Introduction

Procurement is no longer viewed merely as an administrative activity that places orders. In contemporary supply chains, procurement converts organisational requirements into externally sourced goods, services and capabilities. Its decisions affect cost, quality, continuity of supply, innovation, sustainability, compliance and customer value.

A procurement department therefore needs more than purchasing procedures. It requires an organisation structure, a strategy aligned with corporate objectives, reliable spend information, a method for classifying purchases, and plans that translate strategic intentions into measurable actions. This chapter develops those foundations and introduces the Kraljic portfolio model as a practical tool for prioritising procurement effort.

Learning Objectives

By the end of this chapter, you should be able to:

  1. Explain the role and organisation of procurement.
  2. Align procurement objectives with organisational and supply-chain strategy.
  3. Analyse and cleanse procurement-spend data.
  4. Classify purchases using value, risk and portfolio criteria.
  5. Apply the Kraljic purchasing portfolio matrix.
  6. Develop category strategies and procurement plans.
  7. Evaluate governance, ethical, technological and implementation issues.

1. Procurement as a Strategic Organisational Function

Procurement is the controlled process of identifying needs, sourcing suppliers, negotiating commercial terms, placing orders, receiving goods or services, and managing supplier performance. Purchasing is usually narrower, referring mainly to transactional activities such as requisitioning and ordering. Strategic sourcing is the analytical process of designing supply markets, evaluating alternatives and selecting sourcing arrangements. Procurement includes both strategic sourcing and operational purchasing.

The procurement function contributes value through several channels:

  • Commercial value: competitive prices, lower total cost and improved contract terms.
  • Operational value: dependable supply, appropriate quality and shorter lead times.
  • Strategic value: access to innovation, specialist capability and market knowledge.
  • Risk value: reduced exposure to disruption, fraud, legal non-compliance and supplier failure.
  • Sustainability value: improved environmental, labour and social outcomes.

The relevant measure is not always the lowest purchase price. Total cost of ownership includes acquisition, transport, inspection, installation, operation, maintenance, downtime, disposal and other lifecycle costs. A cheaper product may be uneconomic if it fails frequently or creates high disposal costs.

Procurement’s internal relationships

Procurement operates at the intersection of multiple functions. Finance establishes budgets and financial controls; operations defines technical and service requirements; engineering may approve specifications; legal reviews contracts; information technology manages systems and cybersecurity; quality assurance evaluates conformity; and sustainability teams assess environmental and social standards. Effective procurement therefore depends on cross-functional cooperation rather than departmental isolation.

A useful principle is "specify collaboratively, compete fairly, and manage performance continuously." Procurement should not unilaterally define requirements that belong to users or technical specialists, but it should ensure that requirements are clear, non-discriminatory and commercially viable.

2. Procurement Organisation and Governance

Centralised, decentralised and hybrid structures

In a centralised structure, one procurement unit manages most organisational purchasing. Advantages include volume leverage, consistent policies, specialist expertise and better spend visibility. Disadvantages may include slower responses, distance from local users and insufficient knowledge of operational conditions.

In a decentralised structure, departments or business units conduct their own procurement. This can improve responsiveness and local accountability, but may produce fragmented demand, inconsistent contracts, duplicated suppliers and weak control.

A hybrid structure combines central strategic control with delegated operational purchasing. For example, a central team may manage category strategies, supplier frameworks, policy and major negotiations, while local units manage routine orders within approved contracts. Hybrid models are often appropriate for geographically dispersed organisations.

StructureMain strengthMain riskSuitable condition
CentralisedAggregated leverage and standardisationReduced local responsivenessCommon requirements across units
DecentralisedLocal knowledge and speedFragmentation and inconsistent controlHighly diverse or autonomous operations
HybridBalance of control and flexibilityRole ambiguityLarge, complex organisations

Category management organisation

Category management groups similar goods and services according to supply-market characteristics and business requirements. Categories may include raw materials, transport, facilities management, information technology, packaging or professional services. A category manager is responsible for understanding demand, supply markets, risk, cost drivers, supplier capability and the category strategy.

A mature procurement organisation commonly contains four layers:

  1. Governance: policy, authority limits, ethics, risk and compliance.
  2. Category and strategic sourcing: market analysis, tendering, negotiation and supplier strategy.
  3. Procurement operations: requisitions, purchase orders, receipts and invoice resolution.
  4. Procurement support and analytics: systems, data, reporting, contract administration and performance measurement.

Governance and the three lines of control

Procurement governance specifies who may request, approve, source, contract and pay. Separation of duties is essential. The person who selects a supplier should not normally be the sole person who approves payment. A typical control sequence is:

Need identification → specification approval → sourcing or quotation → evaluation → contract approval → purchase order → receipt confirmation → invoice verification → payment.

Controls should be proportionate to risk. Excessive approval requirements can encourage employees to bypass procedures, while weak controls expose the organisation to fraud, conflicts of interest and unauthorised commitments.

3. Aligning Procurement with Organisational Strategy

Organisational strategy expresses how an organisation intends to create value and compete or fulfil its mission. Procurement strategy translates that direction into choices about suppliers, markets, specifications, contracts, relationships, technology and risk.

For example:

  • A cost-leadership strategy may emphasise standardisation, competition, demand aggregation and process efficiency.
  • A differentiation strategy may require suppliers capable of innovation, quality and rapid customisation.
  • A service-reliability strategy may prioritise continuity, capacity reserves and supplier resilience.
  • A sustainability strategy may require lifecycle assessment, emissions reporting and responsible sourcing.
  • A growth strategy may require scalable suppliers, new-market sourcing and flexible contracts.

Strategic alignment can be expressed through a cascade:

Corporate objective → supply-chain objective → procurement objective → initiative → measure.

Example:

LevelExample
Corporate objectiveImprove customer service while protecting margin
Supply-chain objectiveIncrease product availability and reduce avoidable cost
Procurement objectiveSecure reliable supply at competitive total cost
InitiativeDual-source critical packaging and negotiate service-level terms
MeasuresStockout rate, total cost, supplier on-time delivery and risk exposure

Procurement objectives should be specific, measurable, achievable, relevant and time-bound, but numerical targets must be based on credible baselines. A target to reduce expenditure by 20% may be harmful if it leads to quality failures or supply interruption.

Procurement performance measures

Important measures include:

  • purchase-price variance;
  • realised and forecast savings;
  • total cost of ownership;
  • contract coverage;
  • percentage of spend competitively sourced;
  • supplier on-time delivery;
  • defect or rejection rate;
  • procurement-cycle time;
  • invoice exception rate;
  • percentage of spend with approved suppliers;
  • supplier concentration and continuity risk; and
  • emissions, labour and ethical performance.

Savings must be defined carefully. Price savings compare a negotiated price with a valid baseline. Cost avoidance prevents a future increase but may not reduce current expenditure. Demand reduction lowers consumption. These outcomes should not be reported as interchangeable.

A simple price-saving calculation is:

Savings = (Baseline price − New price) × Actual quantity purchased

The formula assumes that the baseline is valid, the quantity is measured over the same period, specifications and service levels are comparable, and currency and other price components are consistently treated. If Q is quantity, measured in units, and prices are measured in currency per unit, savings are measured in currency.

4. Spend Analysis

Spend analysis is the systematic examination of expenditure data to identify what is purchased, from whom, at what price, by which organisational unit, under which contract and with what level of risk. It is the evidence base for category management and sourcing priorities.

The spend-analysis process

  1. Define scope: period, business units, expenditure types and objectives.
  2. Extract data: enterprise resource planning systems, accounts payable, purchase cards, contracts and supplier records.
  3. Clean data: standardise supplier names, currencies, units of measure and descriptions.
  4. Classify expenditure: map items to a category taxonomy such as UNSPSC or an internally controlled hierarchy.
  5. Analyse patterns: examine suppliers, categories, locations, prices, contract status and trends.
  6. Validate findings: discuss anomalies with finance, users and operational experts.
  7. Prioritise action: select categories according to value, risk, opportunity and feasibility.

A basic spend-share calculation is:

Spend sharei = (Category spendi ÷ Total addressable spend) × 100%

The result is meaningful only when the numerator and denominator cover the same period, currency, organisational scope and definition of addressable spend. Addressable spend excludes expenditure that cannot reasonably be influenced, such as statutory charges or highly restricted grants.

Data-quality problems

Common problems include duplicate suppliers, inconsistent descriptions, missing contract references, tax-inclusive and tax-exclusive values, credit notes recorded incorrectly, and purchases made through non-standard channels. Poor classification can make apparently fragmented spend look concentrated, or conceal the fact that several business units buy the same item under different descriptions.

Spend analysis should therefore be treated as an iterative managerial process, not an automatic report. Algorithms can identify patterns, but category specialists must interpret whether products are genuinely substitutable and whether apparent savings are operationally realistic.

ABC analysis

ABC analysis ranks items by annual monetary usage. Annual usage value is commonly calculated as:

Annual usage valuei = Annual demandi × Unit pricei

Items are then ordered from highest to lowest value and assigned cumulative-percentage bands. A common, but not universal, policy is A items representing roughly 70–80% of value, B items the next 15–25%, and C items the remaining value. These percentages are guidelines rather than laws.

ABC analysis helps determine control intensity. A items may justify frequent review, accurate forecasts and senior attention. C items may be managed through catalogues, blanket orders or simplified approval. ABC does not measure supply risk, technical criticality or social importance; it should therefore not be used alone.

5. Purchase Classification and the Kraljic Portfolio Model

Purchase classification supports differentiated management. A routine office supply, a scarce production component and a strategically important technology service should not receive identical sourcing methods or supplier relationships.

Dimensions of the Kraljic model

The Kraljic purchasing portfolio model classifies purchases using two dimensions:

  1. Profit impact: the effect of the purchase on cost, margin, revenue, quality or operational performance.
  2. Supply risk: the probability and consequence of interruption, considering scarcity, market concentration, switching difficulty, logistics, technology and regulatory exposure.

The resulting four categories are:

CategoryProfit impactSupply riskTypical approach
Non-critical or routineLowLowSimplify, standardise and automate
LeverageHighLowAggregate demand and use competition
BottleneckLowHighSecure availability and reduce vulnerability
StrategicHighHighBuild collaborative, long-term relationships

A portfolio position is not permanent. A new technology, merger, regulatory change, supplier failure or change in demand can move an item from one quadrant to another.

Non-critical items

The administrative cost of buying may exceed the value of the item. Appropriate actions include catalogues, purchasing cards, standard specifications, approved suppliers, blanket orders and automated replenishment. The objective is process efficiency, not elaborate negotiation.

Leverage items

These have significant expenditure or business impact but are available from several capable suppliers. Procurement can consolidate demand, conduct competitive tenders, negotiate volume terms, use should-cost analysis and establish framework agreements. Care is needed to avoid excessive dependence on one supplier after competition has reduced the supplier base.

Bottleneck items

Bottleneck items have limited financial impact but high continuity risk. Actions include identifying substitutes, holding appropriate safety stock, qualifying alternative suppliers, simplifying specifications and monitoring supplier health. A low annual spend does not justify neglect if the item can stop production or compromise safety.

Strategic items

Strategic items require joint planning, executive sponsorship, relationship management and potentially supplier development. Contracts should address capacity, quality, intellectual property, confidentiality, change control, business continuity, performance measures and exit arrangements. Collaboration is valuable, but it must not become complacency: performance and market alternatives should still be reviewed.

The Kraljic model is a decision aid, not a mechanical truth. Different stakeholders may rate impact and risk differently. A transparent scoring method and documented assumptions improve consistency.

6. Category Strategy Development

A category strategy explains how the organisation will manage a category over a defined period. It normally includes:

  1. category scope and demand profile;
  2. internal stakeholder requirements;
  3. current expenditure and contract position;
  4. supply-market structure and cost drivers;
  5. risk, resilience and sustainability assessment;
  6. desired future state;
  7. sourcing and supplier relationship approach;
  8. implementation plan;
  9. performance measures; and
  10. review and contingency arrangements.

Internal and external analysis

Internal analysis asks: What is being bought? Why is it needed? Can demand be reduced or standardised? Are specifications unnecessarily restrictive? What is the cost of poor quality or late delivery? External analysis asks: How many capable suppliers exist? What are the barriers to entry? Are prices driven by commodities, labour, energy, exchange rates or capacity? What geopolitical, environmental or regulatory issues could affect supply?

Useful strategic options include:

  • specification standardisation;
  • demand aggregation;
  • make-or-buy review;
  • supplier consolidation or dual sourcing;
  • framework agreements;
  • longer-term contracts with appropriate indexation;
  • supplier development;
  • local or regional sourcing where justified;
  • digital marketplaces; and
  • lifecycle-cost or outcome-based contracting.

Total-cost and should-cost thinking

A should-cost model estimates the economically reasonable cost of an item from its major drivers, such as materials, labour, conversion, logistics, overhead and margin. It is an analytical benchmark, not proof of a supplier’s actual cost. It should be used with market evidence and respect for confidential information.

For a simple purchase, total cost may be represented as:

TCO = Purchase cost + Logistics cost + Operating cost + Quality cost + Disposal cost

The formula is a framework rather than a universal accounting identity. Each component must be defined to avoid double counting. It is most useful when alternatives have different prices but different lifecycle consequences.

7. Developing a Procurement Plan

A procurement plan converts category intentions into sequenced actions. It should cover the planning horizon, demand, timing, sourcing route, budget, responsibilities, risks, approvals and performance measures.

Planning elementQuestions to answer
RequirementWhat is needed, in what specification and quantity?
TimingWhen is demand required, and how long will sourcing take?
MarketWhat suppliers and market conditions exist?
RouteTender, quotation, framework, direct award or another lawful route?
EvaluationHow will price, quality, risk and sustainability be assessed?
ContractWhat terms, service levels, remedies and review mechanisms are needed?
ResourcesWho will lead, approve, evaluate and manage the contract?
RiskWhat could fail, and what controls or contingencies are required?
MeasuresHow will value and supplier performance be demonstrated?

The plan should distinguish forecast requirements from authorised commitments. It should also include milestones such as specification approval, market engagement, tender release, evaluation, award, mobilisation and post-award review.

Procurement methods

  • Routine catalogue buying: appropriate for standard, low-risk requirements.
  • Request for quotation: suitable where specifications are clear and several suppliers can quote.
  • Competitive tender: appropriate for significant or complex requirements requiring formal evaluation.
  • Framework agreement: useful when repeated purchases are expected and terms can be established in advance.
  • Negotiated or direct sourcing: may be justified by technical compatibility, urgency or lack of alternatives, but requires documented authority and safeguards.
  • Outcome-based contracting: focuses on results rather than prescribing every input, but requires measurable outcomes and capable contract management.

The selected method must comply with organisational policy and applicable public-procurement, competition, employment, environmental, tax and anti-corruption law.

8. Applied Case: Northstar Foods Packaging Category

The following is an illustrative case.

Background

Northstar Foods, a regional manufacturer, buys printed cartons from six suppliers. Annual spend is $2.4 million. Production managers report frequent urgent orders, while finance identifies inconsistent prices and several purchases outside contracts.

Problem

The procurement team initially proposes a single-supplier tender to obtain volume discounts. Operations warns that one supplier may not have sufficient capacity during seasonal demand. Quality staff also report that a carton failure can stop a production line.

Analysis

Spend cleansing reveals that four supplier names represent the same corporate group and that specifications differ slightly between factories without a technical reason. Market research identifies five capable suppliers, but two rely on the same paper mill. The category has high profit impact because packaging is essential to production and customer presentation. Supply risk is also high because capacity, specialised printing and paper availability constrain rapid switching. The category is therefore strategic in the Kraljic model.

Approach and solution

A cross-functional team standardises non-essential carton specifications and consolidates demand forecasts. It conducts a competitive process for two qualified suppliers rather than one. The contract includes forecast-sharing, minimum quality standards, capacity commitments, delivery measures, indexation linked to documented paper costs, business-continuity requirements and quarterly performance reviews. A third supplier is qualified as a contingency source. The organisation also introduces a catalogue and approval control to prevent uncontrolled spot buying.

Outcome

After implementation, Northstar obtains improved price transparency and reduces emergency purchases. It retains resilience through two active suppliers and one qualified contingency source. The result is not simply a lower unit price: it is a better balance of cost, continuity, quality and governance.

Learning points

  1. Spend analysis can reveal both supplier consolidation and hidden concentration.
  2. High spend does not automatically justify single sourcing.
  3. Specifications are a major source of avoidable cost and supply restriction.
  4. Portfolio classification should consider operational consequences, not price alone.
  5. Procurement value must be measured after implementation, not only at contract award.

9. Ethics, Sustainability, Risk and Technology

Procurement decisions can create conflicts of interest, favouritism, bribery, labour exploitation, environmental harm and discrimination against smaller suppliers. Ethical procurement requires conflict declarations, transparent evaluation criteria, documented decisions, appropriate confidentiality, whistleblowing channels and supplier due diligence. Gifts and hospitality should be governed by clear rules.

Sustainable procurement considers lifecycle environmental impacts, worker welfare, human rights, responsible minerals, emissions, waste and supplier diversity. Requirements should be relevant and proportionate; unsupported claims should not be accepted as evidence of sustainability. Audits are useful but imperfect, so organisations should combine documentation, site assessment, worker voice and corrective-action monitoring where risk warrants it.

Supply risk management involves identifying threats, assessing likelihood and consequence, selecting controls and monitoring indicators. Common controls include dual sourcing, safety stock, alternative specifications, supplier development, financial-health monitoring, cyber requirements and business-continuity plans. Resilience has a cost; the objective is not to eliminate every risk but to manage exposure according to business priorities.

Digital procurement systems can improve catalogues, contract visibility, workflow, e-sourcing, spend classification and supplier performance reporting. Artificial intelligence may assist with duplicate-supplier detection, description classification, demand analysis, anomaly detection and contract searching. However, AI outputs can reproduce biased data, misclassify items, expose confidential information or create false confidence. Human review, access controls, audit trails, data governance and clear accountability remain essential.

10. Limitations and Best Practices

No portfolio model or procurement plan captures every organisational reality. Kraljic classifications can oversimplify dynamic markets; spend data can be incomplete; savings can displace costs elsewhere; and formal competition can fail when specifications are unclear. Category strategies may also be undermined by poor contract management or stakeholder resistance.

Best practice includes:

  • align procurement objectives with measurable organisational outcomes;
  • maintain a controlled category taxonomy and reliable spend data;
  • involve technical, operational, financial and sustainability stakeholders;
  • differentiate management effort according to value and risk;
  • test specifications for necessity and supplier neutrality;
  • use total-cost and lifecycle perspectives;
  • document sourcing decisions and conflicts of interest;
  • build continuity and exit provisions into important contracts;
  • measure realised results after implementation; and
  • review strategies as markets, technologies and organisational needs change.

Chapter Summary

Procurement is a strategic function that connects organisational objectives with external markets. Its organisation may be centralised, decentralised or hybrid, but effective governance must define responsibilities, approval rights and separation of duties. Strategic alignment requires a clear cascade from corporate goals to supply-chain objectives, procurement initiatives and performance measures.

Spend analysis provides the evidence for category management. Data must be extracted, cleansed, classified and validated before decisions are made. ABC analysis helps prioritise control according to monetary usage, but it does not measure supply risk. The Kraljic model adds the dimensions of profit impact and supply risk, producing routine, leverage, bottleneck and strategic categories. Each category requires a different management approach.

A category strategy combines demand analysis, stakeholder needs, supply-market intelligence, risk assessment, sourcing choices, sustainability considerations and performance measures. A procurement plan then sequences requirements, sourcing activities, approvals, contract milestones and responsibilities. Ethical governance, resilience, technology and human judgement must support the process. The central professional principle is to seek value across cost, quality, continuity, risk and responsible business conduct rather than pursuing price in isolation.

Key Terms

Addressable spend: Expenditure that the organisation can reasonably influence through procurement action.

ABC analysis: Classification of items according to annual monetary usage value.

Bottleneck item: A purchase with relatively low financial impact but high supply risk.

Category management: Strategic management of groups of related purchases and supply markets.

Centralised procurement: A structure in which major procurement authority is concentrated in one function.

Cost avoidance: Prevention of a future cost increase rather than a reduction from current expenditure.

Decentralised procurement: A structure in which business units conduct procurement independently or with substantial autonomy.

Governance: The policies, responsibilities, controls and decision rights that direct procurement activity.

Kraljic portfolio model: A framework classifying purchases by profit impact and supply risk.

Leverage item: A high-impact purchase available from several capable suppliers.

Non-critical item: A low-impact, low-risk purchase that should be processed efficiently.

Procurement plan: A documented schedule of requirements, sourcing actions, approvals, risks and responsibilities.

Procurement strategy: The approach used to obtain goods and services in support of organisational objectives.

Spend analysis: Systematic examination and classification of organisational expenditure.

Strategic item: A high-impact, high-risk purchase requiring close supplier and risk management.

Strategic sourcing: Analysis and design of supply arrangements to achieve long-term value.

Supplier due diligence: Investigation of supplier capability, integrity, financial position and compliance.

Total cost of ownership: The complete lifecycle cost of acquiring, using and disposing of a good or service.

Review Questions

5 Short Answer Questions

  1. Distinguish procurement, purchasing and strategic sourcing.
  2. State two advantages and two risks of a centralised procurement structure.
  3. What is addressable spend, and why is it important?
  4. Define profit impact and supply risk in the Kraljic model.
  5. Explain the difference between price savings and cost avoidance.

5 Long Answer Questions

  1. Explain how procurement objectives can be aligned with corporate and supply-chain strategy. Use an example.
  2. Describe the complete spend-analysis process and discuss three data-quality problems.
  3. Compare routine, leverage, bottleneck and strategic purchases and recommend an appropriate management approach for each.
  4. Explain how a category strategy is developed from internal and external analysis.
  5. Discuss the governance, ethical and sustainability controls needed in a professional procurement function.

3 Analytical / Application Questions

  1. An organisation spends $900,000 on a component that can be sourced from four qualified suppliers, but a shortage would stop production. Classify the component using the Kraljic model and recommend a sourcing strategy.
  2. A procurement report shows a 15% reduction in unit price, but transport costs and defect rates have increased. Analyse why the reported saving may not represent real value and identify the measures that should be reviewed.
  3. Design a procurement-plan outline for a new information-technology service. Include requirements, market analysis, sourcing route, evaluation criteria, risks, contract controls and performance measures.

Multiple Choice Questions with Answers

Question 1

Which procurement structure usually provides the greatest opportunity to aggregate organisational demand?

A. Centralised structure

B. Fully decentralised structure

C. Informal spot-buying structure

D. Uncontrolled user-led structure

Correct Answer: A. Centralised structure

Question 2

Which sequence best represents strategic alignment?

A. Supplier invoice → corporate strategy → specification → budget

B. Corporate objective → supply-chain objective → procurement objective → measure

C. Purchase order → supplier catalogue → mission statement → audit

D. Market price → payment approval → corporate objective → contract

Correct Answer: B. Corporate objective → supply-chain objective → procurement objective → measure

Question 3

What is the main purpose of spend analysis?

A. To eliminate all suppliers except one

B. To identify what is bought, from whom, under what conditions and with what opportunity or risk

C. To replace contract management with automation

D. To calculate only the lowest unit price

Correct Answer: B. To identify what is bought, from whom, under what conditions and with what opportunity or risk

Question 4

ABC analysis commonly ranks items according to which measure?

A. Annual monetary usage value

B. Supplier employee count

C. Contract duration only

D. Number of purchase orders regardless of value

Correct Answer: A. Annual monetary usage value

Question 5

A purchase has high profit impact and high supply risk. In the Kraljic model, it is classified as:

A. Non-critical

B. Leverage

C. Bottleneck

D. Strategic

Correct Answer: D. Strategic

Question 6

Which approach is most appropriate for a bottleneck item?

A. Ignore it because its annual spend is low

B. Secure availability and investigate substitutes or alternative suppliers

C. Use competition only and remove all inventory

D. Automate payment without assessing supply risk

Correct Answer: B. Secure availability and investigate substitutes or alternative suppliers

Question 7

If a baseline price is $12 per unit, the new price is $10 per unit, and 4,000 units are purchased, what is the price saving under the stated assumptions?

A. $2,000

B. $4,000

C. $8,000

D. $48,000

Correct Answer: C. $8,000

Question 8

Which item should normally be included in a procurement plan?

A. Only the supplier’s advertising material

B. Requirements, sourcing milestones, responsibilities, risks and performance measures

C. Only the final invoice value

D. An unapproved supplier preference without evaluation criteria

Correct Answer: B. Requirements, sourcing milestones, responsibilities, risks and performance measures

Question 9

Why is separation of duties important in procurement?

A. It ensures one person controls the entire transaction

B. It reduces the need for records

C. It reduces opportunities for fraud and unauthorised commitments

D. It prevents operational staff from defining requirements

Correct Answer: C. It reduces opportunities for fraud and unauthorised commitments

Question 10

Which statement best describes total cost of ownership?

A. It is always identical to the purchase price

B. It includes relevant acquisition, operating, quality, logistics and disposal costs

C. It excludes maintenance and disposal costs by definition

D. It is used only for financial accounting and not procurement decisions

Correct Answer: B. It includes relevant acquisition, operating, quality, logistics and disposal costs