Introduction

Inventory is the stock of materials, components, work-in-process, finished goods, spare parts, consumables and sometimes information or service capacity held to support operations. In a production system, inventory connects purchasing, manufacturing, maintenance, distribution and customer service. It protects operations against uncertainty, but it also ties up working capital, occupies space, incurs handling and insurance costs, and can become obsolete or damaged.

Inventory planning and control is therefore a balancing activity. The objective is not to maximise inventory or minimise it without qualification. The objective is to provide the required level of availability at an economically and operationally acceptable total cost. Effective control integrates demand information, lead times, replenishment policies, supplier performance, production schedules, warehouse records and financial targets.

Learning Objectives

By the end of this chapter, the learner should be able to:

  • classify inventory by function, stage and importance;
  • explain the principal costs and risks of holding inventory;
  • calculate economic order quantity, reorder points and safety stock;
  • interpret cycle-service level and fill rate;
  • apply ABC analysis and cycle-counting methods;
  • select appropriate replenishment policies;
  • evaluate the trade-off between availability, working capital, obsolescence and shortage risk;
  • use technology and governance controls to improve inventory accuracy and performance.

1. The Role and Classification of Inventory

Inventory exists because supply and demand rarely occur at exactly the same time, quantity and location. A manufacturer may buy steel in economic quantities before production needs it. A retailer may hold finished goods in anticipation of seasonal demand. A maintenance department may store a bearing because failure of a critical machine would otherwise stop production.

1.1 Classification by operational stage

CategoryMeaningTypical control concern
Raw materialsPurchased inputs not yet processedSupplier reliability and purchasing lot size
Work-in-process (WIP)Items being transformed between operationsFlow time, bottlenecks and production scheduling
Finished goodsCompleted products awaiting shipment or saleForecast accuracy and customer service
Maintenance, repair and operating supplies (MRO)Items supporting operations rather than becoming part of the productCriticality and sporadic demand
Packaging and consumablesMaterials consumed during production or distributionUsage visibility and replenishment discipline

1.2 Classification by function

Cycle stock is the inventory replenished in batches and consumed during normal operations. It is largely determined by order or production quantity.

Safety stock is additional inventory held to protect against demand, supply or process uncertainty. It is not intended to cover predictable average demand during the replenishment cycle.

Pipeline inventory is stock in transit or otherwise committed but not yet available for use. Long transport or supplier lead times increase pipeline inventory.

Anticipation inventory is built in advance of predictable events such as seasonal demand, planned shutdowns, promotions or expected price increases.

Decoupling inventory separates operations so that a delay or variation in one process does not immediately stop another. Work-in-process between two machines is a common example.

Speculative inventory is acquired because of an expectation of price increases, scarcity or exchange-rate movements. It may be financially attractive but creates exposure if the expectation is wrong.

1.3 Classification by demand relationship

Independent demand is determined by external customers or markets, as with finished products and service parts. Dependent demand is derived from the planned production of another item, as with components in a bill of materials. Independent-demand items are commonly controlled using forecasting and reorder policies; dependent-demand items are often planned through material requirements planning (MRP), though safety stock and lot-sizing decisions may still be required.

1.4 Inventory record concepts

A stockkeeping unit (SKU) is a uniquely controlled item, normally identified by attributes such as part number, specification, location and unit of measure. The inventory position is more useful for replenishment than physical stock alone:

Inventory position = On-hand inventory + On-order inventory − Backorders

On-hand inventory may need to exclude damaged, quarantined or otherwise unavailable stock. On-order inventory includes confirmed replenishment not yet received. Backorders are committed requirements not yet fulfilled. The inventory position should be calculated consistently with the organisation’s transaction and reservation rules.

2. Inventory Costs and the Economic Trade-off

Four cost groups dominate inventory decisions.

2.1 Purchase or production cost

Purchase cost is the price paid for an item. Production cost may include material, labour and allocated conversion costs. Quantity discounts can make the unit price dependent on order size, so the lowest unit price is not automatically the lowest total cost.

2.2 Ordering or setup cost

Ordering cost includes purchase-order preparation, approval, transport arrangements, receiving and invoice processing. For internally produced items, the comparable cost is setup cost: cleaning, tooling, programming, inspection and downtime required to change production.

2.3 Holding or carrying cost

Holding cost includes capital, storage space, insurance, handling, deterioration, damage, taxes and obsolescence. If annual demand is measured in units and the unit value is monetary, annual holding cost per unit is often represented as:

H = iC

where H is annual holding cost per unit, i is the annual carrying-rate fraction, and C is unit cost. For example, a carrying rate of 25% and unit cost of $40 imply H = 0.25 × 40 = $10 per unit per year. The rate must include only relevant cost elements and should be applied consistently.

2.4 Shortage cost

Shortage cost arises when inventory is unavailable. It may include emergency purchasing, expediting, lost contribution margin, production stoppage, contractual penalties, reputational damage and customer switching. Shortage cost is often difficult to measure, but ignoring it encourages dangerously low stock levels.

The central managerial issue is that larger replenishment quantities reduce order frequency but increase average cycle stock. More safety stock improves availability but increases capital and obsolescence exposure. Decisions should therefore use total relevant cost rather than a single measure such as purchase price or warehouse occupancy.

3. Economic Order Quantity

The basic economic order quantity (EOQ) model identifies the order quantity that minimises the sum of annual ordering and holding costs under simplified conditions.

Q* = √(2DS / H)

Here:

  • Q* = economic order quantity, in units per order;
  • D = annual demand, in units per year;
  • S = ordering or setup cost, in monetary units per order;
  • H = annual holding cost per unit, in monetary units per unit per year.

3.1 Assumptions of the basic model

The classical EOQ model assumes constant and known demand, constant lead time, instantaneous replenishment, no shortages, no quantity discounts, a constant unit cost and independent replenishment decisions. These assumptions are rarely exact in practice, but the model remains useful as a benchmark and starting point.

Average cycle stock is approximately Q/2 when replenishment is instantaneous and demand is steady. The relevant annual cost, excluding purchase cost when unit price is constant, is:

TC(Q) = (D/Q)S + (Q/2)H

The first term is annual ordering cost and the second is annual cycle-stock holding cost. Differentiating with respect to Q and setting the derivative to zero gives:

dTC/dQ = −DS/Q² + H/2 = 0

Therefore:

Q² = 2DS/H and Q* = √(2DS/H)

At EOQ, annual ordering cost equals annual cycle-stock holding cost. This equality is a property of the basic model, not a universal rule for every inventory system.

3.2 Worked example: EOQ

A component has annual demand of 12,000 units. Each order costs $75 to process, and annual holding cost is $3 per unit.

Q* = √[(2 × 12,000 × 75)/3]
Q* = √600,000 ≈ 774.6 units

The practical order quantity is approximately 775 units. The expected number of orders per year is:

D/Q* = 12,000/774.6 ≈ 15.5 orders per year

Average cycle stock is approximately 387.3 units. If orders must be made in full pallet quantities, the calculated EOQ must be compared with feasible multiples and the total cost evaluated.

3.3 Extensions and limitations

If replenishment occurs gradually during internal production, the economic production quantity (EPQ) model is more appropriate. If the production rate is p units per year and demand rate is d, with p > d, the maximum inventory is lower than the lot size because consumption occurs while production is taking place:

Q*EPQ = √[2DS / (H(1 − d/p))]

This formula assumes a constant production rate, constant demand and no shortages. Quantity discounts require comparison of total annual cost at each feasible price-break quantity; selecting the lowest price alone is incorrect. Highly variable demand, capacity restrictions, shelf-life limits and supplier minimum order quantities may also make a simple EOQ unsuitable.

4. Reorder Points and Lead-Time Demand

EOQ determines how much to order; the reorder point (ROP) determines when to order. With constant demand and lead time:

ROP = dL

where d is demand per time period and L is lead time in the same time unit. Unit consistency is essential. If annual demand is used, lead time must be expressed as a fraction of a year.

4.1 Worked example: deterministic reorder point

Daily demand is 80 units and supplier lead time is 6 working days. With no uncertainty:

ROP = 80 × 6 = 480 units

A replenishment order should be released when the inventory position reaches 480 units, not necessarily when physical shelf stock reaches 480, because outstanding orders and backorders are part of the inventory-position calculation.

4.2 Reorder point with safety stock

When demand or lead time is uncertain:

ROP = Expected lead-time demand + Safety stock

For constant demand rate and variable lead time, the expected lead-time demand is dar{L}, where \bar{L} is average lead time. Safety stock must reflect the relevant source of uncertainty.

If demand per period has standard deviation σd, lead time is constant at L periods, and independent demand variations are assumed, the standard deviation of lead-time demand is:

σLT = σd√L

Thus:

ROP = dL + zσd√L

where z is the standard-normal safety factor associated with the target cycle-service probability. The formula assumes independent, identically distributed demand errors and a fixed lead time.

If demand is constant but lead time varies, with lead-time standard deviation σL, then:

σLT = dσL

If both demand and lead time vary independently, a commonly used approximation is:

σLT = √(\bar{L}σd² + d²σL²)

A more exact expression for independent demand and lead time, when demand has mean d and variance σd², is:

Var(LT demand) = \bar{L}σd² + d²σL² + σd²σL²

The last term is often small but should not be omitted uncritically when variability is substantial. If demand and lead time are correlated, covariance terms are needed and the independent formula is not valid.

4.3 Worked example: safety stock and ROP

Daily demand has a mean of 100 units and standard deviation of 20 units. Lead time is constant at 5 days. The organisation targets a 95% cycle-service level, for which z ≈ 1.645 under a normal approximation.

Expected lead-time demand = 100 × 5 = 500 units
σLT = 20√5 ≈ 44.72 units
Safety stock = 1.645 × 44.72 ≈ 73.57 units
ROP = 500 + 73.57 ≈ 573.57 units

The operational ROP is therefore approximately 574 units, subject to rounding and practical constraints. The result is a statistical protection level, not a guarantee that shortages can never occur.

5. Service Levels and Safety Stock

Service level describes the probability or degree to which demand is met from available stock. Two measures must be distinguished.

Cycle-service level (CSL) is the probability of experiencing no stockout during a replenishment cycle. Under a normal lead-time-demand model:

CSL = P(DLT ≤ ROP)

If safety stock equals zσLT, then:

CSL = Φ(z)

where Φ is the cumulative standard-normal distribution function.

Fill rate is the proportion of total demand quantity supplied immediately from stock. A cycle may experience a shortage and still have a high fill rate if the shortage is small relative to total demand. Conversely, a single large shortage may produce a low fill rate even when most cycles have no stockout.

A target service level should be chosen according to item criticality, shortage consequences, customer commitments, demand economics and the cost of additional stock. Applying a 99.9% target to every item is usually financially inefficient. Service segmentation is more appropriate.

Normal-distribution safety factors are approximations. Intermittent, lumpy or highly skewed demand may require empirical quantiles, Croston-type forecasting, negative-binomial models, simulation or a deliberately specified probability distribution. Data quality and forecast bias should be investigated before increasing safety stock.

6. ABC Analysis and Inventory Segmentation

ABC analysis ranks items by annual consumption value:

Annual consumption value = Annual demand × Unit cost

Items are then ordered from highest to lowest value and cumulatively classified. A common, but not mandatory, policy is:

ClassTypical characteristicManagement response
ASmall proportion of items representing a large share of valueFrequent review, accurate forecasting, senior attention, tight records
BIntermediate value and importancePeriodic review and normal control
CMany low-value items representing a small share of valueSimple controls, larger review intervals, economical ordering

ABC is a value classification, not a criticality classification. A low-cost fire extinguisher component may be operationally critical despite a low annual consumption value. A robust segmentation can combine annual value with criticality, demand variability, lead time, obsolescence risk and supplier availability. A two-dimensional policy may therefore identify “A-critical,” “C-critical” and “A-noncritical” items with different controls.

ABC procedure

  1. Establish a reliable annual-demand estimate and unit cost.
  2. Calculate annual consumption value for each SKU.
  3. Rank SKUs in descending value order.
  4. Calculate cumulative value and cumulative item percentage.
  5. Set policy boundaries appropriate to the organisation.
  6. Review classifications periodically and after major changes.

ABC thresholds should not be treated as natural laws. The 80/20 pattern is a useful tendency, not a guaranteed distribution.

7. Cycle Counting and Inventory Accuracy

A periodic physical inventory checks all items at one time. Cycle counting counts selected items continuously throughout the year and investigates discrepancies promptly. It reduces operational disruption and provides faster feedback about transaction errors, picking mistakes, incorrect units of measure, damage, mislocation and unauthorised movements.

A simple record-accuracy measure is:

Inventory record accuracy = (Number of accurate records / Number of records checked) × 100%

A monetary accuracy measure may compare the absolute discrepancy value with the recorded inventory value, but the definition must be documented because positive and negative errors can otherwise cancel each other.

Cycle-count frequencies may be risk-based:

  • A or critical items: frequent counts, perhaps weekly or monthly;
  • B items: quarterly or semi-annual counts;
  • C items: annual or event-triggered counts.

A mature programme does not merely correct the quantity. It identifies root causes and assigns corrective actions. Common causes include receiving before inspection, duplicate item codes, unrecorded scrap, poor location discipline, unit-of-measure conversion errors and delayed system transactions.

Blind counting, in which the counter does not see the system quantity, reduces confirmation bias. Segregation of duties is important where inventory discrepancies could conceal theft or fraud. Count tolerances should be based on value, criticality and operational consequences rather than a single percentage for every item.

8. Replenishment Policies

8.1 Continuous-review (Q, R) system

In a continuous-review system, inventory position is monitored continuously. A fixed quantity Q is ordered when the position reaches reorder point R. EOQ can provide a starting value for Q, while R reflects expected lead-time demand and safety stock. This approach suits important or expensive items where transaction visibility is strong.

8.2 Periodic-review (P, S) system

Inventory is reviewed every P periods and replenished up to an order-up-to level S. The protection period includes the review interval plus lead time. Periodic review can reduce administrative effort and coordinate supplier deliveries, but it generally requires more safety stock because a shortage can occur during the review interval.

8.3 Min–max and two-bin systems

A min–max policy triggers replenishment when stock reaches a minimum and restores it toward a maximum. A two-bin system uses one bin for active use and a second bin as a visual replenishment signal. These methods are simple and effective for stable, low-value consumables, but they are unsuitable for high-value or highly variable items without additional controls.

8.4 MRP and pull systems

MRP uses the master production schedule, bill of materials, inventory records and lead times to calculate dependent requirements. Kanban and other pull systems authorise replenishment based on actual consumption and controlled container quantities. MRP and pull systems are not mutually exclusive: MRP may plan long-lead components while kanban controls repetitive line-side replenishment.

9. Integrated Inventory Decision-Making

Inventory decisions should be evaluated across the supply chain rather than at one departmental boundary. Purchasing may reduce unit price by increasing order size, while finance sees higher working capital and operations faces greater obsolescence. Similarly, production may prefer long runs to reduce setups, while customers experience longer response times and more finished-goods stock.

Important performance indicators include:

MeasureInterpretation
Inventory turnoverCost of goods sold divided by average inventory value; higher is not always better if service suffers
Days of supplyInventory quantity or value expressed as expected days of demand
Fill rateDemand quantity supplied immediately from stock
Cycle-service levelProbability of no stockout during a replenishment cycle
Stockout frequencyNumber or proportion of shortage events
Obsolescence rateValue or quantity written off or at risk of write-off
Record accuracyAgreement between system records and physical stock
Supplier lead-time reliabilityConsistency of actual lead time with planned lead time

No single metric is sufficient. A warehouse can show high turnover by carrying too little stock, while a high fill rate can conceal excessive inventory. Balanced targets should include service, cost, accuracy, flow and risk.

10. Technology, Data and Artificial Intelligence

Enterprise resource planning systems, warehouse-management systems, barcode scanning, radio-frequency identification, electronic data interchange and supplier portals improve transaction visibility. However, technology cannot compensate for defective master data or weak process discipline. Item descriptions, units of measure, lead times, supplier minimums, locations and status codes must be governed.

Analytical tools can segment demand, detect abnormal usage, estimate lead-time distributions and simulate service outcomes. Machine-learning models may improve forecasts when sufficient, stable and relevant data exist. They should not be accepted automatically: planners must test forecast bias, explainability, data drift and the cost of false alarms. A model that predicts demand accurately on average may still perform poorly for critical intermittent-demand parts.

Automation also creates governance obligations. Access rights should prevent unauthorised changes to stock records, audit trails should preserve transaction history, and automated replenishment should include exception thresholds and human review for unusual orders.

11. Illustrative Case: Inventory Policy for a Maintenance Component

Background

A food-processing plant uses a specialised motor bearing. Annual usage is 2,400 bearings. Each purchase order costs $60 to administer, and the estimated annual holding cost is $4 per bearing. Supplier lead time averages 8 working days. Daily demand has a mean of 10 bearings and a standard deviation of 3 bearings. The bearing is not expensive, but failure can stop a production line.

Problem

The plant has suffered emergency purchases despite holding large quantities of other low-value MRO items. The maintenance manager wants a policy that improves availability without indiscriminate stock accumulation.

Analysis

Using the basic EOQ model:

Q* = √[(2 × 2,400 × 60)/4]
Q* = √72,000 ≈ 268.3 bearings

A practical order quantity is approximately 268 or 270 bearings, subject to supplier packaging. For a 95% cycle-service target, assume lead time is constant at 8 days and daily demand errors are independent:

Expected lead-time demand = 10 × 8 = 80 bearings
σLT = 3√8 ≈ 8.49 bearings
Safety stock = 1.645 × 8.49 ≈ 13.97 bearings
ROP = 80 + 13.97 ≈ 94 bearings

The suggested initial policy is therefore a fixed order of approximately 270 bearings when inventory position reaches about 94 bearings. Because the component is operationally critical, it should not be classified solely as a C item merely because its annual monetary value is modest. A criticality flag, approved substitute specification and emergency-supply arrangement are required.

Approach and controls

The plant introduces barcode transactions at receiving and issuing, monthly blind cycle counts, review of supplier lead-time variation, and a quarantine status for damaged or suspect bearings. The maintenance department records actual failures and usage separately from planned preventive replacements. The ROP is reviewed quarterly rather than increased automatically after one unusual event.

Outcome

In this illustrative case, the policy reduces uncontrolled emergency buying while maintaining a defined service target. Its success depends on accurate issue transactions, reliable lead-time data and periodic review. EOQ alone did not solve the problem; the solution combined quantity, timing, criticality, data and governance.

Learning points

  1. Monetary value and operational criticality are different dimensions.
  2. EOQ addresses replenishment quantity, not service protection.
  3. Safety stock should be linked to measured uncertainty and a stated service objective.
  4. Cycle counting and transaction discipline are prerequisites for trustworthy planning.
  5. Policies must be reviewed when demand, suppliers, specifications or production technology change.

12. Challenges, Limitations and Ethical Considerations

Inventory models can create false precision. A calculated safety stock is only as reliable as the demand history, lead-time data, distributional assumptions and service definition behind it. Forecasts may be biased by promotions, stockouts or cancelled orders. Historical demand observed during a stockout understates true demand and can lead to systematically inadequate replenishment.

Obsolescence is especially important for technology products, pharmaceuticals, fashion goods and regulated components. Shelf-life controls, first-expiry-first-out rotation, engineering-change procedures and end-of-life reviews should be integrated with planning. Excess inventory may also create environmental costs through energy use, disposal and unnecessary production.

Ethical control includes preventing concealment of shortages, manipulation of inventory valuations, unauthorised write-offs and inaccurate reporting of service performance. Financial reporting rules may require inventory to be measured at the lower of cost and net realisable value, subject to the applicable accounting framework. Regulated industries may impose traceability, segregation, recall and expiry requirements. Inventory planners must coordinate with finance, quality, compliance and internal audit rather than treating inventory as purely an operational issue.

Best-Practice Guidelines

  • Define inventory categories, item ownership and availability status clearly.
  • Use inventory position, not on-hand quantity alone, for replenishment decisions.
  • Match policy sophistication to item value, criticality and uncertainty.
  • Separate cycle stock from safety stock when analysing performance.
  • Use consistent units, time bases and cost definitions in formulas.
  • Validate lead-time and demand data before recalculating safety stock.
  • Combine ABC value analysis with criticality, variability and obsolescence risk.
  • Establish risk-based cycle-count frequencies and investigate root causes.
  • Review service targets by customer and item class rather than applying one target universally.
  • Include suppliers, production, maintenance, finance and quality in policy design.
  • Monitor total cost, service, accuracy and risk together.
  • Use automation with audit trails, exception rules and human oversight.

Chapter Summary

Inventory planning and control balances product availability against capital, storage, obsolescence and shortage risk. Inventory may be classified by operational stage, function, demand relationship, value and criticality. Cycle stock supports normal replenishment, while safety stock protects against uncertainty; pipeline, anticipation and decoupling inventories serve additional operational purposes.

The EOQ model determines an economical replenishment quantity under stated assumptions, while the reorder point determines when replenishment should begin. Safety stock is calculated from demand and lead-time uncertainty and should be linked to an explicit service objective. Cycle-service level measures the probability of no stockout during a cycle, whereas fill rate measures the proportion of demand supplied immediately; these measures must not be confused.

ABC analysis focuses attention according to annual consumption value, but it should be combined with criticality and risk. Cycle counting improves record accuracy and provides a mechanism for correcting process causes rather than merely adjusting balances. Continuous-review, periodic-review, min–max, MRP and pull systems provide different approaches to replenishment. Effective practice integrates quantitative models with data governance, technology, cross-functional decision-making and ethical control.

Key Terms

Inventory: Stock held to support production, distribution, maintenance or customer service.

Cycle stock: Inventory created by replenishment in batches during normal demand.

Safety stock: Additional inventory held to protect against uncertainty.

Pipeline inventory: Stock in transit or committed but not yet available.

Work-in-process: Material currently undergoing transformation.

Independent demand: Demand generated externally by customers or markets.

Dependent demand: Demand derived from the requirement for another item.

Inventory position: On-hand plus on-order inventory minus backorders.

Holding cost: Annual cost of owning, storing and risking inventory.

Ordering cost: Cost incurred each time a replenishment order is placed.

EOQ: Quantity that minimises ordering and holding cost in the basic model.

Reorder point: Inventory position at which replenishment is initiated.

Lead-time demand: Demand expected during replenishment lead time.

Cycle-service level: Probability of no stockout during a replenishment cycle.

Fill rate: Proportion of demand quantity supplied immediately from stock.

ABC analysis: Ranking inventory by annual consumption value.

Cycle counting: Continuous, scheduled counting of selected inventory records.

Obsolescence: Loss of usefulness or value because an item is outdated, expired or no longer required.

Inventory turnover: Cost of goods sold divided by average inventory value.

Criticality: Consequence of an item being unavailable to operations or customers.

Review Questions

Short Answer Questions

  1. Distinguish cycle stock from safety stock.
  2. What is the purpose of an inventory position calculation?
  3. State two assumptions of the basic EOQ model.
  4. Distinguish cycle-service level from fill rate.
  5. Why is ABC analysis insufficient as the only inventory classification method?

Long Answer Questions

  1. Explain the principal inventory costs and discuss how they influence replenishment decisions.
  2. Derive the basic EOQ relationship from annual ordering and holding costs, stating its assumptions.
  3. Explain how demand and lead-time variability influence safety-stock calculations.
  4. Compare continuous-review and periodic-review replenishment systems.
  5. Discuss how cycle counting, master-data governance and technology jointly improve inventory accuracy.

Analytical / Application Questions

  1. Annual demand for an item is 18,000 units, ordering cost is $50 per order and annual holding cost is $2.50 per unit. Calculate EOQ and explain two practical factors that might require adjustment.
  2. Mean daily demand is 75 units, daily standard deviation is 12 units, and constant lead time is 4 days. Using a 95% cycle-service target with z = 1.645, calculate safety stock and reorder point.
  3. A low-value spare part has highly variable demand and a six-week supplier lead time, while a high-value finished product has stable demand and a two-day lead time. Propose a segmentation and replenishment approach, explaining why annual consumption value alone would be inadequate.

Multiple Choice Questions with Answers

Question 1

Which inventory category is primarily held to protect against uncertainty in demand or supply?

A. Cycle stock

B. Safety stock

C. Pipeline inventory

D. Speculative inventory

Correct Answer: B. Safety stock

Question 2

Annual demand is 10,000 units, ordering cost is $40 per order, and annual holding cost is $2 per unit. What is the basic EOQ?

A. 200 units

B. 400 units

C. 632 units

D. 800 units

Correct Answer: C. 632 units

Question 3

Daily demand is 60 units and lead time is 5 days, with no uncertainty or safety stock. What is the reorder point?

A. 12 units

B. 300 units

C. 360 units

D. 3,000 units

Correct Answer: B. 300 units

Question 4

Which expression correctly represents inventory position?

A. On-hand inventory + backorders − on-order inventory

B. On-hand inventory − on-order inventory − backorders

C. On-hand inventory + on-order inventory − backorders

D. On-order inventory − on-hand inventory + backorders

Correct Answer: C. On-hand inventory + on-order inventory − backorders

Question 5

What does ABC analysis normally use as its primary ranking measure?

A. Annual consumption value

B. Supplier geographic distance

C. Number of warehouse locations

D. Average item weight

Correct Answer: A. Annual consumption value

Question 6

A cycle-service level measures the:

A. Percentage of inventory value counted accurately

B. Probability of no stockout during a replenishment cycle

C. Percentage reduction in annual holding cost

D. Average number of orders placed per cycle

Correct Answer: B. Probability of no stockout during a replenishment cycle

Question 7

Daily demand has standard deviation 10 units and constant lead time is 9 days. Under the independent-demand assumption, what is the standard deviation of lead-time demand?

A. 10 units

B. 19 units

C. 30 units

D. 90 units

Correct Answer: C. 30 units

Question 8

Which practice best describes blind cycle counting?

A. Counting only damaged items

B. Counting without first revealing the system quantity

C. Counting every item only at year-end

D. Counting items after deleting their records

Correct Answer: B. Counting without first revealing the system quantity

Question 9

Which statement about ABC analysis is most accurate?

A. It classifies items according to operational criticality only

B. It guarantees that all C items are unimportant

C. It ranks items using annual consumption value and may need to be combined with criticality

D. It eliminates the need for physical counting

Correct Answer: C. It ranks items using annual consumption value and may need to be combined with criticality

Question 10

A fill rate differs from cycle-service level because fill rate measures:

A. The proportion of demand quantity supplied immediately

B. The probability that an order is placed

C. The number of suppliers used for an item

D. The percentage of orders received early

Correct Answer: A. The proportion of demand quantity supplied immediately