Six Sigma Methodology

Chapter 15
Ethics, Assurance and the Future of Six Sigma

Post Graduate Program in Total Quality Management
Six Sigma Methodology   •   Post Graduate

Ethics, Assurance and the Future of Six Sigma

Introduction

Six Sigma is often presented as a disciplined method for reducing variation and defects through evidence-based decision-making. Yet evidence is never ethically neutral. Data may be collected without meaningful consent, altered to protect a manager’s reputation, interpreted through biased algorithms, or retained in ways that expose individuals to harm. A process can therefore achieve an apparently excellent sigma level while producing unsafe, discriminatory, environmentally damaging, or socially unacceptable outcomes.

The contemporary quality professional must do more than improve capability. They must protect the integrity of evidence, make decisions auditable, respect privacy, challenge misleading performance measures, and consider the long-term effects of improvement projects. This chapter examines these responsibilities and connects them with sustainability, Industry 4.0, Industry 5.0, autonomous quality, and emerging quality-management models.

Learning Objectives

By the end of this chapter, the reader should be able to:

  1. Explain why data integrity and auditability are foundations of ethical Six Sigma.
  2. Evaluate privacy risks and algorithmic bias in quality analytics.
  3. Identify manipulation of metrics and distinguish valid improvement from cosmetic performance.
  4. Design governance controls for automated and autonomous quality systems.
  5. Integrate sustainability, human well-being, and resilience into improvement decisions.
  6. Apply ethical reasoning to a complex Six Sigma case.
  7. Critically assess the future direction of quality management.

1. From Defect Reduction to Responsible Quality

Traditional Six Sigma defines quality primarily through customer requirements, process performance, and reduction of unwanted variation. This remains valuable, but the definition of “customer” must be broadened. Affected employees, communities, regulators, suppliers, future generations, and vulnerable groups may all experience consequences of a process decision.

Responsible quality has four dimensions:

  • Conformance: The product or service meets specified requirements.
  • Performance: The process is stable, capable, and economically effective.
  • Integrity: The evidence and decisions are truthful, traceable, and reproducible.
  • Responsibility: The outcome respects rights, safety, fairness, sustainability, and the public interest.

A narrow focus on conformance can create ethical failure. For example, a call centre may reduce average handling time by pressuring employees to end calls prematurely. The metric improves, but customer resolution, employee welfare, and trust deteriorate. Similarly, a hospital may reduce recorded waiting time by changing the point at which waiting is measured rather than improving patient flow.

Six Sigma practitioners therefore require professional judgment. DMAIC remains useful, but each phase should include ethical questions:

DMAIC phaseEthical and assurance questions
DefineWho is affected? What harms are possible? Are requirements complete?
MeasureAre definitions, sampling, and records trustworthy? Was consent obtained?
AnalyzeCould confounding, exclusion, or algorithmic bias distort conclusions?
ImproveWho bears the cost and who receives the benefit?
ControlCan the result be monitored, audited, reversed, and explained?

2. Data Integrity as a Quality Requirement

Data integrity means that data remain accurate, complete, consistent, attributable, legible, contemporaneous, original or faithfully reproduced, and available for review throughout their life cycle. In regulated environments, these principles are often summarized through the acronym ALCOA+:

  • Attributable: It is clear who created or changed a record.
  • Legible: The record can be read and interpreted.
  • Contemporaneous: It is recorded when the activity occurs.
  • Original: The source record is preserved, or a verified copy is maintained.
  • Accurate: The record reflects reality.
  • Complete, consistent, enduring, and available: The broader “plus” requirements support reliable retention and retrieval.

Data integrity is not merely an information-technology issue. It is a measurement-system issue. If a gauge is poorly calibrated, the physical measurement is unreliable. If a database overwrites historical values without a change log, the organizational measurement system is equally unreliable.

2.1 Common threats to integrity

Threats include manual transcription errors, undocumented spreadsheet formulas, selective deletion of outliers, backdating, duplicate records, inappropriate imputation, unauthorized access, sensor drift, and changes to operational definitions. A particularly serious threat occurs when incentives are linked directly to a metric. Employees may then have a rational reason to alter classifications, delay recording, or avoid difficult cases.

A trustworthy data system should provide:

  1. A written data dictionary defining each field and unit.
  2. A documented sampling plan and inclusion/exclusion rule.
  3. Version control for data, code, dashboards, and models.
  4. Role-based access and separation of duties.
  5. Immutable or reviewable audit trails.
  6. Reconciliation between source records and published metrics.
  7. Formal procedures for corrections, with the original value retained.
  8. Periodic independent review.

2.2 Measurement-system analysis and ethical interpretation

Measurement-system analysis traditionally asks whether observed variation reflects the process or the measurement system. The same logic has an ethical implication: a decision should not be made from data whose uncertainty is hidden.

For a measured observation, a simple conceptual model is:

y = x + e

where y is the observed value, x is the underlying value, and e is measurement error. This additive model assumes that error is represented adequately by an additive term and is especially useful when the measurement scale is approximately continuous. If error varies with the magnitude of the observation, a multiplicative or transformed model may be more appropriate.

For a sample mean, the standard error is commonly expressed as:

SE(ȳ) = s ÷ √n

where ȳ is the sample mean, s is the sample standard deviation, and n is sample size. This relationship assumes independent observations and is not a guarantee of validity when sampling is biased or observations are clustered. A large sample of biased data does not become ethical or representative merely because its standard error is small.

3. Privacy, Confidentiality and Data Governance

Quality analytics increasingly combine production records with employee information, customer behaviour, location, health data, voice recordings, and biometric or behavioural indicators. Such integration can improve diagnosis, but it also increases the possibility of surveillance, re-identification, discrimination, and unauthorized secondary use.

Privacy governance should address the complete data life cycle:

  • Purpose limitation: Collect data for a legitimate, specified purpose.
  • Data minimization: Collect only what is necessary.
  • Transparency: Explain what is collected, why, and how it will be used.
  • Access control: Restrict data according to role and need.
  • Retention control: Delete or anonymize data when the purpose ends.
  • Security: Protect data in storage, transit, and use.
  • Individual rights: Support access, correction, objection, or deletion where applicable law provides such rights.
  • Accountability: Assign an identifiable owner for compliance and risk.

Anonymization and pseudonymization are not identical. Anonymization aims to make re-identification reasonably infeasible, while pseudonymization replaces direct identifiers with codes but may still permit re-identification through a key or linked data. A quality team must not describe pseudonymized employee records as anonymous.

Privacy protection may conflict with analytic resolution. Removing all identifiers can prevent analysis of disparate outcomes; retaining too much detail can expose individuals. A defensible approach is proportionate governance: use the least identifying data that can answer the question, restrict access to sensitive variables, and test whether small groups can be re-identified.

4. Algorithmic Bias and Fairness

Algorithms used in inspection, predictive maintenance, recruitment, credit assessment, triage, and customer prioritization can reproduce or amplify historical inequities. Bias may arise from:

  • Non-representative training data.
  • Labels that encode past human prejudice.
  • Proxy variables, such as postcode or language, that correlate with protected characteristics.
  • Unequal measurement quality across groups.
  • Feedback loops in which predictions influence the future data used to retrain the model.
  • Optimization objectives that reward efficiency while ignoring fairness or safety.

Bias must be assessed at several stages. Before deployment, examine data provenance and group representation. During validation, compare error rates across relevant groups. After deployment, monitor drift and unintended consequences.

For a binary classifier, two basic rates are:

TPR = TP ÷ (TP + FN)
FPR = FP ÷ (FP + TN)

Here TP, FN, FP, and TN denote true positives, false negatives, false positives, and true negatives. The true-positive rate measures the proportion of actual positive cases correctly identified; the false-positive rate measures the proportion of actual negative cases incorrectly classified as positive. These metrics require clearly defined outcomes and a representative evaluation sample. Different fairness criteria may conflict, particularly when base rates differ between groups; therefore, no single numerical test proves that a system is fair.

A responsible model-governance process should include:

  1. A statement of intended use and prohibited use.
  2. Data and feature documentation.
  3. Performance and fairness tests before deployment.
  4. Human review for high-impact decisions.
  5. An explanation and appeal mechanism.
  6. Monitoring for drift and subgroup degradation.
  7. A documented process for suspension or rollback.

“Human in the loop” is not sufficient if the human merely accepts an algorithmic recommendation without understanding or authority to challenge it. Meaningful human oversight requires competence, time, access to relevant evidence, and organizational protection for dissent.

5. Manipulation of Metrics and Goodhart’s Law

A metric becomes dangerous when it is treated as the complete definition of performance. Goodhart’s Law is commonly summarized as: when a measure becomes a target, it ceases to be a good measure. The statement is not a mathematical theorem; it is a practical warning about strategic behaviour and measurement distortion.

Metric manipulation may be explicit or inadvertent. Examples include redefining a defect so that it is excluded, reporting only successful transactions, moving difficult work to an unmeasured channel, resetting a process clock, inflating denominator values, or selecting a favourable time period. Even without fraud, excessive pressure can produce “teaching to the metric.”

A robust performance system uses a balanced set of leading and lagging indicators. For example, a manufacturing project might monitor defect rate, first-pass yield, customer complaints, rework hours, safety incidents, energy use, and employee suggestions rather than defect rate alone.

A conventional defects-per-million-opportunities measure is:

DPMO = (Number of defects ÷ (Number of units × Opportunities per unit)) × 1,000,000

This formula assumes that opportunities are consistently defined, defects are counted without double counting, and the denominator is meaningful. DPMO is not automatically comparable across processes if the opportunity definitions differ. Nor should a DPMO value be converted into a sigma level without stating the conversion convention, including whether a long-term shift assumption is used.

Assurance requires reconciliation between metrics and reality. If a dashboard reports zero defects, reviewers should ask whether production stopped, inspection changed, defects were reclassified, or the process genuinely improved. A zero count is evidence only within the boundaries of the measurement system.

6. Auditability and Professional Responsibility

Auditability is the capacity to reconstruct what was done, by whom, using which data, rules, software, and approvals. It is essential for learning, regulatory compliance, dispute resolution, and public trust.

An auditable Six Sigma project should preserve:

  • The original charter and problem definition.
  • Operational definitions and requirements.
  • Sampling rationale and raw data.
  • Measurement-system evidence.
  • Analysis scripts, model versions, and parameter settings.
  • Records of exclusions, transformations, and imputation.
  • Decision rights and approval records.
  • Control-plan results and exceptions.
  • Post-implementation evaluation.

Auditability does not mean retaining every piece of information forever. Retention must be balanced with privacy, security, legal requirements, and practical usefulness. The objective is a proportionate chain of evidence.

Professional responsibility includes competence, honesty, confidentiality, independence of judgment, and willingness to escalate risk. A practitioner should refuse to certify a result that cannot be supported, even when doing so threatens a deadline or personal standing. Escalation routes should be clear, confidential where appropriate, and protected from retaliation.

7. Sustainability and the Expanded Quality Boundary

Sustainability extends quality beyond immediate customer satisfaction. An improvement that reduces defects but increases toxic waste, energy consumption, resource depletion, or social harm may be locally efficient but globally poor.

A useful quality decision considers three forms of performance:

  • Economic: Cost, productivity, resilience, and value creation.
  • Environmental: Energy, carbon, water, materials, waste, and biodiversity impacts.
  • Social: Safety, dignity, inclusion, labour conditions, community effects, and intergenerational fairness.

Life-cycle thinking is important. A product may have low manufacturing scrap but create excessive waste during use or disposal. Similarly, a digital system may reduce travel while increasing energy demand in data centres. Six Sigma projects should define system boundaries explicitly and examine unintended transfers of burden.

A simple carbon-accounting relationship is:

Total emissions = ∑(Activity dataᵢ × Emission factorᵢ)

where Activity dataᵢ represents the quantity of an activity, such as electricity consumed or fuel used, and Emission factorᵢ represents emissions per unit of that activity. The equation assumes that the factors are appropriate to the location, time period, technology, and reporting boundary. It is an accounting approximation, not a complete representation of environmental impact.

Sustainable Six Sigma therefore combines waste reduction with life-cycle assessment, circular-economy principles, social-impact review, and resilience analysis. The goal is not merely to make a harmful process more efficient, but to question whether the process and its purpose should be redesigned.

8. Industry 4.0, Industry 5.0 and Autonomous Quality

Industry 4.0 refers broadly to connected, data-intensive production involving sensors, industrial internet of things, cloud platforms, digital twins, advanced analytics, robotics, and cyber-physical systems. These technologies can enable real-time control, predictive maintenance, traceability, and faster root-cause analysis.

Industry 5.0 adds emphasis on human centricity, sustainability, and resilience. It challenges the assumption that maximum automation is always the best objective. Skilled workers may collaborate with robots, exercise contextual judgment, and participate in system design.

Autonomous quality systems can detect anomalies, adjust process parameters, block nonconforming output, and initiate corrective actions with limited human intervention. Their benefits include speed and consistency, but risks include automation bias, cyberattack, hidden model failure, and unclear accountability.

A safe architecture separates at least five functions:

  1. Sensing: Collect process and product information.
  2. Interpretation: Convert signals into conditions or predictions.
  3. Decision: Select an action under defined authority.
  4. Actuation: Change the process or disposition product.
  5. Assurance: Log, review, and govern the decision.

Automation should be graduated according to risk. A low-risk packaging adjustment may be automated; a medical-device release or worker-safety intervention may require qualified human authorization. Fail-safe states, independent alarms, cybersecurity controls, model monitoring, and rollback procedures are essential.

Digital twins can support experimentation without disturbing production, but a digital twin is only as reliable as its data, assumptions, and validation. It should not be treated as reality. Differences between the physical system and its digital representation must be measured and governed.

9. Integrated Illustrative Case: The “Zero Defect” Smart Factory

Background

The following is a fictional illustrative case. Orion Components manufactures precision assemblies for medical equipment. It introduces camera-based inspection and an artificial-intelligence model intended to reduce escapes. Senior management announces a target of zero customer defects and links plant bonuses to a dashboard showing DPMO, inspection throughput, and first-pass yield.

Problem

After six months, the dashboard reports a 70% reduction in DPMO. However, customer complaints have not declined. Operators report that the model frequently rejects products with dark surfaces and misses subtle defects on reflective surfaces. The system also stores photographs containing employee faces and workstation identifiers. A project leader proposes deleting images after model training and excluding night-shift data because it is “not representative.”

Analysis

The Six Sigma team investigates five dimensions.

Data integrity: The dashboard uses a revised defect definition, but the revision was not documented. Historical DPMO is therefore not directly comparable. Some inspection failures are recorded as equipment downtime rather than defects.

Sampling bias: Most training images come from day shift and from one product family. Night-shift lighting and two less common products are underrepresented.

Fairness and operational impact: The model’s false-negative rate is higher for reflective products. Although product type is not a protected human attribute, the unequal error pattern creates a quality risk for customers receiving those products.

Privacy: Images include identifiable workers. The original notice described camera use for safety monitoring, not model training. Access controls are weak, and retention is indefinite.

Metric manipulation: The bonus structure rewards first-pass yield. Operators consequently route uncertain products to a rework code that does not reduce first-pass yield, while genuine scrap is classified as “engineering evaluation.”

Auditability: The model version, threshold changes, and override decisions are not retained in a complete log.

Approach and solution

The plant pauses the zero-defect claim and establishes an independent review team. It restores the original defect definition for trend comparison and publishes a change log for any future revision. Product-family, shift, lighting, and surface characteristics are added to the sampling plan. A stratified validation sample is created so that rare but safety-relevant conditions are not hidden by the overall average.

The team separates inspection performance from employee bonus calculations. It introduces a balanced dashboard containing confirmed escape rate, false-negative rate, false-positive burden, rework, safety events, energy use, and customer complaints. No single metric determines remuneration.

Images are minimized, faces are masked where feasible, access is role-based, and retention is limited to the documented purpose. Workers receive clear information and a channel for questions. The model is restricted to recommending dispositions; final release decisions remain with trained quality personnel until validation demonstrates reliable performance.

Every model update requires version approval, test results, fairness and subgroup analysis, cybersecurity review, and a rollback plan. The control plan includes daily checks for lighting and camera calibration, weekly review of overrides, and monthly audit of data lineage.

Outcome

The reported DPMO initially rises because previously hidden defects are counted consistently. Management accepts the increase as a measurement correction rather than a process failure. After redesigning lighting, expanding training data, and changing the incentive system, genuine customer escapes decline. The plant does not achieve literal zero defects, but it achieves a more credible and sustainable reduction in risk.

Learning points

  1. A lower metric is not necessarily a better process.
  2. Data quality includes definitions, sampling, provenance, and incentives.
  3. Algorithmic performance must be examined by condition and subgroup, not only in aggregate.
  4. Privacy and quality assurance are connected because unauthorized data use can undermine trust and participation.
  5. Autonomous tools require accountable human governance.
  6. Ethical correction of a metric may make performance appear worse before it becomes better.

10. Emerging Quality-Management Models

Several developments are reshaping quality management.

Quality 4.0 integrates traditional quality principles with connectivity, analytics, automation, and digital traceability. Its challenge is to avoid treating technology adoption as a substitute for process understanding.

Resilient quality emphasizes the ability to absorb shocks, adapt, and recover while maintaining critical performance. It uses scenario analysis, redundancy, supplier visibility, and leading indicators rather than optimizing only for normal conditions.

Human-centred quality recognizes tacit knowledge, psychological safety, accessibility, and worker participation. Employees are not merely sources of labour or data; they are knowledgeable participants in system design.

Regenerative and circular quality asks whether products, services, and processes restore value, reduce material throughput, and support reuse, repair, remanufacture, and responsible end-of-life treatment.

Continuous assurance replaces occasional inspection with ongoing monitoring of data, models, controls, and outcomes. It is especially relevant to software-defined products and adaptive AI systems.

These models should be integrated selectively. No framework eliminates trade-offs. Greater traceability may increase surveillance; automation may reduce routine error while increasing dependency on opaque systems; resilience may require redundancy that appears inefficient in the short term.

11. Implementation Guidance for Responsible Six Sigma

A practical governance charter should answer the following questions before a high-impact project begins:

  • What decision will the project influence?
  • Who may benefit, and who may be harmed?
  • What data are necessary, and what data are prohibited?
  • How will measurement error and sampling bias be assessed?
  • What assumptions and exclusions will be disclosed?
  • What fairness, safety, privacy, and sustainability tests apply?
  • Who has authority to approve, challenge, suspend, or reverse the intervention?
  • What evidence will be retained for audit?
  • How will affected people appeal or report harm?

Project reviews should include technical specialists, process owners, compliance professionals, cybersecurity experts, data-protection specialists, and representatives of affected users or workers. The appropriate composition depends on risk, but quality decisions should not be left solely to the person who designed the metric or model.

A useful decision rule is proportionality: the more severe, irreversible, or widely distributed the possible harm, the stronger the evidence, oversight, transparency, and human authorization required. Efficiency is important, but it is not a sufficient justification for an unacceptable risk.

Challenges and Limitations

Ethical quality governance faces practical limitations. Privacy protection can reduce analytic detail. Fairness criteria may conflict. Small samples may make subgroup estimates uncertain. Sustainability impacts can be difficult to allocate across supply chains. Audit trails increase storage and administration. Human review can slow decisions and introduce its own inconsistency. Autonomous systems may change faster than organizational policies.

These limitations do not justify inaction. They require explicit assumptions, uncertainty statements, pilot testing, independent challenge, and revision. Ethical governance is not a one-time approval; it is a continuing control process.

Chapter Summary

Ethics and assurance are not additions to Six Sigma; they are conditions for credible improvement. Data integrity requires trustworthy definitions, provenance, access controls, change histories, and measurement-system discipline. Privacy requires purpose limitation, minimization, transparency, security, and proportionate retention. Algorithmic systems must be evaluated for unequal performance, feedback loops, explainability, and meaningful human oversight.

Metric manipulation occurs when incentives, definitions, or reporting boundaries distort the apparent result. Balanced measures, independent review, and auditability reduce this risk. Sustainability broadens the quality boundary to environmental, social, and intergenerational consequences. Industry 4.0 enables connected and predictive quality, while Industry 5.0 emphasizes human centricity, resilience, and sustainability. Autonomous quality can be valuable, but only when authority, monitoring, cybersecurity, rollback, and accountability are explicit.

The central professional obligation is to improve processes without misleading people or transferring hidden harm. The future of Six Sigma will depend less on the volume of data than on the quality of judgment used to collect, interpret, govern, and act upon it.

Key Terms

Algorithmic bias: Systematic and unfair differences in algorithmic outcomes associated with data, design, or deployment conditions.

Auditability: The ability to reconstruct decisions, data, methods, approvals, and changes.

Autonomous quality: Quality sensing, decision, or control performed by automated systems with limited human intervention.

Data dictionary: A controlled description of data fields, meanings, formats, units, and permissible values.

Data integrity: Preservation of the accuracy, completeness, consistency, and reliability of data throughout its life cycle.

DPMO: Defects per million opportunities, calculated using a defined defect and opportunity denominator.

Fairness: The ethically and contextually appropriate treatment of affected groups, assessed through relevant principles and evidence.

Goodhart’s Law: The practical observation that a measure can lose validity when converted into a target.

Industry 4.0: Connected, digital, automated, and data-intensive industrial production.

Industry 5.0: An industrial vision emphasizing human centricity, sustainability, and resilience alongside technology.

Measurement error: The difference between an observed value and the underlying value being measured.

Model drift: Degradation or change in model performance as data, behaviour, or operating conditions change.

Pseudonymization: Replacement of direct identifiers with codes while retaining possible re-identification.

Privacy by design: Integrating privacy protections into systems and processes from the beginning.

Quality 4.0: The integration of quality management with digital connectivity, analytics, and automation.

Resilience: The capacity of a system to absorb disruption, adapt, and recover while maintaining critical functions.

Responsible quality: Quality that combines conformance and performance with integrity, fairness, safety, and sustainability.

Traceability: The ability to follow the history, application, location, or transformation of an object, data item, or decision.

Review Questions

Short Answer Questions

  1. What is meant by data integrity in a Six Sigma project?
  2. Distinguish anonymization from pseudonymization.
  3. Why can a large sample still produce an invalid conclusion?
  4. State two risks associated with autonomous quality systems.
  5. What does auditability enable an organization to do?

Long Answer Questions

  1. Explain how ethical questions can be incorporated into each phase of DMAIC.
  2. Discuss the relationship between metric manipulation, incentives, and Goodhart’s Law.
  3. Compare the quality implications of Industry 4.0 and Industry 5.0.
  4. Explain how privacy, cybersecurity, and data integrity interact in quality analytics.
  5. Evaluate why sustainability should be treated as a quality requirement rather than a separate corporate initiative.

Analytical / Application Questions

  1. A predictive-maintenance model performs well overall but produces substantially more missed failures for one product family. Design an investigation and governance response.
  2. A hospital reports a 40% reduction in waiting time after changing the point at which waiting is measured. How would you test whether genuine improvement occurred?
  3. Design a balanced control dashboard for a smart factory that prevents a single productivity metric from encouraging unsafe or misleading behaviour.

Multiple Choice Questions with Answers

Question 1

Which characteristic most directly supports the auditability of a Six Sigma project?

A. A high number of dashboard indicators

B. A complete record of data, methods, changes, and approvals

C. Automatic deletion of all raw data

D. Use of only aggregated results

Correct Answer: B. A complete record of data, methods, changes, and approvals

Question 2

In the expression DPMO = (defects ÷ (units × opportunities)) × 1,000,000, what must be consistently defined for comparison across processes?

A. The colour of the dashboard

B. The opportunity denominator and defect rule

C. The job titles of operators

D. The software brand used

Correct Answer: B. The opportunity denominator and defect rule

Question 3

Which practice best reflects data minimization?

A. Collecting every available employee attribute

B. Retaining all data indefinitely

C. Collecting only data necessary for the specified purpose

D. Sharing raw data with every project member

Correct Answer: C. Collecting only data necessary for the specified purpose

Question 4

A classifier has TP = 90 and FN = 10. Its true-positive rate is:

A. 10%

B. 50%

C. 90%

D. 100%

Correct Answer: C. 90%

Question 5

What is a major source of algorithmic bias?

A. A representative validation sample

B. A documented model version

C. Training data that underrepresent relevant operating conditions

D. A tested rollback procedure

Correct Answer: C. Training data that underrepresent relevant operating conditions

Question 6

What does Goodhart’s Law warn about?

A. All measurements are impossible

B. A measure may become distorted when treated as a target

C. Small samples are always superior

D. Automation eliminates incentives

Correct Answer: B. A measure may become distorted when treated as a target

Question 7

Which feature most clearly distinguishes Industry 5.0 from a purely automation-centred approach?

A. Human centricity, sustainability, and resilience

B. Removal of all human decisions

C. Maximization of data collection

D. Replacement of quality controls with marketing

Correct Answer: A. Human centricity, sustainability, and resilience

Question 8

Why is a pseudonymized dataset still privacy-sensitive?

A. It contains no information at all

B. The coded records may still be re-identified

C. It cannot be stored securely

D. It automatically creates algorithmic fairness

Correct Answer: B. The coded records may still be re-identified

Question 9

Which action is most appropriate when an automated quality model makes a high-impact decision?

A. Allow deployment without monitoring

B. Remove all records of the decision

C. Require proportionate human oversight, logging, and rollback capability

D. Optimize only for speed

Correct Answer: C. Require proportionate human oversight, logging, and rollback capability

Question 10

Why should sustainability be included in Six Sigma project evaluation?

A. Efficiency improvements can shift environmental or social harm elsewhere

B. Sustainability is unrelated to process performance

C. Only regulators can measure quality

D. Environmental effects never involve data

Correct Answer: A. Efficiency improvements can shift environmental or social harm elsewhere

Six Sigma Methodology
Chapter 15 of 15