Reverse Logistics

Chapter 4
Closed-Loop Network Design

Graduate Program in Supply Chain Management
Reverse Logistics   •   Graduate

Closed-Loop Network Design

Introduction and Context

Reverse logistics concerns the movement of products, components, packaging, and materials from their point of consumption or use toward recovery, redistribution, remanufacturing, recycling, or disposal. Closed-loop network design extends this perspective by integrating forward logistics with reverse flows. Instead of treating returns as exceptional waste streams, the organization designs a system in which products and materials circulate between customers, collection points, recovery facilities, markets, suppliers, and disposal sites.

The design problem is strategically important because network structure determines cost, service quality, environmental performance, regulatory exposure, and the value recovered from returned products. A network with many local collection points may reduce customer effort but increase fixed operating costs. A centralized recovery facility may provide economies of scale but create longer transport distances and greater disruption risk. Outsourcing can provide specialized capabilities, but it may reduce control over data, quality, compliance, and continuity.

A closed-loop network therefore requires more than selecting warehouse locations. It requires simultaneous decisions about:

  • which facilities to open or close;
  • which customer and return points should be served;
  • how products should be routed in forward and reverse directions;
  • how much processing capacity is required;
  • which activities should be performed internally or outsourced;
  • how recovered products should be allocated to secondary markets; and
  • how the network should respond to uncertainty and disruption.

The central managerial challenge is to balance economic efficiency with recovery value, environmental responsibility, customer convenience, and resilience.

Learning Objectives

By the end of this chapter, the reader should be able to:

  1. Distinguish open-loop, closed-loop, centralized, and decentralized reverse-logistics networks.
  2. Map the physical flows, information flows, and decision points in a recovery network.
  3. Formulate a basic mixed-integer network-design model involving collection points, return centers, recovery facilities, secondary markets, and disposal sites.
  4. Evaluate location, capacity, outsourcing, and recovery-channel decisions.
  5. Assess the trade-offs between cost, service, sustainability, and resilience.
  6. Apply network-design principles to a practical closed-loop case.
  7. Identify governance, ethical, regulatory, and technological risks in reverse networks.

1. The Architecture of a Closed-Loop Network

A typical closed-loop network contains two related cycles. The forward cycle moves products from suppliers and manufacturing plants to distribution centers, retailers, and customers. The reverse cycle moves used, defective, obsolete, or unwanted products from customers back through collection and inspection channels. Some items re-enter the forward cycle as repaired or remanufactured products; others become recovered materials or are sent to disposal.

Important facility types include the following:

Facility or nodePrimary role
Customer or userGenerates returns, cores, packaging, or end-of-life products
Collection pointAccepts returns and consolidates small quantities
Return centerReceives, records, inspects, sorts, and routes returns
Recovery facilityRepairs, refurbishes, remanufactures, recycles, or harvests parts
Manufacturing plantProduces new products and may use recovered components
Distribution centerStores and distributes new or recovered products
Secondary marketReceives refurbished, remanufactured, or downgraded products
Material marketPurchases recovered commodities or components
Disposal siteHandles residuals that cannot be economically or safely recovered

The network also includes less visible but essential flows. Information must accompany the physical product: serial number, ownership, warranty status, hazardous-material classification, condition, chain of custody, and final disposition. Inadequate information may cause unnecessary disposal, fraud, unsafe reuse, or regulatory violations.

A recovery network is often better represented as a directed graph than as a simple linear chain. Let G = (N,A) denote a directed network, where N is the set of nodes and A is the set of feasible arcs. An arc represents a permitted movement, such as customer to collection point or recovery facility to secondary market. Feasibility depends on transport rules, product condition, technology, geography, and regulation.

Closed-loop logistics network Supplier Manufacturer Distribution Customer Collection Return center Recovery facility Forward flowReverse flow and recovery
Closed-loop logistics network showing forward and reverse flows
Figure: Closed-loop logistics network showing forward and reverse flows

Figure: A simplified closed-loop network linking forward distribution with reverse collection and recovery.

2. Open-Loop and Closed-Loop Designs

An open-loop reverse network collects products from one supply chain but sends recovered outputs to a different industry or market. For example, used PET bottles may be collected from a beverage system and converted into textile fiber. The recovered material does not necessarily return to the original manufacturer.

A closed-loop network returns products, components, or materials to the original supply chain or to a tightly linked market. Examples include a printer manufacturer collecting cartridges, remanufacturing them, and selling them through its own distribution channel; or an automotive producer recovering batteries for use in new battery production.

The distinction is analytical rather than absolute. A network may be closed for some components and open for others. A returned appliance might yield a compressor reused by the original manufacturer, metals sold to an external recycler, and residual plastics sent to disposal. Effective design therefore tracks recovery pathways at the component or material level.

DimensionOpen-loop networkClosed-loop network
Destination of recoveryDifferent industry or marketOriginal or linked supply chain
Product knowledgeOften lowerUsually higher
Coordination requirementModerateHigh
Recovery-value captureMay be limitedPotentially high
Main riskMarket mismatchReverse-flow complexity and channel conflict

3. Centralized and Decentralized Configurations

A centralized network concentrates inspection, testing, repair, and disposition in one or a few facilities. Centralization can create economies of scale, specialized labor, consistent quality standards, and better investment utilization. It is attractive where returns are geographically dispersed but processing technology is expensive.

However, centralization increases inbound distance and may delay credit issuance or replacement. It also creates single points of failure. A fire, labor dispute, cyberattack, flood, or regulatory closure at the central facility can interrupt the entire reverse system.

A decentralized network places return centers or recovery capabilities closer to customers and markets. It can shorten response time, reduce customer effort, and support local service. Its disadvantages include duplicated equipment, variable process quality, lower utilization, and more difficult governance.

Hybrid designs are common. Collection is decentralized, while inspection and advanced recovery are centralized. Regional return centers may perform triage, sending repairable products to local service providers and complex items to a national recovery facility. The appropriate structure depends on return density, product value, condition variability, transport cost, processing economies, and required service speed.

4. Strategic Design Decisions

4.1 Facility location

Location decisions should consider both forward and reverse demand. Relevant factors include transport rates, labor availability, land and utilities, taxes, environmental permits, hazardous-material restrictions, proximity to customers, proximity to secondary markets, and exposure to floods, earthquakes, storms, political instability, or infrastructure failure.

A return center should not be located solely on the basis of the original distribution network. Return volumes may be correlated with installed product populations, warranty cycles, product failure rates, consumer behavior, and seasonal replacement patterns.

4.2 Capacity

Capacity must be planned for both average and peak returns. A facility designed for average volume may fail during product recalls, seasonal replacement periods, or regulatory take-back campaigns. Conversely, excessive capacity creates fixed-cost waste.

Capacity is multidimensional. A facility may have enough floor space but insufficient diagnostic stations, skilled technicians, battery quarantine space, secure data-erasure equipment, or permitted hazardous-waste capacity. A sound design therefore measures capacity by process stage rather than by square meters alone.

If expected returns in period t are Rt, planned capacity is Kt, and a design utilization limit is ρmax, then a basic feasibility condition is:

Rt ≤ ρmax Kt

Here ρmax is dimensionless and normally less than 1, because some capacity must absorb variability, maintenance, and disruption. This relationship is a planning constraint, not a complete queueing model. It does not determine waiting time unless arrival and processing variability are also modeled.

4.3 Outsourcing and vertical integration

Organizations may outsource collection, transportation, testing, repair, recycling, or disposal. Outsourcing is attractive when a third party has specialized equipment, regulatory licenses, geographic coverage, or scale economies. Internal operation may be preferable when product knowledge, intellectual property, customer data, quality control, or strategic recovery value is important.

The decision should compare total risk-adjusted cost rather than quoted processing price alone. Relevant terms include transition cost, monitoring cost, contract-management cost, transport, data-security controls, supplier failure risk, switching cost, and residual-value sharing.

Contracts should specify service levels, turnaround time, disposition authority, audit rights, environmental performance, data protection, worker safety, subcontracting restrictions, business-continuity plans, and evidence of final recycling or destruction.

4.4 Recovery-channel allocation

Returned products should be routed according to condition and economic value. A common hierarchy is:

  1. direct reuse;
  2. repair;
  3. refurbishment;
  4. remanufacturing;
  5. component harvesting;
  6. material recycling; and
  7. disposal.

This hierarchy is not universal. Safety, warranty, contamination, technology obsolescence, and market demand may make a lower position preferable. A high-value component may be harvested even when the complete product cannot be remanufactured.

5. A Basic Mixed-Integer Network-Design Model

Network design commonly combines discrete facility-opening decisions with continuous flow decisions. Consider collection points i ∈ I, return centers j ∈ J, recovery facilities k ∈ K, secondary markets m ∈ M, and disposal sites n ∈ N.

Let:

SymbolDefinition
yj1 if return center j is opened; 0 otherwise
zk1 if recovery facility k is opened; 0 otherwise
xijUnits shipped from collection point i to return center j
wjkUnits shipped from return center j to recovery facility k
vkmRecovered units shipped from facility k to market m
dknResidual units shipped from facility k to disposal site n
Fj, GkFixed opening costs
cUnit transportation and processing cost on an arc
Kj, LkCapacities of return center and recovery facility
QiAvailable returns at collection point i

A simplified objective minimizes fixed facility cost plus variable transportation, processing, and disposal cost:

min Z = ∑j Fj yj + ∑k Gk zk + ∑i,j cijxij + ∑j,k cjkwjk + ∑k,m ckmvkm + ∑k,n ckndkn

The objective assumes all terms are expressed in the same monetary period and currency. If environmental externalities, service penalties, or risk costs are included, they must be monetized carefully or handled as separate objectives.

Collection availability is constrained by:

∑j xij ≤ Qi for every i

A collection point may send only available returns. Return-center flow conservation is:

∑i xij = ∑k wjk for every j

This assumes no inventory accumulation at the return center. If temporary storage is allowed, inventory variables and a time-indexed balance equation are required.

Facility capacities are enforced by:

∑i xij ≤ Kj yj for every j

and

∑j wjk ≤ Lk zk for every k

These constraints prevent flow through a facility that has not been opened. Recovery yields must be represented when input and output quantities differ. If αk is the recoverable yield at facility k, then:

∑m vkm + ∑n dkn ≤ αk ∑j wjk

where 0 ≤ αk ≤ 1. The inequality allows additional losses or unmodeled inventory. If every recovered unit must be assigned and yield is deterministic, equality may be appropriate.

The model is a mixed-integer linear program when costs, capacities, and yields are linear and facility decisions are binary. It becomes more difficult when routing, economies of scale, uncertain returns, multiple periods, nonlinear recovery quality, or endogenous prices are introduced.

Multiobjective evaluation

Cost minimization alone can produce a fragile or environmentally poor design. A weighted objective may be written as:

min Z = C + λE E + λS S + λR R

where C is monetary cost, E is environmental impact, S is service penalty, R is risk exposure, and the λ terms convert or weight each criterion. The weights must be justified because changing them can change the preferred network. An alternative is a constrained approach, such as minimizing cost subject to a maximum carbon footprint and a minimum service level.

6. Worked Example: Choosing a Recovery Configuration

Consider two possible recovery facilities. Facility A has a fixed annual cost of $180,000 and variable processing cost of $14 per unit. Facility B has a fixed annual cost of $300,000 and variable processing cost of $9 per unit. Annual return volume is 30,000 units. Transportation and collection costs are identical under both alternatives and can therefore be excluded from the comparison.

The total relevant cost for a facility is:

TC = F + cq

where F is annual fixed cost in dollars, c is variable cost per unit, and q is annual volume in units.

For A:

TCA = 180,000 + 14 × 30,000 = $600,000

For B:

TCB = 300,000 + 9 × 30,000 = $570,000

Facility B is preferred at 30,000 units, despite its higher fixed cost. The break-even volume is obtained by equating total costs:

FA + cAq = FB + cBq

Thus:

q = (FB − FA) ÷ (cA − cB) = 120,000 ÷ 5 = 24,000 units

Above 24,000 units, B is cheaper under the stated assumptions. The result is not sufficient by itself for a final decision. B must also have adequate capacity, acceptable transport distance, resilience, labor availability, and regulatory authorization. If B is a single point of failure, the organization may rationally choose A, add backup capacity, or use a dual-sourcing strategy.

7. Resilience in Closed-Loop Networks

Reverse networks face uncertainty in volume, quality, timing, and destination. Returns may surge after a recall, while the proportion of economically recoverable products may decline as technology changes. Resilience is the capability to maintain or rapidly restore acceptable performance after disruption.

Design measures include:

  • dual or multisourcing of recovery services;
  • geographically separated facilities;
  • cross-trained labor;
  • reserved processing capacity;
  • alternate transport routes;
  • modular contracts with third-party providers;
  • emergency disposal and quarantine arrangements;
  • inventory buffers for critical recovered components; and
  • tested business-continuity and cyber-recovery plans.

Resilience should be evaluated against specific disruption scenarios rather than treated as a vague benefit. For scenario s, let ps be its probability and Cs the resulting cost. Expected disruption cost is:

E[C] = ∑s ps Cs

This measure is useful when probabilities are credible. For rare, severe, or poorly understood events, scenario analysis, stress testing, and robust optimization may be more appropriate than expected-cost minimization.

A resilient design may be more expensive in normal conditions. The relevant question is whether the additional cost is justified by avoided losses, regulatory exposure, customer harm, and recovery time. Resilience should also include reverse-specific risks such as hazardous accumulation, data-bearing devices, counterfeit insertion, and loss of traceability.

8. Applied Case: Northstar Devices (Illustrative)

Background

Northstar Devices, a fictional manufacturer of commercial handheld scanners, sells through national distributors. Customers return scanners for warranty repair, trade-in, battery replacement, and end-of-life recycling. Returns currently go directly to a single contractor 700 kilometers from the largest customer clusters.

Problem

The contractor has experienced long queues and inconsistent grading. Customers wait up to three weeks for credit, while usable scanners are sometimes sold as low-value scrap. A new battery regulation also requires documented separation and treatment of damaged lithium-ion batteries. Northstar must decide whether to centralize, regionalize, or outsource more of the network.

Analysis

Northstar mapped 42,000 annual returns, identifying three streams: 45% repairable, 25% suitable for refurbishment, and 30% requiring component harvesting, material recycling, or disposal. The company found that the existing contractor had adequate average capacity but insufficient surge capacity and weak visibility into final disposition.

A total-cost analysis favored two regional return centers for collection, inspection, and rapid customer credit. Complex remanufacturing would remain at one specialized facility. Certified recyclers would process batteries and metals. The design was partly closed loop: refurbished scanners returned to Northstar’s distributor network, while metals and certain plastics entered open-loop commodity markets.

Approach and solution

Northstar implemented the following controls:

  1. standardized condition grades and photographic evidence;
  2. serial-number scanning at collection;
  3. a rules-based routing engine for repair, refurbishment, harvest, recycling, or disposal;
  4. a dual-provider arrangement for specialized recovery;
  5. a capacity reservation for recall events;
  6. contractual audit rights and downstream-disposition certificates; and
  7. a dashboard tracking turnaround time, recovery yield, customer credit, safety incidents, and greenhouse-gas estimates.

Artificial intelligence was used only as decision support. A model predicted likely disposition from historical failure codes and images, but human technicians retained authority for safety-critical decisions. The system was monitored for bias against older models and for false confidence when a product was poorly photographed.

Outcome

After implementation, average credit time fell, recovery yield increased, and battery documentation improved. The network had somewhat higher fixed operating cost, but the company reduced unnecessary disposal and improved service. The dual-provider arrangement also reduced dependence on one contractor. The case illustrates that the least-cost facility configuration is not necessarily the best network when service, compliance, and resilience are included.

Learning points

The case demonstrates five general principles. First, return-center design affects customer experience, not only waste handling. Second, triage close to the customer can coexist with centralized technical recovery. Third, recovery markets must be designed together with processing capacity. Fourth, outsourcing requires governance, not merely a purchase order. Fifth, digital tools improve visibility only when data standards and accountability are sound.

9. Governance, Ethics, and Regulation

Closed-loop networks create responsibilities beyond efficiency. Products may contain personal data, hazardous substances, valuable intellectual property, or components whose reuse affects safety. Organizations must establish clear accountability for the product’s final disposition.

Key governance issues include:

  • truthful claims about recycling and circularity;
  • protection of customer data during repair, resale, and erasure;
  • safe handling of batteries, chemicals, and contaminated equipment;
  • prevention of informal export of hazardous waste;
  • fair labor conditions in dismantling and recycling;
  • transparent chain of custody;
  • anti-counterfeiting controls; and
  • respect for extended producer responsibility and take-back obligations.

A company should distinguish measured recovery from aspirational sustainability language. “Collected,” “reused,” “recycled,” and “diverted from disposal” are not interchangeable claims. Governance systems should retain auditable evidence of quantities, destinations, processing methods, and residuals.

10. Technology and Contemporary Developments

Several technologies are reshaping network design. Internet-of-things data can provide condition, usage, and location information before a product is returned. Digital product passports can record composition, repair history, and disassembly instructions. Automated identification improves traceability, while robotics can support sorting and disassembly.

AI can forecast return volumes, classify product condition, detect fraud, optimize routing, and identify likely component failures. Nevertheless, AI models require representative data and controls against automation bias. A prediction is not proof of safety or legal compliance. Human review is essential where decisions affect hazardous handling, warranty rights, worker safety, or customer privacy.

Digital systems also introduce cyber risk. A compromised serial-number database could enable counterfeit returns, fraudulent credits, or diversion of valuable materials. Network design should therefore include access control, encryption, system redundancy, supplier cyber requirements, and incident-response procedures.

Challenges and Limitations

Closed-loop design models necessarily simplify reality. Demand and returns may be stochastic rather than known. Product quality may be correlated with geography, age, and usage. Recovery yields may depend on batch composition. Secondary-market prices can be volatile, and recovered products may cannibalize new-product sales. Transport emissions depend on vehicle type, load factor, distance, and empty backhauls rather than distance alone.

Linear models may also conceal social and environmental externalities. A facility can appear economical because pollution, unsafe labor, or community disruption is not priced. Multiobjective models reduce this problem but do not eliminate the need for managerial judgment. Finally, a mathematically optimal network may be difficult to implement if data quality is poor, contracts are inflexible, or organizational incentives reward sales rather than recovery.

Best-Practice Design Process

A disciplined design process can follow these steps:

  1. Define product, material, regulatory, and geographic boundaries.
  2. Forecast returns by product, location, timing, condition, and uncertainty.
  3. Map forward and reverse flows, including information and residuals.
  4. Establish recovery options and feasible processing yields.
  5. Generate candidate locations and capacity modules.
  6. Compare centralized, decentralized, hybrid, and outsourced configurations.
  7. Evaluate cost, service, environmental impact, compliance, and resilience.
  8. Stress-test the design under recalls, supplier failure, disasters, and demand shifts.
  9. Select governance controls, contracts, data standards, and performance measures.
  10. Pilot, measure, and revise the network as product and market conditions change.

Chapter Summary

Closed-loop network design integrates forward logistics with the collection, inspection, recovery, redistribution, recycling, and disposal of returned products and materials. Open-loop networks send recovered outputs to other industries, whereas closed-loop networks return value to the original or a linked supply chain. Centralized systems offer scale and consistency; decentralized systems offer proximity and responsiveness; hybrid systems often balance both.

Core design decisions concern facility location, capacity, recovery-channel allocation, outsourcing, secondary markets, and resilience. A mixed-integer model can combine binary facility-opening decisions with continuous product flows, capacity limits, recovery yields, and disposal requirements. However, cost minimization should be complemented by service, environmental, governance, and risk considerations.

Effective networks use accurate return forecasts, product-level traceability, modular capacity, qualified recovery partners, auditable disposition, and scenario-based resilience analysis. Technology and AI can improve prediction and visibility, but they do not replace safety controls, human judgment, or ethical accountability. The best network is therefore not simply the cheapest one; it is the configuration that creates reliable recovery value while meeting customer, regulatory, environmental, and strategic requirements.

Key Terms

Closed-loop network: A logistics system in which recovered products, components, or materials return to the original or a linked supply chain.

Open-loop network: A recovery system in which outputs move to a different industry or market.

Collection point: A location where customers or users deposit returned products or materials.

Return center: A facility that receives, records, inspects, sorts, and routes returns.

Recovery facility: A facility that repairs, refurbishes, remanufactures, recycles, or harvests components.

Secondary market: A market for refurbished, remanufactured, downgraded, or recovered products.

Disposition: The decision concerning the next destination or treatment of a returned item.

Recovery yield: The proportion of input material or products converted into usable output.

Centralization: Concentration of processing activities in a small number of facilities.

Decentralization: Distribution of processing activities across several geographically dispersed facilities.

Triage: Initial inspection and classification of a returned item.

Capacity reservation: Contracted or planned capacity held for peaks or disruptions.

Outsourcing: Assigning a logistics or recovery activity to an external provider.

Remanufacturing: Restoring a used product to a condition meeting specified performance standards.

Component harvesting: Recovering usable parts from a product that will not be reused as a complete unit.

Mixed-integer linear program: An optimization model containing continuous variables and discrete variables with linear relationships.

Resilience: The ability of a network to withstand, adapt to, and recover from disruption.

Extended producer responsibility: A policy approach assigning producers responsibility for products through post-consumer stages.

Digital product passport: A digital record containing information about a product’s composition, history, repair, and recovery.

Residual: Material remaining after recovery processes that must be recycled further or disposed of.

Review Questions

Short Answer Questions

  1. What is the difference between an open-loop and a closed-loop network?
  2. Why might an organization use a hybrid centralized–decentralized design?
  3. Identify four facility types commonly found in a closed-loop network.
  4. What is recovery yield, and why is it important in network modeling?
  5. Name three governance risks associated with outsourced reverse logistics.

Long Answer Questions

  1. Explain the principal trade-offs between centralized and decentralized recovery networks.
  2. Describe how facility location and capacity decisions should reflect uncertainty in returns.
  3. Explain how outsourcing can create both strategic benefits and governance risks.
  4. Discuss why cost minimization alone is inadequate for closed-loop network design.
  5. Explain how resilience can be incorporated into the evaluation of a reverse-logistics network.

Analytical / Application Questions

  1. A company processes 20,000 returned units annually. Facility X costs $150,000 fixed plus $16 per unit, while Facility Y costs $260,000 fixed plus $10 per unit. Calculate the break-even volume and recommend a facility at 20,000 units, ignoring non-comparable costs.
  2. Design a two-stage reverse network for a product with dispersed customers, hazardous components, and a high-value remanufacturing option. Justify collection, inspection, recovery, secondary-market, and disposal locations.
  3. A single recovery contractor is low-cost but vulnerable to flood disruption. Compare at least two resilience alternatives and explain how you would evaluate their cost, service, compliance, and risk consequences.

Multiple Choice Questions with Answers

Question 1

Which feature most clearly distinguishes a closed-loop network from an open-loop network?

A. It uses transportation in both directions.

B. It sends recovered value back to the original or a linked supply chain.

C. It always has a centralized recovery facility.

D. It eliminates disposal activities.

Correct Answer: B. It sends recovered value back to the original or a linked supply chain.

Question 2

What is a principal advantage of centralizing recovery operations?

A. Guaranteed elimination of transport distance.

B. No need for capacity planning.

C. Economies of scale and process consistency.

D. Complete elimination of disruption risk.

Correct Answer: C. Economies of scale and process consistency.

Question 3

If annual returns are 40,000 units, capacity is 50,000 units, and the utilization limit is 0.8, is the facility feasible under the stated capacity constraint?

A. Yes, because 40,000 ≤ 50,000.

B. Yes, because utilization is exactly 0.8.

C. No, because allowable throughput is 40,000 and variability requires more capacity.

D. No, because capacity must exceed 80,000 units.

Correct Answer: C. No, because allowable throughput is 40,000 and variability requires more capacity.

Question 4

Which activity normally occurs first at a return center?

A. Final disposal certification

B. Inspection and sorting

C. Secondary-market advertising

D. Raw-material extraction

Correct Answer: B. Inspection and sorting

Question 5

In the basic network model, what does a binary facility-opening variable represent?

A. The condition of an individual returned product.

B. Whether a candidate facility is opened.

C. The number of units shipped on an arc.

D. The percentage recovery yield.

Correct Answer: B. Whether a candidate facility is opened.

Question 6

A recovery facility receives 10,000 units and has a recovery yield of 0.70. What is the maximum recovered output under the simple yield assumption?

A. 700 units

B. 3,000 units

C. 7,000 units

D. 10,700 units

Correct Answer: C. 7,000 units

Question 7

Which arrangement best illustrates a hybrid reverse network?

A. All activities are performed by customers.

B. Collection is regional, while complex remanufacturing is centralized.

C. Every facility performs every recovery activity.

D. No products are inspected before resale.

Correct Answer: B. Collection is regional, while complex remanufacturing is centralized.

Question 8

When are expected disruption costs most appropriately calculated using E[C] = ∑s ps Cs?

A. When credible scenario probabilities and consequences are available.

B. When no disruption scenarios can be identified.

C. Only when all disruptions have equal probability.

D. Only when fixed costs are zero.

Correct Answer: A. When credible scenario probabilities and consequences are available.

Question 9

Which contract provision is particularly important when a third party handles returned products containing customer data?

A. A restriction on all performance measurement.

B. Data-erasure requirements and audit rights.

C. Permission to subcontract without disclosure.

D. A prohibition on documenting final disposition.

Correct Answer: B. Data-erasure requirements and audit rights.

Question 10

In the worked facility comparison, why could the higher-fixed-cost facility become preferable at higher volume?

A. Its variable cost per unit was lower.

B. Its fixed cost disappears at high volume.

C. Its transport distance is automatically zero.

D. Its recovery yield must be 100%.

Correct Answer: A. Its variable cost per unit was lower.

Reverse Logistics
Chapter 4 of 15