Principles of Operations Management

Chapter 10
Supply Chain, Sourcing and Logistics Operations

Graduate Program in Operation Management (GPOM)
Principles of Operations Management   •   Graduate

Supply Chain, Sourcing and Logistics Operations

Introduction and Context

Operations management increasingly concerns not only what happens inside an organization, but also how value is coordinated across suppliers, logistics providers, distributors, retailers, customers, regulators, and technology platforms. A supply chain is a network of organizations and processes that transforms materials, information, services, and financial resources into value for an end customer. Supply-chain management (SCM) is the deliberate design and coordination of this network to achieve customer-service, cost, resilience, quality, sustainability, and profitability objectives.

Supply-chain decisions are difficult because performance dimensions conflict. A firm may reduce purchase price by sourcing globally, yet incur higher transportation cost, longer lead times, inventory exposure, tariff risk, and disruption risk. A firm may increase warehouse capacity to improve delivery speed, yet create fixed-cost and obsolescence burdens. Consequently, professional decisions must use a total-cost and service perspective rather than a narrow unit-price perspective.

At graduate level, SCM should be understood as a strategic and analytical discipline. It links network design, make-or-buy decisions, procurement, contracting, supplier relationships, demand planning, inventory, transportation, warehousing, last-mile delivery, international trade, risk management, and digital coordination.

Learning Objectives

By the end of this chapter, students should be able to:

  1. Explain the structure and strategic purpose of supply networks.
  2. Evaluate make-or-buy and sourcing decisions using relevant total cost.
  3. Design supplier-selection criteria and procurement processes.
  4. Compare transactional purchasing, partnerships, contracts, and relational governance.
  5. Explain demand amplification and the bullwhip effect.
  6. Evaluate transportation, warehousing, and last-mile alternatives.
  7. Analyze global sourcing trade-offs, trade compliance, resilience, and sustainability.
  8. Apply quantitative and qualitative tools to integrated supply-chain decisions.

1. Supply Networks as Interdependent Systems

A supply chain is better represented as a supply network because most organizations have multiple suppliers, customers, logistics providers, and information flows. The network contains four important flows:

  • Material flow: movement of raw materials, components, work-in-process, finished goods, returns, and waste.
  • Information flow: forecasts, orders, inventory status, shipment events, specifications, and performance data.
  • Financial flow: invoices, payments, credit, duties, insurance, and working capital.
  • Relationship and governance flow: contracts, standards, audits, incentives, dispute resolution, and shared risk.

A focal firm may seek low cost, high availability, short lead time, customization, flexibility, and responsible sourcing simultaneously. These objectives are not automatically compatible. Supply-chain strategy therefore begins by translating competitive priorities into network requirements.

Strategic fit

Strategic fit exists when supply-chain capabilities support the competitive priorities of the business. A firm selling innovative fashion products may value speed, flexibility, and small replenishment quantities. A producer of standardized commodities may prioritize scale efficiency, asset utilization, and low landed cost. The same supplier or transport mode cannot be assumed to be appropriate for both contexts.

A useful diagnostic asks:

  1. What customer promise must the network deliver?
  2. Which products are predictable and which are volatile?
  3. Where is responsiveness more valuable than efficiency?
  4. Which risks are financially material or ethically unacceptable?
  5. Which capabilities should be owned, shared, outsourced, or developed?

Push, pull, and hybrid systems

In a push system, production and replenishment are based primarily on forecasts. Push systems can exploit economies of scale but are vulnerable to forecast error and excess inventory. In a pull system, replenishment is triggered by actual consumption or an authorized downstream signal. Pull systems can reduce unwanted inventory but require dependable information, stable processes, and sufficient response capability. Most modern networks are hybrid: long-lead-time components may be forecast-positioned, while final assembly or distribution is triggered by customer orders.

2. Total-Cost Thinking and Network Design

The relevant cost of a supply decision is not merely the supplier’s quoted price. A practical total landed cost model is:

TLC = P + F + D + I + Q + R + C

where:

  • TLC = total landed cost per unit;
  • P = purchase price;
  • F = freight, handling, and logistics cost;
  • D = duties, tariffs, and border charges;
  • I = inventory-related cost attributable to the decision;
  • Q = quality, inspection, warranty, and failure cost;
  • R = expected disruption, expediting, and recovery cost;
  • C = compliance, documentation, and coordination cost.

The formula is a managerial accounting framework, not a universal accounting standard. Its applicability depends on defining the decision horizon and avoiding double counting. For example, inventory cost should include incremental working-capital and holding exposure, not costs already included in a separate warehouse estimate.

Annual inventory holding cost is commonly estimated as:

H = i × V × Ī

where H is annual holding cost in currency units, i is the annual holding-rate fraction, V is unit value in currency per unit, and Ī is average inventory in units. This estimate assumes that the holding rate adequately represents capital, storage, insurance, deterioration, and obsolescence costs.

For a simple order cycle with a constant replenishment quantity Q and no safety stock, average cycle inventory is Q ÷ 2. With safety stock SS, average inventory is approximately:

Ī = Q ÷ 2 + SS

This special case assumes stable demand, replenishment that is sufficiently regular, and no systematic bias in inventory. Demand and lead-time variability may require additional pipeline or seasonal inventory calculations.

Network design choices

Network design determines the number, location, ownership, and role of facilities. A centralized network may lower duplicated inventory and exploit scale, but it can increase delivery distance and disruption concentration. A decentralized network may improve responsiveness and resilience, but it increases facility, labor, and inventory costs.

Important design variables include:

  • facility location and capacity;
  • supplier geography and concentration;
  • postponement and product-customization points;
  • inventory positioning;
  • transportation mode and cross-docking;
  • reverse-logistics requirements;
  • tax, customs, labor, and environmental conditions.

A network should be tested under ordinary demand and plausible disruption scenarios. The cheapest expected configuration may not be the best configuration when the cost of prolonged stockout or shutdown is high.

3. Make-or-Buy and Sourcing Decisions

A make-or-buy decision determines whether an activity should be performed internally or obtained from an external provider. The decision combines economics, capability, strategy, risk, and governance.

The relevant comparison is incremental avoidable internal cost versus the supplier’s relevant external cost. If internal fixed cost cannot be avoided in the decision horizon, it should not automatically be treated as a saving from outsourcing.

For an internal option:

Cmake = Fa + vm Q + Om

For an external option:

Cbuy = Pb Q + Fb + Ob

where Fa and Fb are avoidable fixed costs, vm is variable internal cost per unit, Q is volume, Pb is supplier price per unit, and Om, Ob represent other relevant operating costs. The model assumes comparable quality, volume, time horizon, and service requirements.

If the two alternatives are linear and vm ≠ Pb, the break-even volume is:

Q* = (Fb − Fa) ÷ (vm − Pb)

The result is meaningful only when it is positive and when the assumed cost structures remain valid around that volume.

Strategic considerations

Internal production may protect intellectual property, preserve learning, assure capacity, and support rapid engineering changes. External sourcing may provide specialized expertise, lower scale cost, access to technology, and variable capacity. Outsourcing can also create dependence, information leakage, switching costs, labor concerns, and loss of process knowledge.

A robust decision evaluates:

  • cost and capacity;
  • quality and process capability;
  • technology and innovation;
  • supply continuity and geographic exposure;
  • intellectual property;
  • labor, environmental, and human-rights conditions;
  • transaction and coordination costs;
  • reversibility and exit options.

4. Supplier Selection and Procurement

Supplier selection should convert strategic requirements into measurable criteria. Common criteria are quality, delivery reliability, total cost, capacity, financial health, technical capability, innovation, cybersecurity, sustainability, and compliance.

A weighted-scoring model can structure a preliminary comparison:

Sj = ∑(wi rij), where ∑wi = 1

Here Sj is the score of supplier j, wi is the importance weight of criterion i, and rij is supplier j’s normalized rating on criterion i. The ratings must use a consistent scale, and the model should not conceal threshold requirements. A supplier failing a mandatory safety or regulatory requirement should be excluded regardless of its weighted score.

Procurement generally includes specification, market analysis, request for information or quotation, supplier evaluation, negotiation, contracting, ordering, receipt, payment, and performance review. Strategic procurement also manages category strategy, supplier development, should-cost analysis, and continuity planning.

Contracting and governance

Contracts allocate price, volume, quality, delivery, intellectual-property, liability, currency, force-majeure, audit, data, and termination risks. A fixed-price contract offers budget certainty but can reduce supplier flexibility when input costs change. A cost-plus arrangement shares cost risk differently but may weaken cost-control incentives. Indexation, volume bands, gain-sharing, service-level agreements, and open-book costing can better align incentives when uncertainty is substantial.

Governance should match transaction characteristics. Highly standardized, low-risk purchases may use competitive bidding and transactional contracts. Asset-specific, technically complex, or strategically critical purchases may require long-term agreements, joint planning, supplier development, and executive escalation mechanisms. Partnerships are not automatically superior: they demand trust, information sharing, dedicated resources, and effective performance measurement.

Useful supplier metrics include defect rate, on-time-in-full delivery, lead-time adherence, responsiveness, cost variance, corrective-action closure, emissions, and audit performance. Metrics should be balanced so that improving one dimension does not damage the system—for example, minimizing price at the expense of quality or continuity.

5. Demand Uncertainty, Inventory, and the Bullwhip Effect

The bullwhip effect is the amplification of demand variability as information moves upstream from customer to retailer, wholesaler, manufacturer, and supplier. Small changes in consumer demand can produce larger changes in orders, production schedules, and upstream inventories.

Major causes include:

  • forecast updating based on distorted orders;
  • order batching to reduce transaction or transport cost;
  • temporary price promotions and forward buying;
  • shortage gaming, in which customers inflate orders during constrained supply;
  • long and variable lead times;
  • limited visibility of actual consumption.

The result can be alternating shortages and excess capacity, unstable production, higher safety stock, and poor supplier utilization.

Mitigation practices include point-of-sale data sharing, collaborative planning and replenishment, smaller order batches, stable pricing, allocation rules, shorter lead times, vendor-managed inventory, and coordinated replenishment policies. These practices do not eliminate uncertainty; they improve the quality and timing of the information used to respond to it.

A simple reorder-point expression is:

ROP = μL + SS

where μL is expected demand during lead time and SS is safety stock. If daily demand has mean μd, constant lead time is L days, and demand is independent across days, then μL = μd L. More advanced safety-stock calculations must account for demand variability, lead-time variability, desired service level, and the selected probability model. The simple formula should not be applied blindly when demand is intermittent, correlated, seasonal, or highly censored by stockouts.

6. Transportation and Logistics Operations

Transportation creates time and place utility but also introduces cost, emissions, damage, security exposure, and variability. Mode selection should consider total logistics cost and required service rather than freight rate alone.

ModeTypical strengthTypical limitation
AirVery fast and reliable for urgent, high-value goodsHigh cost and emissions
RoadFlexible door-to-door serviceCongestion, driver constraints, and variable cost
RailEfficient for heavy inland flowsLess flexible and dependent on network access
OceanLow unit cost for large international volumesSlow and exposed to port disruption
PipelineContinuous flow for suitable liquids or gasesLimited product applicability

Intermodal transportation combines modes to balance cost, speed, and reach. Incoterms define important responsibilities between buyer and seller, including delivery points, transport obligations, and transfer of risk; they do not replace a complete commercial contract or determine every aspect of ownership, payment, or regulatory compliance.

Logistics performance is often evaluated through cost per unit, transit time, reliability, damage rate, capacity availability, carbon emissions, and customer service. A fast mode is not necessarily superior if demand can be planned and the inventory cost of slower transport is acceptable.

7. Warehousing, Fulfillment, and Last-Mile Delivery

Warehouses perform storage, consolidation, break-bulk, cross-docking, order picking, packaging, postponement, returns processing, and information coordination. Their economic role depends on the trade-off between facility and handling cost, inventory pooling, transportation efficiency, and service responsiveness.

Key warehouse design decisions include layout, slotting, storage density, picking method, automation, labor design, safety, inventory accuracy, and integration with transport schedules. Cross-docking minimizes storage by transferring inbound goods to outbound shipments with limited dwell time; it works best when demand, timing, product identification, and transport coordination are dependable.

Last-mile delivery is often the most expensive and operationally complex stage because shipments are small, destinations are dispersed, customers demand narrow time windows, and failed delivery attempts are costly. Options include parcel networks, local fulfillment centers, pickup lockers, collection points, crowdsourced delivery, and customer pickup. The best choice depends on density, promised service, product characteristics, delivery economics, and customer willingness to trade speed for cost or sustainability.

Returns and reverse logistics should be designed rather than treated as exceptions. Returned products may be resold, repaired, refurbished, recycled, harvested for parts, or disposed of. Clear return policies and accurate disposition decisions reduce waste and protect customer trust.

8. Global Sourcing, Resilience, and Sustainability

Global sourcing can provide lower labor or production cost, specialized capabilities, market access, and diversified supply. It can also increase lead time, pipeline inventory, currency exposure, customs complexity, geopolitical risk, carbon emissions, and dependence on ports or trade corridors.

Important global trade questions include:

  • Which party is responsible for freight, insurance, duties, and import clearance?
  • What is the correct customs classification and origin?
  • Are products subject to sanctions, export controls, forced-labor restrictions, or product standards?
  • How will exchange-rate movements affect economic cost?
  • Are labor and environmental practices consistent with organizational commitments?

Resilience is the ability to prepare for, absorb, recover from, and adapt to disruption. Resilience does not mean maximizing inventory or duplicating every asset. It may involve dual sourcing, qualified substitutes, regional capacity, strategic buffers, modular product design, postponement, visibility, supplier financial monitoring, and tested continuity plans.

Sustainability requires consideration of environmental and social effects across the life cycle. Relevant practices include emissions measurement, renewable energy, efficient routing, responsible minerals, worker protection, living wages, waste reduction, circular design, and supplier audits. Audits alone are insufficient when they are predictable, superficial, or disconnected from remediation. Effective governance combines standards, worker voice, traceability, corrective action, and purchasing practices that do not create impossible delivery or price pressures.

9. Digital Technologies and AI in Supply Chains

Enterprise systems, electronic data interchange, warehouse-management systems, transport-management systems, internet-of-things sensors, digital twins, and blockchain-style traceability tools can improve visibility and coordination. Their value depends on data quality, process discipline, interoperability, cybersecurity, and adoption—not on technology alone.

AI can support demand sensing, anomaly detection, ETA prediction, inventory prioritization, supplier-risk monitoring, route planning, and document classification. Managers must distinguish prediction from decision authority. A model may identify a likely delay, but a human governance process should determine whether to expedite, reallocate inventory, change a promise date, or accept the risk.

Risks include biased data, opaque recommendations, automation error, cyberattack, privacy violations, model drift, and overreliance on historical relationships that may not hold during disruption. Appropriate controls include data lineage, access management, human review for high-impact decisions, scenario testing, performance monitoring, and documented accountability.

10. Performance Measurement and Integrated Decision-Making

A supply-chain dashboard should balance financial, service, operational, risk, and sustainability measures. Examples include:

  • total landed cost and cash-to-cash cycle time;
  • order-fill rate and on-time-in-full delivery;
  • forecast error and inventory turns;
  • supplier defect rate and recovery time;
  • capacity utilization and transport emissions;
  • stockout frequency, returns, and customer complaints.

No single metric represents supply-chain performance. For example, inventory turns may improve because inventory was reduced too aggressively, causing stockouts. A balanced scorecard should show trade-offs and distinguish local efficiency from end-to-end effectiveness.

Applied Case: Northstar Medical Devices (Illustrative)

Background

Northstar, an illustrative medical-device manufacturer, assembles diagnostic monitors in Europe. It currently buys a precision sensor from a domestic supplier at $42 per unit. Annual demand is 100,000 units. A qualified Asian supplier offers a price of $30 per unit, but ocean transport, insurance, duties, inspection, and coordination add $8 per unit. The global supplier’s average lead time is eight weeks rather than two weeks. Northstar estimates that the added pipeline and safety inventory would cost $1.60 per unit annually. Expected quality and disruption costs are estimated at $1.20 per unit, while domestic supplier development and capacity-reservation cost $2.00 per unit.

Problem

The purchasing team recommends the global supplier because its quoted price is lower. Operations management must determine whether the global option is genuinely less costly and whether the service and resilience implications are acceptable.

Analysis

The domestic relevant cost is:

42 + 2.00 = $44.00 per unit.

The global total landed cost is:

30 + 8 + 1.60 + 1.20 = $40.80 per unit.

At 100,000 units, the apparent annual advantage is:

(44.00 − 40.80) × 100,000 = $320,000.

However, the calculation assumes that the estimated disruption and quality cost is adequate. It also excludes the managerial value of shorter lead time, possible regulatory delays, emergency airfreight, and the cost of qualifying an alternative sensor. Northstar’s medical-device requirements make traceability, change control, and continuity particularly important.

Approach and solution

Northstar adopts a segmented dual-source strategy. The global supplier receives 70% of forecast volume after a staged qualification program. The domestic supplier retains 30% and serves as a qualified contingency source. Northstar establishes incoming-quality gates, a capacity-reservation clause, a supplier-change notification requirement, quarterly business reviews, and a trigger for shifting volume when delivery or quality thresholds are breached. It also redesigns the sensor interface to permit a technically compatible substitute in the future.

Outcome

The blended arrangement does not achieve the lowest possible purchase price, but it reduces concentration risk and preserves response capability. The decision is evaluated using total cost, service continuity, regulatory assurance, and option value rather than unit price alone.

Learning points

  1. A quotation is not a total-cost analysis.
  2. Risk estimates should be explicit and periodically updated.
  3. Dual sourcing is valuable only when the second source is qualified and available.
  4. Product and process design can reduce future switching costs.
  5. Governance mechanisms must connect performance data to corrective action.

Challenges and Limitations

Supply-chain models simplify reality. Cost estimates may be uncertain, supplier ratings may be subjective, and disruption probabilities are difficult to estimate from limited history. Optimization can also produce fragile solutions if it assumes perfect transport availability, stable tariffs, or unlimited supplier capacity. Qualitative factors such as trust, learning, political legitimacy, worker welfare, and reputational exposure can be difficult to express numerically but should not be ignored.

There is also a danger of local optimization. A procurement team may reduce price while increasing defects; a warehouse may maximize utilization while slowing picking; a transport planner may minimize freight cost while increasing inventory and stockouts. Cross-functional governance, scenario analysis, sensitivity testing, and executive ownership are therefore essential.

Best-Practice Principles

  • Begin with customer service requirements and competitive strategy.
  • Use total landed cost and lifecycle cost, not purchase price alone.
  • Separate mandatory supplier requirements from weighted preferences.
  • Segment suppliers by risk, criticality, and substitutability.
  • Share accurate demand and inventory information across the network.
  • Design contracts and incentives for the actual uncertainty and asset specificity.
  • Qualify alternatives before disruption occurs.
  • Measure end-to-end service, cost, resilience, ethics, and environmental performance.
  • Use digital and AI tools with strong data governance and human accountability.
  • Test decisions through sensitivity analysis and disruption scenarios.

Chapter Summary

Supply-chain management coordinates material, information, financial, and relationship flows across an interdependent network. Effective design aligns the network with customer requirements and evaluates decisions using total cost, service, resilience, sustainability, and strategic capability. Make-or-buy analysis must use relevant avoidable costs and consider knowledge, risk, and reversibility. Supplier selection combines qualification thresholds with weighted evaluation, while contracts and governance should match transaction risk and uncertainty.

The bullwhip effect demonstrates how poor information and incentives amplify demand variability. Visibility, stable pricing, smaller batches, and collaborative replenishment can reduce this amplification. Transportation and warehousing decisions balance speed, cost, capacity, inventory, reliability, emissions, and customer convenience. Global sourcing can reduce direct cost while increasing exposure to lead-time, trade, currency, geopolitical, ethical, and environmental risks. Resilience is developed through visibility, qualified alternatives, postponement, buffers, modularity, and tested response plans. Finally, digital technologies and AI are valuable when embedded in disciplined processes with cybersecurity, data governance, and human accountability.

Key Terms

Supply chain: Network coordinating suppliers, operations, logistics providers, and customers.

Supply-chain management: Design and coordination of network flows and relationships.

Total landed cost: Purchase and all relevant costs of acquiring and delivering a product.

Make-or-buy: Decision to perform an activity internally or obtain it externally.

Strategic sourcing: Long-term procurement approach linking suppliers to organizational strategy.

Supplier segmentation: Classification of suppliers by value, risk, criticality, or substitutability.

Transaction cost: Cost of searching, negotiating, monitoring, coordinating, and switching.

Incoterms: Standardized trade terms allocating delivery responsibilities and risk points.

Bullwhip effect: Upstream amplification of demand variability.

Safety stock: Inventory held to protect against uncertainty.

Reorder point: Inventory position at which replenishment is initiated.

Cross-docking: Moving inbound goods to outbound flows with limited storage.

Last-mile delivery: Final movement from a fulfillment point to the customer.

Reverse logistics: Movement and disposition of returned, repaired, recycled, or recovered goods.

Resilience: Capacity to absorb, recover from, and adapt to disruption.

Postponement: Delaying final configuration or differentiation until demand is clearer.

Service level: Defined probability or performance target for meeting customer demand.

Supplier development: Actions that improve a supplier’s capability or performance.

Total cost of ownership: Lifecycle cost including acquisition, operation, risk, and disposal.

Review Questions

Short Answer Questions

  1. Why is a supply network more accurate than a simple supply-chain line for many organizations?
  2. What cost categories should be included in total landed cost?
  3. State two causes of the bullwhip effect.
  4. What is the purpose of safety stock?
  5. Why can global sourcing increase total risk despite a lower quoted price?

Long Answer Questions

  1. Explain how a firm should align supply-chain strategy with competitive priorities.
  2. Compare transactional purchasing and partnership governance, including when each is appropriate.
  3. Discuss the operational and strategic trade-offs among centralized and decentralized distribution networks.
  4. Explain how transportation, warehousing, and last-mile decisions jointly affect customer service.
  5. Evaluate the role of sustainability and ethical governance in global sourcing.

Analytical / Application Questions

  1. A supplier quotes a low unit price but requires long lead times and large minimum orders. Design a total-cost analysis and identify the data needed before making a decision.
  2. A retailer experiences alternating stockouts and excess inventory after introducing frequent promotions. Diagnose the likely bullwhip mechanisms and recommend an intervention plan.
  3. A critical component is currently single-sourced from a politically exposed region. Develop a resilience strategy that balances cost, qualification time, inventory, supplier development, and service continuity.

Multiple Choice Questions with Answers

Question 1

Which statement best describes total landed cost?

A. The supplier’s quoted unit price only

B. Purchase price plus relevant acquisition, logistics, inventory, quality, risk, and compliance costs

C. Annual warehouse rent divided by total sales

D. The customer’s retail price less its profit margin

Correct Answer: B. Purchase price plus relevant acquisition, logistics, inventory, quality, risk, and compliance costs

Question 2

A make-or-buy analysis should generally exclude which cost from internal production savings when it cannot be avoided during the decision horizon?

A. Avoidable direct labor

B. Incremental material cost

C. Unavoidable fixed cost

D. Incremental inspection cost

Correct Answer: C. Unavoidable fixed cost

Question 3

Which practice is most directly associated with reducing the bullwhip effect?

A. Increasing order batches

B. Using frequent temporary price promotions

C. Sharing point-of-sale demand data

D. Encouraging customers to inflate orders during shortages

Correct Answer: C. Sharing point-of-sale demand data

Question 4

If unit demand during lead time is expected to be 500 units and safety stock is 120 units, what is the reorder point?

A. 380 units

B. 500 units

C. 620 units

D. 720 units

Correct Answer: C. 620 units

Question 5

Which transportation mode is typically most suitable for large international volumes when speed is less important than low unit cost?

A. Air

B. Ocean

C. Motorcycle courier

D. Same-day parcel service

Correct Answer: B. Ocean

Question 6

What is the principal purpose of cross-docking?

A. To maximize long-term storage duration

B. To move inbound goods into outbound flows with limited storage

C. To eliminate the need for shipment coordination

D. To increase product customization before demand is known

Correct Answer: B. To move inbound goods into outbound flows with limited storage

Question 7

Why should a supplier failing a mandatory safety requirement normally be excluded from a weighted-scoring model?

A. Weighted models cannot use numerical ratings

B. Mandatory thresholds take precedence over preference-based scoring

C. Safety is always less important than price

D. Supplier ratings are never useful

Correct Answer: B. Mandatory thresholds take precedence over preference-based scoring

Question 8

Which situation most strongly supports dual sourcing?

A. The item is noncritical and readily available from many suppliers

B. The item is critical, difficult to substitute, and exposed to disruption

C. The firm wants to eliminate all supplier communication

D. Both suppliers are unqualified but offer low prices

Correct Answer: B. The item is critical, difficult to substitute, and exposed to disruption

Question 9

A warehouse that delays final product configuration until a customer order is received is using which approach?

A. Postponement

B. Forward buying

C. Shortage gaming

D. Supplier switching

Correct Answer: A. Postponement

Question 10

Which is an appropriate governance control for an AI-based supplier-risk system?

A. Allowing the model to make all high-impact decisions without review

B. Ignoring model drift after deployment

C. Maintaining data lineage and human review for significant decisions

D. Removing cybersecurity controls because the system is automated

Correct Answer: C. Maintaining data lineage and human review for significant decisions

Principles of Operations Management
Chapter 10 of 15