy. The cheapest supplier is not necessarily the lowest-cost option when disruption costs, qualification delays and reputational damage are included.

2. Supplier Risk Taxonomy

2.1 Quality and process risk

Quality risk arises when a supplier may produce nonconforming, unsafe or inconsistent output. Causes include weak process capability, inadequate change control, ineffective measurement systems, poor traceability, uncontrolled special processes, inadequate calibration and high employee turnover. Quality risk is amplified when defects are detected only after assembly or customer delivery.

Controls include supplier audits, process validation, incoming inspection, statistical process control, first-article approval, corrective-action verification, lot traceability and formal notification of changes. Controls should be risk-based: inspecting every low-risk standard item may consume resources that are needed for critical special processes.

2.2 Continuity and operational risk

Continuity risk includes plant fire, equipment failure, utility interruption, labour disruption, transport failure, epidemic, extreme weather and inadequate recovery capacity. Geographic concentration is important. Several nominally different suppliers may rely on the same industrial park, port, power grid or raw-material source.

2.3 Geopolitical and regulatory risk

Trade restrictions, sanctions, export controls, tariffs, political instability, armed conflict, border closure and regulatory change can interrupt supply or make a transaction unlawful. Compliance cannot be delegated entirely to the supplier. The buying organisation must know relevant jurisdictions, ownership structures, restricted parties, licences and product classifications.

2.4 Financial and commercial risk

Financial distress may lead to deferred maintenance, quality shortcuts, staff loss, reduced inventory and inability to purchase raw materials. Warning indicators include late statutory filings, adverse credit information, covenant pressure, persistent negative cash flow, unusual payment demands and declining investment. Financial indicators require contextual interpretation; a profitable supplier can still be operationally fragile, while a growing supplier may temporarily show weak cash flow.

2.5 Cybersecurity and information risk

Suppliers may access designs, personal data, production systems, credentials or cloud platforms. A compromise can cause intellectual-property loss, ransomware, fraudulent payment instructions, production stoppage or unsafe product changes. Cyber risk includes both the supplier’s own controls and the interfaces between organisations.

Controls should address identity management, least privilege, multifactor authentication, secure software development, vulnerability management, incident notification, backup restoration, logging, segmentation and tested recovery. Cybersecurity questionnaires alone are weak evidence unless supported by independent assurance, technical testing or observed performance.

2.6 Counterfeit, fraudulent and suspect material risk

Counterfeit risk involves deliberate or accidental substitution, falsified documentation, unauthorised channels, recycled parts or altered certificates. It is significant where components are safety-critical, scarce, obsolete or expensive. Prevention includes approved-source controls, traceability, supplier-chain mapping, authenticity testing, serial-number verification, secure storage and employee training. Detection after installation may be difficult and costly.

2.7 Sub-tier and concentration risk

A direct supplier may conceal dependence on a single semiconductor fabricator, chemical producer, tooling provider or logistics route. Sub-tier visibility should be proportionate to criticality. Requirements may include disclosure of critical sub-tier sources, approval of changes, flow-down of quality clauses and notification of disruptions.

Concentration risk can be measured in several ways. If supplier i provides share si of a category, a simple concentration index is:

H = ∑ si²

Here, si is expressed as a proportion between 0 and 1 and the sum covers all suppliers. H approaches 1 when one supplier dominates and becomes smaller as supply is distributed. This index is descriptive, not a complete risk measure: two suppliers may still share the same sub-tier source or geographic hazard.

3. The Supplier Risk Register

A risk register converts dispersed concerns into accountable management information. Each entry should identify the risk event, causes, consequences, affected products or processes, existing controls, owner, indicators, treatment, due date and residual exposure.

A practical register may contain:

FieldPurpose
Risk ID and categoryEnables classification and reporting
Supplier, site and sub-tierDefines the exposure boundary
Risk event and causesSeparates event from underlying drivers
ConsequencesRecords quality, safety, delivery, financial and compliance effects
Inherent assessmentDescribes exposure before additional treatment
Existing controlsRecords prevention, detection and recovery measures
Indicators and triggersProvides early warning
Treatment and ownerConverts analysis into action
Target date and statusSupports governance
Residual assessmentShows remaining exposure after controls

A common screening score multiplies probability and consequence:

R = P × C

where P is a rated likelihood and C is a rated consequence. If each is scored from 1 to 5, the score ranges from 1 to 25. This is an ordinal prioritisation device, not a probability of loss. A score of 12 does not mean twelve times the risk of a score of 1. Scales must be defined, consistently applied and supplemented by judgement, scenario evidence and escalation rules.

Some organisations add detectability, producing a risk priority number:

RPN = S × O × D

Here S is severity, O occurrence and D detectability, each on an agreed ordinal scale. RPN is useful for ranking failure modes within a common assessment, but it can hide a catastrophic low-frequency risk and assumes that multiplication of ordinal ratings is meaningful. High-severity risks should therefore receive explicit review even when their RPN is modest.

4. FMEA for Supplier Risk

Failure Mode and Effects Analysis (FMEA) examines how a product, process or supply arrangement might fail. A supplier-oriented FMEA should examine both the supplied output and the conditions that enable delivery. Typical columns include function, failure mode, effect, cause, prevention control, detection control, severity, occurrence, detectability, recommended action and responsible owner.

The analysis should begin with the customer or process requirement, not with a list of generic hazards. For example, the requirement may be “deliver conforming sterilised components with intact traceability.” Failure modes could include incorrect material, failed sterilisation, damaged packaging and falsified records. Each has different causes and controls.

FMEA is most effective when multidisciplinary. Procurement may understand commercial dependencies, engineering the technical consequences, quality the control system, operations the recovery constraints and cybersecurity specialists the digital exposure. FMEA should be revised after escapes, process changes, new intelligence and crisis exercises.

5. Scenario Analysis and Business Impact Assessment

Historical data cannot represent every future disruption. Scenario analysis explores plausible combinations such as a cyberattack during a port closure, a supplier bankruptcy during a product launch, or a geopolitical restriction affecting a critical sub-tier source.

A useful scenario process is:

  1. Define the disruption, boundary, assumptions and time horizon.
  2. Map affected suppliers, sites, materials, information and transport routes.
  3. Identify immediate, second-order and cascading effects.
  4. Estimate operational, customer, financial, legal and safety consequences.
  5. Identify decisions, triggers, alternatives and resource requirements.
  6. Test the scenario through a tabletop exercise or simulation.
  7. Record gaps, owners and improvement actions.

A Business Impact Assessment (BIA) determines which processes are critical and how quickly they must be restored. Important terms include:

  • Maximum tolerable period of disruption (MTPD): longest period before consequences become unacceptable.
  • Recovery time objective (RTO): target time to restore a process or service.
  • Recovery point objective (RPO): maximum tolerable loss of data measured in time.
  • Minimum business continuity objective (MBCO): minimum acceptable level of service during disruption.

RTO should not be casually set equal to MTPD. The RTO should normally be shorter, allowing time for uncertainty, testing and stabilisation. A BIA should also identify dependencies: trained personnel, tooling, utilities, validated software, approvals, data, logistics and external services.

6. Resilience Strategies

6.1 Dual sourcing and multisourcing

Dual sourcing reduces dependence on one supplier, but it is not automatically resilient. Benefits include alternative capacity, competitive tension, benchmarking and recovery flexibility. Costs include qualification expense, lower volume leverage, more complex scheduling and possible variation between sources.

Effective dual sourcing requires technically interchangeable specifications, validated processes, approved capacity, clear allocation rules, compatible tooling, intellectual-property arrangements and periodic switching exercises. “Paper dual sourcing” exists when two suppliers depend on one sub-tier source or cannot supply within the required recovery time.

6.2 Buffer inventory and strategic capacity

Inventory can absorb short disruptions but creates holding cost, obsolescence and storage risk. A simple cycle-stock relationship is:

Q = D × L

where Q is expected demand during replenishment lead time, D is demand per unit time and L is lead time in the same time units. This is not a complete safety-stock formula; it assumes stable demand and deterministic lead time. Safety stock requires assumptions about demand variability, lead-time variability, service target and replenishment policy.

Capacity reservations, tooling duplication, emergency logistics contracts and approved substitutes can complement inventory. Resilience design should consider cash constraints and the possibility that disruption affects all suppliers simultaneously.

6.3 Substitution, postponement and redesign

Approved alternative materials, modular product architecture and postponement can reduce dependence on a particular source. However, substitution requires engineering evaluation, regulatory approval, validation, customer notification and configuration control. Emergency substitution without adequate validation can convert a continuity problem into a safety or quality crisis.

6.4 Contractual and collaborative controls

Contracts should define quality requirements, audit rights, change notification, traceability, business continuity obligations, cybersecurity controls, incident reporting, intellectual-property protection, data access, exit assistance and recovery cooperation. Contract language is valuable only when requirements are measurable and enforceable.

Collaboration may include joint capacity planning, shared forecasts, supplier development, joint exercises and transparent escalation. Excessive information extraction without reciprocal support can reduce trust and encourage concealment.

7. Crisis Management Architecture

A crisis plan should define activation criteria, authority, communication channels and decision rights before the event. A typical structure includes an executive crisis team, an operational response team, subject-matter specialists and a communications/legal interface.

The first priorities are usually protection of people, containment of unsafe or nonconforming product, preservation of evidence, confirmation of facts and continuity of critical customer commitments. Organisations should avoid premature blame and uncontrolled communications. A single verified situation report reduces contradictory messages.

A crisis playbook commonly includes:

  1. Detect and verify the event.
  2. Classify severity and activate the appropriate response level.
  3. Protect people, customers, data and product integrity.
  4. Establish facts, affected lots, sites, orders and sub-tiers.
  5. Stabilise supply through allocation, alternatives or controlled inventory release.
  6. Communicate with customers, regulators, employees and suppliers.
  7. Recover, validate output and remove temporary controls only when evidence supports it.
  8. Conduct a post-event review and update the risk register.

Crisis metrics should include time to detect, time to escalate, time to establish scope, time to restore minimum service, affected customer volume, containment effectiveness and recurrence of related failures. Speed must not displace accuracy or safety.

8. Illustrative Case: Meridian Medical Devices

Background

Meridian Medical Devices assembles infusion pumps and purchases a pressure sensor from Supplier A. Supplier A has historically achieved high conformance, but the sensor is manufactured at one site and its ceramic element comes from a single sub-tier producer in another country. Meridian has no approved alternative and holds ten days of inventory. The sensor requires regulatory revalidation if its design or manufacturing source changes.

Problem

A geopolitical dispute leads to export restrictions affecting the ceramic element. At the same time, Supplier A reports a ransomware incident that has interrupted production records and shipment scheduling. The immediate temptation is to expedite remaining stock and seek an unapproved substitute.

Analysis

Meridian’s risk register identifies quality, continuity, geopolitical, cybersecurity and sub-tier risks. A BIA establishes that pump production can operate for seven days after existing stock is consumed, whereas regulatory and patient-safety requirements prohibit uncontrolled substitution. FMEA identifies incorrect calibration, loss of traceability and contaminated or damaged sensors as high-consequence failure modes. Scenario analysis shows that a second direct supplier would not solve the problem if both sources used the same ceramic sub-tier.

Approach and solution

The crisis team quarantines inventory with uncertain traceability, verifies unaffected lots, and requests evidence from Supplier A concerning system restoration and shipment integrity. Meridian contacts the sub-tier producer through contractual escalation, reviews alternative ceramic sources, and begins a controlled engineering and regulatory assessment of a substitute. Production is prioritised for critical customer orders, while service parts are temporarily rationed under an approved allocation policy.

For the medium term, Meridian qualifies a second sensor manufacturer using a different ceramic source, establishes minimum traceability and cybersecurity requirements, increases visibility of critical sub-tiers and conducts an annual disruption exercise. It also redesigns the product so that a future sensor alternative can be validated with less rework, without weakening safety requirements.

Outcome and learning points

Meridian avoids releasing material with uncertain provenance and preserves patient safety. Production is reduced temporarily but resumes after validated alternative capacity becomes available. The case demonstrates that supplier quality cannot be separated from geopolitical, cyber and sub-tier exposure. It also shows that resilience is created before the crisis through visibility, qualification, contractual rights, design flexibility and rehearsed decision-making.

9. Governance, Ethics and Regulatory Considerations

Risk decisions affect suppliers, workers, customers and communities. Organisations should not use risk scoring to justify discriminatory sourcing, exploit distressed suppliers or transfer unacceptable hazards to less powerful parties. Supplier audits should respect confidentiality, labour rights, privacy and local law. Corrective actions should address systemic causes rather than merely penalise suppliers for reporting problems.

Governance requires documented risk appetite, independent challenge for high-consequence risks, segregation of duties in supplier approval and procurement, evidence-based assurance, controlled exceptions and board-level visibility of critical dependencies. Personal data collected during supplier due diligence must be minimised, protected and retained lawfully.

Regulatory obligations vary by sector and jurisdiction but commonly concern product safety, traceability, cybersecurity, sanctions, environmental controls, labour practices, record retention and notification of serious incidents. Legal review is essential where emergency decisions involve export controls, recalls, data transfers or changes to regulated products.

10. Technology, Analytics and Contemporary Developments

Digital supplier platforms can integrate quality complaints, delivery performance, financial signals, cyber alerts, weather data, sanctions information and sub-tier mapping. Machine learning may identify unusual patterns, such as simultaneous lead-time deterioration and invoice changes. However, predictive models inherit data bias, may generate false alarms and can obscure reasoning. Human review, data lineage, model validation and override controls remain necessary.

Digital twins and network graphs can support “what-if” analysis by showing shared sites, materials and logistics nodes. Internet-connected devices can improve condition monitoring, but they also enlarge the attack surface. Artificial intelligence should therefore be governed as both a resilience tool and a supplier risk.

Contemporary resilience thinking is moving from simple redundancy toward adaptive capability: modular design, rapid learning, ecosystem collaboration, regional balance, cyber-physical security and climate-informed planning. Resilience should not be confused with permanent excess capacity. The strategic question is which capabilities must be redundant, which risks can be shared, and which consequences are unacceptable.

Challenges and Limitations

Risk registers can become bureaucratic inventories rather than decision tools. Scores may create false precision, encourage ranking manipulation or neglect correlated risks. Audits provide a point-in-time view and may reward documentation rather than actual capability. Supplier declarations can be incomplete, especially at sub-tier levels. Dual sourcing can increase complexity and may fail during systemic events. Inventory protects against some interruptions but not necessarily cyber compromise, regulatory prohibition or counterfeit material.

Scenario analysis is constrained by imagination and assumptions. Financial data may be delayed or strategically presented. Recovery plans may exist but remain untested. These limitations require triangulation: combine performance data, site evidence, independent assurance, exercises, expert judgement and direct engagement. The risk process should be treated as a learning system, not a one-time compliance exercise.

Best-Practice Checklist

  • Identify critical products, processes, services and dependencies.
  • Map direct and critical sub-tier suppliers.
  • Use risk registers with named owners, triggers and residual-risk decisions.
  • Apply FMEA to quality and supply failure modes, not only product defects.
  • Perform BIAs with explicit MTPD, RTO, RPO and minimum-service requirements.
  • Test dual-source assumptions and shared sub-tier dependencies.
  • Validate substitutes before emergency use.
  • Include cyber, counterfeit, geopolitical and financial indicators.
  • Exercise crisis plans and verify recovery evidence.
  • Link contracts, supplier development and executive governance.
  • Protect safety, privacy, labour rights and due process.
  • Capture lessons after incidents and revise controls accordingly.

Chapter Summary

Supplier risk management extends quality management from conformance at the point of receipt to the resilience of the entire supply network. Important exposures include quality failure, operational interruption, geopolitical change, financial distress, cyberattack, counterfeit material and hidden sub-tier dependence. A risk register makes exposures, controls, owners and triggers visible. FMEA supports structured failure analysis, while scenario analysis and business impact assessment reveal cascading effects, critical processes and recovery requirements.

Resilience may be developed through dual or multisourcing, strategic inventory, capacity reservations, approved substitutes, modular design, contractual controls, supplier collaboration and tested recovery plans. These measures involve trade-offs and must be evaluated against safety, cost, complexity and correlated disruption. Crisis management depends on pre-agreed authority, rapid fact verification, containment, communication and disciplined recovery. Effective governance combines quantitative screening with judgement, evidence, ethical safeguards and continual learning.

Key Terms

Supplier risk: Possibility that supplier-related events harm organisational objectives.

Supply-chain resilience: Capability to absorb, adapt to and recover from disruption.

Crisis management: Direction and coordination during a severe disruptive event.

Risk register: Controlled record of risks, controls, owners, indicators and treatments.

FMEA: Structured method for analysing failure modes, effects, causes and controls.

Scenario analysis: Examination of plausible future disruption situations and consequences.

Business Impact Assessment: Analysis of how disruption affects critical processes and stakeholders.

MTPD: Maximum tolerable period before disruption consequences become unacceptable.

RTO: Target time for restoring a process or service.

RPO: Maximum tolerable loss of data measured in time.

Dual sourcing: Use of two qualified suppliers for a requirement.

Sub-tier supplier: Supplier that provides inputs to a direct supplier.

Concentration risk: Exposure created by dependence on a limited number of sources or nodes.

Counterfeit material: Unauthorised or falsely represented product or component.

Residual risk: Risk remaining after controls and treatments are applied.

Early-warning indicator: Information signalling deterioration before major impact.

Business continuity: Capability to maintain critical operations during disruption.

Recovery: Restoration of acceptable performance after a disruptive event.

Risk appetite: Amount and type of risk an organisation is willing to accept.

Review Questions

5 Short Answer Questions

  1. Distinguish supplier risk from supplier resilience.
  2. Why can two direct suppliers fail to provide genuine diversification?
  3. What information should a supplier risk register contain?
  4. Define MTPD, RTO and RPO.
  5. Why is counterfeit risk particularly serious for safety-critical components?

5 Long Answer Questions

  1. Explain how quality, financial, geopolitical and cybersecurity risks can interact in a supplier crisis.
  2. Critically evaluate the strengths and limitations of FMEA and risk-priority scoring in supplier management.
  3. Discuss the strategic benefits and costs of dual sourcing, including the conditions required for it to be effective.
  4. Explain how a BIA supports supplier continuity and recovery planning.
  5. Design a governance model for managing critical supplier risks across procurement, quality, operations and executive leadership.

3 Analytical / Application Questions

  1. A critical component is supplied by one firm, but that firm and its apparent competitor use the same raw-material sub-tier. Analyse the exposure and recommend a resilience plan.
  2. A supplier reports a ransomware attack while several lots are in transit. Develop an immediate response, containment and recovery sequence that protects product integrity and customer commitments.
  3. Construct a risk register entry for a financially distressed supplier of a regulated component. Specify the event, causes, consequences, controls, indicators, treatment and residual-risk decision.

Multiple Choice Questions with Answers

Question 1

Which statement best distinguishes resilience from continuity?

A. Resilience concerns only product inspection, whereas continuity concerns only procurement.

B. Resilience concerns absorbing, adapting to and recovering from disruption, whereas continuity focuses on maintaining critical operations.

C. Resilience is a financial measure, whereas continuity is a cybersecurity measure.

D. Resilience eliminates all risks, whereas continuity transfers all risks to suppliers.

Correct Answer: B. Resilience concerns absorbing, adapting to and recovering from disruption, whereas continuity focuses on maintaining critical operations.

Question 2

In the concentration index H = ∑ si², what does si represent?

A. Supplier lead time in days

B. Supplier defect rate

C. Supplier share of the relevant category

D. Supplier audit score

Correct Answer: C. Supplier share of the relevant category

Question 3

What is a major limitation of multiplying ordinal risk ratings to form an RPN?

A. It cannot rank any failure modes.

B. It always produces a probability of financial loss.

C. It may hide a high-severity, low-frequency risk and imply unjustified precision.

D. It can only be used for cybersecurity risks.

Correct Answer: C. It may hide a high-severity, low-frequency risk and imply unjustified precision.

Question 4

Which activity most directly tests whether dual sourcing is genuine?

A. Comparing the two suppliers’ logos

B. Checking whether both suppliers share a critical sub-tier source

C. Selecting the supplier with the lowest quoted price

D. Increasing the number of purchase orders issued to one supplier

Correct Answer: B. Checking whether both suppliers share a critical sub-tier source

Question 5

The maximum tolerable period of disruption is best defined as:

A. The time needed to complete a supplier audit

B. The longest period before disruption consequences become unacceptable

C. The average supplier payment period

D. The time between two quality inspections

Correct Answer: B. The longest period before disruption consequences become unacceptable

Question 6

Which is the most appropriate first priority during a serious supplier crisis involving a regulated product?

A. Release all available material immediately

B. Protect people and contain potentially unsafe or nonconforming product

C. Terminate the supplier before verifying facts

D. Publish an unverified public explanation

Correct Answer: B. Protect people and contain potentially unsafe or nonconforming product

Question 7

Why is supplier cybersecurity risk a supply-quality concern?

A. Cyber incidents can compromise production, traceability, data and product integrity.

B. Cybersecurity affects only the supplier’s marketing activities.

C. Cybersecurity eliminates the need for process validation.

D. Cyber incidents cannot affect physical operations.

Correct Answer: A. Cyber incidents can compromise production, traceability, data and product integrity.

Question 8

Which approach is most suitable for evaluating a proposed emergency substitute for a regulated component?

A. Use it immediately if its price is lower.

B. Accept the supplier’s verbal assurance without records.

C. Complete engineering, quality and regulatory evaluation before controlled use.

D. Inspect only the packaging and ignore functional performance.

Correct Answer: C. Complete engineering, quality and regulatory evaluation before controlled use.

Question 9

What is the principal purpose of a Business Impact Assessment?

A. To determine which processes are critical and how quickly they must be restored

B. To replace all supplier audits with financial analysis

C. To calculate the exact probability of every future crisis

D. To select the supplier offering the largest discount

Correct Answer: A. To determine which processes are critical and how quickly they must be restored

Question 10

Which practice best supports ethical supplier risk governance?

A. Penalising suppliers whenever they report a problem

B. Transferring unacceptable safety risks to weaker suppliers

C. Using evidence-based controls while respecting privacy, labour rights and due process

D. Ignoring legal requirements during emergencies

Correct Answer: C. Using evidence-based controls while respecting privacy, labour rights and due process