Steel Structures

Chapter 9
Steel Floor Systems and Composite Construction

Bachelors Program in Construction Technology
Steel Structures   •   Bachelor

Steel Floor Systems and Composite Construction

Introduction and context

Steel floor systems transfer gravity loads from occupants, partitions, finishes, and services to beams, columns, and foundations. Modern construction frequently combines profiled steel decking, reinforced concrete, steel beams, and mechanical shear connectors to form a composite floor. Composite action can reduce beam size, improve stiffness, accelerate construction, and provide a robust working platform. It also introduces design responsibilities that do not exist in an isolated steel beam: the designer must consider construction-stage stability, concrete placement, connector performance, vibration, fire, openings, tolerances, and coordination with building services.

This chapter presents the principles used to design and detail steel decking, floor beams, composite beams, shear connectors, and composite columns. It is written around limit-state design concepts. Numerical values and resistance factors must ultimately be taken from the governing design standard, such as the applicable Eurocode, AISC specification, or national building code. The equations below are representative forms and must not replace project-specific code provisions.

Learning objectives

By the end of this chapter, the reader should be able to:

  • distinguish permanent formwork decking from structural composite decking;
  • identify load paths and construction stages in a steel floor system;
  • calculate preliminary actions in floor beams and assess bending, shear, and deflection;
  • explain composite beam action and determine the design number of shear connectors;
  • describe composite column behavior and the role of encasement or concrete filling;
  • assess vibration, fire protection, temporary bracing, penetrations, and service coordination;
  • apply a systematic design and checking process to a practical floor-system case.

1. Floor-system components and load paths

A typical steel floor comprises the following elements:

  1. Profiled steel decking, spanning between beams and acting as permanent formwork, tensile reinforcement, or both.
  2. Concrete slab, which provides compression capacity, fire mass, acoustic separation, and diaphragm action when properly detailed.
  3. Primary and secondary beams, which collect slab loads and deliver them to columns.
  4. Shear connectors, usually welded headed studs, which transfer longitudinal interface shear between steel and concrete.
  5. Columns and foundations, which resist accumulated axial force and, where required, bending and shear.
  6. Connections, bracing, edge trims, reinforcement, openings, and services, which frequently control constructability even when the main members are adequate.

The load path should be traced explicitly:

surface load → slab → decking and secondary beams → primary beams → columns → foundations.

Loads include self-weight, finishes, ceilings, partitions, services, imposed occupancy loads, construction loads, snow where applicable, and horizontal actions transferred through the floor diaphragm. Load combinations are prescribed by the governing code. A designer should not assume that a floor diaphragm automatically transfers lateral loads: deck orientation, attachment, reinforcement, collectors, and perimeter connections must be designed.

Important terminology

  • Construction stage: the condition before the concrete has reached its specified strength and before composite action is available.
  • Final stage: the condition after the concrete has hardened and the designed composite section is effective.
  • Effective width: the portion of slab assumed to participate in compression with a beam.
  • Unshored construction: decking and beams support wet concrete without temporary props.
  • Shored construction: temporary props reduce construction-stage bending and deflection.
  • Degree of shear connection: the proportion of the theoretically available interface force transferred by connectors.
  • Deck diaphragm: in-plane structural action of the profiled sheet, usually requiring designed fasteners and collectors.

2. Steel decking systems

2.1 Deck types

Profiled decking is commonly classified as:

TypeMain functionTypical design concern
Permanent formwork deckSupports wet concrete and construction loadsLocal bending, web crippling, ponding, deflection
Composite deckActs as tensile reinforcement after hardeningRib geometry, embossments, longitudinal shear, fire behavior
Cellular or integrated service deckForms voids or service zonesLocal loads, openings, acoustic and fire detailing

The deck profile, thickness, yield strength, span, support condition, fastener arrangement, concrete thickness, and construction sequence all affect capacity. Deck manufacturers generally provide tested or code-assessed resistance data. Because embossment geometry and local buckling are highly profile-dependent, a generic steel-sheet formula should not be substituted for approved design data.

2.2 Construction-stage design

Before concrete hardens, the deck supports its own weight, wet concrete, reinforcement, workers, equipment, and temporary storage. Wet concrete causes a particularly important effect: deflection can create ponding, which increases the depth and weight of concrete and may produce further deflection.

For a simply supported strip under a uniformly distributed load, an initial elastic estimate is:

Mmax = wL² / 8
δmax = 5wL⁴ / (384EI)

Here, w is the uniformly distributed load per unit width, L is the span, E is the elastic modulus of steel, and I is the second moment of area of the deck strip. These equations assume a prismatic, simply supported member, small elastic deflection, and uniform loading. They are screening equations only; profiled decks require consideration of plate local buckling, effective section properties, continuity, fasteners, and manufacturer limits.

A construction-stage check should include:

  • deck bending and shear;
  • web crippling or bearing at supports;
  • deflection and ponding;
  • concentrated loads from workers, buggies, pumps, and stored materials;
  • stability of unrestrained beam flanges;
  • adequacy of temporary props and their foundations;
  • edge protection and safe access.

Deck sheets should normally be laid in the specified direction and securely fixed before concrete placement. End laps, side laps, support lengths, closures, and edge trims must follow the product assessment. Cutting or drilling the deck without engineering approval can seriously reduce diaphragm and composite performance.

2.3 Final-stage deck and slab behavior

In a composite slab, the concrete above the deck ribs and the ribs themselves form a structural system. The deck may provide longitudinal tensile reinforcement, but additional mesh or bars are usually needed for crack control, transverse distribution, continuity, edges, openings, and fire resistance. Reinforcement over supports is particularly important where the slab acts continuously or where shrinkage and thermal restraint produce cracking.

Openings should be planned before deck installation. Small openings may be framed with local reinforcement; large openings commonly require trimming beams or designed reinforcement transfer. A service penetration must never be treated as harmless merely because it is small: its location relative to ribs, studs, beam supports, and reinforcement is decisive.

3. Steel floor beams

3.1 Actions and idealization

A beam may support slab load directly, through deck bearing, or through secondary beams. For a simply supported beam carrying a uniform design load, the familiar idealizations are:

MEd = wL² / 8
VEd = wL / 2

where MEd is the maximum design bending moment, VEd is the support shear, w is the factored line load, and L is the span. These expressions apply only to the stated simply supported, uniformly loaded case. Continuous beams, point loads, cantilevers, torsional actions, and frame interaction require appropriate structural analysis.

The line load may be estimated from an area load q multiplied by tributary width bt:

w = q bt + wbeam

where wbeam is the beam self-weight per unit length. Units must be consistent; for example, q in kN/m² and bt in m produce kN/m.

3.2 Bending, shear, and stability

The beam must be checked for cross-section resistance, lateral-torsional buckling, shear resistance, web bearing, web buckling, and connection resistance. During construction, the compression flange may be unrestrained because the concrete slab has not yet hardened. Consequently, a beam that is stable in the final composite stage may be vulnerable during erection and concreting.

Designers should establish the restraint supplied by deck attachments. A deck is not automatically a reliable lateral restraint simply because it touches the beam. The attachment must transfer the required force, and the beam flange, deck, fasteners, and diaphragm must form a credible load path.

3.3 Deflection and vibration

Serviceability often controls floor design. A useful elastic estimate for a simply supported beam under uniform service load is:

δmax = 5wsL⁴ / (384EI)

Here ws is the unfactored service line load. In a composite beam, the effective stiffness depends on the transformed composite section, cracking, creep, shrinkage, connector slip, and the construction sequence. Deflection limits are code- and client-dependent; no single universal limit is appropriate for every floor.

Vibration requires a dynamic assessment when spans are long, occupancy is sensitive, or rhythmic activity is expected. Important parameters include natural frequency, modal mass, damping, walking excitation, and acceleration. A simple frequency estimate for a uniform simply supported beam is not sufficient for a real floor because the slab, beams, partitions, finishes, and neighboring bays participate. Offices, hospitals, laboratories, residential buildings, and footbridges may have different acceptance criteria.

Practical vibration control includes increasing stiffness, reducing span, adding secondary beams, increasing composite interaction, avoiding resonance with walking frequencies, and providing suitable damping through partitions and finishes. A floor that satisfies static deflection limits can still feel uncomfortable.

4. Composite beam action

4.1 Structural mechanism

A steel beam alone resists tension and compression within its section. When a concrete slab is connected to the beam, the slab generally acts as a compression flange in positive bending while the steel beam carries tension and part of the compression force. The connectors transfer longitudinal interface shear and prevent excessive slip.

The internal force equilibrium is commonly expressed as:

C = T

where C is the compressive resultant in the effective concrete slab and T is the tensile resultant in the steel section, subject to the governing plastic or elastic design model. The design plastic resistance is limited by the weakest of the available compression force, steel tension force, and connector transfer capacity.

For a simplified rectangular concrete compression block:

Cc = α fcd beff x

Here fcd is the design concrete compressive strength, beff is effective slab width, x is compression-block depth, and α is a code-defined stress-block coefficient. This expression is applicable only when the relevant code permits the rectangular block model and when x and the neutral-axis position satisfy its assumptions.

The moment resistance can be estimated from the force couple:

MRd ≈ C z

where z is the lever arm between compression and tension resultants. A complete code design must include the steel section geometry, slab reinforcement, neutral-axis position, connector capacity, ductility classification, and possible negative-moment regions.

4.2 Effective slab width

Only a limited slab width participates fully in compression because shear-lag causes nonuniform longitudinal stress. Effective width depends on span, beam spacing, support conditions, slab geometry, and the selected design standard. It is not simply the full floor width. For an internal beam, the effective width is usually made from portions extending toward adjacent beams, subject to code limits. For an edge beam, only one side contributes.

Effective width in positive bending may differ from the width used in negative bending. In negative bending, concrete is generally cracked in tension, so the steel beam and reinforcement over the support become more important than the concrete compression block.

4.3 Degree of shear connection

If enough connectors are provided to develop the required interface force, the beam is fully connected for the selected design model. Fewer connectors may provide partial connection, provided the code permits it and the resulting resistance, stiffness, ductility, and slip are checked. Partial connection is not merely a reduction in stud count; it changes the force–slip behavior and may affect serviceability.

A practical design sequence is:

  1. determine the required longitudinal interface force;
  2. obtain the design resistance of one connector;
  3. calculate the required number of connectors;
  4. check spacing, edge distance, deck orientation, welding quality, and group effects;
  5. check fatigue or cyclic effects where relevant;
  6. verify construction-stage installation and inspection.

5. Shear connectors

5.1 Headed studs

Welded headed studs are the most common connectors in building floors. Their resistance depends on stud diameter, height, steel strength, concrete strength, density, deck geometry, rib orientation, embedment, spacing, and the possibility of concrete splitting or local failure. Standard design equations often provide separate steel-governed and concrete-governed resistances, with the lower value adopted.

A generic design principle is:

NRd = min(Nsteel,Rd, Nconcrete,Rd)

where NRd is the design resistance of one connector. The exact component equations and reduction factors must be taken from the governing standard because deck-related factors differ substantially among codes and product systems.

The required number of connectors over a region may be expressed as:

nreq = Fh / NRd

where Fh is the design longitudinal interface force to be transferred and nreq is rounded upward to a whole number. If connectors are distributed between points of zero and maximum moment, the interface force demand varies along the beam. Connector spacing should therefore reflect the force flow rather than being selected only for convenience.

5.2 Detailing and quality control

Studs must be welded through the deck or after local deck preparation in accordance with the approved system. Inspection should address stud location, weld collars, damaged studs, concrete cover, rib filling, and weld access. Studs placed too close to deck ribs, edges, reinforcement, or one another may not achieve the assumed resistance.

Alternative systems include channel connectors, angle connectors, welded bars, and mechanical fasteners. They may be useful in refurbishment or where welding is impractical, but their behavior and approval data must be documented. Connector installation is a safety-critical operation because hidden defects can remain after concreting.

6. Composite columns

A composite column combines a steel section with concrete and reinforcement. Common forms are:

  • concrete-encased rolled or welded steel sections;
  • concrete-filled hollow structural sections;
  • partially encased I-sections;
  • concrete-filled box or tubular columns.

Composite action increases axial resistance, stiffness, fire endurance, and robustness. The design must consider axial compression, bending, second-order effects, local buckling, load introduction, confinement, concrete cracking, reinforcement, and interaction between steel and concrete.

A simplified squash-load concept is:

Npl,Rd ≈ Aa fyd + Ac fcd + As fsd

where Aa, Ac, and As are steel, concrete, and reinforcement areas; fyd, fcd, and fsd are their respective design strengths. This is a conceptual plastic axial-resistance expression, not a universal code equation. It assumes adequate interaction, load transfer, confinement, and stability. Design standards may apply coefficients, effective strengths, slenderness limits, and interaction diagrams.

Load must be introduced so that both materials participate. End plates, cap plates, reinforcement, shear transfer devices, and concrete bearing details may be required. A steel beam framing into a composite column can produce concentrated forces that cause local column failure even when the gross axial capacity is satisfactory.

7. Construction stages, temporary bracing, and fire

7.1 Construction sequence

A credible design separates at least these stages:

  1. column and frame erection;
  2. beam installation and temporary stability;
  3. deck placement and fixing;
  4. reinforcement, edge forms, and service penetrations;
  5. concrete placement and curing;
  6. development of composite action;
  7. installation of finishes, partitions, and services;
  8. final fire and architectural completion.

The governing member or connection may change from one stage to another. Temporary bracing, erection ties, props, lifting points, and sequencing notes should therefore appear in design information, not remain assumptions known only to the engineer.

7.2 Fire protection

Fire design addresses both load-bearing resistance and fire spread. Unprotected steel loses strength and stiffness rapidly as temperature rises. Concrete slabs provide thermal mass, but deck profiles, exposed beam flanges, penetrations, joints, and column connections can create weak points. Protection may include intumescent coatings, spray-applied protection, board systems, concrete encasement, or concrete-filled sections.

Fire protection must be compatible with welding, corrosion protection, moisture, inspection, and architectural finishes. Service penetrations and fire-stopping should be coordinated so that openings do not bypass compartmentation. Fire engineering may permit performance-based solutions, but these require documented thermal and structural analysis rather than informal assumptions.

8. Coordination with building services

Steel floors are particularly sensitive to coordination because beams, deck ribs, studs, ducts, pipes, sprinklers, cable trays, lighting, and ceiling zones compete for limited depth. The preferred sequence is to reserve service zones during structural planning rather than cut members after fabrication.

Coordination should establish:

  • beam and deck orientation relative to major ducts;
  • maximum permitted openings and trimming details;
  • stud locations relative to penetrations;
  • ceiling and raised-floor zones;
  • access for fire protection and inspection;
  • drainage falls and floor levels;
  • tolerances and as-built survey requirements.

Building information modelling can assist by detecting geometric clashes and recording approved penetrations. It cannot determine structural acceptability automatically unless the model contains correct design assumptions, material properties, connection data, and revision control. Artificial intelligence may support clash classification, quantity checking, image-based inspection, or anomaly detection, but professional engineers remain responsible for design decisions and verification.

9. Worked example: preliminary composite beam design

Illustrative example. An internal simply supported beam spans 8.0 m and has a tributary width of 3.0 m. The factored floor area load, including finishes, partitions, services, and imposed load, is 8.0 kN/m². Beam self-weight is estimated as 0.6 kN/m. Assume a preliminary simply supported model.

The factored line load is:

w = 8.0 × 3.0 + 0.6 = 24.6 kN/m

The maximum bending moment is:

MEd = 24.6 × 8.0² / 8 = 196.8 kN·m

The support shear is:

VEd = 24.6 × 8.0 / 2 = 98.4 kN

These are actions for preliminary sizing, not final resistance checks. Suppose a selected steel section has a design steel tension resistance of 520 kN, while the effective concrete compression block can develop 430 kN. The governing longitudinal force for a simplified positive-moment plastic check is therefore 430 kN, before considering the applicable code model.

Assume approved headed studs have a design resistance of 86 kN each under the actual deck and concrete conditions. The minimum number required to transfer this force is:

nreq = 430 / 86 = 5.00

Thus, at least five connectors are required in the idealized force-transfer region; practical detailing, code minimums, distribution, construction tolerances, and connector ductility may require more. If the design standard requires connectors to be distributed over the beam length, the five studs cannot simply be placed at one location without checking local force transfer and spacing.

The example demonstrates the workflow: calculate actions, identify the effective compression force, compare component capacities, design connectors, and then complete resistance, stability, serviceability, fire, fatigue where applicable, and detailing checks.

10. Applied case: illustrative office-floor project

Background

An illustrative six-storey office building uses composite beams with profiled decking. The architectural brief requires shallow floors to preserve ceiling height, while mechanical services require several large air-handling ducts crossing the main beam lines.

Problem

The initial structural model showed adequate beam strength but excessive vibration in a long-span meeting-room zone. In addition, late service penetrations conflicted with several shear studs, and the construction team proposed storing concrete reinforcement bundles on already-installed deck.

Analysis

The design team separated the issue into final-stage and construction-stage conditions. A vibration assessment included the slab and secondary beams rather than checking the main beam alone. Service coordination identified a dedicated duct corridor and relocated penetrations away from high connector-density regions. Temporary loading from stored materials was compared with the deck’s construction-stage limits.

Approach and solution

The meeting-room zone received closer secondary beams and a deeper composite beam, increasing stiffness and reducing walking-induced response. The deck layout was revised so that ribs ran consistently across the intended span, and openings were framed before fabrication. Stud positions were incorporated into the coordination model. A construction method statement prohibited concentrated storage on unsupported deck and required staged concrete placement. Temporary bracing was retained until the frame and diaphragm connections were complete.

Outcome

The revised system satisfied the project’s strength and serviceability criteria, reduced clashes, and avoided site cutting of beams. The contractor also obtained a clear inspection sequence for deck fixing, studs, reinforcement, concrete placement, and fire protection.

Learning points

The case illustrates that composite design is a system problem. Beam strength alone does not guarantee a successful floor. Vibration, construction loads, service routes, fire protection, and inspection requirements must be addressed during concept design and coordinated through fabrication and erection.

11. Challenges, limitations, and professional responsibilities

Composite floor design involves uncertainties in material properties, construction tolerances, connector installation, concrete cracking, shrinkage, creep, and actual occupancy. Simplified elastic models are valuable for preliminary design but may not capture local buckling, slip, load redistribution, or dynamic response. Manufacturer data must be checked for the exact deck profile and installation method.

Designers should retain clear responsibility boundaries among the structural engineer, deck manufacturer, steel fabricator, concrete contractor, fire engineer, services engineer, and building control authority. Changes in deck direction, stud diameter, concrete strength, beam camber, slab thickness, or opening size require engineering review. Records of inspection, nonconformance, repair, and as-built conditions are part of structural governance.

Sustainability decisions should consider steel reuse, recycled content, concrete volume, demountable connections, fire-protection materials, transport, and whole-life maintenance. A lighter beam is not automatically the lowest-impact solution if it requires excessive fire protection, complex fabrication, or early replacement.

Best-practice design checklist

  • Establish load paths and design situations before selecting member sizes.
  • Check both construction and final stages.
  • Obtain verified deck and connector data for the exact product.
  • Design effective width and composite resistance using the governing standard.
  • Check vibration separately from static deflection.
  • Coordinate openings, studs, reinforcement, ducts, and fire stopping before fabrication.
  • Design temporary bracing, propping, storage limits, and concrete placement sequence.
  • Specify inspection and acceptance criteria for deck, welds, studs, reinforcement, and protection.
  • Control revisions through coordinated structural and services models.
  • Record assumptions, limitations, and changes in the design documentation.

Chapter Summary

Steel floor systems are integrated structural and construction systems comprising decking, concrete, beams, connectors, columns, bracing, protection, and services. Decking must be checked during wet-concrete construction as well as in the final slab. Steel beams require checks for bending, shear, lateral stability, deflection, and vibration. Composite beams use the concrete slab as an effective compression component, with headed studs or other connectors transferring interface shear. The required connector quantity depends on the longitudinal force demand and the verified resistance of the particular connector and deck arrangement. Composite columns combine steel, concrete, and reinforcement, but their capacity depends on interaction, stability, load introduction, and fire behavior. Successful practice requires explicit construction-stage design, temporary bracing, fire engineering, service coordination, inspection, and controlled changes. The central professional lesson is that structural adequacy must be demonstrated across the entire life cycle, not only in the final analytical model.

Key Terms

Composite beam: A steel beam connected to a concrete slab so that both act structurally together.

Composite column: A column in which steel and concrete resist load through designed interaction.

Profiled decking: Formed steel sheet used as permanent formwork and, in some systems, structural reinforcement.

Permanent formwork: Formwork that remains in the completed construction but may not provide full composite reinforcement.

Effective width: The idealized slab width assumed to participate in compression with a beam.

Shear connector: A device that transfers longitudinal force between steel and concrete.

Headed stud: A welded steel connector with a head that provides anchorage in concrete.

Longitudinal interface shear: Shear force transferred along the steel–concrete interface.

Full shear connection: Connector provision sufficient to develop the governing composite force for the design model.

Partial shear connection: Deliberately reduced connection with resistance and slip checked by an approved method.

Construction stage: Condition before concrete hardening and development of composite action.

Final stage: Condition after the composite floor has developed its intended structural properties.

Unshored construction: Construction in which beams and decking support wet concrete without temporary props.

Shored construction: Construction using temporary supports to reduce construction-stage actions.

Lateral-torsional buckling: Instability involving lateral movement and twisting of a beam.

Ponding: Accumulation of additional wet concrete caused by deck or beam deflection.

Diaphragm action: In-plane floor behavior that transfers horizontal forces to vertical bracing or frames.

Effective stiffness: Stiffness used in analysis after considering composite action, cracking, slip, and time effects.

Fire protection: Measures that preserve structural resistance and compartmentation during fire exposure.

Review Questions

5 Short Answer Questions

  1. What are the principal functions of profiled steel decking in a composite floor?
  2. Why must a composite beam be checked during the construction stage?
  3. What is meant by effective slab width?
  4. State two factors that influence headed-stud resistance.
  5. Why can a floor satisfy static deflection limits yet still have unacceptable vibration?

5 Long Answer Questions

  1. Explain the load path in a composite steel floor from occupancy loading to the foundations.
  2. Describe the design checks required for unshored profiled decking during concrete placement.
  3. Explain how shear connectors enable composite beam action and how their quantity is determined.
  4. Compare concrete-encased and concrete-filled composite columns, including structural and fire considerations.
  5. Discuss why service coordination and temporary works should be integrated into structural design.

3 Analytical / Application Questions

  1. A simply supported beam spans 7.5 m and carries a factored uniform line load of 22 kN/m. Calculate its preliminary maximum moment and support shear using the simple-span equations, and state two limitations of this idealization.
  2. A composite beam must transfer 360 kN of longitudinal interface force. Each approved connector has a design resistance of 72 kN. Determine the theoretical minimum number of connectors and explain why the practical number may be greater.
  3. An office floor has adequate bending resistance but users report noticeable rhythmic vibration. Propose a structured investigation and at least four possible design or construction remedies.

Multiple Choice Questions with Answers

Question 1

Which component primarily transfers longitudinal interface shear in a conventional composite beam?

A. Edge trim

B. Headed shear connectors

C. Ceiling suspension rods

D. Column base plate

Correct Answer: B. Headed shear connectors

Question 2

For a simply supported beam carrying a uniform load w over span L, the maximum bending moment is:

A. wL²/8

B. wL/2

C. wL²/2

D. wL/8

Correct Answer: A. wL²/8

Question 3

Why is construction-stage design essential for an unshored composite floor?

A. Concrete has already reached full strength

B. Composite action is fully available before pouring

C. Decking and beams support wet concrete and construction loads before hardening

D. Fire protection is unnecessary during construction

Correct Answer: C. Decking and beams support wet concrete and construction loads before hardening

Question 4

Effective slab width accounts principally for:

A. Uniform stress across the entire building floor

B. Shear-lag and nonuniform longitudinal slab stress

C. The weight of ceiling finishes only

D. Column base stiffness

Correct Answer: B. Shear-lag and nonuniform longitudinal slab stress

Question 5

If the required interface force is 430 kN and each connector has a design resistance of 86 kN, the theoretical minimum number of connectors is:

A. 3

B. 4

C. 5

D. 6

Correct Answer: C. 5

Question 6

Which condition can produce ponding during concrete placement?

A. Deck or beam deflection that increases wet-concrete depth

B. Removal of all temporary loads

C. Concrete curing after full hardening

D. Reduction in tributary width

Correct Answer: A. Deck or beam deflection that increases wet-concrete depth

Question 7

A composite column obtains its resistance primarily through:

A. Steel–concrete interaction designed for the relevant loading

B. Concrete acting only as architectural finish

C. Decking acting as a column splice

D. Ceiling tiles restraining the column

Correct Answer: A. Steel–concrete interaction designed for the relevant loading

Question 8

Which statement about vibration is correct?

A. Static strength checks alone always establish comfort

B. Natural frequency, modal mass, damping, and excitation are relevant

C. Only column capacity affects floor vibration

D. Vibration is eliminated by increasing imposed load

Correct Answer: B. Natural frequency, modal mass, damping, and excitation are relevant

Question 9

For a beam carrying area load q over tributary width b_t, the corresponding area-load contribution to line load is:

A. q ÷ b_t

B. q + b_t

C. q b_t

D. b_t ÷ q

Correct Answer: C. q b_t

Question 10

Which practice is most appropriate when a late service opening conflicts with a beam or stud layout?

A. Cut the member without notification

B. Ignore the opening if it is visually concealed

C. Obtain engineering review and provide designed trimming or relocation

D. Remove nearby reinforcement arbitrarily

Correct Answer: C. Obtain engineering review and provide designed trimming or relocation

Steel Structures
Chapter 9 of 15