13. Techno-Economic, Environmental and Risk AssessmentIntroduction and contextRenewable-energy projects are often described as technically feasible because the resource is available and a conversion technology exists. Technical feasibility, however, is only one condition for a sound investment. A wind farm may produce electricity reliably but remain unattractive if grid-connection costs are excessive. A biomass plant may offer dispatchable generation but create environmental liabilities through unsustainable feedstock supply. A solar installation may have a low operating cost but require careful treatment of degradation, replacement, financing, land use and end-of-life management. Techno-economic, environmental and risk assessment provides the integrated basis for such judgments. It connects engineering performance with monetary value, environmental consequences, uncertainty and decision quality. The central task is not merely to calculate a single cost or emissions value, but to understand how assumptions, system boundaries, time, risk and stakeholder priorities shape the result. For postgraduate engineers, assessment must therefore go beyond simple payback calculations. It should include energy and exergy accounting, discounted cash flow, levelized cost, sensitivity and uncertainty analysis, reliability evaluation, life-cycle assessment, carbon accounting and multi-criteria decision-making. These methods are complementary. Energy analysis measures quantities; exergy analysis evaluates quality; economic analysis values resources and cash flows; environmental assessment examines life-cycle burdens; risk analysis addresses uncertain outcomes; and multi-criteria methods support decisions when no single metric is sufficient. Learning objectivesAfter completing this chapter, the student should be able to: 1. Distinguish energy, exergy, economic, environmental and risk-based performance measures. 2. Construct energy and exergy balances for renewable-energy systems. 3. Estimate levelized cost of electricity or useful energy using discounted cash flow. 4. Evaluate project cash flows, net present value, internal rate of return and payback. 5. Conduct sensitivity, scenario and probabilistic uncertainty analyses. 6. Assess reliability, availability and the consequences of component failure. 7. Apply life-cycle assessment and carbon-accounting principles. 8. Use multi-criteria decision analysis for technology selection. 9. Interpret results responsibly, including ethical, regulatory and governance considerations. 10. Integrate technical, economic, environmental and risk evidence into professional recommendations. The assessment problem: from performance to decisionA renewable-energy assessment begins by defining the decision. The question may be whether to install a photovoltaic system, select between wind and solar technologies, size a battery, replace a diesel generator, or determine whether a biomass resource can support a long-term plant. Each question requires a different boundary, time horizon and set of performance indicators. A useful assessment architecture contains five linked layers. The first is the physical layer, describing resource availability, conversion efficiency, output profile, degradation and auxiliary consumption. The second is the economic layer, including capital expenditure, operating expenditure, financing, revenue and residual value. The third is the environmental layer, covering materials, construction, operation, transport and disposal. The fourth is the risk and reliability layer, addressing uncertainty, failure, variability and resilience. The fifth is the decision layer, in which alternatives are compared according to explicit stakeholder preferences. The quality of a result depends heavily on assumptions. A levelized cost calculated with an optimistic capacity factor, a short equipment life and no replacement cost is not comparable with one calculated using conservative production estimates and a full life-cycle boundary. Consequently, every assessment should document the functional unit, system boundary, time horizon, discount rate, resource data, degradation assumptions, price basis and treatment of uncertainty. Energy and exergy accountingEnergy accountingThe first law of thermodynamics provides the basis for energy accounting. For a system over a defined period, Energy input = useful energy output + rejected energy + losses + change in stored energy. For a steady-state conversion device, an energy efficiency may be written as η = E useful / E input. In a solar thermal collector, useful heat may be compared with incident solar radiation. In a biomass gasifier, chemical energy in the feedstock may be compared with the chemical energy of the product gas and recovered heat. For a wind turbine, the resource-side input is commonly represented by the kinetic energy flux through the rotor, while the useful output is electrical energy. Energy accounting is indispensable for sizing and performance verification, but it treats all energy quantities as if they had equal usefulness. This is a significant limitation. One unit of electricity can theoretically be converted into nearly one unit of high-temperature heat, whereas one unit of low-temperature environmental heat cannot perform the same work. Exergy accountingExergy is the maximum theoretical useful work obtainable as a system comes into equilibrium with a specified reference environment. It measures energy quality rather than energy quantity. Electricity and shaft work are high-exergy forms, while low-temperature heat has lower exergy relative to the ambient environment. For heat transferred at temperature T to an environment at reference temperature T0, the associated exergy is approximately Ex heat = Q(1 − T0/T), where temperatures are absolute. The exergy balance can be expressed as Exergy input = useful exergy output + exergy destruction + exergy loss. Exergy destruction is associated with irreversibility and is linked to entropy generation through the Gouy–Stodola relation: Ex destruction = T0 S generation. Exergy efficiency is commonly defined as η ex = useful exergy output / exergy input. This measure is particularly valuable in hybrid renewable systems. For example, a solar-assisted heat-pump system may show a high energy efficiency because it delivers substantial low-temperature heat, yet its exergy efficiency may reveal poor matching between supply temperature and demand. Similarly, a biomass combined heat-and-power system should not automatically receive equal credit for electricity and low-grade heat; exergy analysis helps distinguish their thermodynamic value. Exergoeconomic interpretationExergoeconomics combines exergy accounting with economic costing. Costs are assigned to exergy streams, allowing the analyst to identify components that destroy valuable work and money simultaneously. A heat exchanger with a modest monetary cost may cause substantial exergy destruction, while an expensive turbine may operate close to its thermodynamic optimum. The combined analysis supports better choices than either energy efficiency or purchase price alone. Economic evaluation of renewable-energy projectsCost classification and cash-flow structureProject costs should be separated into capital expenditure, fixed operating expenditure, variable operating expenditure, replacement expenditure and decommissioning expenditure. Capital expenditure may include equipment, civil works, engineering, construction, land preparation, development, interconnection and commissioning. Operating expenditure may include scheduled maintenance, insurance, labor, leases, consumables and administrative costs. Cash-flow timing is important. A payment made in year zero is economically different from an equal payment in year ten. The present value of a future amount is PV = CFt/(1 + i)^t, where CFt is the cash flow in year t and i is the discount rate. The discount rate may reflect the cost of capital, inflation treatment, project risk and the perspective of the analysis. Nominal cash flows should be discounted using a nominal rate; real cash flows should use a real rate. Mixing the two produces biased results. Net present value and internal rate of returnNet present value is NPV = Σ [CFt/(1+i)^t] − I0, where I0 is the initial investment. A positive NPV indicates that the project exceeds the required return under the stated assumptions. The internal rate of return is the discount rate that makes NPV equal to zero. IRR is useful for communication but can be misleading when cash flows change sign more than once or when projects have different scales and lives. NPV is generally the stronger decision criterion for mutually exclusive investments. Payback period measures the time required for cumulative undiscounted or discounted cash flow to recover the initial investment. It is easy to understand but ignores benefits after payback and may neglect the time value of money. It should therefore be treated as a supplementary indicator. Levelized cost of energyThe levelized cost of energy (LCOE) expresses the discounted lifetime cost per unit of discounted energy delivered: LCOE = [Σt (Ct + Ot + Ft + Rt − St)/(1+i)^t] / [Σt Et/(1+i)^t]. Here Ct represents capital expenditure, Ot operating expenditure, Ft fuel expenditure where relevant, Rt replacement or end-of-life cost, St salvage value and Et energy output in year t. LCOE is useful for comparing technologies that provide a similar service, but it is not a complete measure of system value. It may omit grid flexibility, capacity contribution, transmission requirements, curtailment, environmental externalities and energy delivered at different times. For storage, a cost per discharged kilowatt-hour should account for round-trip efficiency, cycle life, usable depth of discharge, degradation and replacement. For heating systems, the functional output should be useful heat rather than electricity generated. A consistent functional unit is essential. Revenue and support mechanismsRenewable projects may earn revenue from energy sales, capacity payments, renewable certificates, avoided fuel purchases, demand-charge reduction, ancillary services or carbon credits. Subsidies, feed-in tariffs and tax incentives should be identified explicitly rather than hidden in a generic cost figure. A robust analysis usually presents both the unsubsidized and policy-supported cases. Risk, sensitivity and uncertaintyA deterministic financial model produces a single result from a single set of assumptions. Real projects face uncertain resource quality, equipment performance, inflation, interest rates, electricity prices, construction costs, policy conditions and component lifetimes. Risk analysis makes these uncertainties visible. Sensitivity analysisOne-way sensitivity analysis changes one input while holding others constant. It can identify the break-even electricity price, minimum capacity factor or maximum acceptable capital cost. Tornado diagrams are effective for ranking influential variables. Two-way sensitivity analysis examines interactions, such as discount rate and capacity factor or battery cost and cycle life. Sensitivity does not assign probabilities. It answers the question: how strongly does the result respond to a change in an assumption? A variable with high sensitivity deserves improved data, contractual protection or design attention. Scenario and probabilistic analysisScenario analysis combines assumptions into coherent futures, such as low-price, reference and high-price cases. It is useful when variables are correlated or when policy and market conditions change together. Monte Carlo analysis assigns probability distributions to uncertain inputs and repeatedly samples them to obtain a distribution of outputs. Results may include the probability that NPV is negative, the confidence interval for LCOE or the probability of violating an emissions limit. The model must use defensible distributions and correlations; thousands of simulations cannot correct poor assumptions. Risk can also be represented through decision trees, real-options analysis or risk-adjusted discount rates. Real options are particularly relevant where a project can be expanded, delayed, abandoned or operated flexibly as information improves. Reliability, availability and resilienceRenewable resources are variable, but variability is not identical to unreliability. A photovoltaic plant may be highly reliable when sunlight is available, while its output remains unavailable at night. Reliability analysis distinguishes resource availability from equipment availability and from system adequacy. Common indicators include mean time between failures, mean time to repair, forced outage rate, capacity factor and availability: Availability = uptime/(uptime + downtime). For a series system, failure of one essential component can interrupt the whole service. For redundant components, the system may continue operating after one failure. A simple reliability model may use component failure rates and repair rates, while more advanced studies employ fault-tree analysis, event-tree analysis, Markov models or Monte Carlo simulation. In renewable microgrids, reliability may be measured by loss-of-load probability, expected energy not served and interruption duration. Battery degradation, inverter failure, weather extremes and communication-system failure should be included. Resilience extends the analysis to recovery from shocks such as storms, floods, cyberattacks and fuel disruptions. Life-cycle assessment and carbon accountingLife-cycle assessment frameworkLife-cycle assessment (LCA) evaluates environmental impacts across a defined product or service life. The usual stages are goal and scope definition, inventory analysis, impact assessment and interpretation. The functional unit might be one kilowatt-hour of electricity delivered to a specified busbar, one megajoule of useful heat, or one tonne of hydrogen supplied at a defined pressure. The system boundary may be cradle-to-gate, cradle-to-grave, gate-to-gate or cradle-to-cradle. For renewable-energy systems, relevant processes include raw-material extraction, material processing, manufacturing, transport, construction, operation, maintenance, replacement, recycling and disposal. Operational emissions may be low, but embodied emissions in steel, cement, aluminum, glass, polymers and batteries can be significant. Impact categories may include climate change, water consumption, land occupation, mineral resource use, particulate matter, eutrophication and toxicity. LCA results depend on allocation rules, background databases, regional electricity mixes, recycling assumptions and treatment of co-products. Results should therefore be interpreted rather than presented as universally fixed numbers. Carbon accountingCarbon accounting quantifies greenhouse-gas emissions, usually as carbon dioxide equivalent. Direct emissions occur within the project boundary; indirect emissions arise from purchased electricity, fuel production, manufacturing and transport. Avoided emissions should be calculated against a clearly defined counterfactual, such as marginal grid generation or displaced diesel fuel. The net life-cycle carbon balance can be expressed as Net emissions = project life-cycle emissions − credited avoided emissions. Care is needed with biogenic carbon. Biomass is not automatically carbon neutral: cultivation, processing, transport, land-use change, methane leakage and regrowth times affect the result. Carbon credits also require additionality, permanence, leakage control, monitoring, reporting and verification. Multi-criteria technology selectionTechnology decisions rarely depend on cost alone. A municipality may value local employment and visual impact; an industrial user may prioritize reliability and process-temperature quality; a utility may emphasize firm capacity, flexibility and land constraints. Multi-criteria decision analysis (MCDA) makes these priorities explicit. A typical procedure is to define alternatives, establish criteria, normalize performance values, assign weights, aggregate scores and test the robustness of the ranking. Criteria may include LCOE, NPV, emissions, water use, land requirement, reliability, maturity, resource risk, social acceptance and safety. The weighted-sum method is transparent but assumes that criteria can be meaningfully normalized and combined. Analytic hierarchy process, outranking methods and compromise programming offer alternatives. Weight selection should involve stakeholders, and sensitivity analysis should test whether a small change in weights reverses the ranking. A high composite score does not eliminate the need to inspect unacceptable performance on an individual criterion. An integrated assessment workflowA rigorous professional study commonly follows these steps: 1. Define the decision, functional unit, alternatives, boundary and study period. 2. Characterize the resource using measured or validated data and quantify temporal variability. 3. Build an energy and exergy model, including auxiliary loads and degradation. 4. Develop the engineering design and estimate annual production, availability and replacement needs. 5. Construct a transparent discounted cash-flow model. 6. Calculate economic indicators and test financing, price and policy assumptions. 7. Perform LCA and carbon accounting using consistent boundaries. 8. Model reliability, failure modes, maintenance and extreme events. 9. Conduct sensitivity, scenario and probabilistic analysis. 10. Compare alternatives using MCDA where several objectives matter. 11. Report assumptions, uncertainty ranges, limitations and decision implications. Digital tools can support this workflow through time-series simulation, geographic information systems, optimization, spreadsheet models, Python or MATLAB scripts, and reliability databases. Machine learning may improve resource forecasting or predictive maintenance, but it does not replace physical validation, traceable data or engineering judgment. Automated models should be auditable and protected against data leakage, hidden assumptions and inappropriate extrapolation. Illustrative case study: selecting energy supply for a remote health facilityBackgroundThis illustrative case concerns a remote health facility currently supplied by a diesel generator. The facility requires electricity for refrigeration, lighting, communications, water pumping and medical equipment. Three alternatives are considered: continued diesel generation, a solar-battery-diesel hybrid, and a small wind-battery-diesel hybrid. Situation and problemDiesel fuel is expensive to transport, and outages threaten vaccine refrigeration and clinical services. The decision-maker wants to reduce fuel use without sacrificing reliability. Solar and wind resource data are available for two years, but the site has limited maintenance capacity and uncertain future fuel prices. AnalysisThe engineering model uses hourly demand, resource data, battery state of charge, generator minimum loading, inverter limits and reserve requirements. Energy accounting estimates annual useful electricity and fuel consumption. Exergy analysis is less central for the electrical load but is used to evaluate wasted generator heat and the quality of electricity supplied to critical equipment. The economic model includes initial equipment, transport, installation, battery replacement, scheduled maintenance, fuel, generator overhaul and salvage value. Discounted cash flow is calculated over the project life under low, reference and high fuel-price scenarios. LCOE alone is not used because reliability and fuel logistics are important. The environmental model includes manufacturing, transport, diesel combustion, battery replacement and end-of-life treatment. Carbon accounting compares each alternative with continued diesel operation. Reliability analysis assigns failure rates to generators, inverters, batteries and control equipment, and calculates expected energy not served for critical loads. The MCDA criteria are life-cycle cost, expected energy not served, emissions, maintenance complexity and fuel dependence. Because the health facility considers service continuity more important than a small cost difference, reliability receives the greatest weight. Weight sensitivity is then performed to determine whether the result changes when cost is prioritized. Approach and solutionThe analysis recommends the solar-battery-diesel hybrid as the preferred base case, provided that battery replacement is funded and a maintenance contract is established. The diesel generator remains as backup for prolonged cloudy periods and unusual demand. The wind alternative performs well in the high-wind scenario but is less robust because its resource estimate has greater uncertainty and specialized maintenance would be required. The recommendation is conditional rather than absolute. If the battery price rises substantially, or if solar resource data prove unrepresentative, the hybrid design must be re-evaluated. The project plan therefore includes additional resource monitoring, spare inverter capacity, a battery-health monitoring system and a contingency budget. Outcome and learning pointsThe case illustrates that the least-cost technology is not necessarily the best technology. A decision based only on LCOE could undervalue reliability, fuel-supply risk and medical consequences of interruption. It also demonstrates the importance of boundary consistency: battery replacement, transport and backup operation must be included for all relevant alternatives. Finally, uncertainty analysis converts a seemingly precise recommendation into a managed decision with explicit conditions. Challenges, limitations and professional responsibilitiesSeveral errors recur in renewable-energy assessment. Analysts may use average annual resource values that conceal hourly mismatch, ignore curtailment, omit inverter and balance-of-system losses, or assume nameplate output equals delivered energy. Economic studies may mix nominal and real values, exclude financing fees, ignore degradation or apply inconsistent tax treatment. Environmental studies may count operational emissions while excluding manufacturing and disposal. MCDA studies may assign arbitrary weights and present the resulting rank as objective fact. Boundary selection can also create misleading comparisons. A system boundary that includes transmission for one technology but not another is inequitable. Similarly, an avoided-emissions claim requires a credible counterfactual; it cannot be based automatically on the average grid factor when the project displaces a different marginal generator. Professional practice requires traceability, reproducibility and disclosure of uncertainty. Engineers should distinguish measured data, manufacturer claims, modeled estimates and expert judgments. Stakeholders affected by land use, noise, water demand or waste disposal should be consulted. Environmental justice requires attention to who receives project benefits and who bears impacts. Safety obligations include electrical protection, fire risk, battery thermal events, hydrogen hazards, occupational exposure and emergency response. Regulatory compliance may involve environmental permits, grid codes, construction standards, hazardous-material rules, carbon-reporting requirements and procurement procedures. Compliance is a minimum condition, not evidence that a project is socially optimal. Governance should also address conflicts of interest, data ownership, cybersecurity of digital control systems and the independence of verification. Emerging directions and best practicesAssessment is moving toward integrated, time-resolved and consequential analysis. Instead of reporting only annual energy and average emissions, analysts increasingly model hourly dispatch, marginal grid effects, flexibility value, transmission congestion and extreme-weather conditions. Digital twins can connect design models with operational data, while predictive maintenance can reduce downtime if sensor quality and model governance are adequate. Circular-economy assessment is becoming more important as photovoltaic modules, wind-turbine blades and batteries reach replacement or retirement. Design for repair, material recovery, reuse and responsible recycling should be included in early project decisions. Climate adaptation is also essential: resource patterns, heat stress, flooding, wildfire and storm intensity may change over the asset life. Good practice can be summarized as follows: - define the decision and functional unit before collecting data;
- use time-resolved engineering models where variability matters;
- make all financial, thermodynamic and environmental boundaries explicit;
- include degradation, replacement, decommissioning and backup operation;
- separate deterministic results from probabilistic confidence ranges;
- test influential assumptions and correlations;
- value reliability and flexibility where the service requires them;
- involve affected stakeholders in criteria and weight selection;
- document data sources, version control and model validation; and
- present recommendations with conditions, limitations and monitoring plans.
Chapter SummaryTechno-economic, environmental and risk assessment integrates the physical performance, financial value, environmental burden and uncertainty of renewable-energy systems. Energy accounting establishes conservation and conversion efficiency, while exergy accounting evaluates the quality and destruction of available work. Discounted cash flow supports NPV, IRR and payback analysis, and LCOE provides a useful but incomplete cost comparison. Sensitivity, scenario and Monte Carlo methods reveal the influence and probability of uncertain outcomes. Reliability and resilience analysis address failure, maintenance and service continuity. LCA and carbon accounting extend evaluation across materials, construction, operation and end of life. MCDA supports technology selection when cost, emissions, reliability, social effects and resource constraints must be considered together. Sound professional decisions require consistent boundaries, transparent assumptions, stakeholder involvement, ethical governance and explicit treatment of uncertainty. Key TermsEnergy accounting: Quantitative balance of energy inputs, useful outputs, losses and stored energy. Exergy: Maximum theoretical useful work obtainable relative to a reference environment. Exergy destruction: Loss of work potential caused by thermodynamic irreversibility. Exergy efficiency: Ratio of useful exergy output to exergy input. Exergoeconomics: Method combining exergy analysis with monetary costing. Discounted cash flow: Valuation method that converts future cash flows to present value. Net present value: Present value of benefits and costs less the initial investment. Internal rate of return: Discount rate at which project NPV equals zero. Payback period: Time required to recover an initial investment from project cash flows. Levelized cost of energy: Discounted lifetime cost divided by discounted lifetime energy output. Capacity factor: Actual energy production divided by potential production at rated output. Sensitivity analysis: Study of output changes caused by varying input assumptions. Scenario analysis: Evaluation of coherent alternative future conditions. Monte Carlo analysis: Probabilistic simulation using repeated random sampling of uncertain inputs. Availability: Proportion of total time that equipment or a system is operational. Life-cycle assessment: Evaluation of environmental impacts across a product or service life. Functional unit: Quantified reference service used to compare life-cycle impacts. Carbon accounting: Measurement and reporting of greenhouse-gas emissions in carbon-dioxide-equivalent terms. Multi-criteria decision analysis: Structured comparison of alternatives using several weighted criteria. Counterfactual: Reference condition against which project effects, especially avoided emissions, are assessed. Review QuestionsShort Answer Questions1. Why can energy efficiency and exergy efficiency lead to different interpretations of a renewable system? 2. State the principal difference between NPV and payback period. 3. What is the purpose of defining a functional unit in LCA? 4. Distinguish sensitivity analysis from probabilistic uncertainty analysis. 5. Why should reliability be considered separately from renewable-resource variability? Long Answer Questions1. Explain the structure of an integrated techno-economic, environmental and risk assessment for a renewable-energy project. 2. Derive and discuss the use of discounted cash flow, NPV, IRR and LCOE in project evaluation. 3. Explain how energy, exergy and exergoeconomic analyses can guide the design of a hybrid renewable system. 4. Describe the stages, boundary choices and major limitations of life-cycle assessment and carbon accounting. 5. Discuss the application of MCDA to renewable-technology selection, including normalization, weighting and robustness testing. Analytical / Application Questions1. A solar-battery project has a positive NPV under reference assumptions but a negative NPV when capacity factor falls by 12%. What additional analyses and risk responses should be undertaken before investment? 2. Compare two microgrid alternatives with similar LCOE but different expected energy-not-served values. How should a hospital incorporate reliability into its decision? 3. Design an assessment framework for choosing between biomass combined heat-and-power and solar thermal energy for an industrial process. Identify the required technical, economic, environmental and stakeholder criteria. 22. Multiple Choice Questions with AnswersQuestion 1Which statement best explains why exergy analysis adds value to an energy balance? A. It eliminates the need to measure energy inputs. B. It distinguishes the usefulness or quality of different energy forms. C. It calculates project revenue without financial assumptions. D. It measures only the quantity of rejected heat. Correct Answer: B. It distinguishes the usefulness or quality of different energy forms. Question 2A project has future cash flows expressed in real currency terms. Which discounting approach is consistent? A. Use a nominal discount rate without adjustment. B. Use a real discount rate consistent with the real cash flows. C. Do not discount because renewable projects have no fuel cost. D. Use the inflation rate as the discount rate. Correct Answer: B. Use a real discount rate consistent with the real cash flows. Question 3Why is LCOE insufficient as the sole criterion for comparing a solar-battery system with a diesel generator? A. LCOE cannot include capital expenditure. B. LCOE always excludes energy production. C. It may not represent reliability, flexibility, backup requirements or time-dependent value. D. It is applicable only to fossil-fuel technologies. Correct Answer: C. It may not represent reliability, flexibility, backup requirements or time-dependent value. Question 4What does a one-way sensitivity analysis primarily reveal? A. The probability distribution of every project outcome. B. The effect of changing one input while other assumptions remain fixed. C. The exact future value of electricity prices. D. The thermodynamic irreversibility of a component. Correct Answer: B. The effect of changing one input while other assumptions remain fixed. Question 5In a Monte Carlo assessment, the probability that NPV is negative is most directly obtained from: A. The project nameplate capacity. B. The number of criteria in an MCDA model. C. The proportion of simulated trials producing negative NPV. D. The average exergy efficiency. Correct Answer: C. The proportion of simulated trials producing negative NPV. Question 6Which indicator most directly measures the proportion of time equipment is operational? A. Availability B. Internal rate of return C. Carbon intensity D. Capacity factor Correct Answer: A. Availability Question 7In an LCA, the functional unit is used primarily to: A. Set the project discount rate. B. Provide a common reference for comparing environmental impacts. C. Determine the failure rate of an inverter. D. Calculate the tax payable on electricity sales. Correct Answer: B. Provide a common reference for comparing environmental impacts. Question 8Why must an avoided-emissions claim specify a counterfactual? A. Emissions avoided depend on what generation or activity the project displaces. B. All renewable projects have identical life-cycle emissions. C. The counterfactual determines the battery round-trip efficiency. D. Without it, the project cannot calculate capital cost. Correct Answer: A. Emissions avoided depend on what generation or activity the project displaces. Question 9A remote clinic gives greater weight to expected energy not served than to a small difference in LCOE. This is an example of: A. Ignoring economic analysis entirely. B. Using MCDA to reflect service priorities. C. Replacing reliability analysis with energy accounting. D. Applying a nominal discount rate to real cash flows. Correct Answer: B. Using MCDA to reflect service priorities. Question 10Which practice most improves the credibility of an integrated assessment? A. Reporting a single precise result without assumptions. B. Using different system boundaries for competing technologies. C. Documenting data sources, boundaries, uncertainty and model validation. D. Excluding replacement and end-of-life costs from all alternatives. Correct Answer: C. Documenting data sources, boundaries, uncertainty and model validation.
|