Introduction and Context

Property due diligence does not end when documents have been collected and defects have been identified. The managerial challenge is to convert fragmented legal, technical, financial and factual findings into a defensible investment decision. A title defect may be legally serious but commercially immaterial; conversely, a seemingly minor discrepancy may delay finance, construction or sale. Title risk analytics provides the structured methods required to distinguish these situations.

Title risk analytics is the systematic identification, evaluation, quantification and treatment of risks affecting ownership, control, use, transferability, financeability and value of real property. It connects legal analysis with investment appraisal and governance. Its output is not merely a legal opinion. It is a decision architecture supporting one of four broad recommendations: proceed, renegotiate, insure or exit.

The central principle is that a title risk should be assessed in relation to the proposed transaction, intended use, time horizon, capital structure and risk appetite. The same title condition can produce different recommendations for a long-term owner-occupier, a residential developer, a lender or a short-term trader.

Learning Objectives

By the end of this chapter, the learner should be able to:

  1. Construct a property title risk register using legally and commercially relevant categories.
  2. Apply severity–probability matrices and red-flag scoring without confusing them with legal conclusions.
  3. Quantify expected financial, schedule and reputational exposure using transparent assumptions.
  4. Use scenario analysis, sensitivity analysis and decision trees in title-related decisions.
  5. Evaluate the suitability and limitations of contractual protection, title insurance, indemnities and other controls.
  6. Present a reasoned go, renegotiate, insure or exit recommendation to senior management or an investment committee.

1. From Due-Diligence Findings to Decision Risk

A due-diligence finding becomes a decision risk when it can affect an objective. Typical objectives include obtaining good and marketable title, securing planning permission, drawing debt, commencing construction, achieving a target return and completing a sale.

A useful distinction is between four levels of analysis:

LevelQuestionExample
FindingWhat fact or discrepancy was observed?A boundary differs between deed and survey.
Legal issueWhat right, obligation or enforceability question arises?Is the disputed strip owned by the seller?
ExposureWhat could happen if the issue is adverse?Construction access may be blocked.
Decision implicationWhat should management do?Obtain a registered easement before completion.

A title review should therefore avoid two errors. The first is legal reductionism: treating every defect as an automatic reason to reject. The second is commercial optimism: treating an unresolved legal issue as harmless because it appears unlikely to materialise.

1.1 Risk, uncertainty and ambiguity

Risk generally refers to an uncertain event for which outcomes and approximate likelihoods can be considered. Uncertainty is broader and may arise where probabilities are not reliably estimable. Ambiguity occurs when the meaning, ownership, legal effect or factual status of an item is contested.

For example, an expired consent with clear documentary evidence may be a defined compliance risk. An informal family arrangement concerning access may be an ambiguity risk: the relevant parties, legal effect and probability of dispute may all be unclear. The distinction matters because ambiguity often requires investigation or control rather than a numerical score alone.

1.2 Inherent and residual risk

Inherent risk is the exposure before controls. Controls may include corrective conveyancing, release deeds, boundary agreements, escrow, warranties, indemnities, title insurance, lender conditions and monitoring. Residual risk is the exposure after considering the effectiveness and reliability of those controls.

A control should not be treated as effective merely because it is proposed. Its enforceability, counterparty strength, scope, exclusions, duration and evidence of completion must be tested.

2. The Title Risk Register

A title risk register is a controlled record of material issues and management responses. It should be maintained throughout due diligence and updated when new evidence becomes available.

A robust register normally contains:

FieldPurpose
Risk IDProvides traceability.
Asset and parcel referenceIdentifies the affected property.
Finding and sourceRecords the evidence, document and date.
Risk categoryEnables aggregation and reporting.
Cause and eventSeparates the underlying condition from the possible occurrence.
ConsequenceDescribes legal, financial, schedule and reputational effects.
Inherent likelihood and impactAssesses exposure before controls.
Existing controlsRecords protections already in place.
Residual likelihood and impactAssesses remaining exposure.
OwnerAssigns accountability.
Treatment and deadlineConverts analysis into action.
Status and evidenceDemonstrates closure or escalation.

2.1 Principal title-risk categories

Important categories include:

  • Ownership and authority: defective chain of title, forged instruments, incomplete succession, lack of authority or competing claims.
  • Identity and description: wrong parcel, inconsistent area, inaccurate boundaries, parcel subdivision or map discrepancies.
  • Encumbrances: mortgages, charges, liens, restrictive covenants, leases, options, rights of first refusal and easements.
  • Possession and occupation: tenants, licensees, informal occupants, adverse possession claims and vacant-possession failures.
  • Public law and land use: zoning, planning permissions, building approvals, compulsory acquisition, environmental restrictions and heritage controls.
  • Access and services: legal access, drainage, utilities, road reservations and shared infrastructure obligations.
  • Registration and formalities: unregistered interests, missing consents, stamp or registration defects and execution irregularities.
  • Transaction and counterparty: seller insolvency, litigation, tax arrears, sanctions, fraud and inability to deliver agreed documents.
  • Development and financeability: title conditions that prevent debt drawdown, construction, subdivision or onward disposal.

Categories should be adapted to the jurisdiction. Property law is local, and the register must be read with the applicable land-registration, conveyancing, planning, insolvency, tax and insurance rules.

2.2 Recording causation

A strong register distinguishes:

Cause → risk event → consequence → control.

For example: an unregistered access arrangement (cause) may be challenged by the servient owner (event), preventing construction traffic and delaying completion (consequence); a registered easement and completion condition (control) may reduce the exposure.

This structure prevents vague entries such as “access issue—high risk,” which do not tell management what could happen or what action is required.

3. Severity–Probability Assessment

3.1 Impact dimensions

Impact should not be compressed too early into a single number. First assess separate dimensions:

  1. Legal impact: probability of losing ownership, use rights or enforceability.
  2. Financial impact: diminution in value, remediation cost, delay cost, financing cost and transaction loss.
  3. Schedule impact: expected delay to completion, development or sale.
  4. Strategic impact: effect on the investment thesis or exit route.
  5. Reputational impact: effect on investors, regulators, communities, lenders or future buyers.

A five-level scale can be used, provided it is defined for the organisation. For example, financial impact might be scored from 1 (immaterial) to 5 (threatens project viability), while schedule impact might range from 1 (less than one week) to 5 (more than six months). The scale must not imply false precision.

3.2 Probability definitions

Probability ratings should be anchored to evidence. A qualitative scale may define 1 as remote, 3 as plausible and 5 as highly likely. Where reliable data exist, numerical ranges may be used. The assessor should state whether probability refers to:

  • the probability that the adverse event occurs;
  • the probability that a claim succeeds; or
  • the probability that loss remains after controls.

These are different probabilities and should not be combined casually.

3.3 A basic risk score

A commonly used screening score is:

R = P × I

where R is the risk score, P is the probability rating and I is the impact rating. Both ratings are usually on a 1–5 ordinal scale.

This score is a prioritisation device, not a probability-weighted monetary valuation. Because ordinal numbers do not necessarily represent equal intervals, a score of 12 is not necessarily twice as serious as a score of 6. The organisation should define thresholds, escalation rules and overrides.

A matrix can classify scores, for example: 1–4 low, 5–9 moderate, 10–16 high and 17–25 critical. These thresholds are governance choices, not universal legal standards.

3.4 Red-flag scoring

Some findings deserve escalation regardless of their calculated score. Red flags may include:

  • credible evidence of fraud or forgery;
  • an unresolved competing ownership claim;
  • inability to identify the correct parcel;
  • absence of legally enforceable access for the proposed use;
  • a prohibition on the intended development;
  • an undisclosed mortgage or charge that cannot be discharged;
  • material litigation or insolvency affecting the seller;
  • a missing consent that is a condition of registration or finance;
  • an uninsurable or excluded risk affecting marketability.

Red-flag scoring should operate as a gate, not as a cosmetic addition to a matrix. A critical red flag may require escalation even where probability is uncertain.

4. Quantifying Exposure

Quantification supports comparison, but it does not replace legal judgment. The model should state assumptions, units, time period and whether values are nominal or discounted.

4.1 Expected monetary exposure

For a discrete adverse event:

EMV = p × L

where EMV is expected monetary value, p is the probability of the event, and L is the monetary loss if it occurs. The formula assumes a sufficiently defined event, a meaningful probability estimate and a loss measured on a comparable basis.

If there are mutually exclusive outcomes:

EMV = ∑ pᵢLᵢ

where pᵢ is the probability of outcome i, Lᵢ is its loss and the probabilities sum to 1. If outcomes are not mutually exclusive, dependencies must be addressed rather than simply added.

Expected value is useful for comparison, but it can conceal catastrophic low-probability outcomes and does not capture risk appetite. A board may reject a project with a modest EMV if the worst-case loss threatens solvency or reputation.

4.2 Schedule exposure

If delay produces a daily cost, a simple delay exposure is:

Cd = d × c

where C_d is delay cost, d is delay duration in days and c is cost per day. Cost per day may include interest, site overhead, standing time, temporary accommodation, lost rent and contractual liquidated damages. Revenue loss should not be double-counted with profit loss.

If delay duration is uncertain, expected delay cost is:

E(Cd) = E(d) × c

only where the daily cost is constant or independent of duration. If daily costs change by phase, use a phase-specific schedule or scenario model.

4.3 Present value of delayed cash flows

For a cash flow CFₜ received at time t, discounted at rate r per period:

PV = CFₜ ÷ (1 + r)ᵗ

The rate and period must be consistent. A monthly cash flow requires a monthly rate, unless the annual rate is appropriately converted. The model should distinguish delay-related loss from ordinary investment discounting.

4.4 Worked example: access risk

An illustrative developer is considering a site priced at £8,000,000. Counsel identifies a disputed access right. If access is successfully secured, no direct loss is expected. If the claim fails after completion, management estimates a £600,000 alternative-access and redesign cost, an expected 90-day delay at £12,000 per day, and £100,000 of additional finance and professional costs. Counsel estimates a 20% probability of failure, subject to the stated assumptions.

The adverse loss is:

£600,000 + (90 × £12,000) + £100,000 = £1,780,000.

The expected monetary exposure is:

0.20 × £1,780,000 = £356,000.

This figure is not automatically the amount that should be deducted from the price. Management must consider whether the estimate includes all consequences, whether the probability is reliable, whether the event could threaten the project, and whether a registered easement or insurance can reduce the residual exposure. If a pre-completion easement eliminates the risk at a cost of £80,000, the control may be economically attractive, but its legal effectiveness must be confirmed.

5. Scenario and Sensitivity Analysis

Scenario analysis explores coherent combinations of assumptions rather than changing one variable in isolation. Typical scenarios are:

  • Base case: title is accepted and the intended use proceeds.
  • Adverse case: a title defect is enforced, causing specified cost and delay.
  • Severe case: the defect prevents the intended use or financing and requires exit or litigation.
  • Control case: the defect is resolved by a deed, release, consent or insurance policy.

A scenario table should state probability, trigger, financial consequence, schedule consequence, management action and residual risk. Probabilities should not be presented as objective facts where they are merely expert judgments.

Sensitivity analysis changes one assumption at a time, such as delay duration, remediation cost or probability of loss. It identifies variables to which the investment case is most vulnerable. For example, if a project remains viable with a 60-day delay but fails with a 120-day delay, the completion condition should focus on evidence that controls access before the 120-day threshold is approached.

Correlation matters. A title dispute may simultaneously increase legal cost, delay completion, increase interest and reduce sale value. Adding independent expected losses can understate or overstate exposure if the components are correlated.

6. Decision Trees and Strategic Options

A decision tree represents choices, uncertain events and outcomes in sequence. A simplified title decision may begin with the choice to proceed unconditionally, renegotiate, obtain protection or exit. The protection branch may then depend on whether a deed is executed and whether the remaining risk materialises.

Illustrative title risk decision tree Decision ProceedRenegotiateExit Risk No lossLoss Target completed Cost and delay Price/control agreed Capital preserved
Illustrative title risk decision tree
Figure: Illustrative title risk decision tree

Figure: Simplified decision structure for a title-risk response.

The tree should include all material costs, including the price concession, legal fees, insurance premium, opportunity cost and transaction costs. It should also show non-financial constraints, such as a prohibition on accepting an uninsurable ownership defect.

The four principal responses are:

6.1 Go

A go recommendation is justified where title is sufficiently reliable, residual risks are within approved tolerance, critical conditions are satisfied and the transaction remains viable under reasonable adverse scenarios. “Go” may be conditional on obtaining specified documents before completion.

6.2 Renegotiate

Renegotiation may involve price, timing, conditions precedent, retention, escrow, warranties, indemnities, seller-funded rectification or a revised development obligation. A price reduction is not a substitute for legal title where the risk threatens ownership or financeability.

6.3 Insure or transfer

Title insurance or a bespoke indemnity can transfer some financial consequences. The assessment must examine insured risk, exclusions, limits, deductibles, defence control, notification duties, policy duration, subrogation, insurer solvency and whether the lender is protected. Insurance generally does not create ownership, access or planning rights; it compensates defined loss subject to its terms.

6.4 Exit

Exit is appropriate where the defect threatens the investment thesis, cannot be controlled, is uninsurable, exceeds risk appetite, or creates unacceptable legal or reputational exposure. Exit costs should be compared with the cost of continuing, including sunk transaction costs and the value of alternative opportunities.

7. Governance and Managerial Presentation

A decision paper should be concise but auditable. It should contain:

  1. the proposed transaction and intended use;
  2. the material findings and evidence relied upon;
  3. the risk register and red flags;
  4. assumptions behind probability and loss estimates;
  5. scenario and sensitivity results;
  6. proposed controls and responsible owners;
  7. residual exposure after controls;
  8. recommendation and approval required;
  9. conditions precedent and post-completion monitoring.

Legal, technical, financial and commercial specialists should not work in isolated silos. A boundary discrepancy may be a legal issue, a survey issue, a planning issue and a valuation issue simultaneously. A cross-functional review improves causal analysis.

Governance should also address conflicts of interest. Deal teams may be incentivised to close and may unconsciously down-rate risks. Independent legal review, escalation thresholds and documented dissent protect decision quality. A risk register should preserve prior versions so that later decisions can be reconstructed.

8. Technology, Data and AI

Digital land registries, geographic information systems, document-management platforms, optical character recognition and workflow tools can improve completeness and traceability. GIS can compare cadastral boundaries, surveys, planning layers, flood zones and infrastructure corridors. Automated extraction can identify names, dates, parcel numbers and encumbrance terms for human verification.

AI can assist with classification, anomaly detection and document comparison, but it should not be treated as the source of legal validity. Risks include poor scans, inconsistent historical terminology, jurisdiction-specific drafting, hallucinated interpretations, biased training data and leakage of confidential transaction information. A defensible workflow requires source-document links, confidence indicators, human review, access controls and an audit trail.

Technology should support—not replace—professional judgment. The system should distinguish extracted text from verified legal conclusions and should record the person responsible for acceptance of each material finding.

9. Limitations and Critical Evaluation

Risk matrices suffer from rating compression, anchoring, optimism bias and inconsistent interpretation of scales. Two professionals may assign different scores to the same issue. Numerical EMV can create an illusion of objectivity where probability and loss estimates are speculative. Low-frequency events may be underweighted, while reputational consequences are difficult to monetise.

The response is not to abandon analytics but to use multiple lenses: red-flag gates, qualitative legal judgment, scenario analysis, sensitivity testing, expert challenge and explicit risk appetite. The model should show ranges where appropriate and identify the assumptions that would change the recommendation.

Another limitation is model boundary. A title model may exclude tax, construction, market, environmental or counterparty risks even though a title event can trigger them. The decision paper should identify interfaces with other workstreams and avoid double counting.

10. Illustrative Case Study: Riverside Logistics Site

Background

This fictional case concerns a proposed acquisition of a 12-hectare logistics site for £24 million. The investment committee requires a registered and financeable title, legal highway access and completion within six months. The proposed development includes warehouses and a service road.

Problem

Due diligence identifies three issues:

  • the seller’s title contains a historic mortgage, with discharge evidence incomplete;
  • the service-road route crosses land apparently owned by a neighbouring company, although the seller relies on an old unregistered access agreement;
  • a boundary plan shows a 0.4-hectare area differently from the current cadastral record.

The access issue is a red flag because the proposed use depends on heavy vehicle access. The mortgage is potentially curable but must be discharged or otherwise dealt with at completion. The boundary issue may reduce developable area and affect planning drawings.

Analysis

The team records the risks as follows:

RiskInherent assessmentConsequenceProposed control
Historic mortgageP=3, I=4Enforcement or inability to transfer clean titleLender undertaking and discharge at completion
Unregistered heavy-vehicle accessP=3, I=5; red flagNo lawful route, redesign, delay and financing concernRegistered easement from neighbour before completion
Boundary discrepancyP=4, I=3Reduced area, redesign and valuation adjustmentJoint survey, boundary agreement and revised plan

The access scenario is estimated as follows. If unresolved, there is a 25% probability of a material adverse outcome. The estimated loss is £1.2 million in redesign and alternative access, £18,000 per day for 100 days of delay, and £150,000 in additional finance and professional costs.

Total loss is:

£1,200,000 + (100 × £18,000) + £150,000 = £3,150,000.

Expected monetary exposure is:

0.25 × £3,150,000 = £787,500.

These estimates exclude the possibility that the project becomes commercially infeasible. A severe scenario is therefore retained separately rather than averaged away.

Approach and solution

The committee imposes conditions precedent:

  1. the historic mortgage must be discharged simultaneously with completion;
  2. the neighbouring company must grant and register a heavy-vehicle easement;
  3. the boundary must be confirmed by an independent survey and reflected in transaction documents;
  4. the seller must bear the cost of rectification and provide a limited indemnity for pre-completion title breaches;
  5. failure of any condition permits termination and return of the deposit.

The buyer also seeks a 90-day extension option and escrow for unresolved boundary costs. Title insurance is considered but rejected as the primary solution for access because monetary compensation would not itself provide operational access. It may, however, supplement protection for residual historical defects.

Outcome

The transaction receives a conditional “renegotiate and proceed” recommendation, not an unconditional go. If the easement is not registered by the long-stop date, the recommendation automatically changes to exit. The mortgage and boundary items are treated as curable controls; the access issue is treated as a strategic gate.

Learning points

The case demonstrates that: (i) not all risks should be monetised as if they were interchangeable; (ii) a legal right required for the intended use should normally be obtained rather than merely insured; (iii) completion conditions can convert uncertainty into a decision gate; and (iv) the recommendation must state what event changes the decision.

Best-Practice Checklist

Before presenting a title-risk recommendation, the professional should confirm that:

  • every material finding has a source and responsible owner;
  • ownership, access, use, financeability and transferability have been assessed;
  • inherent and residual risk are distinguished;
  • red flags are separately identified;
  • probability and impact definitions are documented;
  • monetary and schedule assumptions are transparent and unit-consistent;
  • correlated consequences and severe scenarios are considered;
  • proposed controls are enforceable, funded and time-bound;
  • insurance terms have been reviewed rather than assumed;
  • legal, valuation, planning and technical interfaces are addressed;
  • the recommendation includes conditions, escalation triggers and an exit route;
  • conflicts, uncertainty and dissent are recorded.

Chapter Summary

Title risk analytics converts due-diligence findings into structured managerial choices. A title risk register records the finding, cause, event, consequence, controls, owner and status. Severity–probability matrices help prioritise issues, but ordinal scores are not monetary values and must be supplemented by red-flag gates and professional judgment.

Expected monetary value, schedule-cost analysis, present-value reasoning, scenario analysis and sensitivity testing provide disciplined ways to quantify exposure. Their usefulness depends on transparent assumptions, consistent units, recognition of correlation and attention to catastrophic outcomes. Decision trees clarify the choices between proceeding, renegotiating, transferring risk through insurance or indemnity, and exiting.

The most important managerial insight is that legal control and financial compensation are not equivalent. A registered access right, valid ownership and development permission may be essential operational conditions that insurance cannot replace. Strong decisions therefore integrate legal enforceability, commercial viability, risk appetite, governance, technology controls and explicit conditions precedent.

Key Terms

Title risk analytics: Systematic assessment of risks affecting property ownership, use, transfer and value.

Title risk register: Controlled record of title findings, consequences, controls, owners and status.

Inherent risk: Exposure before controls are applied.

Residual risk: Exposure remaining after controls.

Red flag: A material issue requiring escalation or a decision gate.

Severity: Magnitude of a risk consequence.

Probability: Estimated likelihood of an adverse event.

Risk matrix: Framework combining probability and impact ratings.

Expected monetary value: Probability multiplied by monetary loss for a defined event.

Scenario analysis: Evaluation of coherent combinations of assumptions and outcomes.

Sensitivity analysis: Testing the effect of changing a variable on an outcome.

Decision tree: Diagram representing choices, uncertain events and consequences.

Condition precedent: Requirement that must be satisfied before a contractual obligation or completion proceeds.

Title insurance: Contractual financial protection against specified title-related losses.

Indemnity: Promise to compensate another party for defined loss.

Financeability: Capacity of a property and its title to satisfy lender requirements.

Marketability: Practical ability to transfer or sell property on acceptable terms.

Residual exposure: Remaining legal, financial, schedule or reputational risk after treatment.

Risk appetite: Level and type of risk an organisation is willing to accept.

Review Questions

Short Answer Questions

  1. What is the difference between a title finding and a decision risk?
  2. Why should inherent risk be distinguished from residual risk?
  3. State the formula for expected monetary value and define its variables.
  4. Why should red flags not be treated merely as high numerical scores?
  5. Identify two situations in which title insurance may not replace a legal right.

Long Answer Questions

  1. Explain how a title risk register should be designed and maintained throughout a property transaction.
  2. Critically evaluate the strengths and limitations of severity–probability matrices in property due diligence.
  3. Discuss how financial, schedule and reputational exposure should be integrated into an investment committee paper.
  4. Compare the managerial implications of go, renegotiate, insure and exit recommendations.
  5. Explain how governance and technology can improve the reliability of title-risk analytics.

Analytical / Application Questions

  1. A disputed access right has a 20% probability of producing a £2,000,000 loss. Calculate the expected monetary exposure and explain why management should not rely on this figure alone.
  2. Construct a risk register for a property with an unresolved mortgage, a boundary discrepancy and an informal access arrangement. Identify one red flag and propose a condition precedent.
  3. An insurance policy compensates financial loss but does not grant physical access. Using a decision-tree approach, determine when obtaining a registered easement should be preferred to relying on insurance.

Multiple Choice Questions with Answers

Question 1

Which statement best describes residual risk?

A. Risk before any controls are applied

B. Risk remaining after controls are considered

C. The monetary value of the property

D. The probability that a transaction completes

Correct Answer: B. Risk remaining after controls are considered

Question 2

A defined title event has a probability of 0.20 and a potential loss of £1,500,000. What is its expected monetary value?

A. £75,000

B. £300,000

C. £1,200,000

D. £1,500,000

Correct Answer: B. £300,000

Question 3

What is the principal purpose of a title risk register?

A. To replace the land register

B. To record and manage findings, consequences, controls and accountability

C. To guarantee that no title defect exists

D. To calculate market rent

Correct Answer: B. To record and manage findings, consequences, controls and accountability

Question 4

Which issue is most appropriately treated as a potential red flag?

A. A formatting difference in a non-material report

B. A minor delay in receiving a routine invoice

C. No legally enforceable access for the proposed development

D. A typographical error corrected before signing

Correct Answer: C. No legally enforceable access for the proposed development

Question 5

In the formula R = P × I, what do P and I ordinarily represent?

A. Price and income

B. Probability and impact ratings

C. Parcel and interest

D. Premium and indemnity

Correct Answer: B. Probability and impact ratings

Question 6

Why may insurance be insufficient for an access problem?

A. Insurance always increases the purchase price

B. Insurance cannot compensate any title-related loss

C. Financial compensation does not itself create a legal access right

D. Insurance is relevant only to lenders

Correct Answer: C. Financial compensation does not itself create a legal access right

Question 7

Which analysis changes one assumption at a time to examine its effect on an outcome?

A. Sensitivity analysis

B. Chain-of-title analysis

C. Registration analysis

D. Authority analysis

Correct Answer: A. Sensitivity analysis

Question 8

A delay costs £10,000 per day and lasts 60 days. Ignoring other effects, what is the delay cost?

A. £6,000

B. £60,000

C. £600,000

D. £1,000,000

Correct Answer: B. £60,000

Question 9

Which statement about a risk score based on a 1–5 probability and impact scale is correct?

A. It is automatically a monetary valuation

B. It proves that a risk with score 12 is twice as serious as one with score 6

C. It is a prioritisation tool whose interpretation depends on defined scales

D. It eliminates the need for professional judgment

Correct Answer: C. It is a prioritisation tool whose interpretation depends on defined scales

Question 10

Which recommendation is most appropriate where a defect threatens the investment thesis, cannot be controlled and is uninsurable?

A. Proceed unconditionally

B. Exit

C. Ignore the defect

D. Record it only after completion

Correct Answer: B. Exit

Property Titles & Due Diligence
Chapter 12 of 15