Strategic Cost & Financial Accounting

Chapter 12
Strategic Cost Management and Value-Chain Analysis

Post Graduate Programme in Materials Management
Strategic Cost & Financial Accounting   •   Post Graduate

Strategic Cost Management and Value-Chain Analysis

Introduction

Strategic cost management (SCM) is the deliberate use of cost information to support an organisation’s competitive strategy. It differs from conventional cost control, which often concentrates on reducing current-period expenditure. SCM asks a broader question: How should the organisation design, operate and govern its value-creating activities so that cost, quality, speed, innovation, resilience and sustainability reinforce competitive advantage?

For a materials-management professional, this question extends beyond the purchase price of a material. It includes supplier development, logistics, inventory, quality failures, working capital, production interruptions, customer service, environmental effects and end-of-life obligations. A low purchase price may therefore create a higher total cost if it increases defects, delays or disposal costs.

This chapter integrates value-chain analysis, target costing, kaizen costing, lifecycle costing, quality costing, benchmarking, the balanced scorecard and lean accounting. These tools are most effective when used as a coherent management system rather than as isolated techniques.

Learning Objectives

After studying this chapter, the learner should be able to:

  1. Explain strategic cost management and distinguish it from short-term cost reduction.
  2. Analyse an organisation’s internal and external value chain.
  3. Apply target costing, kaizen costing and lifecycle costing to strategic decisions.
  4. Classify and interpret quality costs and connect them with process improvement.
  5. Use benchmarking and the balanced scorecard to evaluate strategic performance.
  6. Explain lean accounting and its relationship with materials flow and customer value.
  7. Evaluate trade-offs among cost, quality, resilience, sustainability and customer value.
  8. Design an integrated strategic cost-management system with appropriate governance.

1. Strategic Cost Management: Scope and Logic

SCM combines three dimensions:

  • Cost-driver analysis: identifying the operational, structural and executional factors that cause cost.
  • Strategic positioning: determining whether the organisation competes through low cost, differentiation, responsiveness, innovation, sustainability or a combination of these.
  • Value-chain analysis: examining activities from suppliers’ suppliers through the customer’s customer and, where relevant, product disposal or recovery.

A strategic cost is not necessarily a cost that should be minimised. Expenditure on advanced materials, supplier collaboration, cybersecurity or preventive maintenance may increase immediate cost but reduce lifecycle cost and protect long-term value. The relevant criterion is the relationship between resources consumed and strategic outcomes.

A useful decision model is:

Strategic value = Customer benefits + Risk reduction + Future capability − Total lifecycle cost

The expression is conceptual rather than a universal accounting identity. Its terms must be defined using appropriate financial and non-financial measures; benefits and costs should be compared over a consistent time horizon. Where cash flows occur at different times, discounted cash-flow methods may be required:

NPV = ∑[t=0 to n] CFt ÷ (1 + r)t

Here, CFt is the net cash flow in period t, r is the relevant discount rate per period, and n is the number of periods. The formula assumes that cash flows can be estimated and that the discount rate reflects timing and risk. It is not a substitute for strategic or social evaluation.

Cost drivers

Cost drivers may be classified as follows:

CategoryExamplesStrategic significance
StructuralScale, technology, product complexity, vertical integrationShape the economics of the business over the long term
ExecutionalWorkforce capability, supplier coordination, quality systems, capacity utilisationDetermine how effectively the chosen structure is operated
TransactionalNumber of purchase orders, setups, inspections, deliveriesReveal activity-related administrative and process costs
ExternalCommodity prices, regulation, exchange rates, disruptionRequire scenario planning and risk management

Managers should avoid treating volume as the only cost driver. Product variety, engineering changes, expedited freight and supplier quality can be more influential than units produced.

2. Value-Chain Analysis

Value-chain analysis decomposes an organisation into activities that create, deliver and sustain customer value. Porter’s model distinguishes primary activities— inbound logistics, operations, outbound logistics, marketing and sales, and service—from support activities such as procurement, technology development, human-resource management and infrastructure. In strategic cost management, the model is extended beyond organisational boundaries.

Internal and external value chains

The internal value chain identifies activities within the organisation and examines their cost, capability and contribution to customer value. The industry value chain includes suppliers, logistics providers, distributors, customers, recyclers and other participants. The extended view is essential in materials management because procurement decisions often transfer costs rather than eliminate them.

For example, buying a cheaper component may increase incoming inspection, production stoppages, warranty claims and customer dissatisfaction. Conversely, a supplier with a higher unit price may provide stable quality, shorter lead times, design support and recyclable packaging.

A method for conducting value-chain analysis

  1. Define the customer segment, product or service and strategic promise.
  2. Map material, information, cash and reverse flows across the chain.
  3. Identify activities, resources, outputs, responsible parties and performance measures.
  4. Assign costs using causal drivers rather than arbitrary averages where practical.
  5. Assess each activity for customer value, business necessity, risk and waste.
  6. Identify linkages among activities; a local saving may damage a downstream activity.
  7. Develop alternatives and test them against cost, quality, responsiveness, resilience and sustainability.
  8. Establish ownership, data controls and review mechanisms.

A value-adding activity changes the product or service in a way the customer values and is performed correctly the first time. A necessary but non-value-adding activity may be required by regulation or current process design. Pure waste consumes resources without contributing to customer or organisational objectives. This classification should be used carefully: inspection, for example, may be necessary, but a mature process should progressively prevent defects rather than rely on detection.

Linkage analysis

Strategic advantage frequently arises from linkages. Examples include:

  • supplier design collaboration reducing material usage and assembly time;
  • electronic purchasing reducing order-processing cost and errors;
  • standardised packaging reducing transport damage and warehouse handling;
  • preventive maintenance improving delivery reliability;
  • product modularity reducing both inventory variety and end-of-life disposal complexity.

The manager must therefore optimise the chain, not merely the department. Transfer prices, departmental budgets and purchase-price variance can obscure this objective.

3. Target Costing

Target costing is a market-oriented method used primarily during product and process design. It begins with the price customers are willing to pay and the profit required by the organisation. The allowable cost is then derived rather than estimated solely from an existing cost structure.

Target cost = Target selling price − Target profit

The formula assumes that the target selling price is realistic for the defined market and that target profit is specified on a consistent basis. If profit is a percentage of selling price, then:

Target cost = Target selling price × (1 − Profit margin percentage)

If profit is a return on cost, the calculation differs; therefore, the basis of the margin must always be stated.

Worked example: target costing

A manufacturer estimates that a new industrial pump can be sold competitively for ₹50,000. Management requires a profit margin of 20% of selling price.

Target profit = ₹50,000 × 0.20 = ₹10,000.

Target cost = ₹50,000 − ₹10,000 = ₹40,000.

The design team’s initial estimated lifecycle manufacturing cost is ₹44,000. The cost gap is:

Cost gap = Current estimated cost − Target cost

Cost gap = ₹44,000 − ₹40,000 = ₹4,000.

The gap is not automatically closed by reducing material quality. Cross-functional teams may redesign components, reduce process steps, negotiate with suppliers, improve yield or remove features that customers do not value.

Value engineering and customer value

Target costing is commonly supported by value engineering. A feature’s importance is compared with its relative cost contribution. A simple indicative index is:

Value index = Relative customer importance ÷ Relative cost contribution

The index is diagnostic, not a precise measure of economic value. A high index may indicate under-resourcing of an important feature, while a low index may suggest redesign or elimination. Customer research, engineering judgment and safety requirements remain essential.

Target costing has greatest influence before production begins, when design decisions determine a large proportion of future cost. Its limitations include uncertain market prices, unreliable customer preferences, pressure to reduce supplier margins and the danger of sacrificing durability or ethical standards.

4. Kaizen Costing

Kaizen costing is continuous, incremental cost improvement during production. Whereas target costing establishes an allowable cost before manufacture, kaizen costing seeks controlled reductions in actual cost while maintaining or improving quality, safety and delivery performance.

Typical kaizen activities include reducing setup time, improving material yield, eliminating motion, simplifying replenishment, preventing defects, reducing changeover losses and improving supplier scheduling. The method depends on employee participation and repeated measurement.

A kaizen target may be expressed as:

Required cost reduction = Baseline cost − Kaizen target cost

For example, if the baseline conversion cost per unit is ₹1,200 and the approved kaizen target is ₹1,140, the required reduction is ₹60 per unit, or 5%. The percentage is:

Reduction percentage = (Baseline cost − Target cost) ÷ Baseline cost × 100

This calculation assumes that the cost bases are comparable and that output volume, product mix and accounting treatment have been controlled. A lower reported cost caused only by reduced production volume or reclassification is not genuine kaizen.

Target costing and kaizen costing are complementary:

FeatureTarget costingKaizen costing
Main phaseDesign and developmentProduction and operation
Starting pointMarket price and required profitCurrent process cost
Main questionWhat must the product cost?How can the process cost less tomorrow?
Typical methodsValue engineering, design collaborationContinuous improvement, standard work, waste elimination
Main riskOver-design or unrealistic targetIncrementalism or excessive pressure on employees

5. Lifecycle Costing

Lifecycle costing evaluates costs across the complete life of a product, asset or service. Relevant stages may include research, design, procurement, production, distribution, operation, maintenance, warranty, recycling and disposal.

A basic undiscounted lifecycle cost is:

LCC = Cdesign + Cacquisition + Cproduction + Cdistribution + Coperation + Cmaintenance + Cend-of-life

Each C represents the cost incurred in the relevant stage. The formula is suitable for a simple total-cost comparison when timing and risk differences are immaterial. For long-lived assets, discounted lifecycle cost is more appropriate:

LCCPV = C0 + ∑[t=1 to n] (Ct ÷ (1 + r)t) − (Sn ÷ (1 + r)n)

C0 is the initial cost, Ct is the cost in period t, r is the discount rate, n is the evaluation horizon and Sn is the residual or salvage value at the end. Costs should be measured consistently, and assumptions about inflation, maintenance, energy prices and asset life should be documented.

Materials-management application

Suppose Machine A costs ₹8,000,000 and Machine B costs ₹8,700,000. Over five years, the estimated undiscounted operating and maintenance costs are ₹4,000,000 for A and ₹2,600,000 for B. Disposal costs are ₹200,000 for A and ₹100,000 for B. The undiscounted totals are:

  • A: ₹8,000,000 + ₹4,000,000 + ₹200,000 = ₹12,200,000.
  • B: ₹8,700,000 + ₹2,600,000 + ₹100,000 = ₹11,400,000.

Although B has the higher acquisition price, it has the lower estimated lifecycle cost by ₹800,000. A decision should also examine capacity, reliability, emissions, operator capability, supplier support and uncertainty. Lifecycle costing prevents the purchase department from optimising only the invoice price.

6. Quality Costing

Quality costing makes the economic consequences of quality management visible. The conventional categories are:

  1. Prevention costs: training, process design, supplier development, preventive maintenance and quality planning.
  2. Appraisal costs: inspection, testing, audits and calibration.
  3. Internal failure costs: scrap, rework, retesting, downtime and material loss before shipment.
  4. External failure costs: returns, warranty, complaint handling, recalls, penalties and reputational damage.

The traditional cost-of-quality total is:

COQ = Prevention + Appraisal + Internal failure + External failure

The categories are managerial classifications, not necessarily separate ledger accounts. Some consequences—lost trust, safety harm and environmental damage—are difficult to quantify but should not be ignored.

A mature quality strategy often increases prevention spending while reducing failure costs. The objective is not simply to minimise appraisal spending. A reduction in inspection can be beneficial when process capability is demonstrated, but dangerous when it merely shifts defects to customers.

For materials managers, supplier-quality indicators may include incoming defect rate, corrective-action closure time, first-pass acceptance, line stoppage hours, warranty incidents and cost recovery. Measures should distinguish supplier-caused defects from internal handling or specification problems.

7. Benchmarking

Benchmarking is the systematic comparison of processes or performance with a reference organisation, recognised standard or internal best performer. It is not copying. Differences in product mix, geography, regulation, technology and strategy must be analysed before targets are adopted.

Types include:

  • Internal benchmarking: comparison across plants, warehouses or business units.
  • Competitive benchmarking: comparison with direct competitors, subject to legal and ethical limits.
  • Functional benchmarking: comparison with organisations performing similar activities in different industries.
  • Process benchmarking: detailed comparison of how a process is designed and executed.
  • Best-practice benchmarking: examination of leading methods, even where direct performance data are unavailable.

A basic gap measure is:

Performance gap = Organisation’s performance − Benchmark performance

The direction must be interpreted according to the metric. For cost per order, a positive gap may be unfavourable; for service level, a positive gap may be favourable. Benchmark data must define the numerator, denominator, period, scope and accounting treatment.

Ethical benchmarking requires lawful data collection, confidentiality, non-collusion and avoidance of misleading comparisons. Competitors should not exchange commercially sensitive information in ways that breach competition law.

8. Balanced Scorecard and Strategic Alignment

The balanced scorecard translates strategy into objectives, measures, targets and initiatives. Its traditional perspectives are:

PerspectiveTypical questionsMaterials-management examples
FinancialAre returns and cash flow improving?Total cost, working capital, procurement savings
CustomerIs the organisation delivering promised value?On-time delivery, availability, complaint rate
Internal processWhich processes must excel?Supplier quality, replenishment reliability, order-cycle time
Learning and growthCan the organisation sustain improvement?Skills, digital adoption, improvement suggestions

Contemporary scorecards may add sustainability or stakeholder perspectives. The four perspectives are not rigid categories; their usefulness depends on the strategy and context.

A good scorecard expresses causal logic. For example, training in supplier analytics may improve supplier collaboration; better collaboration may reduce defects and lead time; these improvements may reduce inventory and improve customer delivery; improved service may support revenue and cash generation. The assumed linkages should be tested rather than treated as proven facts.

Measures should meet five requirements: strategic relevance, clear definition, controllability, data reliability and balanced incentives. Excessive reliance on a single measure creates dysfunctional behaviour. A buyer rewarded only for purchase-price variance may buy excess quantities, accept poor quality or select fragile suppliers.

9. Lean Accounting

Lean management seeks to create customer value with fewer resources by eliminating waste and improving flow. Lean accounting adapts measurement, reporting and control to support this operating model. It does not mean ignoring financial control; it means presenting financial information in ways that reflect value streams and operational reality.

Important features include:

  • value-stream reporting rather than excessive departmental cost allocations;
  • visual performance measures available close to the process;
  • simplified and timely transaction processing;
  • inventory reduction and recognition of the financial effects of flow;
  • elimination of measures that encourage overproduction;
  • continued reconciliation to statutory and financial-reporting requirements.

A value stream is the complete sequence of activities required to deliver a product family or service to a customer. Value-stream costing accumulates the people, facilities, support and operating costs associated with that stream. Managers should ensure that shared costs, capacity effects and product-family boundaries are treated consistently.

Lean accounting must address a known tension: reducing inventory can temporarily worsen reported absorption-cost performance because fixed manufacturing overhead is spread over fewer units. If managers are evaluated only on unit cost, they may overproduce. Lean-oriented measures therefore emphasise lead time, first-time-through quality, delivery reliability, inventory turns, cash flow and customer value, while preserving appropriate financial reporting controls.

10. Integrating the Tools into a Strategic System

The tools form a management cycle:

  1. Strategy and customer insight: define the competitive promise and sustainability commitments.
  2. Value-chain analysis: identify activities, linkages, risks and cost drivers.
  3. Target costing: establish allowable cost during design.
  4. Lifecycle costing: evaluate costs and benefits across ownership and end-of-life.
  5. Kaizen costing: improve the operating process continuously.
  6. Quality costing: measure prevention, appraisal and failure consequences.
  7. Benchmarking: compare performance and learn from superior processes.
  8. Balanced scorecard: connect financial and non-financial outcomes.
  9. Lean accounting: provide timely value-stream information and discourage wasteful behaviour.
  10. Governance and learning: review assumptions, verify data and update decisions.

This system should be supported by cross-functional teams involving procurement, engineering, operations, finance, quality, logistics, sales, sustainability and suppliers. Digital systems can connect purchase orders, supplier performance, inventory, production, transport and lifecycle data. Artificial intelligence may help detect cost drivers, forecast demand or identify anomalous supplier transactions, but models require validated data, human oversight, explainability and controls against biased or manipulated inputs.

Illustrative Case: GreenFlow Pumps (Fictional)

Background

GreenFlow Pumps, a fictional industrial-equipment manufacturer, supplies water-treatment plants. It competes on dependable delivery, energy efficiency and low operating cost. Procurement has traditionally rewarded buyers for annual purchase-price reductions.

Problem

A newly sourced motor reduced the purchase price of each pump by ₹1,500. Within six months, field failures increased, emergency shipments rose and customers reported higher energy consumption. The finance team also observed increased warranty provisions. The purchase-price variance appeared favourable, but total value had deteriorated.

Analysis

A cross-functional team mapped the extended value chain. It identified the following effects:

  • lower motor price: saving of ₹1,500 per pump;
  • additional incoming inspection and testing: ₹250;
  • production rework: ₹450;
  • expected warranty and service cost: ₹1,100;
  • emergency logistics and customer compensation: ₹600;
  • energy cost imposed on customers over the expected operating life: ₹2,000.

The organisation’s direct additional cost was ₹2,400 per pump, exceeding the purchase saving by ₹900. Customer lifecycle cost increased by ₹2,000, threatening the firm’s differentiation strategy.

Approach and solution

GreenFlow established a target cost based on the market price and required margin, then formed a supplier-engineering team. The team redesigned the motor interface, introduced supplier process-capability reviews, improved preventive testing and negotiated a longer-term agreement based on total cost and performance. A balanced scorecard replaced the single purchase-price measure. Measures included total landed cost, first-pass acceptance, field failure rate, energy efficiency, delivery reliability and supplier corrective-action performance.

Kaizen teams subsequently reduced test time without reducing assurance, improved material flow and introduced standard work. Lifecycle costing was added to major capital and design decisions. A sustainability review included energy consumption, recyclable materials and end-of-life treatment.

Outcome

After implementation, the original purchase-price saving was partly retained, while rework, emergency freight and failures declined. The supplier received a higher price than the initial low-cost source but delivered lower total lifecycle cost and more stable performance. The case demonstrates that a strategic cost system can convert a narrow price decision into a customer-value and resilience decision.

Learning points

  1. Purchase price is only one cost element.
  2. Value-chain linkages can reverse the apparent benefit of a local saving.
  3. Cost, quality, delivery, sustainability and customer outcomes require a balanced set of measures.
  4. Supplier relationships should be governed by transparent total-cost and performance criteria.
  5. Financial and non-financial data must be integrated, but assumptions must remain visible.

Challenges, Limitations and Governance

Strategic cost systems face several limitations. Cost allocation can create false precision, especially where shared resources support multiple value streams. Lifecycle estimates are sensitive to uncertain demand, inflation, technology change, maintenance behaviour and disposal regulation. Benchmarking may compare unlike processes. Balanced scorecards can become bureaucratic if too many indicators are used. Lean initiatives may fail when workforce participation is superficial or when improvement targets create unsafe work intensity.

Ethical governance is therefore central. Managers should not set quality or inventory targets that encourage unsafe materials, conceal defects, manipulate forecasts or transfer environmental burdens to suppliers and communities. Sustainability claims must be supported by traceable evidence. Supplier evaluations should consider labour standards, environmental compliance, anti-bribery controls, data protection and continuity risk. Cost reductions that depend on forced labour, regulatory evasion or deliberate under-maintenance are not strategic improvements.

A robust system includes clear data ownership, documented definitions, audit trails, segregation of duties, scenario analysis and periodic post-implementation review. Managers should compare forecast and actual lifecycle outcomes, investigate material variances and revise models when assumptions change.

Contemporary Developments and Best Practices

Several developments are reshaping strategic cost management:

  • Total cost of ownership analytics: combines price, logistics, quality, inventory, risk and end-of-life factors.
  • Circular value chains: evaluate reuse, remanufacturing, repair, recycling and reverse logistics.
  • Digital twins and IoT: provide operating and maintenance data for lifecycle decisions.
  • Scope 3 and supply-chain emissions management: extend responsibility beyond organisational boundaries.
  • Resilience costing: quantifies dual sourcing, safety stock, local capacity and disruption exposure.
  • Product-as-a-service models: shift attention from selling units to delivering lifetime performance.
  • Advanced analytics and AI: support forecasting, anomaly detection and scenario modelling, subject to governance.

Best practice is not the adoption of every tool. It is the disciplined selection of methods that fit strategy, product economics, data maturity and organisational capability. Managers should begin with a clearly defined decision, identify the relevant value chain, use causal data, test assumptions and align incentives with long-term customer and stakeholder value.

Chapter Summary

Strategic cost management aligns cost structures with competitive strategy rather than treating cost reduction as an isolated objective. Value-chain analysis extends attention from internal departments to suppliers, customers and end-of-life flows, revealing linkages and cost transfers. Target costing starts with market price and required profit to establish an allowable design cost; kaizen costing improves actual operating cost continuously. Lifecycle costing evaluates acquisition, operation, maintenance and disposal, while quality costing exposes prevention, appraisal and failure consequences.

Benchmarking supports learning when comparisons are valid and ethical. The balanced scorecard connects financial outcomes with customer, internal-process and learning measures. Lean accounting provides timely value-stream information and avoids incentives for overproduction. Together, these approaches support decisions involving materials, suppliers, inventory, quality, resilience and sustainability. Their effectiveness depends on reliable data, cross-functional collaboration, transparent assumptions, ethical governance and measures that reward total customer value rather than narrow departmental performance.

Key Terms

Strategic cost management: Use of cost information to support long-term competitive and strategic decisions.

Value chain: Linked activities through which inputs are transformed and value is delivered to customers.

Cost driver: A factor that causes or influences the cost of an activity.

Target costing: Market-oriented method that derives allowable cost from target price and required profit.

Cost gap: Difference between estimated current cost and target cost.

Value engineering: Systematic redesign to provide required function at lower or more appropriate cost.

Kaizen costing: Continuous, incremental cost improvement during production.

Lifecycle costing: Evaluation of costs across the complete life of a product, asset or service.

Total cost of ownership: Acquisition and subsequent costs associated with owning and using an item.

Quality costing: Measurement and analysis of prevention, appraisal and failure costs.

Prevention cost: Cost incurred to avoid defects or nonconformance.

Failure cost: Cost resulting from defects detected internally or by customers.

Benchmarking: Systematic comparison with a reference organisation, process or standard.

Balanced scorecard: Strategic performance framework linking objectives, measures, targets and initiatives.

Value stream: Complete sequence of activities required to deliver a product family or service.

Lean accounting: Accounting and performance practices designed to support lean value streams and flow.

Resilience costing: Evaluation of the cost and value of capabilities that protect against disruption.

Circular value chain: Value chain incorporating reuse, repair, remanufacture, recycling and reverse flows.

Cost of quality: Total prevention, appraisal and failure costs.

Value engineering: Structured analysis of functions, customer requirements and cost alternatives.

Review Questions

Short Answer Questions

  1. What distinguishes strategic cost management from conventional cost control?
  2. Define target costing and state its basic formula.
  3. What are the four conventional categories of quality cost?
  4. Explain the purpose of lifecycle costing in a procurement decision.
  5. Identify the four traditional perspectives of the balanced scorecard.

Long Answer Questions

  1. Explain how value-chain analysis can reveal cost transfers between a buying organisation and its suppliers or customers.
  2. Compare target costing and kaizen costing, including their timing, methods and limitations.
  3. Discuss the role of lifecycle costing in sustainable materials-management decisions.
  4. Explain how lean accounting differs from traditional departmental cost reporting.
  5. Design a balanced scorecard for a strategic procurement function and justify the measures selected.

Analytical / Application Questions

  1. A component has a market price of ₹18,000 and a required profit margin of 25% of selling price. The estimated cost is ₹14,500. Calculate the target cost and cost gap, and recommend two actions that do not compromise safety or quality.
  2. A supplier offers a ₹900 lower unit price but is expected to add ₹250 in inspection, ₹400 in rework and ₹600 in expected warranty cost. Analyse the decision using total cost and identify non-financial information that should be collected.
  3. Develop an integrated strategic cost-management plan for a company facing volatile material prices, rising customer sustainability expectations and unreliable international logistics. Specify tools, measures, governance controls and likely trade-offs.

Multiple Choice Questions with Answers

Question 1

Which formula correctly expresses target cost when target profit is stated as an absolute amount?

A. Target cost = Target selling price + Target profit

B. Target cost = Target selling price − Target profit

C. Target cost = Target profit − Target selling price

D. Target cost = Target selling price × Target profit

Correct Answer: B. Target cost = Target selling price − Target profit

Question 2

A product has a target selling price of ₹50,000 and a required profit margin of 20% of selling price. What is its target cost?

A. ₹10,000

B. ₹30,000

C. ₹40,000

D. ₹60,000

Correct Answer: C. ₹40,000

Question 3

Which technique primarily focuses on continuous cost improvement during production?

A. Target costing

B. Kaizen costing

C. Lifecycle costing

D. Benchmarking

Correct Answer: B. Kaizen costing

Question 4

Which of the following is an external failure cost?

A. Supplier training

B. Incoming inspection

C. Production rework before shipment

D. Customer warranty claim

Correct Answer: D. Customer warranty claim

Question 5

The main strategic advantage of lifecycle costing is that it:

A. Considers only the purchase price

B. Ignores maintenance and disposal costs

C. Evaluates costs across the life of an asset or product

D. Replaces all non-financial measures

Correct Answer: C. Evaluates costs across the life of an asset or product

Question 6

Which balanced-scorecard perspective most directly includes on-time delivery and complaint rate?

A. Customer

B. Financial

C. Learning and growth

D. Internal audit

Correct Answer: A. Customer

Question 7

Why can a lower purchase price fail to reduce total supply-chain cost?

A. Purchase price is never relevant

B. It may increase quality, logistics, inventory or warranty costs

C. Suppliers always charge hidden taxes

D. Accounting standards prohibit price comparisons

Correct Answer: B. It may increase quality, logistics, inventory or warranty costs

Question 8

Which is a central characteristic of lean accounting?

A. Encouraging overproduction to absorb fixed overhead

B. Reporting only statutory figures and excluding operational measures

C. Providing timely information around value streams

D. Eliminating all financial controls

Correct Answer: C. Providing timely information around value streams

Question 9

If baseline cost is ₹1,200 and the kaizen target is ₹1,140, what is the required reduction percentage?

A. 3%

B. 5%

C. 6%

D. 10%

Correct Answer: B. 5%

Question 10

Which practice is most consistent with ethical strategic cost management?

A. Reducing inspection by concealing defects

B. Selecting suppliers solely on the lowest quoted price

C. Ignoring environmental costs outside the organisation

D. Using transparent total-cost, quality and sustainability criteria

Correct Answer: D. Using transparent total-cost, quality and sustainability criteria

Strategic Cost & Financial Accounting
Chapter 12 of 15