Retail Demand, Assortment and Sourcing AlignmentIntroductionRetail sourcing is not simply the act of finding suppliers and placing purchase orders. It is the managerial process of translating uncertain customer demand into a commercially viable assortment, sourcing specification, quantity, timing, service promise and replenishment policy. A sourcing decision is therefore effective only when it aligns four elements: what customers want, when they want it, where they want it and how reliably the retailer can supply it. Misalignment produces familiar retail problems. Excess inventory results when the assortment is broader or quantities are larger than demand supports. Stockouts occur when forecasts, lead times or service-level assumptions are inadequate. Markdowns arise when seasonal products arrive late or the product life cycle has been misunderstood. Omnichannel operations add further complexity because inventory may be sold through stores, websites, marketplaces, mobile applications and fulfilment centres simultaneously. This chapter develops an integrated approach to demand, assortment and sourcing alignment. It covers demand interpretation, assortment architecture, seasonality, product life cycles, service levels, lead-time planning, inventory quantities, replenishment and omnichannel execution. Learning ObjectivesBy the end of this chapter, the reader should be able to: - Explain how demand information is converted into sourcing requirements.
- Design an assortment structure consistent with customer segments and retail strategy.
- Incorporate seasonality, life-cycle stage and uncertainty into sourcing decisions.
- Calculate basic forecast, safety-stock, reorder-point and open-to-buy measures.
- Distinguish sourcing decisions for stable, seasonal, fashion and long-lead products.
- Evaluate the implications of service levels and omnichannel fulfilment.
- Critically assess the limitations of forecasts, algorithms and supplier data.
1. Demand as the Starting Point of SourcingRetail demand is the quantity customers are willing and able to purchase under specified conditions of price, availability, location, promotion and time. Observed sales are not identical to demand. If a product was unavailable, recorded sales may understate the quantity customers would have purchased. If a promotion or unusually low price was offered, recorded sales may overstate normal demand. A useful distinction is: - Observed sales: units actually sold.
- Unconstrained demand: estimated demand if inventory had been continuously available.
- Forecast demand: a forward-looking estimate based on historical data, market information and managerial judgement.
- Derived demand: demand for a product or component generated by demand for another product.
Demand signals may include point-of-sale transactions, web searches, product-page views, basket additions, conversion rates, customer reviews, loyalty data, competitor prices, macroeconomic indicators and qualitative input from buyers. Each signal has a different degree of reliability. Search activity may indicate interest but not purchase intent; sales data may be distorted by stockouts; and historical data may be irrelevant when a product is new or materially redesigned. The first sourcing task is to convert demand into a planning unit. This might be units by stock-keeping unit (SKU), size, colour, store, channel and week. Sourcing decisions should avoid excessive aggregation. A forecast for “women’s footwear” may be useful for capacity planning, but a supplier needs specifications for a particular style, size range, colour and delivery window. Demand segmentationDemand should be segmented before it is forecast. Common dimensions include: | Dimension | Examples | Sourcing implication |
|---|
| Customer | Value, premium, children, professional | Quality, price and compliance requirements | | Product | Basic, seasonal, fashion, innovation | Replenishment and commitment strategy | | Channel | Store, web, marketplace, wholesale | Packaging, allocation and fulfilment requirements | | Geography | Urban, rural, climatic zones | Local assortment and demand variability | | Time | Day, week, season, event | Capacity and delivery timing |
A demand forecast is more actionable when it explains the drivers behind variation. A weekly forecast of 10,000 units without assumptions about price, promotion, channel mix and availability is not an adequate sourcing specification. 2. From Assortment Strategy to Sourcing SpecificationAn assortment is the planned collection of products offered to customers. Its structure communicates the retailer’s positioning and determines the complexity of sourcing and inventory management. Important assortment dimensions include breadth, depth, price architecture, brand composition, size and colour coverage, newness and substitutability. - Breadth is the number of product categories or product types carried.
- Depth is the number of alternatives within a category.
- Assortment width often refers to breadth, while assortment depth refers to choices within a category.
- Core products are relatively stable items that support repeat demand.
- Seasonal products are linked to predictable calendar or climatic periods.
- Fashion products have uncertain demand and often short selling windows.
- Traffic or destination products attract customers, sometimes with low margins.
- Profit products contribute disproportionately to gross margin.
Assortment planning should reflect the customer’s decision process rather than merely the supplier’s product catalogue. A supplier may offer 40 colours, but customers may value only five commercially meaningful choices. Excessive variety creates inventory fragmentation: total category demand may be adequate while demand for each individual SKU is too low to justify the inventory and purchasing complexity. Assortment architectureA practical assortment architecture combines: - Strategic role: traffic, transaction, image, profit or service.
- Price tier: opening price point, mainstream, premium and luxury.
- Need state: basic need, occasion, trend or solution.
- Lifecycle status: new, growth, mature or declining.
- Supply strategy: continuous replenishment, seasonal buy, test-and-repeat or exclusive commitment.
The resulting assortment plan should be translated into a product brief. A sourcing specification normally includes SKU description, target customer, technical materials, dimensions, colours, size ratios, quality standards, packaging, labelling, compliance requirements, target cost, order quantity, delivery window, minimum order quantity, tolerances, inspection method and expected service level. The specification must be precise without eliminating commercially useful flexibility. For example, a garment specification may define fibre composition, colourfastness, seam strength and measurement tolerances while allowing a supplier to propose alternative finishing technology that reduces environmental impact without reducing performance. 3. Forecasting and Quantifying DemandForecasting combines data, models and judgement. The appropriate method depends on demand stability, product history, data quality and the cost of forecast error. For a simple moving average over the previous n periods: Ft+1 = (Dt + Dt-1 + ... + Dt-n+1) / n Here, Ft+1 is the forecast for the next period, Dt is observed demand in period t, and n is the number of periods included. The method assumes that recent observations are reasonably representative and gives equal weight to each included period. It is unsuitable without adjustment for strong trend, seasonality, promotions or stockouts. A weighted moving average is: Ft+1 = ∑i=1n wi Dt+1-i, where ∑i=1n wi = 1 The weights wi are non-negative and sum to one. Greater weight may be assigned to more recent observations, but the weights should be validated rather than selected arbitrarily. Forecast error for period t can be written as: et = Dt - Ft Mean absolute deviation (MAD) is: MAD = (∑t=1T |et|) / T MAD is expressed in units and is useful for estimating typical absolute error. Mean absolute percentage error is: MAPE = (100/T) ∑t=1T |et / Dt| MAPE is undefined when Dt = 0 and can be misleading when actual demand is very small. Forecast accuracy should therefore be reported with an appropriate measure, not a single universal metric. Worked example: moving averageSuppose weekly demand for a basic product was 100, 120 and 110 units in the last three weeks. The three-week moving-average forecast is: Ft+1 = (100 + 120 + 110) / 3 = 110 units. If actual demand in the next week is 130 units, the forecast error is e = 130 - 110 = 20 units. This indicates under-forecasting, but one error alone does not establish systematic bias. Demand adjustmentsA sourcing team should explicitly adjust the baseline forecast for: - planned promotions and discounts;
- store openings, closures or relocations;
- distribution changes;
- cannibalisation by a new product;
- competitor exits or launches;
- weather and local events;
- known supply constraints;
- channel substitution;
- price elasticity and expected price changes.
The adjustment should be documented with an owner and rationale. Unrecorded overrides weaken accountability and make forecast learning difficult. 4. Seasonality and Product Life CyclesSeasonality is a recurring demand pattern associated with calendar, climate, pay cycles, holidays or social events. It may be additive or multiplicative. An additive pattern has approximately constant seasonal variation in units; a multiplicative pattern has seasonal variation proportional to the level of demand. A simple multiplicative decomposition is: Dt = Lt × St × It where Dt is demand, Lt is the underlying level or trend, St is the seasonal index and It is an irregular component. The model assumes that these components can be meaningfully separated and that the seasonal pattern is sufficiently stable. In practice, promotions, changing customer behaviour and climate variation may violate these assumptions. A seasonal index for a period can be estimated as: Sj = average demand in season j / average demand across comparable seasons Indices are normally normalised so that their average across a complete cycle is 1.00. A seasonal index of 1.25 indicates demand approximately 25% above the underlying average, subject to model assumptions. Product life-cycle stages affect sourcing risk: | Stage | Demand pattern | Sourcing response |
|---|
| Introduction | Uncertain, information-poor | Small initial buy, flexible supplier, rapid learning | | Growth | Rising volume, improving knowledge | Capacity reservation, repeatable specifications | | Maturity | More stable, competitive | Cost efficiency, service reliability, replenishment | | Decline | Falling or fragmented demand | Reduce commitments, consolidate options, manage exit |
Fashion products often require a different logic from basics. For a basic product, forecast accuracy and low unit cost may dominate. For fashion, speed, flexibility and the option to reorder may be more valuable than the lowest initial cost. A retailer may deliberately place a smaller initial order and use early sales data to repeat, provided the supplier can respond within the remaining selling window. 5. Lead Time, Order Quantity and ReplenishmentLead time is the elapsed time between initiating a supply decision and making inventory available for sale. It can include approval, purchase-order processing, production, quality inspection, transport, customs, receiving and put-away. Total lead time must be measured end to end rather than using only supplier production time. A sourcing decision should distinguish: - Fixed lead time: relatively stable and predictable.
- Variable lead time: affected by capacity, transport, customs or quality failures.
- Commercial lead time: time needed for approvals and commitments.
- Physical lead time: manufacturing and movement time.
- Information lead time: time required to detect demand and transmit orders.
For a continuous-review system, the reorder point is commonly expressed as: ROP = μL + SS where μL is expected demand during lead time and SS is safety stock. If average demand per period is d and lead time is L periods, then: μL = d × L This assumes demand is measured in consistent periods and that average demand is an acceptable estimate during lead time. When demand and lead-time variation are independent and approximately normally distributed, a commonly used safety-stock approximation is: SS = z × √(Lσd2 + d2σL2) where σd is the standard deviation of demand per period, σL is the standard deviation of lead time in periods, z is the standard-normal factor associated with the target cycle-service probability, d is average demand per period and L is average lead time. This formula assumes independence, stable parameters and a normal approximation. If demand and lead time are correlated, an additional covariance term is required; if demand is intermittent or highly skewed, simulation or empirical quantiles may be more appropriate. For constant lead time, the formula simplifies to: SS = zσd√L Worked example: reorder pointA retailer sells an average of 40 units per day. Lead time is five days, daily demand standard deviation is 8 units and lead-time variation is negligible. For an approximately 95% cycle-service target, use z ≈ 1.645. Expected lead-time demand is: μL = 40 × 5 = 200 units. Safety stock is: SS = 1.645 × 8 × √5 ≈ 29.4 units. Therefore: ROP = 200 + 29.4 ≈ 229.4 units. The operational policy may round this to 230 units, subject to case-pack and order constraints. The result does not mean that 95% of orders will be filled; it represents an approximate cycle-service objective under the stated assumptions. Order quantities and open-to-buyEconomic order quantity (EOQ) is sometimes used for stable, replenished products: Q^* = √(2DS/H) where D is annual demand in units, S is ordering cost per order and H is annual holding cost per unit. EOQ assumes relatively stable demand, constant costs, replenishment without shortages and no quantity discounts. These assumptions are often weak in fashion retail, where markdowns, limited selling windows and supplier minimums dominate. Open-to-buy (OTB) controls future purchasing capacity. In a simplified unit or monetary form: OTB = planned sales + planned ending inventory − beginning inventory − on-order inventory The calculation must use a consistent valuation basis, such as retail value or cost. It should also account for returns, shrinkage, markdowns, cancellations and commitments not yet reflected in the system. OTB is a control mechanism, not a forecast; a poor sales plan can produce a formally correct but commercially misleading OTB. 6. Service Levels and Omnichannel RequirementsA service level expresses how reliably customer demand is fulfilled. Two measures must be distinguished: - Cycle service level: probability of no stockout during a replenishment cycle.
- Fill rate: proportion of demand units supplied immediately from available stock.
These measures are not interchangeable. A system can have a high cycle service level while suffering a low fill rate if occasional stockouts are large. Service targets should be differentiated by product role, customer promise and cost of failure. A critical replenishment item may justify a high target, while a low-margin seasonal item may not. Omnichannel retail changes the inventory problem because inventory can be pooled or separated across locations. Common fulfilment models include: - Ship from distribution centre: efficient control but potentially slower local delivery.
- Ship from store: uses store inventory but may increase picking costs and disrupt presentation.
- Buy online, pick up in store: provides speed and convenience but requires accurate stock records.
- Endless aisle: displays products not physically stocked in the store.
- Marketplace fulfilment: expands assortment while introducing supplier-service and data risks.
The sourcing specification must therefore include channel-specific packaging, barcodes, carton configuration, digital content, returns handling, delivery appointment rules and inventory visibility. A product suitable for store replenishment may fail in e-commerce if packaging is weak, dimensions are inaccurate or returns are costly. Inventory pooling can reduce total safety stock because demand variability may partially offset across locations. However, pooling benefits can be lost through transport constraints, regional service promises, inaccurate inventory records or channel-priority rules. The decision is not simply whether to centralise stock; it is whether the cost and speed of repositioning inventory support the promised customer experience. 7. Supplier Alignment and GovernanceDemand and assortment plans must be translated into a supplier collaboration process. A useful planning calendar identifies when the retailer freezes the assortment, issues specifications, requests quotations, approves samples, places commitments, receives production updates and revises forecasts. Supplier alignment should cover: - capacity and production calendars;
- minimum order quantities and economic pack sizes;
- material availability and substitution rules;
- quality and testing requirements;
- delivery windows and escalation procedures;
- forecast-sharing protocols;
- flexibility for cancellation, postponement or repeat orders;
- ethical, environmental and legal standards;
- data formats and inventory visibility.
Forecasts shared with suppliers should be classified clearly as indicative, planned or committed. A supplier may reasonably reserve capacity against a forecast, but should not treat an unapproved forecast as an unconditional purchase order. Governance should specify who can change quantities, approve substitutions and accept late delivery. Key performance indicators should balance cost, service and risk. Examples include supplier on-time-in-full delivery, lead-time reliability, defect rate, forecast bias, forecast accuracy, repeat-order response time, cancellation rate, inventory turnover, stockout rate and markdown percentage. No single metric is sufficient. Pressuring suppliers only on purchase price may encourage lower quality, unsafe labour practices or hidden delays. 8. Technology, Analytics and Artificial IntelligenceRetail planning systems increasingly integrate point-of-sale, enterprise resource planning, warehouse management, order management, product lifecycle management and supplier portals. Advanced analytics may support demand sensing, size-curve optimisation, allocation, anomaly detection and dynamic replenishment. Artificial intelligence can identify patterns across large datasets, but it does not eliminate the need for managerial judgement. Risks include data leakage, unstable relationships, biased historical data, poor treatment of stockouts, opaque recommendations and excessive confidence in precise forecasts. A model trained on past availability may learn that low sales mean low demand when the real cause was repeated stockout. Good governance requires data lineage, documented features, validation against simple benchmarks, human review for exceptional decisions, access controls and monitoring for drift. AI recommendations should be evaluated on business outcomes such as availability, margin, waste and supplier feasibility rather than prediction accuracy alone. 9. Ethical, Environmental and Regulatory ConsiderationsSourcing alignment has social and environmental consequences. Overbuying can create waste, while urgent air freight may increase emissions. Very short lead times may transfer pressure to workers through excessive overtime or unsafe subcontracting. Product specifications should therefore consider durability, repairability, recycled content, restricted substances, packaging reduction and end-of-life pathways where relevant. Retailers must maintain due diligence over labour standards, forced-labour risks, modern slavery, product safety, labelling, intellectual property and data protection. Traceability is particularly important when claims such as organic, recycled or ethically produced are made. A sourcing decision should not treat compliance as a final inspection only; it should embed requirements in supplier selection, contracts, audits, testing and corrective action. 10. Illustrative Case: Northstar Outdoor RetailBackgroundNorthstar Outdoor Retail sells insulated jackets through 60 stores and an online channel. The jacket is a seasonal product with a six-month selling window. Its overseas supplier has a 70-day average production and transport lead time. The retailer historically placed one large order before winter. ProblemIn the previous season, Northstar stocked out of popular sizes in early winter but held 18% of inventory after the season. The buying team had used total category demand and had not separated store and online demand. Supplier minimum order quantities also encouraged overbuying. AnalysisThe retailer decomposed demand by size, colour, channel and week. It found that black and navy accounted for most sales, while a fashion colour had high initial demand but rapid decline. The retailer also discovered that recorded sales understated demand during two weeks of stockout. The product had a stable technical specification, but colour demand was volatile. The team classified the jacket as a seasonal core product with fashion attributes. It redesigned the sourcing strategy into three commitments: a firm base order for core colours, a smaller initial order for fashion colours and a conditional repeat order. The supplier agreed to reserve fabric and production capacity for repeat orders, reducing repeat lead time to 25 days. Approach and solutionNorthstar introduced: - size- and colour-level forecasts rather than category-level forecasts;
- a documented stockout adjustment;
- separate service targets for core and fashion colours;
- weekly online and store demand review;
- postponement of final colour finishing where feasible;
- an OTB limit for uncommitted fashion inventory;
- shared supplier visibility into revised demand;
- a channel allocation rule protecting online availability while permitting store transfers.
OutcomeIn the following season, the retailer reduced end-of-season inventory by 22% and improved availability of core sizes. The result did not come from a more complex algorithm alone. It came from matching product classification, supplier flexibility, channel data and commitment timing. The retailer still accepted some fashion-colour stockout risk because eliminating all risk would have required excessive inventory. Learning points- Aggregate category forecasts conceal SKU-level risk.
- Lead-time reduction can be more valuable than a small unit-cost reduction.
- Supplier capacity reservation can support postponement and test-and-repeat models.
- Service levels should reflect product role and customer importance.
- A commercially rational plan manages both availability and residual inventory.
11. Limitations and Critical EvaluationNo planning model can remove demand uncertainty. Forecasts may fail when customer preferences change, competitors launch unexpected products, weather shifts, suppliers default or channels substitute for one another. Historical data can also reproduce past assortment bias. A statistically accurate forecast may still be strategically wrong if the retailer is intentionally creating a new market. Quantitative models are simplifications. Normal-distribution safety stock may be inappropriate for intermittent demand. EOQ can encourage large buys when markdown risk is high. Service-level optimisation may ignore brand damage or customer lifetime value. Conversely, purely qualitative buying may be difficult to audit and vulnerable to cognitive bias. Managers should use model ensembles, scenario analysis and sensitivity testing where stakes are high. Questions should include: What happens if demand is 20% above plan? What if lead time increases by two weeks? Which SKUs can be expedited? Which orders can be cancelled? What is the financial and ethical cost of leftover stock? Such analysis makes uncertainty visible and supports deliberate trade-offs. Best-Practice FrameworkAn integrated sourcing-alignment process can follow these steps: - Define the customer promise and product role.
- Segment demand by SKU, channel, geography and time.
- Clean sales data for stockouts, promotions and exceptional events.
- Build a baseline forecast and document adjustments.
- Translate assortment intent into measurable specifications.
- Estimate lead time, variability, minimums and supplier capacity.
- Select commitment, replenishment and flexibility policies.
- Set differentiated service and inventory targets.
- Test scenarios for demand, lead-time and channel disruption.
- Monitor outcomes and feed learning into the next planning cycle.
Chapter SummaryRetail sourcing alignment converts customer and market information into product specifications, quantities, delivery timing and replenishment decisions. Observed sales must be distinguished from unconstrained demand, particularly when stockouts or promotions distort the data. Assortment planning establishes breadth, depth, price architecture, product roles and lifecycle responsibilities; sourcing then translates these choices into technical, commercial and compliance requirements. Forecasting methods such as moving averages are useful under defined assumptions, but seasonal patterns, promotions, new products and intermittent demand require adjustment. Product life-cycle stage determines whether the retailer should prioritise low cost, speed, flexibility, capacity reservation or exit management. Reorder points combine expected lead-time demand with safety stock, while service-level measures clarify the desired balance between availability and inventory cost. Omnichannel retail requires accurate inventory visibility, channel-specific fulfilment and packaging requirements, and explicit rules for pooled or dedicated inventory. Supplier collaboration must address lead time, minimums, capacity, quality, ethics and information governance. Technology and AI can improve sensing and allocation, but require data quality, transparency and human oversight. The central managerial principle is that sourcing decisions should optimise total commercial and strategic value rather than purchase price alone. Key TermsDemand: Quantity customers are willing and able to purchase under specified conditions. Observed sales: Transactions actually recorded by the retailer. Unconstrained demand: Estimated demand assuming adequate product availability. Forecast: A forward-looking estimate of demand. Assortment: The planned collection of products offered by a retailer. Breadth: Number of categories or product types carried. Depth: Number of alternatives within a category. SKU: Stock-keeping unit representing a distinct product variation. Core product: Relatively stable product supporting repeat demand. Seasonality: Recurring demand variation associated with time, climate or events. Product life cycle: Progression through introduction, growth, maturity and decline. Lead time: Time from initiating supply to inventory availability. Safety stock: Inventory held to protect against demand or supply uncertainty. Reorder point: Inventory position at which replenishment is triggered. Cycle service level: Probability of no stockout during a replenishment cycle. Fill rate: Proportion of demand supplied immediately from available stock. Open-to-buy: Budgetary capacity for future purchasing. Postponement: Delaying product differentiation or commitment until demand information improves. Omnichannel retail: Integrated selling and fulfilment across multiple channels. Forecast bias: Persistent tendency to over-forecast or under-forecast. Review QuestionsShort Answer Questions- Why are observed sales not always an accurate measure of demand?
- Distinguish assortment breadth from assortment depth.
- What is the purpose of safety stock?
- Define cycle service level and fill rate.
- Identify three elements that should appear in a sourcing specification.
Long Answer Questions- Explain how a retailer can translate an assortment strategy into supplier requirements.
- Discuss how seasonality and product life-cycle stage influence sourcing decisions.
- Explain the assumptions and limitations of the reorder-point and safety-stock approach.
- Compare sourcing strategies for basic, seasonal and fashion products.
- Evaluate the opportunities and risks of artificial intelligence in retail demand planning.
Analytical / Application Questions- A product sells 60 units per day, has a seven-day constant lead time and daily demand standard deviation of 10 units. Using z = 1.645, calculate expected lead-time demand, safety stock and reorder point.
- A retailer experiences frequent stockouts during promotions. Design a diagnostic process to determine whether the principal problem is forecast bias, inventory allocation, supplier lead time or inventory-record accuracy.
- Develop an omnichannel sourcing and replenishment policy for a seasonal product with uncertain demand, a long initial lead time and a supplier willing to support a shorter repeat-order lead time.
Multiple Choice Questions with AnswersQuestion 1Which statement best distinguishes observed sales from unconstrained demand? A. Observed sales always equal customer demand. B. Observed sales may understate demand when products are unavailable. C. Unconstrained demand excludes the effects of price. D. Observed sales are estimates rather than transactions. Correct Answer: B. Observed sales may understate demand when products are unavailable. Question 2A retailer’s three-week demand history is 100, 120 and 110 units. Using a simple three-week moving average, what is the next-period forecast? A. 100 units B. 105 units C. 110 units D. 120 units Correct Answer: C. 110 units Question 3Which product is most suitable for a test-and-repeat sourcing strategy? A. A highly predictable basic product with stable replenishment B. A fashion product with uncertain demand and a short selling window C. A regulated product requiring a fixed annual contract D. A product with no supplier capacity flexibility Correct Answer: B. A fashion product with uncertain demand and a short selling window Question 4In the expression ROP = μL + SS, what does μL represent? A. Annual holding cost B. Expected demand during lead time C. Supplier minimum order quantity D. Maximum available inventory Correct Answer: B. Expected demand during lead time Question 5If average daily demand is 40 units and lead time is five days, expected lead-time demand is: A. 45 units B. 80 units C. 200 units D. 400 units Correct Answer: C. 200 units Question 6Which condition is required for the simple three-period moving average described in the chapter? A. Each included observation receives equal weight. B. Demand must be zero in every period. C. Lead time must be normally distributed. D. The product must be in the decline stage. Correct Answer: A. Each included observation receives equal weight. Question 7Which statement about cycle service level and fill rate is correct? A. They are always identical measures. B. Cycle service level measures the proportion of units filled. C. Fill rate measures the probability of no stockout in a cycle. D. They measure different aspects of inventory availability. Correct Answer: D. They measure different aspects of inventory availability. Question 8What is a major advantage of postponement? A. It eliminates all demand uncertainty. B. It delays commitment until better demand information is available. C. It guarantees the lowest unit purchase price. D. It removes the need for supplier collaboration. Correct Answer: B. It delays commitment until better demand information is available. Question 9Which issue can cause an AI demand model to interpret low sales incorrectly? A. The model has access to too much accurate inventory data. B. Historical low sales may have resulted from stockouts. C. The model uses a documented forecast benchmark. D. Managers monitor model performance over time. Correct Answer: B. Historical low sales may have resulted from stockouts. Question 10Which measure is expressed in units and calculates average absolute forecast error? A. MAD B. MAPE C. OTB D. EOQ Correct Answer: A. MAD
|