Six Sigma & Lean Manufacturing

Chapter 3
Six Sigma Architecture and DMAIC

Post Graduate Program in Production Management
Six Sigma & Lean Manufacturing   •   Post Graduate

Six Sigma Architecture and DMAIC

Introduction

Six Sigma is a disciplined management and improvement system for reducing process variation, preventing defects, and improving customer-defined performance. Although the term originated in statistical quality control, contemporary Six Sigma combines statistical reasoning with project governance, financial accountability, structured problem solving, and cross-functional change management.

For production managers, Six Sigma is valuable because it connects three levels of decision-making:

  1. Strategic level: selecting improvement priorities that support business and customer objectives.
  2. Process level: identifying where defects, delays, variation, and waste arise.
  3. Analytical level: using data to distinguish common-cause from special-cause variation and to verify improvement.

The central project methodology is DMAIC: Define, Measure, Analyze, Improve, and Control. DMAIC is intended primarily for improving an existing process whose performance is inadequate or unstable. It should not be confused with design methodologies such as DMADV or Design for Six Sigma, which are used when a new product or fundamentally new process must be designed.

Learning Objectives

After studying this chapter, the learner should be able to:

  • interpret sigma level, defects, yield, DPMO, and cost of poor quality;
  • distinguish units, defects, opportunities, and defective units;
  • explain critical-to-quality requirements and construct CTQ trees;
  • structure a DMAIC project using a charter and tollgates;
  • apply stakeholder analysis, VOC, SIPOC, and process boundaries;
  • evaluate the managerial, statistical, and governance implications of Six Sigma projects;
  • recognize the limitations of capability measures and sigma conversion conventions.

1. The Architecture of Six Sigma

Six Sigma architecture consists of mutually reinforcing elements rather than a single statistical tool. Its main components are shown below.

ElementPurpose
Customer focusConverts customer needs into measurable requirements
Process viewTreats outputs as consequences of process inputs and methods
Measurement systemEstablishes trustworthy operational data
Statistical analysisSeparates signal from noise and identifies influential causes
Project governanceDefines ownership, resources, scope, and decision gates
Financial linkageRelates improvement to cost, revenue, risk, or capacity
Control disciplinePrevents performance from returning to its former state
People systemAssigns roles, develops capability, and manages change

Six Sigma projects generally follow the logic that process outputs are functions of inputs:

Y = f(X₁, X₂, …, Xₖ)

Here, Y is a critical process output, X₁ through Xₖ are potentially influential inputs, and f represents the process relationship. The expression is conceptual unless a specific mathematical model has been estimated. It reminds the project team that changing an output directly is usually less effective than controlling the process factors that produce it.

A mature Six Sigma system therefore asks four questions:

  • What does the customer value?
  • How is that value translated into measurable requirements?
  • Which process factors create variation or defects?
  • How will the improved performance be maintained?

2. Defects, Units, Opportunities, and Yield

Clear definitions are essential because quality metrics become misleading when their denominators are inconsistent.

  • A unit is an item or service transaction being evaluated.
  • A defect is a failure to meet a specified requirement.
  • A defective unit is a unit containing one or more defects.
  • A defect opportunity is a distinct chance for a defect to occur on one unit.
  • Yield is the proportion of units that meet the stated acceptance criterion.

A unit can contain multiple defects. For example, a fabricated panel may have a dimensional error, a surface blemish, and an incorrect label. It is one defective unit but contains three defects. This distinction matters when calculating defect-based and unit-based measures.

2.1 First-pass yield and rolled throughput yield

For a single process step:

FPY = (Units entering the step − Units with defects) ÷ Units entering the step

First-pass yield (FPY) counts units that pass without rework, repair, or substitution. If 950 of 1,000 units pass a process step without rework, FPY = 950 ÷ 1000 = 0.95, or 95%.

When a process contains several sequential steps, the probability that a unit passes every step without failure is represented by rolled throughput yield (RTY):

RTY = FPY₁ × FPY₂ × … × FPYₙ

The formula assumes that each FPY is measured on a comparable basis and that the step yields are conditional yields for units entering the respective steps. For three steps with FPYs of 0.98, 0.95, and 0.97:

RTY = 0.98 × 0.95 × 0.97 = 0.90293, approximately 90.3%.

Thus, apparently respectable individual yields can produce a substantially lower end-to-end yield. RTY also exposes the hidden cost of internal failure and rework.

2.2 Defects per opportunity and DPMO

Defects per opportunity (DPO) is:

DPO = Number of defects ÷ (Number of units × Opportunities per unit)

Defects per million opportunities (DPMO) is:

DPMO = DPO × 1,000,000

The denominator counts opportunities, not merely units. Suppose 2,000 invoices are reviewed, each with five CTQ opportunities, and 18 defects are found:

DPO = 18 ÷ (2,000 × 5) = 0.0018

DPMO = 0.0018 × 1,000,000 = 1,800.

DPMO is useful for comparing processes with different numbers of opportunities per unit, but only when the opportunity definitions are stable and credible. Teams must not inflate or reduce the number of opportunities to make performance appear better.

2.3 Defects per unit and defective percentage

Defects per unit (DPU) is:

DPU = Number of defects ÷ Number of units

In the example above, DPU = 18 ÷ 2,000 = 0.009. DPU may exceed 1 when units can contain multiple defects. By contrast, the defective-unit rate is the number of defective units divided by total units and cannot exceed 1.

3. Sigma Level and Its Interpretation

A sigma level expresses process performance relative to specification limits. In a short-term statistical interpretation, the distance from the process mean to the nearest specification limit is expressed in standard deviations:

Zᵦ = min((USL − μ) ÷ σ, (μ − LSL) ÷ σ)

Here, USL is the upper specification limit, LSL is the lower specification limit, μ is the process mean, σ is the within-process standard deviation, and Zᵦ is the short-term capability distance, often called sigma capability. The equation applies when the measurement scale is continuous and the relevant process distribution and variation estimate are appropriate.

For a one-sided upper specification, the expression becomes:

Zᵦ = (USL − μ) ÷ σ

A higher sigma level means that the process centre is farther from the nearest specification limit in relation to its variation. Sigma level is not identical to a specification width, a control limit, or a capability index.

Two commonly used capability indices are:

Cp = (USL − LSL) ÷ (6σ)
Cpk = min((USL − μ) ÷ (3σ), (μ − LSL) ÷ (3σ))

Cp measures potential capability assuming the process is centred. Cpk accounts for centring. These indices assume meaningful specification limits, a stable process, and an appropriate estimate of within-process variation. A high Cp with a low Cpk indicates that the spread may be acceptable but the process is poorly centred.

3.1 The 1.5-sigma convention

Many Six Sigma tables associate a long-term “4.5 sigma” performance with approximately 3.4 defects per million opportunities by allowing a conventional 1.5-sigma long-term shift from a short-term 6-sigma position. This is a historical convention, not a universal law of nature. It depends on a particular definition of opportunity, distributional assumptions, and treatment of long-term drift.

Accordingly, a responsible report should state whether it is using:

  • a short-term Z value based on observed within-process variation;
  • a long-term performance estimate based on overall variation; or
  • the traditional 1.5-sigma shift convention.

Sigma labels should never replace direct reporting of defect rates, yield, confidence intervals, and customer risk.

4. Critical-to-Quality Requirements and Cost of Poor Quality

4.1 Voice of the customer

The voice of the customer (VOC) includes explicit statements, complaints, survey responses, warranty data, regulatory requirements, observed behaviour, and latent expectations. VOC is not automatically a specification. It must be interpreted, prioritized, and translated into measurable requirements.

A useful translation chain is:

VOC → customer need → driver → measurable CTQ requirement → specification or target.

For example:

  • VOC: “The delivery must arrive when promised.”
  • Need: reliable delivery.
  • Driver: delivery-date adherence.
  • CTQ: percentage of orders delivered by the confirmed date.
  • Requirement: at least 98% on-time delivery, subject to an agreed measurement rule.

A critical-to-quality (CTQ) characteristic is a measurable feature whose performance is essential to customer acceptance, safety, compliance, or business value. A CTQ should have an operational definition, a measurement method, an owner, and an acceptance criterion.

4.2 CTQ trees

A CTQ tree decomposes a broad need into measurable requirements. It normally contains three levels:

  1. Need: what the customer wants.
  2. Driver: a factor that determines satisfaction.
  3. Requirement: a measurable condition with a target, limit, or classification rule.

A requirement should avoid vague terms such as “fast,” “robust,” or “accurate” unless they are operationalized. For example, “fast response” may become “95% of service requests acknowledged within 30 minutes during staffed hours.”

CTQs should also be prioritized. A requirement may be important because it affects safety, legal compliance, customer retention, revenue, or downstream process stability. Weighting methods such as customer importance ratings, failure-mode risk analysis, or strategic alignment can assist prioritization, but the chosen method should be documented.

4.3 Cost of poor quality

Cost of poor quality (COPQ) is the economic consequence of failing to meet requirements. It commonly includes:

  • Internal failure costs: scrap, rework, retesting, sorting, downtime, and excess material;
  • External failure costs: warranty, returns, complaints, penalties, recalls, field service, and lost customers;
  • appraisal costs: inspection, testing, audits, and verification undertaken to detect nonconformance;
  • prevention costs: training, mistake-proofing, process design, maintenance, and supplier development.

In the traditional prevention–appraisal–failure framework, prevention and appraisal are costs of conformance, while failure costs are costs of nonconformance. Some organizations report appraisal and prevention separately from COPQ; others include only failure costs in the narrow COPQ measure. The accounting boundary must therefore be stated.

A simple annual failure-cost estimate is:

Annual failure cost = Failure volume × Cost per failure

If 1,200 units require rework at ₹450 per unit and 80 customer returns cost ₹2,500 each:

Annual failure cost = (1,200 × ₹450) + (80 × ₹2,500) = ₹740,000.

This calculation excludes intangible effects such as reputation and employee time unless they are separately estimated. Financial validation should be performed with finance personnel to avoid overstating savings. A reduction in defects is not automatically a cash saving if it merely releases theoretical capacity or avoids a cost that would not otherwise have been incurred.

5. DMAIC as a Governed Improvement System

DMAIC is both a problem-solving sequence and a governance architecture. Each phase has a purpose, expected outputs, analytical questions, and a tollgate review.

DMAIC cycle with five connected phases DefineProblem and value MeasureBaseline and data AnalyzeRoot causes ImproveSolutions ControlSustain gains Tollgates, evidence, ownership and feedback
DMAIC cycle with five connected phases
Figure: DMAIC cycle with five connected phases

Figure: DMAIC as a sequential but feedback-enabled improvement cycle.

5.1 Define

Define establishes why the project matters and what it will address. Core outputs include:

  • project charter;
  • business case and problem statement;
  • goal statement;
  • scope and exclusions;
  • preliminary VOC and CTQs;
  • project team and governance;
  • high-level process view, often a SIPOC.

A strong problem statement describes the gap, location, time period, population, and consequence without presuming the cause. “The line operator is careless” is a cause assertion and an inappropriate problem statement. “First-pass yield on Line 4 averaged 91.2% from April to June, compared with a target of 97%, creating rework and delayed dispatch” is measurable and neutral.

5.2 Measure

Measure creates a defensible baseline. It requires operational definitions, sampling plans, data sources, data integrity checks, and measurement-system evaluation. For continuous data, the team may assess repeatability and reproducibility; for attribute data, it may assess agreement among inspectors or classification accuracy.

A baseline should report the relevant metric, time period, denominator, stratification, and uncertainty where appropriate. Averages alone can conceal shifts, outliers, product-family differences, or instability.

5.3 Analyze

Analyze identifies and verifies relationships between process inputs and CTQ outputs. Useful methods include process stratification, Pareto analysis, cause-and-effect diagrams, five whys, hypothesis tests, regression, analysis of variance, and failure-mode analysis.

A cause is not validated merely because it is plausible. Evidence should show that changing or observing the suspected input is associated with a meaningful and reproducible change in the output, while alternative explanations are considered.

5.4 Improve

Improve develops, tests, and implements solutions. Solutions should address verified causes rather than symptoms. Common interventions include standard work, setup reduction, mistake-proofing, equipment modification, parameter optimization, supplier controls, and redesign of information flow.

Pilot trials are preferable to full-scale implementation when risk is material. Experimental design may be used when several factors interact and one-factor-at-a-time trials would be inefficient or misleading. Improvement claims should distinguish statistical significance from practical or financial significance.

5.5 Control

Control institutionalizes the improved process through:

  • control plans;
  • standard operating procedures and visual standards;
  • process-owner handover;
  • control charts or other monitoring rules;
  • reaction plans;
  • training and competency verification;
  • audit schedules;
  • benefit tracking.

Control limits are calculated from process behaviour; specification limits come from customer, engineering, legal, or business requirements. Confusing these limits can lead to inappropriate decisions. A process can be statistically stable but incapable of meeting specifications, or apparently capable over a short period but unstable over time.

6. Project Charter, Roles, and Tollgates

A project charter is an authorization and alignment document, not a substitute for analysis. It usually contains:

Charter elementEssential question
Business caseWhy should the organization invest?
Problem statementWhat measurable gap exists?
Goal statementWhat improvement is required and by when?
ScopeWhich products, processes, sites, and periods are included?
Out of scopeWhat will not be addressed?
CTQ and baselineHow is performance currently measured?
BenefitsWhat financial, customer, capacity, risk, or safety value is expected?
Team and sponsorWho owns decisions and removes barriers?
MilestonesWhen will tollgates and deliverables occur?
Constraints and risksWhat may limit the project?

Typical roles include an executive sponsor, process owner, project leader or Black Belt, Green Belt or analyst, subject-matter experts, finance representative, quality representative, and affected operators. Titles vary by organization; accountability must not.

Tollgates are evidence-based reviews. A tollgate should ask whether the phase objective has been met, whether assumptions remain valid, whether risks are controlled, and whether the project should proceed, be redirected, or be stopped. A ceremonial sign-off that ignores weak data undermines Six Sigma governance.

7. Stakeholder Analysis and SIPOC

Stakeholder analysis identifies individuals or groups that influence, contribute to, are affected by, or can block the project. A practical approach maps stakeholders by influence and impact, then defines an engagement strategy.

Stakeholder positionAppropriate response
High influence, high impactInvolve closely; clarify decisions and accountability
High influence, low impactKeep satisfied; provide concise evidence
Low influence, high impactConsult and protect; capture operational knowledge
Low influence, low impactMonitor and communicate proportionately

Stakeholder analysis is not political manipulation. It is a risk-control activity. Operators and maintenance personnel often possess tacit knowledge that is unavailable in formal databases. Excluding them can produce technically elegant but operationally unusable solutions.

SIPOC means Suppliers, Inputs, Process, Outputs, Customers. It is a high-level boundary-setting tool rather than a detailed process map. A SIPOC should identify the process start and end points, major process stages, key inputs, outputs, and customers. It helps prevent scope expansion and exposes assumptions about who supplies information or receives the result.

A SIPOC for order fulfilment might include suppliers such as sales and suppliers; inputs such as customer order, inventory, and dispatch data; process stages such as receive, schedule, pick, pack, and ship; outputs such as confirmed and delivered order; and customers such as the external buyer and downstream service function.

8. VOC to CTQ: An Integrated Translation Method

A disciplined VOC process includes:

  1. collect direct and indirect customer evidence;
  2. segment customers and use cases;
  3. distinguish stated needs from proposed solutions;
  4. identify consequences of failure;
  5. translate needs into measurable CTQs;
  6. define operational rules and data sources;
  7. validate priorities with customers and process owners.

For example, a medical-device customer may state that a component must be “safe and reliable.” The team must decompose this into requirements such as dimensional conformity, material traceability, sterilization compatibility, and failure-rate limits. Regulatory requirements may become CTQs even when customers do not articulate them directly.

CTQ definitions should specify:

  • characteristic and unit of measure;
  • population and sampling rule;
  • measurement method and instrument;
  • lower and/or upper acceptance limit;
  • treatment of missing, borderline, or reworked units;
  • responsible owner;
  • reporting frequency.

This level of precision prevents the common failure in which a project improves a local metric while customer outcomes remain unchanged.

9. Illustrative Case: Reducing Late Dispatches in an Industrial Plant

The following is a fictional illustrative case designed for learning.

Background

An industrial-equipment plant reported increasing customer complaints about late dispatches. Management initially suspected warehouse staffing, but the process included order release, production completion, inspection, documentation, picking, and carrier handover.

Define

The charter defined the CTQ as “orders handed to the contracted carrier by the confirmed dispatch date.” The baseline period was 12 weeks. The project scope covered standard products shipped from one plant; export orders and engineered-to-order projects were excluded. The target was to increase on-time dispatch from 89% to at least 97% within six months.

A SIPOC revealed that dispatch performance depended on production completion, inspection release, document accuracy, inventory location, and carrier booking. Stakeholder analysis identified planning, production, quality, warehouse, sales administration, carriers, and customers as relevant groups.

Measure

The team operationally defined a late order as one whose carrier handover timestamp was later than the confirmed dispatch date. It verified timestamps against the enterprise system and manually sampled 120 orders. The measurement review found that orders cancelled by customers and orders awaiting customer documentation had previously been mixed with genuine process delays; these categories were separated.

Of 1,000 eligible orders, 110 were late, producing 89% on-time dispatch. A Pareto analysis of late orders showed: production not complete, 42; inspection hold, 25; documentation errors, 18; warehouse-location issue, 15; carrier booking, 10.

Analyze

The initial assumption that warehouse staffing was the dominant cause was not supported. Stratification showed that inspection holds were concentrated in one product family and occurred mainly after a recent change in inspection sampling. Documentation errors were associated with manual copying of serial numbers. The team confirmed the relationships by reviewing order records and conducting a controlled observation of the process.

The analysis also identified a definition problem: some “late” orders were released late by sales administration but were measured against the original requested date rather than the confirmed date. Correcting the operational definition improved data validity, although it did not itself improve the process.

Improve

The team implemented three changes:

  • a pre-release checklist and automated serial-number validation;
  • an inspection queue with an escalation rule for orders approaching their dispatch date;
  • a daily cross-functional short-interval meeting for orders within 48 hours of dispatch.

A four-week pilot on one product family reduced late orders from 11% to 4.5%. The team checked that the reduction was not caused by excluding difficult orders or lowering inspection standards.

Control

The process owner introduced a weekly on-time-dispatch dashboard, a control chart for the proportion of late orders, an escalation reaction plan, and monthly audit of order-date definitions. The charter was closed only after the new method had operated for three months and finance validated the realized capacity benefit.

Learning points

The case illustrates that:

  • a plausible cause may be wrong;
  • operational definitions are part of measurement quality;
  • customer requirements must be translated into observable CTQs;
  • cross-functional projects require process ownership beyond one department;
  • control mechanisms are necessary to preserve gains.

10. Limitations, Ethics, and Contemporary Practice

Six Sigma is powerful but not universal. It is less suitable when the problem is poorly defined, the process is undergoing fundamental design, data are unavailable, or the cost of measurement exceeds the value of improvement. Excessive focus on local metrics can produce suboptimization. A department may improve its own yield while increasing total lead time or customer inconvenience.

Statistical significance can be misleading with very large samples, while small samples may conceal important risks. Capability indices are inappropriate when the process is unstable or when specifications are not meaningful. DPMO comparisons can be distorted by inconsistent opportunity definitions. Sigma conversion tables should therefore be treated as conventions, not exact physical laws.

Ethical governance requires accurate reporting, transparent exclusions, protection of worker dignity, and avoidance of target manipulation. Employees should not be blamed for system-generated variation without evidence. Data collected for improvement must respect privacy, access control, and applicable labour, safety, quality, and sector regulations.

Digital production systems, sensors, process mining, and AI can strengthen DMAIC by improving traceability, anomaly detection, and pattern recognition. However, AI-generated correlations do not establish causation. Models may reproduce biased measurement practices, and automated recommendations require human validation, cybersecurity controls, explainability appropriate to the risk, and documented change management. Technology should strengthen the DMAIC logic rather than replace customer definition, process understanding, or accountable decisions.

Best practice is to combine Lean flow analysis with Six Sigma variation reduction: remove obvious waste and delays while using statistical evidence to address persistent or complex variation. The result is not merely a better metric but a more capable, stable, and customer-responsive process.

Chapter Summary

Six Sigma is an integrated system of customer focus, process management, measurement, statistical analysis, project governance, and control. Its core metrics require precise distinctions among units, defects, defective units, opportunities, yield, DPU, DPO, and DPMO. Sigma level and capability indices describe performance relative to specifications, but their interpretation depends on stability, distributional assumptions, measurement quality, and the stated short-term or long-term convention.

VOC must be translated into CTQs through explicit needs, drivers, operational definitions, and acceptance criteria. COPQ connects quality failure to economic consequences, although claimed savings require financial validation. DMAIC provides a governed route from problem definition to sustained control. The charter, stakeholder analysis, SIPOC, tollgates, measurement-system evaluation, root-cause verification, pilot improvement, and control plan together create a disciplined project architecture. Effective Six Sigma is evidence-based, cross-functional, ethically governed, and attentive to both local process performance and total customer value.

Key Terms

Six Sigma: A structured approach for improving process performance and reducing variation and defects.

DMAIC: Define, Measure, Analyze, Improve, and Control improvement methodology.

Unit: The item, transaction, or service instance being evaluated.

Defect: Failure to meet a specified requirement.

Defective unit: A unit containing one or more defects.

Defect opportunity: A distinct chance for a defect to occur on one unit.

First-pass yield: Proportion passing a process step without rework.

Rolled throughput yield: Product of first-pass yields across sequential process steps.

DPU: Defects per unit.

DPO: Defects per opportunity.

DPMO: Defects per million opportunities.

Sigma level: Distance between process performance and the nearest specification expressed in standard deviations.

Cp: Potential capability index assuming a centred process.

Cpk: Capability index accounting for process centring.

VOC: Voice of the customer.

CTQ: Critical-to-quality characteristic or requirement.

COPQ: Cost arising from failure to meet requirements.

SIPOC: High-level map of Suppliers, Inputs, Process, Outputs, and Customers.

Tollgate: Evidence-based review at a DMAIC phase boundary.

Review Questions

Short Answer Questions

  1. Distinguish a defect from a defective unit.
  2. Why is RTY generally lower than or equal to each individual process-step yield?
  3. What is the purpose of a CTQ tree?
  4. State two differences between control limits and specification limits.
  5. Why should a problem statement avoid asserting a cause?

Long Answer Questions

  1. Explain the Six Sigma architecture and show how customer focus, measurement, governance, and control interact.
  2. Describe each DMAIC phase, including its principal outputs and tollgate evidence.
  3. Explain DPU, DPO, DPMO, FPY, and RTY, and discuss the risks of using inconsistent denominators.
  4. Discuss the role of a project charter, stakeholder analysis, and SIPOC in controlling project scope.
  5. Critically evaluate the traditional 1.5-sigma shift convention and explain why sigma labels should be accompanied by direct performance measures.

Analytical / Application Questions

  1. A process produces 5,000 units. Each unit has four defect opportunities, and inspection finds 30 defects. Calculate DPO and DPMO. Explain one assumption required for the calculation to be meaningful.
  2. Three sequential operations have FPYs of 0.96, 0.98, and 0.94. Calculate RTY and interpret the result for a production manager.
  3. Construct a VOC-to-CTQ tree for a customer requirement that a service request be handled “quickly and reliably.” Include operational definitions and identify two stakeholder groups whose input should be obtained.

Multiple Choice Questions with Answers

Question 1

A process produces 2,000 units with five opportunities per unit and 18 defects. What is the DPMO?

A. 180

B. 1,800

C. 9,000

D. 18,000

Correct Answer: B. 1,800

Question 2

Which measure counts units that pass a process step without rework?

A. DPU

B. DPMO

C. First-pass yield

D. Cpk

Correct Answer: C. First-pass yield

Question 3

What is the primary purpose of a SIPOC?

A. To calculate process sigma

B. To define high-level process boundaries and relationships

C. To replace a control plan

D. To estimate annual COPQ

Correct Answer: B. To define high-level process boundaries and relationships

Question 4

Which DMAIC phase establishes the baseline and evaluates data quality?

A. Define

B. Measure

C. Improve

D. Control

Correct Answer: B. Measure

Question 5

A high Cp and low Cpk most directly suggest that the process is:

A. Highly variable but perfectly centred

B. Potentially narrow enough but poorly centred

C. Stable and automatically customer capable

D. Missing specification limits

Correct Answer: B. Potentially narrow enough but poorly centred

Question 6

Which item is an external failure cost?

A. Operator training

B. Preventive maintenance

C. Warranty replacement

D. Incoming inspection

Correct Answer: C. Warranty replacement

Question 7

If sequential FPYs are 0.98, 0.95, and 0.97, the RTY is approximately:

A. 90.3%

B. 92.1%

C. 95.0%

D. 97.0%

Correct Answer: A. 90.3%

Question 8

Which statement best describes a CTQ?

A. A vague customer preference

B. A measurable requirement critical to acceptance or value

C. A suspected root cause

D. A project team title

Correct Answer: B. A measurable requirement critical to acceptance or value

Question 9

What is the main function of a DMAIC tollgate?

A. To guarantee that every project continues

B. To provide an evidence-based phase review

C. To replace stakeholder communication

D. To set customer specifications without data

Correct Answer: B. To provide an evidence-based phase review

Question 10

Why should AI-based correlations in a Six Sigma project be validated before action?

A. Correlation always proves causation

B. AI cannot process production data

C. Correlations may reflect bias, confounding, or unstable measurement

D. Validation is only needed for financial projects

Correct Answer: C. Correlations may reflect bias, confounding, or unstable measurement

Six Sigma & Lean Manufacturing
Chapter 3 of 14