Global Sourcing, Risk and Supply ResilienceIntroductionGlobal sourcing enables organisations to access lower costs, specialised capabilities, scarce materials, advanced technology and international markets. It also exposes the purchasing system to risks that may be distant from the buying organisation but capable of interrupting production, damaging reputation or threatening financial viability. A low unit price is therefore not equivalent to low total supply cost or superior sourcing performance. Global sourcing risk is the possibility that an external event, condition or failure will prevent a supply network from achieving its objectives. Supply resilience is the capability to anticipate, absorb, adapt to and recover from disruption while maintaining an acceptable level of service. Resilience is not identical to redundancy. Redundancy is one possible design choice; resilience also depends on visibility, flexibility, collaboration, recovery capability and effective governance. For a purchasing manager, the central question is not simply “Which supplier offers the lowest price?” It is: “Which sourcing configuration provides acceptable cost, service, risk and strategic value over its expected life?” Learning objectivesAfter studying this chapter, the learner should be able to: - Classify major risks in global sourcing and explain their interactions.
- Assess country, geopolitical, logistics, currency, cyber, financial, quality and continuity risks.
- Construct and interpret a risk register and heat map.
- Apply scenario analysis, stress testing and supplier-network mapping.
- Design responses including dual sourcing, buffers, localization, contractual controls and business continuity planning.
- Evaluate resilience investments using total cost, service and risk perspectives.
- Recognise governance, ethical, regulatory and technology implications of resilient sourcing.
1. The global sourcing risk environmentA global supply network consists of suppliers, sub-suppliers, logistics providers, ports, financial institutions, information systems, regulators and customers. Risk can arise at any node or link. A disruption at a lower-tier supplier may be invisible until it stops a critical component. Similarly, a supplier may appear geographically diversified while depending on one country for a key raw material, one port for exports or one cloud platform for production planning. Risk is commonly analysed through three dimensions: - Probability: the likelihood that an event will occur within a specified period.
- Impact: the consequence for cost, service, safety, compliance, revenue or reputation.
- Velocity: the speed at which the risk develops and affects the network.
A fourth dimension, detectability, is useful in complex networks. A highly probable risk that is detected early may be manageable; a less probable risk with no warning and rapid impact may require substantial preparedness. Risk exposure should be assessed at the level of the sourcing system, not only at the level of individual suppliers. Correlated risks are particularly important. Two suppliers located in different countries may share the same semiconductor producer, shipping route, financing bank or cyber software. Apparent diversification may therefore be illusory. 1.1 Categories of global sourcing risk| Risk category | Typical sources | Possible consequences |
|---|
| Country and political | sanctions, trade restrictions, civil unrest, expropriation, policy change | blocked supply, legal penalties, forced exit | | Geopolitical | conflict, diplomatic tension, export controls, strategic rivalry | route closure, restricted technology or materials | | Logistics | port congestion, carrier failure, customs delays, extreme weather | longer lead time, premium freight, stockout | | Currency and financial | exchange-rate volatility, inflation, interest rates, supplier insolvency | price escalation, payment failure, capacity loss | | Cyber and information | ransomware, data theft, system outage, compromised software | operational shutdown, fraud, loss of confidentiality | | Quality and technical | process instability, counterfeit inputs, weak traceability | defects, recalls, safety incidents | | Continuity and operational | fire, flood, epidemic, labour disruption, inadequate recovery plans | prolonged interruption and customer dissatisfaction | | Ethical and regulatory | forced labour, unsafe work, environmental breach, corruption | legal sanctions, reputational damage, loss of licence to operate |
These categories overlap. For example, an export restriction is geopolitical and regulatory; a cyberattack may create both operational and financial risk. Classification is useful for accountability, but managers should also examine causal chains. 2. Risk assessment frameworks2.1 The risk registerA risk register is a controlled record of identified risks, their causes, consequences, owners, controls, ratings, indicators and treatment plans. A useful register includes: | Field | Purpose |
|---|
| Risk statement | Describes cause, event and consequence clearly | | Affected material or supplier | Establishes scope and criticality | | Existing controls | Records current preventive and recovery measures | | Probability and impact | Supports prioritisation | | Risk owner | Assigns managerial accountability | | Early-warning indicator | Enables monitoring before failure | | Treatment | Specifies avoidance, reduction, transfer or acceptance | | Trigger and escalation | Defines when action changes | | Review date | Keeps the assessment current |
Risk statements should avoid vague wording such as “China risk” or “transport risk”. A stronger statement is: “If export controls restrict the shipment of the specialised alloy from the approved country, the organisation may experience a six-week production interruption because no qualified alternative source is currently available.” 2.2 Heat maps and scoringA simple risk-prioritisation score is: R = P × I where P is the probability score and I is the impact score. If each is rated from 1 to 5, the score ranges from 1 to 25. This is an ordinal prioritisation tool, not a probability estimate in the statistical sense. It assumes that the scales are consistently defined and that multiplying them is useful for screening. A heat map may classify scores of 1–4 as low, 5–9 as moderate, 10–16 as high and 17–25 as extreme. Organisations should not treat these boundaries as universal. A safety-critical or legally prohibited event may require escalation even when its numerical score is low. A more analytically rigorous expected-loss model is: E[L] = ∑ᵢ pᵢLᵢ where E[L] is expected loss per assessment period, pᵢ is the probability of scenario i, and Lᵢ is its monetary loss. The model assumes that scenarios are adequately specified and that probabilities and losses are meaningful. It can be extended to include prevention and recovery costs, but it may understate low-probability, catastrophic events and correlated risks. 2.3 Criticality assessmentRisk treatment should be linked to material and process criticality. A critical item may have high customer impact, long replenishment time, no approved substitute, regulatory significance or substantial qualification cost. A practical criticality score can combine service, safety, financial and substitutability assessments, but the result should support managerial judgement rather than replace it. The distinction between single sourcing and sole sourcing is important. Single sourcing means one supplier is currently used, although alternatives may exist. Sole sourcing means no acceptable alternative is presently available because of technology, intellectual property, regulation or market structure. Sole-source items require deeper continuity planning, design collaboration and executive attention. 3. Assessing major risk domains3.1 Country and geopolitical riskCountry analysis should cover political stability, legal enforceability, corruption exposure, trade policy, sanctions, customs administration, labour regulation, infrastructure, environmental regulation and the security of intellectual property. A country risk rating is only a starting point. Conditions can vary greatly by region, industrial zone, port and supplier. Geopolitical analysis should identify dependencies on: - restricted technologies and strategic minerals;
- trade corridors, canals, straits and border crossings;
- countries subject to sanctions or export controls;
- politically sensitive suppliers or state-owned entities; and
- changing rules of origin and local-content requirements.
Purchasing decisions must be checked against applicable sanctions, export-control, anti-bribery, competition, forced-labour and customs laws. Legal review is essential because a commercially attractive source may be unusable or unlawful. 3.2 Logistics and lead-time riskInternational logistics risk involves transport capacity, port reliability, inland connectivity, customs, documentation, weather, carrier concentration and route disruption. Managers should measure not only average lead time but also variability and recovery time. For an inventory item with demand during replenishment lead time, a basic reorder-point model is: ROP = μₗ + SS where ROP is the reorder point in units, μₗ is expected demand during lead time, and SS is safety stock. If demand per period has mean d̄, and lead time is constant at L, then μₗ = d̄L. This special case assumes stable demand and constant lead time. When demand and lead time are independent and approximately normally distributed, a commonly used approximation is: SS = z√(Lσd² + d̄²σL²) where z is the service-factor value, σd is the standard deviation of demand per period, σL is the standard deviation of lead time, L is mean lead time, and d̄ is mean demand per period. Units must be consistent. The formula omits the interaction term and is an approximation; it is most suitable when demand and lead-time variation are reasonably represented by the assumptions. If demand and lead time are correlated, or distributions are highly skewed, simulation or empirical percentiles are preferable. Illustrative calculation. Suppose mean daily demand is 100 units, mean lead time is 20 days, daily demand standard deviation is 15 units, lead-time standard deviation is 4 days, and the selected service factor is 1.65. Then: SS = 1.65√(20×15² + 100²×4²) = 1.65√(4,500 + 160,000) ≈ 2,098 units. Expected lead-time demand is 2,000 units, so the reorder point is approximately 4,098 units. This result is sensitive to the assumed lead-time variation and should not be interpreted as a guarantee against extreme disruption. 3.3 Currency and financial riskA foreign-currency purchase creates transaction exposure between the date of commitment and payment. The buyer should distinguish: - transaction exposure, arising from contracted foreign-currency cash flows;
- economic exposure, arising from long-term effects on competitiveness; and
- translation exposure, arising when financial statements are converted into another currency.
Possible responses include currency clauses, indexed pricing, natural hedging, matching currency inflows and outflows, forward contracts, options and negotiated sharing bands. Financial instruments require treasury expertise and governance; hedging should protect an underlying exposure rather than become speculative trading. Supplier financial risk can be assessed through liquidity, leverage, cash generation, covenant pressure, customer concentration, insurance, payment behaviour and dependence on one lender or commodity. A financially weak supplier may reduce maintenance, quality investment or inventory before formal insolvency becomes visible. 3.4 Cyber and information riskSupply chains increasingly depend on enterprise-resource-planning systems, electronic data interchange, cloud platforms, product designs, remote diagnostics and connected equipment. Cyber due diligence should examine identity management, privileged access, patching, segmentation, backup integrity, incident response, subcontractor access, secure development and notification obligations. A supplier may meet a security questionnaire yet remain vulnerable through a sub-tier provider. Contractual requirements should specify minimum controls, audit rights, breach notification, data ownership, recovery objectives and responsibilities for forensic cooperation. Cyber resilience also requires offline or segregated backups and tested manual workarounds. 3.5 Quality and continuity riskQuality risk includes process drift, inadequate change control, counterfeit materials, poor calibration, weak traceability and insufficient validation. Supplier approval should be risk-based, combining technical audits, capability evidence, sample testing, process controls and performance history. Business continuity planning asks how essential operations will continue during disruption. It should identify critical processes, maximum tolerable downtime, recovery time objective, recovery point objective, alternate facilities, critical records, emergency contacts, substitute materials and decision authority. A plan that has not been exercised is an assumption, not demonstrated capability. 4. Supplier mapping and network visibilitySupplier mapping should proceed beyond the immediate supplier. A tiered map records sites, materials, processes, ownership, capacity, logistics routes, ports, sub-tier dependencies and common infrastructure. It should distinguish physical flows, information flows and financial flows. A useful mapping process is: - Identify critical products and materials.
- Trace direct suppliers to production sites.
- Trace critical components and raw materials to lower tiers.
- Record geographic, transport, technology and financial dependencies.
- Identify common nodes and concentration points.
- Validate information through evidence, not declarations alone.
- Link each dependency to an owner, indicator and response plan.
Visibility has a cost. A firm should prioritise deep mapping for critical items rather than require identical information from every supplier. Data quality, confidentiality and supplier willingness must be managed through purpose limitation, secure systems and clear contractual arrangements. 5. Scenario analysis and stress testingHistorical data cannot fully predict structural breaks. Scenario analysis therefore explores plausible futures, while stress testing examines whether the sourcing system remains viable under severe conditions. A scenario should specify the initiating event, duration, scope, affected nodes, management assumptions and performance measures. Examples include a 30-day port closure, a 20% currency depreciation, loss of a sole-source plant, a cyber outage lasting ten days, a sudden export ban or a 50% demand increase. Stress tests should examine: - time to stockout;
- service level and backlog;
- cash requirement;
- premium freight and alternate-source cost;
- production loss;
- customer and regulatory consequences; and
- recovery time.
A strong exercise tests interactions. For example, a geopolitical event may close a route while currency depreciation raises the cost of the alternative route. Management should define trigger points in advance: when to activate alternate suppliers, release emergency stock, change transport mode, communicate with customers or invoke contractual rights. 6. Resilience strategies6.1 Dual and multiple sourcingDual sourcing reduces dependence on one supplier, but it introduces qualification, coordination and volume-allocation costs. A second supplier is valuable only if it has available capacity, compatible specifications, validated quality and access to required sub-tier inputs. Allocation can be fixed, flexible or contingent on performance and disruption signals. Multiple sourcing is not always optimal. For highly specialised items, splitting volume may destroy scale economies or reduce accountability. The decision should compare the expected disruption cost with the recurring cost of diversification. 6.2 Buffers and strategic inventoryInventory buffers absorb uncertainty but tie up capital, consume space and may become obsolete. Buffer design should consider demand variability, lead-time variability, disruption duration, shelf life, service criticality and recovery capacity. Strategic stock is most defensible for critical, stable, high-consequence items when alternatives are slow to qualify. Other buffers include spare capacity, alternate tooling, reserved logistics capacity, documented procedures, trained personnel and redundant information systems. 6.3 Localization and regionalizationLocalization can reduce transport distance, geopolitical exposure and response time. It may increase labour, compliance, energy or material costs and can create a new concentration risk if regional suppliers share the same hazard. Regionalization should therefore be evaluated as a portfolio decision, not assumed to be inherently safer. 6.4 Flexibility and design choicesStandardised components, modular product architecture, interchangeable specifications and common tooling can make substitution faster. Design-for-resilience should be balanced against engineering cost, performance requirements and intellectual-property protection. Early involvement of engineering, operations, quality, finance, legal and sustainability teams is essential. 6.5 Contracts and collaborationContracts can allocate responsibilities for forecasts, capacity reservation, emergency production, inventory ownership, audit, quality, cyber incidents, business continuity, force majeure, change notification, termination assistance and ethical compliance. Contracts cannot create physical capacity where none exists. They work best when supported by supplier collaboration, shared data and realistic incentives. 7. Evaluating resilience economicallyA sourcing decision should use total cost of ownership rather than purchase price alone: TCO = P + F + Q + I + C + R where P is purchase cost, F freight and customs cost, Q quality-related cost, I inventory cost, C administrative and compliance cost, and R expected risk or disruption cost. All terms must be measured over the same time horizon and currency. The expected-risk term is uncertain and should be presented with assumptions or ranges. For a resilience investment, a simple net-benefit test is: NB = ΔEL + ΔCₐ − Cᵣ where NB is net benefit, ΔEL is the reduction in expected loss, ΔCₐ is any avoided consequential cost, and Cᵣ is the recurring and implementation cost of resilience. This screening model excludes financing and tax effects unless explicitly included. Catastrophic or irreversible outcomes may justify action even when expected monetary benefit is difficult to estimate. 8. Applied case: Meridian Medical DevicesBackgroundMeridian Medical Devices, an illustrative multinational manufacturer, purchased a precision sensor from one qualified overseas supplier. The sensor represented only 2.5% of product cost but was essential to regulatory approval. Its nominal lead time was 35 days, although recent observations ranged from 30 to 70 days. The supplier’s plant and its specialised coating sub-supplier were located in the same region. ProblemA geopolitical dispute created a credible risk of export restriction. At the same time, a cyber incident affected the supplier’s production-planning system. Meridian’s existing safety stock covered 28 days of demand, and procurement had no validated alternative. The low purchase price had obscured the high consequence of interruption. AnalysisThe cross-functional team mapped the sensor’s tier-one and tier-two dependencies. It rated export restriction as high probability/high impact, cyber outage as moderate probability/high impact and supplier insolvency as low probability/high impact. The team also discovered that a proposed second supplier used the same coating sub-supplier, so apparent dual sourcing did not remove the common-node risk. Scenario analysis showed that a 45-day interruption would stop final assembly after 28 days and create significant customer and regulatory consequences. A stress test combining export restriction and a 20% currency movement showed that emergency purchasing from an unqualified source would be both expensive and non-compliant. Approach and solutionMeridian implemented a portfolio response: - qualified a second sensor supplier in another region;
- required the second supplier to use an independent coating source;
- retained a calibrated strategic buffer for the sensor;
- established quarterly capacity and continuity reviews;
- required cyber incident notification and tested recovery evidence;
- created an engineering change process for an interchangeable sensor;
- negotiated currency bands and emergency capacity provisions; and
- conducted an annual disruption exercise involving procurement, quality, engineering, logistics, legal and finance.
OutcomeThe solution increased unit cost and qualification expenditure, but reduced dependence on a common sub-tier node and shortened the estimated recovery time. Meridian also gained better visibility of its regulatory exposure. The case illustrates that resilience is achieved through coordinated design, supplier development, information governance and operational preparedness—not by simply adding a second purchase order. 9. Governance, ethics and contemporary developmentsResilience programmes must respect competition law, privacy, confidentiality and supplier rights. Information requests should be proportionate and protected. Ethical sourcing requires attention to forced labour, worker safety, discrimination, environmental damage, corruption and the treatment of communities. A firm should not transfer all risk to small suppliers through impossible delivery obligations or unilateral payment practices. Regulatory expectations increasingly require supply-chain due diligence, cyber controls, traceability, climate-risk disclosure and responsible mineral sourcing. Requirements vary by jurisdiction, so organisations need a legal register and documented evidence. Procurement professionals should distinguish compliance from ethical leadership: satisfying a minimum rule does not necessarily eliminate human or environmental harm. Digital tools, artificial intelligence and external-risk platforms can improve mapping, anomaly detection, demand sensing and scenario modelling. Their outputs remain dependent on data quality, model assumptions and timely human validation. AI should not autonomously make sanctions-sensitive or safety-critical sourcing decisions without explainability, controls, audit trails and accountable approval. False alarms can create unnecessary cost, while missed signals can create dangerous confidence. Climate change increases the relevance of physical risk, water availability, energy reliability, extreme weather and transition regulation. Resilience and sustainability may reinforce each other through efficient logistics, renewable energy and circular materials, but they can also conflict when redundancy increases resource use. The appropriate objective is robust, responsible performance over the full system life cycle. 10. Implementation roadmap and limitationsA practical implementation sequence is: - Establish executive sponsorship, risk appetite and decision rights.
- Segment materials and suppliers by criticality and substitutability.
- Map priority networks to relevant lower tiers.
- Build and calibrate the risk register and heat map.
- Select indicators, thresholds and escalation procedures.
- Run disruption scenarios and stress tests.
- Fund proportionate treatments such as qualification, buffers, alternate routes or localization.
- Test business continuity plans and record corrective actions.
- Review assumptions after geopolitical, operational, financial or regulatory change.
Important limitations remain. Risk scores can create false precision. Supplier information may be incomplete or strategically presented. Historical frequencies may be unreliable for unprecedented events. Diversification may fail when suppliers share hidden dependencies. Inventory can protect against delay but not necessarily against regulatory prohibition or design failure. Finally, resilience has opportunity costs: capital used for buffers or alternate capacity cannot be used elsewhere. Professional judgement and cross-functional governance are therefore indispensable. Chapter SummaryGlobal sourcing creates access to capability and cost advantages while exposing organisations to interconnected country, geopolitical, logistics, currency, financial, cyber, quality, continuity and ethical risks. Effective assessment combines risk registers, criticality analysis, heat maps, expected-loss reasoning, supplier mapping, scenario analysis and stress testing. Risk must be considered across tiers and common dependencies, not only at the direct-supplier level. Resilient sourcing uses a portfolio of responses: dual or multiple sourcing, strategic buffers, alternate logistics, localization, flexible product design, contractual controls, supplier collaboration and tested business continuity plans. These responses should be evaluated through total cost of ownership and explicit assumptions about disruption losses. Resilience is not free and is not equivalent to simple redundancy. It is a governed capability to anticipate, absorb, adapt and recover while maintaining acceptable service, compliance, quality and ethical performance. Key TermsGlobal sourcing: Procuring goods, services or capabilities across national borders. Supply resilience: The ability to anticipate, absorb, adapt to and recover from disruption. Risk register: A controlled record of risks, controls, owners, indicators and treatments. Heat map: A visual prioritisation of risks by probability and impact. Risk exposure: The potential consequence of a risk under specified conditions. Country risk: Exposure arising from political, legal, economic and social conditions in a country. Geopolitical risk: Exposure arising from international conflict, rivalry, sanctions or trade restrictions. Sole sourcing: A condition in which no acceptable alternative supplier is currently available. Single sourcing: Using one supplier even though alternatives may exist. Common-node risk: A hidden dependency shared by apparently separate suppliers. Supplier mapping: Documenting suppliers, sites, tiers, dependencies and flows. Scenario analysis: Examination of plausible future events and their consequences. Stress testing: Evaluating system performance under severe but plausible conditions. Safety stock: Inventory held to protect against demand or replenishment uncertainty. Business continuity plan: A documented arrangement for maintaining or restoring critical operations. Recovery time objective: The targeted maximum time to restore a process or service. Total cost of ownership: The complete cost of acquiring, using and managing a source. Transaction exposure: Currency risk affecting contracted foreign-currency cash flows. Supplier criticality: The importance of a supplier or item to organisational objectives. Localization: Moving supply, production or capability closer to the consuming market. Review QuestionsShort Answer Questions- Distinguish single sourcing from sole sourcing.
- What information should a risk register contain?
- Why can apparent dual sourcing fail to provide resilience?
- Define recovery time objective.
- State two limitations of a probability–impact heat map.
Long Answer Questions- Explain how country, geopolitical, logistics and currency risks can interact in a global sourcing decision.
- Discuss the advantages and limitations of dual sourcing, strategic inventory and localization.
- Explain how supplier mapping should extend beyond tier-one suppliers.
- Describe the role of scenario analysis and stress testing in business continuity planning.
- Evaluate the importance of ethical, regulatory and cyber governance in resilient sourcing.
Analytical / Application Questions- A firm depends on one overseas supplier for a safety-critical component. Develop a risk register with at least five risks, appropriate indicators and treatments.
- Using the reorder-point formulas in this chapter, calculate safety stock when mean daily demand is 80 units, mean lead time is 15 days, daily demand standard deviation is 10 units, lead-time standard deviation is 3 days and z = 1.65. State the assumptions and interpret the result.
- Compare two sourcing strategies: a low-cost single source with a 20-day lead time and a higher-cost regional dual-source design with a 12-day lead time. Propose a decision framework that includes TCO, service, disruption exposure, qualification cost and ethical compliance.
Multiple Choice Questions with AnswersQuestion 1Which statement best distinguishes sole sourcing from single sourcing? A. Sole sourcing always has two approved suppliers, while single sourcing has one. B. Sole sourcing means no acceptable alternative is currently available, while single sourcing means one supplier is currently used. C. Sole sourcing applies only to domestic purchases, while single sourcing applies internationally. D. Sole sourcing concerns logistics, while single sourcing concerns quality. Correct Answer: B. Sole sourcing means no acceptable alternative is currently available, while single sourcing means one supplier is currently used. Question 2A risk register primarily supports which management activity? A. Assigning ownership, monitoring indicators and planning treatments B. Replacing all supplier contracts with spot purchases C. Eliminating the need for supplier audits D. Calculating exchange rates automatically Correct Answer: A. Assigning ownership, monitoring indicators and planning treatments Question 3What is a common-node risk? A. A risk that exists only in domestic logistics B. A risk caused by using too many inventory locations C. A hidden dependency shared by apparently separate suppliers D. A risk that can be eliminated by a heat map Correct Answer: C. A hidden dependency shared by apparently separate suppliers Question 4If probability is scored 4 and impact is scored 5, the simple risk-prioritisation score R = P × I is: A. 9 B. 20 C. 25 D. 45 Correct Answer: B. 20 Question 5In the reorder-point relationship ROP = μₗ + SS, what does SS represent? A. Supplier sales B. Standard shipment C. Safety stock D. Seasonal sourcing Correct Answer: C. Safety stock Question 6Which action most directly reduces dependence on a shared sub-tier supplier? A. Adding a second supplier that uses the same sub-tier supplier B. Increasing the purchase price paid to the existing supplier C. Qualifying a supplier with an independent source for the critical subcomponent D. Reducing the frequency of supplier reviews Correct Answer: C. Qualifying a supplier with an independent source for the critical subcomponent Question 7What is the principal purpose of stress testing a sourcing network? A. To guarantee that no disruption will occur B. To evaluate performance under severe but plausible conditions C. To replace all preventive controls with insurance D. To calculate only average purchase price Correct Answer: B. To evaluate performance under severe but plausible conditions Question 8Which of the following is transaction exposure? A. The long-term effect of competition on market position B. The effect of translating accounts into a reporting currency C. The effect of exchange-rate changes on contracted foreign-currency cash flows D. The risk of a supplier changing its product design Correct Answer: C. The effect of exchange-rate changes on contracted foreign-currency cash flows Question 9Using SS = z√(Lσd² + d̄²σL²), with z = 1, L = 4, σd = 2, d̄ = 10 and σL = 0, safety stock is: A. 4 units B. 8 units C. 16 units D. 40 units Correct Answer: B. 8 units Question 10Which statement about AI-based supply-chain risk platforms is most appropriate? A. Their outputs are independent of data quality. B. They eliminate the need for accountable managerial approval. C. They can support detection and modelling but require validation and governance. D. They automatically resolve sanctions and ethical compliance issues. Correct Answer: C. They can support detection and modelling but require validation and governance.
|