Strategic sourcing is not merely the acquisition of goods and services at the lowest apparent cost. It is the design and governance of supply arrangements that can continue to create value when assumptions fail. A supplier may be commercially attractive yet expose the buying firm to disruption through geographic concentration, cyber vulnerability, financial distress, inadequate quality systems, climate exposure, sanctions, or dependence on a single transport route.

Supply risk is therefore multidimensional. It concerns the probability that an event will impair supply and the severity of its consequences. Resilience is the capability of a supply network to anticipate, absorb, adapt to, and recover from disruption while maintaining an acceptable level of performance. Continuity management converts this capability into documented priorities, response procedures, recovery targets, responsibilities, and tested alternatives.

For procurement professionals, the central challenge is not to eliminate every risk. Total elimination is usually impossible and may be uneconomic. The challenge is to identify material exposures, quantify them sufficiently for decision-making, select proportionate treatments, and monitor changing conditions.

Learning Objectives

By the end of this chapter, the learner should be able to:

  1. Distinguish supply risk, vulnerability, disruption, resilience, and continuity.
  2. Identify operational, financial, quality, cyber, geopolitical, climate, logistics, and concentration risks.
  3. Apply risk matrices, failure mode and effects analysis (FMEA), scenario analysis, and stress testing.
  4. Quantify expected loss, supplier concentration, recovery requirements, and resilience performance.
  5. Evaluate dual sourcing, buffers, postponement, substitution, visibility, and contractual protections.
  6. Design and govern a supplier continuity and resilience programme.
  7. Critically assess the costs, limitations, ethical implications, and unintended consequences of resilience investments.

1. The Nature of Supply Risk

Risk may be represented conceptually as the interaction of likelihood and consequence. A simple expected-loss model is:

EL = ∑ᵢ pᵢ Cᵢ

where EL is expected loss per planning period, pᵢ is the probability of event i, and Cᵢ is its monetary consequence. The events should be mutually exclusive or otherwise modelled so that overlapping probabilities are not double-counted. Expected loss is useful for prioritisation, but it does not describe the range or timing of outcomes. A low-probability catastrophe may deserve attention even when its expected value is modest.

A practical risk statement specifies:

  • the hazard or initiating event;
  • the exposed object, process, or node;
  • the vulnerability that permits impact;
  • the consequence pathway;
  • existing controls;
  • the owner and monitoring indicator.

For example, “a flood may interrupt the sole resin supplier” is less actionable than “a flood affecting the supplier’s only plant may stop resin deliveries for up to eight weeks; exposure is reduced by regional inventory and an approved alternate formulation.”

Major risk categories

Risk categoryTypical sourcesPotential consequences
OperationalEquipment failure, labour shortage, poor maintenanceCapacity loss, missed deliveries
FinancialInsolvency, liquidity stress, commodity-price shocksSupplier failure, price escalation
QualityProcess drift, counterfeit inputs, weak traceabilityRecalls, scrap, customer harm
Cyber and informationRansomware, compromised credentials, data leakageProduction stoppage, intellectual-property loss
Geopolitical and regulatorySanctions, tariffs, export controls, conflictBlocked supply, legal penalties
Climate and environmentalFlood, drought, wildfire, heat, water scarcityFacility closure, raw-material shortage
LogisticsPort closure, carrier failure, route congestionTransit delay, premium freight
ConcentrationSingle supplier, country, site, technology, or routeCorrelated disruption and weak bargaining flexibility

Risk is often systemic rather than isolated. Several suppliers may depend on the same sub-tier processor, port, cloud provider, mine, or energy grid. A supplier-by-supplier assessment can therefore underestimate common-cause exposure.

2. Vulnerability, Resilience and Continuity

Vulnerability is the susceptibility of a supply system to harm. It is influenced by exposure, sensitivity, and lack of adaptive capacity. Supply disruption is an event or condition that prevents supply from meeting defined requirements. Resilience is a capability, not simply a stockpile: it includes anticipation, absorption, adaptation, recovery, and learning. Business continuity is the organised ability to maintain or restore critical activities within agreed limits after disruption.

These concepts should not be confused with redundancy. Redundancy is one resilience mechanism—such as an additional supplier, site, machine, route, or inventory position—but redundancy without qualification, contracts, technical approval, or logistics capability may provide only apparent resilience.

A useful performance profile distinguishes three phases:

  1. Pre-disruption: prevention, detection, preparation, qualification, and investment.
  2. During disruption: containment, prioritisation, allocation, communication, and controlled substitution.
  3. Post-disruption: recovery, root-cause analysis, learning, and redesign.

A supply network can be efficient in normal conditions but fragile under stress. Conversely, excessive buffers and redundant capacity may create cost, obsolescence, and environmental impacts. Strategic design therefore seeks an economically and ethically defensible balance between efficiency and robustness.

3. Risk Identification and Mapping

Risk identification should combine internal data, supplier evidence, external intelligence, and cross-functional expertise. Relevant sources include purchase orders, quality records, logistics events, supplier financial statements, cyber assessments, insurance information, geopolitical alerts, weather and climate projections, and interviews with engineering and operations personnel.

A supply-risk map should operate at several levels:

  • Material level: which components or services are critical?
  • Supplier level: which firms, sites, and sub-tier suppliers are involved?
  • Process level: which operations cannot be bypassed or rapidly restored?
  • Geographic level: where are facilities, ports, utilities, and labour pools located?
  • Network level: where are common dependencies and bottlenecks?

Criticality is not identical to spend. A low-value seal, software licence, or regulatory component may stop a high-value production line. Criticality should consider safety, revenue, customer commitments, regulatory obligations, substitutability, recovery time, and the availability of technical alternatives.

Risk matrix

A risk matrix ranks likelihood and impact using defined scales. For example, a score may be calculated as:

R = L × I

where L is the ordinal likelihood score and I is the ordinal impact score. The result is a prioritisation index, not a probability of loss. The scales must be defined consistently; a score of 12 has no inherent meaning across organisations unless the scoring criteria are comparable.

Impact should be assessed across multiple dimensions—financial, safety, customer, legal, environmental, and reputational—rather than reduced automatically to purchase price. A matrix is useful for screening but should be supplemented by scenario analysis for high-consequence or correlated risks.

FMEA

Failure Mode and Effects Analysis examines how a process, product, or supply arrangement can fail. For each failure mode, the team documents its effects, causes, existing controls, and proposed actions. Traditional FMEA uses three ordinal ratings: severity (S), occurrence (O), and detection (D). The risk priority number is:

RPN = S × O × D

Each rating is normally assigned on a 1–10 scale, with higher values representing greater severity, occurrence, or difficulty of detection. RPN is a prioritisation aid, not a statistical risk measure. Multiplication can conceal important differences—for example, a catastrophic but infrequent failure may receive the same RPN as a moderate and frequent failure. High-severity failures should therefore receive explicit review regardless of RPN.

Illustrative example. A single-source electronic controller has ratings S = 9, O = 4, and D = 7. Its RPN is 9 × 4 × 7 = 252. An action might be an approved alternate design, a supplier process audit, and a controlled emergency stock. After implementation, ratings are reassessed rather than assumed to improve automatically.

4. Quantitative Assessment of Exposure

Expected loss and scenario ranges

Suppose a disruption has a 10% annual probability and would cause a direct contribution-margin loss of $600,000 plus $100,000 of recovery cost. Its expected annual loss is:

EL = 0.10 × ($600,000 + $100,000) = $70,000

This estimate excludes indirect effects unless they can be defensibly measured. It also assumes the probability and consequences are appropriate for the same annual horizon and that the event is not already represented elsewhere in the model.

Scenario analysis is more appropriate when probabilities are uncertain. A firm may model mild, severe, and extreme cases, specifying duration, affected nodes, demand, available capacity, transport conditions, and management actions. Stress testing asks whether the network remains within risk appetite under deliberately adverse but plausible assumptions. Reverse stress testing starts with a failure threshold—for example, “what combination of site loss and demand increase would exhaust all recovery options?”

Concentration risk

Supplier spend concentration can be summarised using the Herfindahl–Hirschman Index (HHI):

HHI = ∑ᵢ sᵢ²

where sᵢ is supplier i’s share of relevant spend expressed as a proportion between 0 and 1. If three suppliers have shares 0.50, 0.30, and 0.20, then HHI = 0.50² + 0.30² + 0.20² = 0.38. A larger value indicates greater concentration. HHI should be calculated for the relevant category, component, geography, or capacity—not only for total corporate spend. It also fails to reveal shared sub-tier dependencies unless the data is extended beyond the immediate supplier.

Inventory and time-to-recover

For a critical item, the required protection depends on demand during the period before supply is restored. A simplified cycle-stock or emergency-stock estimate is:

B = d × T

where B is required units, d is average demand per unit of time, and T is the protection period in the same time unit. This is a deterministic approximation and does not include demand variability, lead-time variability, service-level targets, spoilage, or inventory already available.

If demand and lead time are uncertain, safety stock may be estimated under a specified service-level model. For independent demand and lead-time variation, one commonly used approximation is:

SS = z × √(L̄σd² + d̄²σL²)

where SS is safety stock in units, z is the standard-normal service factor, L̄ is mean lead time, σd is standard deviation of demand per time unit, d̄ is mean demand per time unit, and σL is standard deviation of lead time. The formula assumes suitable measurement periods, approximately independent demand and lead-time variation, and a normal approximation. Correlation, non-normal demand, intermittent demand, review policies, and a finite disruption horizon require more appropriate modelling.

5. Resilience Strategies

Supplier and capacity strategies

Dual or multiple sourcing reduces dependence on one source, but it is effective only when alternate suppliers are qualified, contractually available, technically compatible, and able to scale. Splitting volume can also reduce learning economies and supplier commitment. A common approach is a qualified primary supplier plus a smaller, actively maintained secondary source.

Capacity reservation or flexible contracts may be preferable where a second supplier is too costly. Contracts should define allocation during shortages, lead-time commitments, force-majeure boundaries, audit rights, data-sharing duties, change notification, recovery support, and termination or step-in rights.

Postponement and modular design delay final configuration until demand and supply conditions are clearer. Standardisation and substitution reduce dependence on unique parts, but require engineering validation, regulatory approval, and change-control discipline.

Inventory and network strategies

Buffers can be held as raw materials, components, finished goods, tooling, or critical spares. The correct location depends on lead time, value density, shelf life, product customisation, and the point at which differentiation occurs. Regional or multi-echelon inventory can protect against local disruption but may not help when the common upstream source is unavailable.

Network diversification should address correlated exposure. Moving two suppliers to different countries does not necessarily diversify risk if both depend on one port, semiconductor foundry, raw-material mine, or trade corridor. Mapping must therefore include sites, routes, utilities, technology, ownership, and sub-tier relationships.

Information and collaboration strategies

Early-warning systems monitor indicators such as deteriorating liquidity, late confirmations, defect trends, capacity utilisation, cyber incidents, sanctions, severe weather, port congestion, and unusual changes in order behaviour. Data should trigger defined actions, not merely produce dashboards.

Supplier collaboration may include joint business continuity exercises, shared forecasts, engineering support, emergency logistics, and coordinated recovery plans. However, information sharing must respect competition law, confidentiality, privacy, and cybersecurity requirements.

6. Continuity Planning and Governance

A continuity plan should begin with a business impact analysis. The analysis identifies critical products and processes, minimum acceptable service, dependencies, maximum tolerable period of disruption (MTPD), recovery time objective (RTO), and recovery point objective (RPO) where information systems are involved.

  • MTPD: longest period an activity can be unavailable before unacceptable harm occurs.
  • RTO: targeted time to restore a process or service after disruption.
  • RPO: maximum acceptable loss of data measured in time.

The plan should assign an accountable owner and specify escalation thresholds. A typical structure includes detection, assessment, incident command, supplier and customer communication, allocation of scarce supply, technical substitution, logistics prioritisation, recovery, and post-event review.

Continuity plans should be exercised. Tabletop exercises test decisions and communication; simulations test operational execution; live or parallel tests provide stronger evidence but may introduce operational risk. Plans that have not been tested should be treated as assumptions rather than capabilities.

Governance requires a risk appetite, approval thresholds, periodic review, internal audit, and board or executive visibility for critical exposures. Procurement should work with operations, quality, engineering, finance, legal, information security, compliance, and sustainability teams. A supplier questionnaire alone is not adequate assurance: evidence, testing, performance data, and independent verification are needed for material risks.

7. Measuring Resilience

Resilience metrics should combine outcomes, capabilities, and trade-offs. Useful measures include:

  • time to detect, respond, recover, and return to target performance;
  • percentage of critical items with qualified alternatives;
  • percentage of critical suppliers with tested continuity plans;
  • days of coverage for critical materials;
  • concentration by supplier, site, country, route, and sub-tier;
  • disruption frequency, duration, and recovery cost;
  • proportion of supplier risks with current owners and treatment plans;
  • customer service and quality performance during recovery.

A simple service-recovery measure is the area under a performance curve. If P(t) is the proportion of normal performance at time t, over a disruption interval from 0 to T, average retained performance is:

P̄ = (1/T) ∫₀ᵀ P(t) dt

The integral is the area under the performance curve and has units of performance × time; division by T returns an average performance proportion. The metric is meaningful only when the performance measure and time interval are clearly defined. Recovery time alone can be misleading: two networks may recover in the same time while one suffers a much deeper initial decline.

Metrics can create perverse incentives. A buyer rewarded only for inventory reduction may remove resilience. A supplier rewarded only for on-time delivery may conceal capacity stress or defer maintenance. Balanced scorecards should therefore include cost, service, quality, safety, sustainability, transparency, and recovery capability.

8. Technology, Cyber Risk and Artificial Intelligence

Digital procurement and supply-chain platforms improve visibility, but connectivity creates attack surfaces. Cyber risk assessment should cover identity and access management, network segmentation, patching, backups, incident response, third-party software, operational technology, and recovery testing. Contractual requirements should specify notification times, minimum controls, audit rights, data location, subcontractor controls, and secure deletion.

Artificial intelligence can assist in anomaly detection, scenario generation, supplier monitoring, and document analysis. Its output should not be treated as established fact. Models may use incomplete, biased, stale, or manipulated data; false alarms can waste scarce investigative capacity, while missed signals can delay intervention. Human accountability, explainability appropriate to the decision, model validation, access control, and documented overrides are essential.

9. Ethical, Legal and Sustainability Considerations

Resilience decisions distribute risk. A buyer may protect its own production by diverting scarce supply from smaller customers, imposing unreasonable inventory burdens on suppliers, or transferring environmental and labour risks to vulnerable regions. Responsible sourcing requires attention to human rights, worker safety, forced labour, community impacts, emissions, water use, and supplier financial viability.

Force-majeure clauses should not be used automatically to avoid reasonable responsibility. Contracts must align with applicable procurement, competition, sanctions, data-protection, environmental, and product-safety law. Supplier monitoring should be proportionate and should protect commercially sensitive information. Emergency procurement may be necessary, but post-event review should test whether urgency was genuine and whether controls were bypassed without justification.

10. Illustrative Case: Resilience in Medical Device Components

Background

A medical-device manufacturer relies on a specialised polymer housing supplied by one plant. Annual demand is 120,000 units, or approximately 10,000 per month. The component is low in purchase cost but requires regulatory approval and six months to qualify from a new source. The supplier is located in a region exposed to flooding, and its moulding equipment is highly specialised.

Problem

A risk review identifies four exposures: single-site concentration, long qualification time, flood vulnerability, and limited visibility of the supplier’s resin sub-tier. A risk matrix rates the consequence as very high and likelihood as medium. FMEA produces a high RPN, but the team recognises that the numerical score alone does not capture the regulatory consequence of a prolonged shortage.

Analysis

A scenario assumes that flooding stops production for eight weeks. Demand during the disruption is:

B = 10,000 units/month × 2 months = 20,000 units

The firm has 6,000 units of available stock, so the unprotected shortfall is 14,000 units before considering emergency production or demand management. A temporary inventory policy cannot solve the longer-term qualification problem; it only buys time.

Approach

The cross-functional team adopts four measures:

  1. qualify a second moulder and an alternative resin formulation;
  2. hold a controlled buffer of 15,000 units at a regional location;
  3. require flood-response evidence, sub-tier mapping, and quarterly capacity confirmation;
  4. establish a continuity playbook prioritising life-support product lines and defining regulatory escalation.

The secondary supplier receives a standing minimum order and participates in an annual production trial. The contract provides access to tooling, change notification, emergency allocation, and recovery information. Inventory is reviewed for shelf life and regulatory traceability rather than treated as an unlimited solution.

Outcome

The manufacturer increases resilience at additional cost but avoids dependence on an untested emergency supplier. Its residual risk is not zero: the two moulders still depend on the same resin market, and regulatory approval limits rapid substitution. The risk register therefore retains the exposure and identifies resin diversification as a subsequent action.

Learning points

The case demonstrates that resilience is layered. Inventory, alternative capacity, technical qualification, sub-tier visibility, contractual rights, and prioritisation reinforce one another. It also illustrates why low spend does not imply low criticality and why a continuity plan must integrate procurement, engineering, quality, regulatory affairs, and operations.

Challenges and Limitations

Risk models are affected by sparse data, subjective scoring, changing dependencies, probability ambiguity, and unknown unknowns. Historical stability may provide little guidance about climate extremes, geopolitical realignment, or novel cyberattacks. Supplier self-assessments may be optimistic, while excessive auditing can burden smaller suppliers without materially improving control.

Diversification can increase cost, emissions, qualification workload, and quality variation. Large inventories can become obsolete and may conceal poor root-cause management. Nearshoring can reduce transport exposure but may increase dependence on a smaller local supplier base. Resilience is thus a portfolio decision under uncertainty, not a universal prescription.

The most effective programmes use multiple methods: quantitative analysis where data is credible, structured expert judgement where it is not, scenario testing for extreme events, and continuous learning from near misses. Assumptions should be documented, challenged, and revisited.

Best-Practice Design Principles

  1. Assess criticality by consequence and substitutability, not spend alone.
  2. Map common dependencies beyond tier-one suppliers.
  3. Separate inherent risk from residual risk after controls.
  4. Use risk matrices for screening, not as a substitute for analysis.
  5. Treat high-severity failures explicitly in FMEA.
  6. Combine redundancy, flexibility, buffers, visibility, and recovery capability.
  7. Qualify and periodically exercise alternatives; do not merely list them.
  8. Align contracts, technical approvals, inventory, and logistics with the continuity design.
  9. Define measurable recovery objectives and test them.
  10. Govern resilience jointly across procurement, operations, quality, finance, legal, security, and sustainability.
  11. Use technology as decision support with human accountability.
  12. Review risks after disruptions, near misses, acquisitions, supplier changes, and major environmental or geopolitical developments.

Chapter Summary

Supply risk is multidimensional and arises from hazards, exposure, vulnerability, and consequences across the supply network. Effective management identifies operational, financial, quality, cyber, geopolitical, climate, logistics, and concentration risks, including common dependencies below tier one. Risk matrices and FMEA support structured prioritisation, while expected loss, concentration indices, scenario analysis, and stress testing provide deeper quantitative insight.

Resilience is the capacity to anticipate, absorb, adapt, recover, and learn. Its mechanisms include qualified dual sourcing, capacity reservation, modular design, substitution, strategic buffers, network diversification, visibility, collaboration, cybersecurity, and tested continuity plans. These mechanisms involve costs and trade-offs; none is universally optimal. Continuity requires business-impact analysis, recovery objectives, responsibilities, escalation procedures, and exercises. Measurement should include disruption outcomes, capability indicators, recovery curves, and unintended incentives. Finally, resilience must be governed ethically, legally, and sustainably, with accountability shared across the enterprise and its supply partners.

Key Terms

Supply risk: The possibility that a supply condition or event will impair required performance.

Vulnerability: Susceptibility of a supply system to disruption or harm.

Disruption: An event or condition that prevents supply from meeting defined requirements.

Resilience: Capability to anticipate, absorb, adapt to, recover from, and learn from disruption.

Business continuity: Organised capability to maintain or restore critical activities.

Expected loss: Probability-weighted consequence of one or more events.

Risk matrix: Structured comparison of likelihood and impact categories.

FMEA: Method for analysing failure modes, effects, causes, and controls.

RPN: Product of severity, occurrence, and detection ratings in traditional FMEA.

Concentration risk: Exposure created by dependence on a limited number of sources or shared dependencies.

HHI: Sum of squared supplier shares used as a concentration indicator.

Common-cause failure: A single cause that affects multiple apparently separate sources.

Dual sourcing: Use of two qualified sources for a requirement.

Safety stock: Inventory held to protect against uncertainty in demand or replenishment.

MTPD: Maximum tolerable period of disruption.

RTO: Target time to restore a process or service.

RPO: Maximum acceptable time-based loss of data.

Stress testing: Evaluation of performance under severe but plausible conditions.

Time to recover: Time required to restore specified performance after disruption.

Sub-tier supplier: A supplier serving another supplier rather than the buying organisation directly.

Review Questions

Short Answer Questions

  1. Distinguish supply risk, vulnerability, resilience, and business continuity.
  2. Why can a low-spend item be highly critical to operations?
  3. What are the limitations of using RPN as the sole FMEA prioritisation method?
  4. Define MTPD, RTO, and RPO.
  5. Why may two geographically different suppliers still represent a common risk?

Long Answer Questions

  1. Explain how a procurement function can combine risk matrices, FMEA, scenario analysis, and stress testing in one governance process.
  2. Evaluate the advantages and limitations of dual sourcing, inventory buffers, and postponement as resilience strategies.
  3. Design a continuity-management framework for a strategically important category.
  4. Discuss how cyber, climate, geopolitical, and logistics risks can interact in a supply network.
  5. Critically assess the ethical and sustainability trade-offs involved in resilience investment.

Analytical / Application Questions

  1. A critical component has average demand of 8,000 units per month and an expected disruption duration of 1.5 months. Existing stock is 5,000 units. Estimate the deterministic shortfall during the disruption and recommend two additional controls. State the assumptions behind your calculation.
  2. Three suppliers hold category shares of 0.60, 0.25, and 0.15. Calculate the HHI and interpret the result. What additional information would you need before concluding that the category is resilient?
  3. Construct a scenario for the simultaneous loss of a supplier site and its main transport route. Specify the impact measures, early-warning indicators, recovery objectives, and actions that should be tested in an exercise.

Multiple Choice Questions with Answers

Question 1

Which statement best distinguishes resilience from redundancy?

A. Resilience is limited to holding extra inventory.

B. Redundancy is one possible mechanism within broader resilience capability.

C. Resilience eliminates all uncertainty from supply networks.

D. Redundancy concerns only financial risk.

Correct Answer: B. Redundancy is one possible mechanism within broader resilience capability.

Question 2

A risk matrix score calculated as likelihood multiplied by impact is best interpreted as:

A. A precise probability of financial loss.

B. A legally binding risk measurement.

C. A prioritisation index based on defined ordinal scales.

D. A replacement for scenario analysis.

Correct Answer: C. A prioritisation index based on defined ordinal scales.

Question 3

In traditional FMEA, RPN is calculated as:

A. Severity + occurrence + detection.

B. Severity × occurrence × detection.

C. Likelihood ÷ consequence.

D. Impact − occurrence.

Correct Answer: B. Severity × occurrence × detection.

Question 4

If disruption probability is 0.10 and total consequence is $700,000, what is the expected loss?

A. $7,000

B. $70,000

C. $630,000

D. $700,000

Correct Answer: B. $70,000

Question 5

For supplier shares of 0.50, 0.30, and 0.20, the HHI is:

A. 0.20

B. 0.30

C. 0.38

D. 1.00

Correct Answer: C. 0.38

Question 6

Which condition most directly limits the effectiveness of dual sourcing?

A. Both suppliers are technically qualified and independently capable.

B. The alternate supplier is qualified, contracted, and regularly tested.

C. Both suppliers depend on the same critical sub-tier processor.

D. Demand is monitored and capacity is reviewed.

Correct Answer: C. Both suppliers depend on the same critical sub-tier processor.

Question 7

The maximum tolerable period of disruption refers to:

A. The time required to issue a purchase order.

B. The longest period an activity can be unavailable before unacceptable harm occurs.

C. The standard supplier payment period.

D. The time between two supplier audits.

Correct Answer: B. The longest period an activity can be unavailable before unacceptable harm occurs.

Question 8

Which measure captures average retained performance over a disruption interval?

A. Supplier spend share only.

B. Area under the performance curve divided by the interval length.

C. Number of suppliers multiplied by inventory value.

D. Maximum lead time divided by purchase price.

Correct Answer: B. Area under the performance curve divided by the interval length.

Question 9

Why should high-severity FMEA failures receive explicit review even when their RPN is moderate?

A. RPN is always a monetary measure.

B. Multiplication of ordinal scores can conceal catastrophic consequences.

C. Severity is excluded from the RPN.

D. Occurrence is never relevant to FMEA.

Correct Answer: B. Multiplication of ordinal scores can conceal catastrophic consequences.

Question 10

Which is an appropriate governance practice for AI-based supplier-risk monitoring?

A. Allow the model to make unreviewed supplier termination decisions.

B. Ignore data quality because algorithms remove bias.

C. Use validation, human accountability, access controls, and documented overrides.

D. Use only historical data and prohibit scenario analysis.

Correct Answer: C. Use validation, human accountability, access controls, and documented overrides.