International firms face risks that cannot be managed adequately through financial derivatives alone. A currency forward may reduce exchange-rate uncertainty, but it cannot reopen a closed port, replace a sanctioned supplier, restore a damaged factory, or secure regulatory approval. Such exposures require operational and strategic hedging: designing the firm’s supply network, contracts, assets, inventory, insurance arrangements and investment decisions so that adverse events are absorbed, transferred or avoided.

Operational hedging is the deliberate use of flexibility in production, sourcing, logistics, inventory and capacity. Supply-chain hedging applies this logic across suppliers, locations, transport routes and distribution channels. Strategic hedging extends it to longer-term commitments, including localization, alliances, real options and political-risk positioning. The central managerial problem is not to eliminate all risk. Complete redundancy is usually too expensive. The objective is to create an economically justified portfolio of alternatives that preserves critical capabilities when conditions change.

This chapter examines diversification, sourcing flexibility, localization, contractual clauses, inventory, business interruption insurance and real options as mutually reinforcing tools. It also considers geopolitical, regulatory, disaster and technology-related risks, together with governance, measurement and implementation issues.

Learning Objectives

By the end of this chapter, students should be able to:

  1. Distinguish operational, supply-chain and strategic hedging from financial hedging.
  2. Diagnose how concentration, dependency and lack of flexibility amplify international risk.
  3. Evaluate supplier diversification, multi-sourcing, localization and inventory strategies.
  4. Design contractual provisions that allocate disruption, compliance and political risks.
  5. Explain the role and limitations of business interruption insurance.
  6. Apply real-options reasoning to capacity, sourcing and market-entry decisions.
  7. Construct an integrated hedging portfolio using cost, resilience and governance criteria.

1. The Logic of Operational Hedging

A supply chain is exposed when a disruption affects the firm’s ability to obtain inputs, transform them, move them or sell them. Common sources include:

  • geopolitical conflict, sanctions, export controls and trade restrictions;
  • earthquakes, floods, storms, fires and pandemics;
  • cyberattacks and critical-infrastructure failures;
  • supplier insolvency, quality failure or labor disputes;
  • regulatory changes involving tariffs, carbon, data, safety or localization;
  • transport congestion, port closure and energy shortages.

Risk has at least three dimensions: probability, impact and speed of propagation. A low-probability event may justify substantial protection when its impact is catastrophic and recovery is slow. A disruption at a single-source semiconductor supplier, for example, may halt multiple plants and cause lost customer relationships far beyond the supplier’s invoice value.

A useful conceptual representation of expected disruption loss is:

EL = ∑ᵢ pᵢLᵢ

Here, pi is the probability of disruption scenario i, Li is the corresponding loss, and EL is expected loss. The expression is a screening tool, not a complete decision rule. It assumes that scenarios are sufficiently defined and that losses can be estimated consistently. It may understate systemic events, correlated disruptions and non-financial consequences such as reputational damage.

The economic value of a hedging measure can be assessed as:

NHB = ΔEL + ΔF − C

where NHB is net hedging benefit, ΔEL is the reduction in expected disruption loss, ΔF is the value of flexibility or strategic opportunity created, and C is the annualized total cost of the measure. Costs include supplier premiums, duplicated qualification, inventory carrying cost, insurance premiums, contractual commitments and management complexity. A measure is attractive when its benefits exceed its full economic cost, subject to risk appetite and non-financial constraints.

Operational hedging differs from financial hedging in several ways. Financial hedging typically changes the payoff attached to a financial variable, such as an exchange rate or interest rate. Operational hedging changes the firm’s physical ability to respond. The two can complement each other: a company may use a currency forward to stabilize the cost of imported inventory while simultaneously developing a second source in another currency region.

2. Mapping Exposure and Dependency

Before selecting a hedge, managers should map the supply network beyond immediate tier-one suppliers. The relevant object is not merely the supplier list but the dependency structure: which materials, technologies, facilities, logistics nodes and legal permissions are indispensable?

A practical risk map records:

DimensionDiagnostic questionTypical indicator
ConcentrationHow much spend or capacity depends on one source?Share of volume from largest supplier
SubstitutabilityCan an alternative be qualified quickly?Qualification lead time
Geographic exposureAre sources exposed to the same hazard?Sites within one hazard zone
Time criticalityHow long can operations continue without supply?Days of critical inventory
VisibilityHow far can the firm see into the network?Tier coverage and data quality
RecoverabilityHow quickly can capacity be restored?Time to recover
ComplianceCould law or sanctions interrupt supply?Country and product screening results

Concentration is not always irrational. A single supplier may provide superior quality, intellectual property protection or economies of scale. The managerial question is whether the benefit compensates for the vulnerability and whether a credible contingency exists.

A basic concentration measure is the Herfindahl–Hirschman Index:

HHI = ∑ⱼ sⱼ²

where sj is supplier j’s share of total sourcing, expressed as a decimal or percentage consistently. With four equally sized suppliers, each has sj = 0.25, giving HHI = 0.25. With one supplier, HHI = 1. The index captures concentration but not geographic correlation, supplier financial health or substitutability. Two suppliers located in the same industrial park may provide less resilience than their shares suggest.

3. Diversification and Sourcing Flexibility

Supplier diversification

Diversification spreads volume across suppliers, countries or production technologies. It can reduce the effect of an isolated failure, improve bargaining power and provide comparative information about quality and cost. However, excessive fragmentation may increase transaction costs, reduce scale economies and complicate quality control.

Diversification is most valuable when suppliers are not strongly correlated. Geographic diversification is weak if all suppliers depend on the same port, energy grid, raw material or sub-tier processor. Effective diversification therefore requires analysis of common-mode failure.

Single, dual and multi-sourcing

Single sourcing may be justified for highly specialized inputs, but it should be accompanied by documented contingency plans, emergency tooling, technical drawings, supplier financial monitoring and pre-approved alternatives. Dual sourcing allocates supply to two qualified providers. Multi-sourcing adds more providers, often with a primary supplier and smaller “option” suppliers retained for surge capacity.

A common mistake is nominal dual sourcing: two suppliers exist legally, but one provides 95% of volume and the other lacks current tooling or qualification. Flexibility is real only when the alternative can deliver acceptable quantity, quality, compliance and lead time.

Flexible contracts and capacity reservation

Firms can purchase flexibility through options embedded in commercial agreements. Examples include:

  • minimum and maximum volume bands;
  • rights to increase orders during disruption;
  • reserved production capacity;
  • supplier-held safety stock;
  • alternative-material approval;
  • shorter termination or switching periods;
  • rights to audit sub-tier dependencies;
  • obligations to notify the buyer of ownership, location or compliance changes.

The premium paid for reserved capacity should be compared with the value of avoiding a shutdown. A capacity reservation that cannot be exercised because the supplier lacks raw materials or export permission is not genuine flexibility.

4. Localization and Regionalization

Localization moves production, sourcing or inventory closer to customers or within a political and regulatory jurisdiction. Regionalization may involve “China plus one,” nearshoring, friend-shoring or regional distribution centers. These approaches can reduce transport distance, border exposure and response time, while supporting local-content requirements.

Localization is not automatically safer. A local site may be exposed to domestic political instability, a small labor market, high energy costs or a single local disaster. It may also duplicate fixed costs and reduce global scale. The correct comparison is between integrated risk-adjusted economics, not labor cost alone.

A location decision should examine:

  1. total landed cost, including duties, transport, inventory and compliance;
  2. access to skills, utilities, suppliers and logistics;
  3. political and regulatory stability;
  4. hazard exposure and business continuity capability;
  5. intellectual-property and data-security conditions;
  6. ability to serve multiple markets from the location;
  7. exit, transfer and expansion options.

Regionalization is often a portfolio strategy: maintain efficient global production for stable demand while establishing modest regional capacity for critical products. This “base-load plus flex” design can provide resilience without duplicating every asset.

5. Inventory as a Time Hedge

Inventory buys time. It allows the firm to continue operating while a supplier, route or plant is restored. Safety stock is especially valuable for long-lead, high-consequence items with limited substitutes.

For a simple continuous-review model with independent demand and lead-time uncertainty, a common safety-stock expression is:

SS = zσLT

where SS is safety stock in units, z is the chosen service-factor associated with the target cycle-service probability, and σLT is the standard deviation of demand during lead time. This formula applies only when demand during lead time is approximately normally distributed and the relevant standard deviation is correctly estimated. It does not automatically capture supplier disruption, batch constraints or correlated demand.

If daily demand is independent with standard deviation σd, lead time is constant at L days, then:

σLT = σd√L

If both daily demand and lead time vary independently, with average daily demand μd, average lead time μL, demand standard deviation σd and lead-time standard deviation σL, a commonly used approximation is:

σLT = √(μLσd² + μd²σL²)

The units are products squared inside the square root, yielding units of products. The approximation assumes independence and is most suitable for planning rather than precise service guarantees.

Inventory hedging should be differentiated by criticality. A firm may hold ordinary cycle stock for routine operations, safety stock for normal variability, and strategic stock for severe but plausible disruption. Strategic stock can become obsolete, expire or be damaged; therefore, rotation, substitution and replenishment policies are essential.

Inventory also has a financial cost. A simplified annual carrying cost is:

CC = I × v × r

where I is average inventory units, v is value per unit, and r is the annual carrying-rate percentage expressed as a decimal. The carrying rate may include financing, insurance, storage, deterioration and obsolescence. The formula excludes ordering and shortage costs and should not be treated as a complete inventory optimization model.

6. Contractual Hedging

Contracts distribute risk through rights, obligations and remedies. They cannot eliminate physical scarcity, but they can improve information, preserve access and clarify financial responsibility.

Important provisions include:

  • Force majeure: defines extraordinary events that excuse or suspend performance. Poorly drafted clauses may be too narrow, too broad or silent on pandemics, government action and supply-chain failures.
  • Change-in-law and tariff clauses: specify price adjustment, renegotiation or termination when duties, sanctions or regulatory requirements change.
  • Allocation clauses: determine how scarce output is distributed among customers during disruption.
  • Service-level agreements: establish delivery, quality, recovery-time and reporting requirements.
  • Business continuity obligations: require tested continuity plans, backup sites, recovery exercises and notification.
  • Audit and transparency rights: permit verification of sub-tier sources, labor standards, cybersecurity and sanctions compliance.
  • Termination and step-in rights: allow the buyer to shift tooling, data or work to another provider under defined circumstances.
  • Indemnity and limitation-of-liability provisions: allocate specified losses, subject to enforceability and governing law.

Contractual hedging must be reviewed across jurisdictions. A clause enforceable in one legal system may be restricted elsewhere. Contracts should also align with insurance policies; an uninsured indemnity may create only a paper claim against an insolvent counterparty.

7. Business Interruption Insurance

Business interruption insurance transfers some financial consequences of physical damage or other covered events. Coverage commonly addresses lost gross profit or business income, continuing expenses and extra expenses incurred to reduce interruption. Contingent business interruption coverage may respond when a covered supplier or customer suffers damage, subject to policy terms.

Managers must distinguish:

  • the physical damage trigger;
  • the covered peril and exclusions;
  • the waiting period or time deductible;
  • the indemnity period;
  • policy limits and sublimits;
  • the definition of gross profit or income;
  • contingent supplier and customer requirements;
  • civil-authority, ingress/egress and denial-of-access provisions;
  • cyber, infectious disease, war, terrorism and political-risk exclusions.

Insurance is a financial hedge, not a substitute for continuity. Claims may be delayed, disputed or capped. Coverage should be tested against realistic scenarios, documented property values, recovery periods and dependencies. Firms should maintain evidence of inventories, forecasts, extra expenses and mitigation actions.

8. Real Options and Strategic Flexibility

A real option is the value of managerial flexibility under uncertainty. Unlike a binding commitment, an option allows the firm to defer, expand, contract, switch or abandon an activity after receiving more information.

Examples include:

  • leasing rather than purchasing a second facility;
  • designing a plant to use multiple inputs;
  • qualifying a backup supplier before it is needed;
  • reserving land or production capacity;
  • entering a market through a small pilot before full investment;
  • maintaining modular production that can be transferred between regions.

The value of flexibility is generally higher when uncertainty is high, the investment is partly reversible, the decision can be delayed and alternative actions are meaningful. It is lower when the option is expensive, expires before it can be exercised or cannot be executed operationally.

A simple two-state illustration can clarify the logic. Suppose a firm may invest in a regional assembly facility after one year. The investment cost is $20 million. In one year, demand is either favorable or unfavorable. The favorable state produces a present value of benefits of $32 million; the unfavorable state produces $12 million. If the firm must invest immediately, the expected benefit at equal probabilities is $22 million, yielding an expected net value of $2 million before considering risk. If it can wait and invest only in the favorable state, the expected net value is:

0.5 × max(32 − 20, 0) + 0.5 × max(12 − 20, 0) = $6 million

The waiting right has value because the firm avoids investing in the unfavorable state. This is an illustrative decision-tree calculation, not a full option-pricing model. It assumes equal probabilities, known state values, no discounting over the one-year period and no cost of waiting. In practice, discount rates, changing probabilities, competitive response, irreversibility and correlation with other risks must be incorporated.

9. Integrating Hedging Instruments

No single instrument protects against every disruption. An integrated portfolio may combine:

RiskPrimary hedgeSupporting measures
Supplier failureDual sourcingStrategic stock, supplier monitoring, tooling transfer
Port closureRoute and carrier diversificationRegional inventory, alternative incoterms
Sanctions or export controlsCountry and product diversificationLegal screening, contractual exit rights
Natural disasterGeographic dispersionBusiness interruption insurance, recovery plans
Demand volatilityFlexible capacityPostponement, modular design, option contracts
Regulatory changeLocalization and compliance capabilityChange-in-law clauses, scenario analysis
Cyber disruptionSegmented systems and recovery capabilityInsurance, tested backups, supplier controls

Portfolio design should avoid offsetting one risk by creating another. Moving production to a second country may reduce geopolitical concentration but increase quality, currency or intellectual-property risk. A risk register should therefore record residual risk after each measure, not merely the existence of a control.

Useful performance indicators include time to detect, time to respond, time to recover, percentage of critical suppliers with tested continuity plans, qualified alternative capacity, days of strategic coverage, concentration by hazard zone and percentage of tier-one and tier-two spend with verified visibility. Metrics should be connected to decisions rather than used as ceremonial reporting.

10. Illustrative Case: Meridian Appliances

Background

Meridian Appliances, a fictional multinational manufacturer, sells premium refrigerators in Europe and North America. Its compressor control module is sourced from one supplier in a coastal Asian industrial cluster. The supplier is technically excellent and low cost, but the cluster is exposed to typhoons, port congestion and changing export regulations.

Problem

A severe storm closes the port for three weeks. Meridian has only ten days of module inventory, and the supplier’s own microcontroller sub-supplier is not visible to Meridian. Production stops after the tenth day. The company loses sales, pays expedited freight after reopening and damages retailer relationships.

Analysis

The immediate exposure is single-source dependency combined with geographic and sub-tier concentration. The inventory policy protected against ordinary lead-time variation but not a prolonged network disruption. The contract contained a general force-majeure clause but no minimum continuity requirements, allocation rights or sub-tier disclosure obligation. Insurance covered physical damage at Meridian’s facilities but not the supplier interruption because the contingent business interruption extension was absent.

Approach

Meridian develops a three-part program:

  1. Sourcing flexibility: qualify a second supplier in Eastern Europe for 30% of normal volume and reserve emergency capacity up to 60%. The second supplier is more expensive but geographically less correlated.
  2. Inventory and design: hold six weeks of strategic stock for the control module, rotate it through normal production, and redesign the module so that two approved microcontrollers can be used.
  3. Contract and insurance: add continuity testing, sub-tier notification, allocation rules, recovery-time commitments and step-in rights. Purchase contingent business interruption coverage after verifying supplier physical-damage requirements and policy limits.

Meridian also leases, rather than immediately builds, a small regional final-assembly line. This creates a real option to expand regional production if tariffs or political risk increase.

Outcome

The program raises unit cost and working capital. However, a later port disruption lasts four weeks. Meridian uses strategic stock during the first period, switches 30% of supply to the European source and temporarily increases final assembly in the regional facility. Production continues at reduced volume rather than stopping. The company still incurs higher logistics cost, but it avoids major retailer penalties and preserves customer confidence.

Learning points

First, resilience requires qualified and executable alternatives, not merely supplier names. Second, inventory is valuable when it is positioned before the disruption and compatible with product design. Third, contracts and insurance must be coordinated. Fourth, a real option may be more efficient than immediate full duplication. Finally, resilience investments should be tested through exercises and updated as technology, law and supplier networks change.

11. Governance, Ethics and Regulation

Supply-chain hedging creates governance responsibilities. Firms should not transfer risk to vulnerable suppliers through unlimited penalties, unrealistic delivery obligations or unilateral cancellation rights. Ethical procurement requires attention to labor conditions, forced labor, environmental harm and corruption in alternative locations. A “resilient” source that violates human rights can generate legal, reputational and operational risks.

Regulatory compliance must be embedded in sourcing decisions. Sanctions screening, export-control classification, customs valuation, local-content rules, data-transfer requirements and product standards may determine whether a contingency source is usable. Artificial intelligence can support supplier monitoring, anomaly detection and scenario analysis, but it does not remove accountability. Poor data, opaque models and false alerts can cause unjustified supplier exits or missed threats. Human review, audit trails, data governance and clear decision rights are essential.

12. Challenges and Limitations

Operational hedging has several limitations:

  • redundancy can reduce efficiency and increase prices;
  • diversification may dilute learning and quality control;
  • inventory can become obsolete or create cash-flow pressure;
  • local production may increase fixed costs and emissions;
  • insurance excludes important perils or pays only after lengthy adjustment;
  • contracts may be unenforceable against sovereign action or insolvency;
  • real options are difficult to value when probabilities and outcomes are uncertain;
  • risk measures may encourage gaming or ignore low-frequency catastrophic events;
  • supplier networks are adaptive, so a hedge can change behavior and create new dependencies.

Managers should use scenario analysis, stress testing and reverse stress testing. Rather than asking only “What is the expected loss?”, reverse stress testing asks, “What combination of events would make the business unable to continue, and which controls would fail first?”

13. Best-Practice Implementation Process

A disciplined implementation sequence is:

  1. Define critical products, customers, processes and recovery objectives.
  2. Map direct and indirect dependencies, including logistics, utilities and sub-tier inputs.
  3. Assess probability, impact, correlation, detectability and recovery time.
  4. Establish risk appetite and minimum resilience standards.
  5. Compare diversification, inventory, insurance, contractual and capacity alternatives.
  6. Evaluate total cost and real-option value, not only purchase price.
  7. Assign ownership across procurement, operations, finance, legal, insurance and compliance.
  8. Contract, qualify and test alternatives before the crisis.
  9. Monitor leading indicators such as financial distress, sanctions, weather, transport and regulatory signals.
  10. Conduct exercises, update scenarios and retire ineffective controls.

The best hedge is usually layered: prevention reduces the probability of disruption, flexibility limits operational impact, inventory buys time, contracts allocate consequences, insurance protects the balance sheet and real options preserve future strategic choices.

Chapter Summary

Operational, supply-chain and strategic hedging manage physical and institutional exposures that financial instruments cannot address alone. Diversification reduces concentration but is effective only when alternatives are genuinely qualified and not exposed to the same common-mode failure. Sourcing flexibility can be purchased through dual sourcing, reserved capacity, modular design and switching rights. Localization and regionalization reduce some border and distance risks but may create new cost, regulatory and concentration exposures.

Inventory acts as a time hedge, although its level must reflect demand and lead-time uncertainty, disruption duration, carrying cost and obsolescence. Contracts can allocate disruption, compliance and recovery responsibilities, while business interruption insurance transfers selected financial consequences subject to triggers and exclusions. Real options give firms the right, but not the obligation, to expand, switch, defer or abandon investments as information improves.

Effective resilience is a portfolio decision. Firms should map dependencies, assess correlated risks, value flexibility, integrate legal and insurance arrangements, test continuity plans and govern ethical and regulatory consequences. The objective is not maximum redundancy but economically justified recoverability.

Key Terms

Operational hedging: Using physical processes, capacity, sourcing or inventory to reduce operational risk.

Supply-chain resilience: The ability of a supply network to prepare for, absorb, recover from and adapt to disruption.

Diversification: Spreading sourcing, production or logistics across alternatives to reduce concentration.

Common-mode failure: A single cause that disrupts multiple apparently separate components.

Dual sourcing: Procuring a critical input from two qualified suppliers.

Localization: Placing production, sourcing or inventory within or near a target market.

Regionalization: Organizing operations around geographic regions rather than one globally concentrated network.

Safety stock: Inventory held to protect against routine demand or lead-time variability.

Strategic stock: Inventory held against severe or extended disruption.

Force majeure: A contractual provision addressing extraordinary events that affect performance.

Change-in-law clause: A clause allocating consequences of regulatory or legal change.

Business interruption insurance: Insurance covering specified financial consequences of covered interruption.

Contingent business interruption: Coverage for interruption caused by damage to a covered supplier or customer.

Real option: A managerial right to make a future operational or investment decision under uncertainty.

Capacity reservation: Contractual access to specified production capability.

Time to recover: Time required to restore an affected process or supply capability.

Total landed cost: Purchase, logistics, duty, inventory, compliance and related costs of obtaining supply.

Reverse stress testing: Identifying events or combinations of events that would threaten viability.

Review Questions

5 Short Answer Questions

  1. What distinguishes operational hedging from financial hedging?
  2. Why may geographic diversification fail to reduce risk?
  3. What is the purpose of strategic inventory?
  4. Identify four contractual provisions that support supply-chain resilience.
  5. What conditions increase the value of a real option?

5 Long Answer Questions

  1. Critically evaluate the advantages and disadvantages of single, dual and multi-sourcing.
  2. Explain how localization and regionalization can reduce geopolitical risk while creating new exposures.
  3. Discuss the role, triggers and limitations of business interruption insurance.
  4. Explain how inventory, contracts and supplier diversification can be integrated into one resilience portfolio.
  5. Assess the ethical and regulatory responsibilities involved in relocating supply to alternative countries.

3 Analytical / Application Questions

  1. A firm relies on one supplier for a critical component and has fourteen days of inventory. Develop a hedging program covering sourcing, inventory, contracts, insurance and real options. Justify the sequence and trade-offs.
  2. Two alternative suppliers are located in different countries but use the same sub-tier semiconductor producer. Analyze the residual risk and recommend additional controls.
  3. A company is deciding whether to build a second plant immediately or lease a smaller facility with expansion rights. Design a decision framework that incorporates uncertainty, reversibility, cost and strategic flexibility.

Multiple Choice Questions with Answers

Question 1

Which feature makes dual sourcing a genuine operational hedge?

A. Two suppliers are listed, but one is not qualified

B. Both suppliers can provide acceptable quality and deliver within required recovery limits

C. The smaller supplier receives no orders for several years

D. Both suppliers depend on the same unavailable facility

Correct Answer: B. Both suppliers can provide acceptable quality and deliver within required recovery limits

Question 2

What is a major limitation of the supplier HHI measure?

A. It cannot measure supplier market shares

B. It ignores all purchasing costs

C. It does not capture geographic or common-mode correlation

D. It applies only to financial derivatives

Correct Answer: C. It does not capture geographic or common-mode correlation

Question 3

If daily demand standard deviation is 10 units and constant lead time is 4 days, what is the standard deviation of demand during lead time under the independent-demand assumption?

A. 5 units

B. 14 units

C. 20 units

D. 40 units

Correct Answer: C. 20 units

Question 4

Which contractual provision primarily addresses the consequences of a new tariff or regulation?

A. Change-in-law clause

B. Quality inspection clause

C. Confidentiality clause

D. Payment currency clause

Correct Answer: A. Change-in-law clause

Question 5

What is the principal function of strategic inventory?

A. To eliminate all procurement costs

B. To buy time during severe or extended disruption

C. To guarantee higher product demand

D. To replace business continuity planning

Correct Answer: B. To buy time during severe or extended disruption

Question 6

Business interruption insurance is best understood as:

A. A guarantee that operations will never stop

B. A substitute for supplier qualification

C. A transfer of specified financial consequences subject to policy terms

D. A method of reducing physical hazard probability

Correct Answer: C. A transfer of specified financial consequences subject to policy terms

Question 7

A real option creates value primarily because it allows a firm to:

A. Commit immediately regardless of future conditions

B. Avoid unfavorable states while acting in favorable states

C. Remove uncertainty from all forecasts

D. Ignore the cost of flexibility

Correct Answer: B. Avoid unfavorable states while acting in favorable states

Question 8

Which situation most weakens geographic diversification?

A. Suppliers use different transport routes and power systems

B. Suppliers are independently qualified and geographically dispersed

C. Suppliers are in different countries but rely on the same sub-tier producer

D. Suppliers maintain separate emergency inventories

Correct Answer: C. Suppliers are in different countries but rely on the same sub-tier producer

Question 9

Which is an example of a common-mode failure?

A. One supplier’s isolated machine breakdown

B. A shared regional earthquake disabling several suppliers

C. A buyer changing its product color

D. A routine annual supplier audit

Correct Answer: B. A shared regional earthquake disabling several suppliers

Question 10

What is the main purpose of reverse stress testing?

A. To calculate normal reorder quantities only

B. To identify combinations of events that could threaten business viability

C. To maximize supplier concentration

D. To replace legal review of contracts

Correct Answer: B. To identify combinations of events that could threaten business viability