Product and Service Costing SystemsIntroduction and contextCosting systems convert resource consumption into information about the cost of products, services, contracts, customers, processes and activities. In strategic cost and financial accounting, the purpose of costing is not merely to calculate an inventory value. A well-designed system supports pricing, sourcing, capacity planning, profitability analysis, performance evaluation, budgeting, continuous improvement and financial reporting. The central design question is: What is the cost object, and how does the organisation consume resources in producing it? A customised aircraft, a legal engagement, a standard chemical product, a construction project and a hospital procedure require different cost accumulation methods. The principal systems examined in this chapter are job costing, batch costing, contract costing, process costing, operation costing and service costing. A costing system normally has two linked dimensions: - Cost accumulation: collecting direct materials, direct labour and overhead in an appropriate cost pool or cost object.
- Cost assignment: tracing or allocating accumulated costs to products, services, contracts or inventory.
Direct costs are economically traceable to a cost object. Indirect costs cannot be traced conveniently or economically and are assigned using an allocation base, such as machine hours, labour hours, transaction counts or occupied bed-days. The quality of a cost figure therefore depends not only on arithmetic but also on the causal logic of the assignment process. Learning objectivesAfter studying this chapter, the learner should be able to: - distinguish the major product and service costing systems;
- select a costing system appropriate to the production or service environment;
- calculate predetermined overhead rates and assign overhead using appropriate cost drivers;
- accumulate and reconcile costs under job, batch, contract, process, operation and service costing;
- calculate equivalent units and unit costs in a process-costing environment;
- account for joint products and by-products;
- evaluate traditional and activity-based approaches to overhead allocation;
- interpret cost information for pricing, control and strategic decisions; and
- identify behavioural, ethical, technological and governance risks in costing-system design.
1. Cost objects, cost classifications and cost flowsA cost object is anything for which a separate measurement of cost is required. Examples include a customer order, production batch, construction contract, product line, patient episode and delivery route. Costs may be classified by traceability, behaviour, function and controllability. | Classification | Meaning | Example |
|---|
| Direct material | Material economically traceable to a cost object | Steel used in a machine | | Direct labour | Labour directly engaged in the cost object | Technician assembling the machine | | Manufacturing overhead | Indirect production cost | Factory rent, supervision and maintenance | | Prime cost | Direct material plus direct labour | Main conversion inputs | | Conversion cost | Direct labour plus manufacturing overhead | Cost of converting material | | Product cost | Cost attached to inventory until sale | Manufacturing cost | | Period cost | Cost charged to the period incurred | Selling and administration cost |
The basic product-cost relationship is: Product cost = Direct material + Direct labour + Manufacturing overhead For financial accounting, the cost flow commonly proceeds from materials inventory to work in process, then to finished goods and finally to cost of goods sold. In a simplified manufacturing system: Opening WIP + Manufacturing costs − Closing WIP = Cost of goods manufactured Opening finished goods + Cost of goods manufactured − Closing finished goods = Cost of goods sold These identities assume that the relevant inventory balances and manufacturing costs are measured consistently. Abnormal losses, rework, scrap and under- or over-applied overhead require separate analysis. 2. Overhead allocation: from resource pools to cost objectsOverhead allocation is necessary because many resources support several products or services. A traditional system often uses departmental cost pools and a volume-related allocation base. The predetermined overhead rate is: Predetermined overhead rate = Budgeted overhead cost ÷ Budgeted allocation base The allocation base may be direct labour hours, machine hours, direct labour cost, units produced or another measurable driver. The rate has units. For example, if overhead is measured in currency and the base in machine hours, the rate is currency per machine hour. Applied overhead is calculated as: Applied overhead = Predetermined overhead rate × Actual quantity of allocation base used At period end: Overhead variance = Actual overhead − Applied overhead If actual overhead exceeds applied overhead, overhead is under-applied; if applied overhead exceeds actual overhead, it is over-applied. The treatment of the variance depends on materiality and accounting policy. It may be closed to cost of goods sold or allocated among work in process, finished goods and cost of goods sold. Worked example: departmental overheadA fabrication department budgets overhead of ₹1,200,000 and 30,000 machine hours. The predetermined rate is: ₹1,200,000 ÷ 30,000 machine hours = ₹40 per machine hour Job 417 uses 180 machine hours. The overhead charged to the job is: 180 × ₹40 = ₹7,200 If actual departmental overhead is ₹1,260,000 and actual machine hours are 30,500, applied overhead is ₹1,220,000. The department therefore has ₹40,000 under-applied overhead: ₹1,260,000 − ₹1,220,000 = ₹40,000 The calculation is valid only if machine hours are a reasonable predictor of overhead consumption. When products differ substantially in complexity, setups, inspections or material handling, a single volume base may distort cost. Activity-based costingActivity-based costing (ABC) assigns resource costs to activities and then assigns activity costs to cost objects using cost drivers. A typical sequence is: - identify significant activities;
- create an activity cost pool;
- estimate the cost-driver quantity;
- calculate an activity rate; and
- assign cost according to actual driver usage.
Activity rate = Cost of activity pool ÷ Expected quantity of cost driver For example, a setup pool costing ₹600,000 is expected to require 1,200 setups. The setup rate is ₹500 per setup. A product requiring 18 setups receives ₹9,000 of setup cost. ABC is particularly useful where batch size, product variety, quality requirements and customer service intensity drive overhead more strongly than production volume. ABC is not automatically superior. It requires data, judgement and maintenance. Excessive detail can create measurement cost without improving decisions. A practical system should use the simplest driver structure that produces materially better information. 3. Job costingJob costing accumulates costs separately for identifiable jobs or orders. It is appropriate where products or services are customised and each job differs in materials, labour, processing requirements or specifications. Examples include specialised engineering, printing, ship repair, consulting, audit engagements and custom furniture. A job-cost record normally contains: - job identification and customer information;
- material requisitions;
- labour time records;
- applied overhead;
- subcontracting and other direct charges; and
- total and unit cost, where meaningful.
The job-cost formula is: Total job cost = Direct material + Direct labour + Applied overhead + Other direct costs If a job produces multiple identical units, unit cost is: Unit cost = Total job cost ÷ Number of good units The unit-cost calculation assumes that the units are sufficiently homogeneous. If the job contains substantially different outputs, cost should be reported by output category rather than forced into one average. Job-costing exampleA custom equipment job incurs direct materials of ₹85,000 and 620 direct labour hours at ₹300 per hour. Factory overhead is applied at ₹450 per direct labour hour. Freight of ₹8,000 is directly attributable to the customer order. Direct labour is ₹186,000, and applied overhead is ₹279,000. Therefore: Total job cost = ₹85,000 + ₹186,000 + ₹279,000 + ₹8,000 = ₹558,000 If the quotation applies a 25% markup on cost, the quoted price is: ₹558,000 × 1.25 = ₹697,500 A markup on cost is not the same as a margin on selling price. A 25% markup produces a margin of 20% of selling price, because ₹139,500 divided by ₹697,500 equals 20%. 4. Batch costingBatch costing is a variant of job costing in which a group of identical or similar units is treated as one cost unit. It is common in pharmaceuticals, garments, bakery production, components and printed materials. Direct and indirect costs are accumulated for the batch and then divided by acceptable output. Batch unit cost = Total batch cost ÷ Good units in the batch Normal process loss may be absorbed by good units, whereas abnormal loss is normally identified separately for control purposes. Suppose a batch costs ₹240,000, contains 1,000 units and has a normal loss of 40 units. If the normal loss has no recoverable value, expected good output is 960 units: ₹240,000 ÷ 960 = ₹250 per good unit The treatment differs if scrap has a realisable value. Scrap proceeds may reduce the batch cost, depending on the organisation’s policy and the nature of the loss. Batch costing is strategically important because setup costs often make small batches expensive. A costing system that reports only average unit cost may conceal the cost of frequent changeovers. Setup hours, number of production runs and inspection events may therefore be useful supplementary drivers. 5. Contract costingContract costing applies to large, separately identifiable projects that usually extend over more than one accounting period. Construction, infrastructure, shipbuilding, major installation and long-term engineering projects are typical applications. Each contract is a cost object, and a contract account accumulates materials, labour, plant, subcontracting, site overhead and directly attributable administration. Contract costs may include: - materials delivered to and consumed at the site;
- wages and benefits of site personnel;
- depreciation or hire charges for contract plant;
- subcontractor charges;
- architect, surveyor and engineering fees;
- allocated site overhead; and
- approved variations and claims, subject to recognition rules.
Material returned to stores, unused material transferred to another contract and plant returned from a site must be credited to the contract account. This prevents both overstatement of contract cost and double counting. A contract’s financial position should distinguish costs incurred from revenue recognised. Recognition of revenue and profit is governed by applicable financial reporting standards and the entity’s estimates of performance obligations, progress and expected losses. Cost accounting supports those estimates but does not replace the reporting standard. Escalation and contract controlLong contracts expose organisations to inflation, foreign exchange changes, design changes, delay penalties and scope uncertainty. Cost engineers and accountants should maintain an estimate at completion: Estimated cost at completion = Cost incurred to date + Estimated cost to complete A forecast margin can then be assessed against approved contract revenue, subject to the applicable recognition requirements. Expected losses on an onerous contract should not be deferred merely because the project is incomplete. 6. Process costingProcess costing is appropriate where large volumes of homogeneous or nearly homogeneous units pass continuously or repetitively through production processes. It is used in chemicals, cement, food, paper, oil refining and many utilities. Costs are accumulated by process or department for a period and averaged over output. The fundamental process-costing challenge is that some units may be incomplete at period end. Equivalent units express partially completed work in terms of fully completed units. Equivalent unitsFor a single cost category, the weighted-average method is: Equivalent units = Units completed and transferred + Equivalent units in ending WIP If ending work in process contains 2,000 units that are 60% complete for conversion, its equivalent conversion units are: 2,000 × 60% = 1,200 equivalent units Materials may be added at the start of a process while conversion occurs evenly. In that case, ending WIP may be 100% complete for materials but only 60% complete for conversion. Equivalent units must therefore be calculated separately by cost component. The weighted-average cost per equivalent unit is: Cost per equivalent unit = (Opening WIP cost + Current-period cost) ÷ Equivalent units This method blends opening WIP and current-period work. The FIFO method keeps opening WIP separate and calculates the equivalent units of work performed in the current period. FIFO is more informative for current-period efficiency but requires more detailed records. Process-costing exampleA department has no opening WIP. During the month, 10,000 units are started. Eight thousand units are completed and transferred, and 2,000 units remain in ending WIP. Materials are 100% complete in ending WIP and conversion is 60% complete. Materials cost ₹150,000 and conversion cost ₹210,000. Equivalent units are: | Cost component | Completed units | Ending WIP equivalent units | Total equivalent units |
|---|
| Materials | 8,000 | 2,000 | 10,000 | | Conversion | 8,000 | 1,200 | 9,200 |
Cost per equivalent unit is therefore ₹15 for materials and approximately ₹22.8261 for conversion: ₹150,000 ÷ 10,000 = ₹15.00 ₹210,000 ÷ 9,200 ≈ ₹22.8261 Cost transferred out is: 8,000 × (₹15.00 + ₹22.8261) ≈ ₹302,608.80 Ending WIP is: (2,000 × ₹15.00) + (1,200 × ₹22.8261) ≈ ₹57,391.20 The amounts reconcile to ₹360,000, the total process cost. This reconciliation is an essential control: assigned costs must equal the costs available for assignment, subject to separately treated losses or gains. Losses, gains and transferred-in costsNormal loss is the expected loss under efficient operating conditions. Its cost is generally absorbed by good output. Abnormal loss is outside the expected level and should be reported separately for management control. Abnormal gain occurs when actual loss is less than expected. In multistage production, a department may receive transferred-in cost from a previous process. Transferred-in units are treated as a separate cost component, and the receiving department must reconcile units received, units completed, ending WIP and losses. 7. Joint products and by-productsA joint process produces two or more outputs from common inputs up to a split-off point. Costs incurred before split-off are joint costs. After split-off, separable costs can be traced to individual products. Joint costs cannot be traced objectively to individual products before split-off. They must therefore be allocated for inventory valuation, profitability reporting or other specified purposes using a systematic method. Common methods include: - physical-measure method, based on weight, volume or units;
- sales-value-at-split-off method; and
- net-realizable-value method, based on final sales value less separable processing and selling costs.
The sales-value-at-split-off allocation is: Joint cost assigned to product i = Joint cost × (Product i sales value at split-off ÷ Total sales value at split-off) The net-realizable-value method is: NRV = Final sales value − Separable costs after split-off These methods serve reporting and cost-assignment purposes. Joint-cost allocation is generally irrelevant to a sell-or-process-further decision because the joint cost has already been incurred. The relevant comparison is incremental revenue from further processing against incremental separable cost. A by-product has relatively minor sales value compared with the main products. Its treatment may be to deduct net realisable value from joint cost, recognise other income, or use another policy permitted by the reporting framework. The policy must be applied consistently and disclosed where material. Joint-product exampleA process incurs joint cost of ₹900,000 and produces Product A and Product B. Their sales values at split-off are ₹600,000 and ₹400,000. The allocation proportions are 60% and 40%. Therefore, Product A receives ₹540,000 and Product B receives ₹360,000. If Product B can be processed further for ₹120,000 to generate additional revenue of ₹180,000, further processing increases profit by: ₹180,000 − ₹120,000 = ₹60,000 The allocated ₹360,000 joint cost is not relevant to that incremental decision. 8. Operation costingOperation costing combines features of job and process costing. It is used where products pass through a sequence of standard operations but may differ in materials, design, grade or configuration. Examples include component manufacture, footwear, furniture and engineered-to-order products with common production stages. Conversion costs are often accumulated by operation or department, as in process costing, while direct materials are traced to individual jobs or product variants, as in job costing. The system is suitable where: - operations are repetitive and measurable;
- products share common conversion activities; and
- material specifications or final configurations differ.
For example, two product variants may use the same cutting, machining and finishing operations, but require different materials and final assembly components. Operation costing can assign common conversion cost by machine hours or operation time while tracing variant-specific material cost directly. The main design risk is inconsistency. If some operations are treated as standard process costs and others as job costs without clear rules, cost records may be incomplete or duplicated. Standard operation definitions, routing data and production reporting are therefore essential. 9. Service costingService costing measures the cost of intangible or semi-intangible outputs. Service organisations often produce simultaneous, customer-specific and perishable outputs, making inventory measurement less prominent than in manufacturing. Examples include transport, hospitals, hotels, education, telecommunications, banking and maintenance services. A service cost unit should reflect the output consumed. Examples are: | Service | Possible cost unit |
|---|
| Passenger transport | Passenger-kilometre | | Freight transport | Tonne-kilometre | | Hotel | Occupied room-night | | Hospital | Patient-day or case-mix-adjusted episode | | Electricity distribution | Kilowatt-hour delivered | | Education | Student-credit-hour | | Call centre | Resolved contact or agent-minute |
A composite unit may combine two dimensions. A transport service could use passenger-kilometres, calculated as passengers multiplied by kilometres travelled. The chosen unit should be understandable, measurable and causally related to resource use. Service costing commonly separates fixed and variable costs. For example, a bus operator may incur vehicle depreciation and route permits as fixed or capacity-related costs, while fuel and distance-based maintenance vary with kilometres. However, costs are not permanently fixed: over a sufficiently long horizon, fleet size, premises and staffing can change. Service-costing exampleA diagnostic centre incurs monthly operating costs of ₹2,400,000 and performs 12,000 weighted diagnostic cases. Its average cost per weighted case is: ₹2,400,000 ÷ 12,000 = ₹200 per weighted case If a complex case carries a weight of 2.5, its allocated operating cost is ₹500 before any separately traceable patient-specific cost. Weighting is useful only if the weights represent relative resource consumption and are periodically validated. 10. Selecting and designing a costing systemThe selection should follow the production and service architecture rather than organisational habit. The following comparison is a useful starting point. | System | Main cost object | Output pattern | Typical setting | Principal control issue |
|---|
| Job | Individual job or order | Distinct/customised | Engineering, consulting | Completeness of job records | | Batch | Batch of similar units | Repetitive in lots | Pharmaceuticals, garments | Setup and normal-loss treatment | | Contract | Large project | Long-term, site-specific | Construction, infrastructure | Forecast cost and progress | | Process | Process/department and period | Continuous, homogeneous | Chemicals, food | Equivalent units and losses | | Operation | Operation plus product variant | Common operations, variant inputs | Components, footwear | Routing and driver consistency | | Service | Service unit, episode or customer | Intangible or simultaneous | Transport, healthcare, hotels | Defining a meaningful service unit |
Important design criteria include: - heterogeneity of outputs;
- production flow and degree of repetition;
- material and labour traceability;
- significance of work in process;
- length of the operating cycle;
- diversity of overhead consumption;
- regulatory and reporting requirements;
- information-system capability; and
- the decisions the system must support.
Hybrid systems are common. A hospital may use service costing for departments, job costing for complex patient episodes and ABC for support activities. A manufacturer may use process costing for basic conversion and batch or job costing for final customisation. 11. Cost-flow reconciliation and governanceReconciliation is the discipline that links operational records, cost ledgers and financial statements. A sound monthly close should reconcile: - material issues to production and inventory records;
- labour time to payroll and production reporting;
- applied overhead to actual overhead and driver usage;
- units introduced, completed, transferred, lost and remaining;
- work-in-process schedules to the general ledger; and
- subledger balances to reported inventory and cost of sales.
A cost-system reconciliation should explain differences rather than conceal them. Common differences arise from timing, standard-cost variances, scrap, rework, inventory adjustments, foreign exchange, unrecorded receipts and incorrect job or process coding. Governance risks include manipulating completion percentages to accelerate profit recognition, assigning common costs to make an unprofitable product appear profitable, using obsolete standard costs and charging unrelated expenditure to contracts. Controls should include segregation of duties, approval of master-data changes, audit trails, independent review of estimates, access controls and periodic driver validation. Cost information also has ethical consequences. Product costs influence prices, supplier decisions, employment, service access and investment. Managers should avoid false precision, disclose material assumptions and distinguish controllable from uncontrollable costs. A cost allocation that is acceptable for external inventory valuation may be unsuitable for a capacity decision; users must understand the purpose and limitations of the number. 12. Technology and contemporary developmentsEnterprise resource planning systems, barcode capture, manufacturing execution systems, time tracking, Internet-of-Things sensors and cloud analytics increasingly automate cost collection. Machine data can provide actual machine hours, setup duration, energy consumption and material movements. Process mining can reveal delays and rework that conventional ledgers do not show. Artificial intelligence can assist anomaly detection, cost-driver forecasting and estimate-at-completion analysis. It should not replace professional judgement. Models may reproduce errors in historical data, obscure causal assumptions or create inappropriate confidence in predicted costs. Effective governance requires documented data lineage, human review, access controls, model monitoring and explainable exception handling. Contemporary costing also extends beyond the factory gate. Life-cycle costing considers research, design, production, distribution, use, maintenance and disposal. Target costing begins with an acceptable market price and required profit: Target cost = Target selling price − Target profit This is a planning relationship, not a guarantee that the target can be achieved. It requires cross-functional design, procurement and operations improvement. Environmental and social costs may also be incorporated where measurement is sufficiently reliable and decision-useful. Applied case: Meridian Modular SystemsThe following is an illustrative case. BackgroundMeridian Modular Systems produces standard electrical panels, customised panels for industrial clients and provides installation and maintenance services. Historically, it used one factory-wide overhead rate based on direct labour hours. Management observed that standard panels appeared highly profitable, while small customised orders appeared unprofitable, although customer demand suggested the opposite. ProblemThe factory had three major overhead activities: machine processing, production setup and engineering support. Standard panels used many machine hours but few setups and little engineering support. Custom panels used fewer machine hours but required frequent setups, design changes and inspections. The existing rate assigned too much overhead to standard panels and too little to customised work. AnalysisThe finance team collected annual data: | Activity | Cost pool | Expected driver quantity |
|---|
| Machine processing | ₹3,000,000 | 60,000 machine hours | | Setups | ₹1,200,000 | 2,000 setups | | Engineering support | ₹800,000 | 4,000 engineering hours |
The activity rates were ₹50 per machine hour, ₹600 per setup and ₹200 per engineering hour. A standard order used 40 machine hours, 1 setup and 2 engineering hours. Its assigned overhead was: (40 × ₹50) + (1 × ₹600) + (2 × ₹200) = ₹3,000 A customised order used 25 machine hours, 4 setups and 12 engineering hours. Its assigned overhead was: (25 × ₹50) + (4 × ₹600) + (12 × ₹200) = ₹5,450 Under the former machine-hour-only system, the total overhead rate was ₹5,000,000 ÷ 60,000 = ₹83.33 per machine hour. The standard order would receive approximately ₹3,333, while the customised order would receive approximately ₹2,083. The former system understated the resource consumption of the customised order by about ₹3,367 relative to the ABC assignment and overstated the standard order by about ₹333. Approach and outcomeMeridian introduced ABC for quotation analysis while retaining the existing financial ledger for statutory inventory measurement. Sales staff were required to identify expected setups and engineering hours before quoting. Operations redesigned panel families, reduced setup time and introduced engineering-change fees for unusually complex orders. The result was not an automatic abandonment of customised products. Instead, management discovered that some customised orders justified higher prices, some could be redesigned profitably and some should not be accepted during constrained capacity periods. The ABC model was reviewed quarterly, and rates were updated when activity volumes changed materially. Learning points- A costing system should reflect causal resource consumption.
- A more sophisticated method is useful only when it changes decisions or improves control.
- Cost allocation and pricing decisions should be distinguished from financial-reporting requirements.
- Operational measures such as setups and engineering hours can be strategically important.
- Models require continuing validation; historical driver quantities are not automatically future reality.
Challenges and limitationsNo costing system provides an absolutely true cost. Allocation necessarily involves conventions, especially for shared facilities, common support functions and joint processes. Key limitations include: - inaccurate or incomplete operational data;
- arbitrary allocation of capacity-related costs;
- excessive system complexity;
- averaging that hides product or customer diversity;
- volatile utilisation and changing product mix;
- difficulty measuring service quality and intangible outputs;
- behavioural responses to performance measures; and
- confusion between accounting cost and relevant incremental cost.
Managers should therefore use cost information with contribution analysis, capacity analysis, customer profitability, quality measures and strategic considerations. A reported full cost is not automatically the cost relevant to every decision. Chapter SummaryProduct and service costing systems are designed around the cost object and the way resources are consumed. Job costing accumulates costs for distinct orders; batch costing treats a group of similar units as one cost object; contract costing follows large, often long-term projects; process costing averages costs over continuous production and uses equivalent units for incomplete output; operation costing combines job and process characteristics; and service costing measures the resources required to deliver meaningful service units. Overhead must be assigned using rational, consistently applied drivers. Predetermined rates support timely costing, while activity-based costing can improve accuracy where overhead diversity is substantial. Process costing requires separate equivalent-unit calculations for material and conversion, with reconciliation of assigned costs to costs available. Joint costs may be allocated for reporting, but sunk joint costs should not drive sell-or-process-further decisions. By-products require a consistent policy. A professionally governed costing system reconciles operational records with the general ledger, documents assumptions, protects data integrity and recognises the difference between reporting cost and decision-relevant cost. Technology can improve measurement, but automation and AI require human oversight, validation and ethical governance. The best system is not the most elaborate one; it is the system that produces sufficiently reliable information for the organisation’s strategic and operational decisions. Key TermsCost object: Anything for which cost is measured separately. Direct cost: A cost economically traceable to a specific cost object. Indirect cost: A cost that cannot be conveniently traced and is assigned using an allocation method. Manufacturing overhead: Indirect production costs other than direct materials and direct labour. Predetermined overhead rate: Budgeted overhead divided by the budgeted allocation-base quantity. Applied overhead: Overhead assigned to output using the predetermined rate and actual driver usage. Job costing: A system that accumulates costs for distinct jobs or customer orders. Batch costing: A system that accumulates costs for a group of similar units. Contract costing: Project-based costing for large, separately identifiable and often long-term contracts. Process costing: Cost accumulation by process or department for homogeneous continuous output. Equivalent unit: A measure of partially completed production expressed as completed-unit equivalents. Weighted-average method: Process-costing method that combines opening WIP and current-period costs. FIFO process costing: Method that keeps opening WIP separate and measures current-period work performed. Joint cost: Common cost incurred before the split-off point for multiple products. Split-off point: Point at which joint products become separately identifiable. By-product: A secondary output with relatively minor value compared with principal products. Operation costing: Hybrid system using common operation costs and product-specific direct costs. Service cost unit: A measurable unit representing service output consumed. Activity-based costing: System assigning costs through activities and cost drivers. Target cost: Target selling price less target profit. Review QuestionsShort Answer Questions- What is a cost object, and why is its definition important in costing-system design?
- Distinguish product costs from period costs.
- What is the purpose of a predetermined overhead rate?
- Why are equivalent units required in process costing?
- Distinguish a joint product from a by-product.
Long Answer Questions- Compare job, batch, contract and process costing, including their applications and control challenges.
- Explain how activity-based costing differs from a traditional volume-based overhead system.
- Describe the weighted-average process-costing method and explain how material and conversion completion may differ.
- Explain the accounting and decision-making issues associated with joint products and by-products.
- Discuss the governance, ethical and technological requirements of a modern costing system.
Analytical / Application Questions- A manufacturer has high setup and engineering costs but low direct labour content. Evaluate whether a single labour-hour overhead rate is appropriate and propose an alternative.
- A process starts 20,000 units, transfers 16,000 units and leaves 4,000 units 75% complete for conversion but 100% complete for materials. Explain how equivalent units would be calculated and what additional cost data are required to determine unit cost.
- A service organisation reports a falling average cost per service unit while customer complaints and idle capacity are increasing. Analyse possible causes and recommend measures to improve the usefulness of its costing system.
Multiple Choice Questions with AnswersQuestion 1Which costing system is most appropriate for a highly customised engineering order? A. Process costing B. Job costing C. Service-unit costing only D. Joint-product costing Correct Answer: B. Job costing Question 2Budgeted overhead is ₹900,000 and budgeted machine hours are 30,000. What is the predetermined overhead rate? A. ₹3 per machine hour B. ₹27 per machine hour C. ₹30 per machine hour D. ₹270 per machine hour Correct Answer: C. ₹30 per machine hour Question 3Under process costing, 3,000 units are 40% complete for conversion. What are the conversion equivalent units? A. 1,200 B. 1,800 C. 3,000 D. 7,500 Correct Answer: A. 1,200 Question 4Which method assigns joint cost according to each product’s proportion of sales value at split-off? A. Physical-measure method B. Sales-value-at-split-off method C. Direct-labour method D. Replacement-cost method Correct Answer: B. Sales-value-at-split-off method Question 5Which cost is generally irrelevant to a decision to process a joint product further? A. Additional processing cost B. Additional revenue C. Joint cost incurred before split-off D. Incremental selling cost Correct Answer: C. Joint cost incurred before split-off Question 6A batch costs ₹120,000 and yields 480 good units after normal loss. What is the cost per good unit? A. ₹200 B. ₹250 C. ₹300 D. ₹600 Correct Answer: C. ₹300 Question 7Which system combines standard operation conversion costs with product-specific material tracing? A. Operation costing B. Contract costing C. Pure process costing D. Absorption-only service costing Correct Answer: A. Operation costing Question 8If actual overhead exceeds applied overhead, the result is: A. Over-applied overhead B. Under-applied overhead C. A favourable sales variance D. A joint-product gain Correct Answer: B. Under-applied overhead Question 9Which is the most suitable service cost unit for hotel accommodation? A. Machine hour B. Tonne-kilometre C. Occupied room-night D. Batch equivalent unit Correct Answer: C. Occupied room-night Question 10Target cost is normally calculated as: A. Target profit minus target selling price B. Target selling price plus target profit C. Target selling price minus target profit D. Actual cost minus target selling price Correct Answer: C. Target selling price minus target profit
|