Lean Materials Flow and Replenishment SystemsIntroduction and ContextMaterials management has traditionally been concerned with ensuring that the right material is available at the right time, place, quantity, quality and cost. Lean materials management adds a further requirement: material should flow through the supply network with minimum interruption, excess inventory, handling, waiting and information distortion. The central managerial problem is therefore not simply how much to purchase, but how to design a replenishment system that responds to actual consumption while protecting operations from unacceptable disruption. Lean flow is closely associated with just-in-time (JIT) production, the Toyota Production System, pull control, standardised work, supplier integration and continuous improvement. However, lean does not mean zero inventory under all circumstances. Inventory may be necessary because of demand variability, supply unreliability, transport constraints, minimum order quantities, regulatory requirements or the economics of purchasing and production. The objective is to hold the minimum inventory consistent with the required service, resilience and total cost. This chapter compares push and pull systems and examines JIT, Kanban, two-bin replenishment, vendor-managed inventory (VMI), consignment stock and postponement. It also develops methods for identifying waste and bottlenecks and for improving flow and lead time. Learning ObjectivesAfter studying this chapter, the learner should be able to: - Explain the principles of lean materials flow and replenishment.
- Compare push and pull control systems and identify suitable applications.
- Analyse the operation and limitations of JIT, Kanban, two-bin, VMI, consignment and postponement systems.
- Calculate basic replenishment quantities, Kanban quantities and flow metrics.
- Identify material-flow waste, bottlenecks and lead-time reduction opportunities.
- Evaluate implementation, governance, technology, resilience and ethical implications.
1. Foundations of Lean Materials Flow1.1 Value, flow and wasteLean thinking defines value from the perspective of the customer. An activity is value-adding when it transforms the product or service in a way the customer requires and is performed correctly the first time. Necessary but non-value-adding activities, such as regulatory inspection or unavoidable transport, should be reduced where possible. Pure waste should be eliminated. The classic categories of waste are: - Overproduction: making or ordering earlier or in greater quantity than required.
- Waiting: idle time for materials, information, equipment, approvals or transport.
- Transportation: unnecessary movement between locations.
- Overprocessing: performing more work or specification than the customer requires.
- Inventory: excess raw material, work-in-process or finished goods.
- Motion: unnecessary movement by people or equipment.
- Defects: errors, rework, scrap, returns and corrective activity.
Contemporary lean practice often adds the underuse of human capability as an eighth waste. Poorly designed replenishment systems can create several wastes simultaneously. For example, a large batch purchased to obtain a price discount may create inventory, storage, handling, obsolescence and cash-flow costs. 1.2 Flow and lead timeMaterial lead time is the elapsed time from the release of a requirement until the material is available for its intended use. It may include order processing, supplier production, transport, receiving, inspection, put-away, picking and internal delivery. A short supplier lead time does not necessarily imply short total lead time if internal queues and approvals are long. A useful flow measure is the process cycle efficiency (PCE): PCE = Value-Adding Time ÷ Total Lead Time Value-adding time and total lead time must use the same units, such as minutes or days. PCE is a diagnostic measure, not a complete performance indicator: a process may have high PCE but poor quality, high cost or weak resilience. Total lead time includes value-adding, waiting, transport, inspection and other elapsed time. Little’s Law links average inventory, throughput and flow time in a stable system: L = λW Here, L is average work-in-process or inventory in units, λ is average throughput in units per unit of time, and W is average flow time in the same time unit. The relationship assumes a stable long-run system in which average inflow equals average outflow and the measured population is consistently defined. Thus, if throughput is 500 units per week and average flow time is 0.4 week, average work-in-process is 200 units. Reducing flow time reduces inventory when throughput remains constant. 1.3 The relationship between variability and inventoryInventory often performs one or more buffering functions: - Cycle stock covers replenishment in batches.
- Safety stock protects against demand or supply uncertainty.
- Pipeline stock is material in transit or otherwise unavailable for use.
- Anticipation stock prepares for predictable seasonal or promotional demand.
- Decoupling stock separates processes with different operating rates.
Lean design does not remove these functions without analysis. Instead, it seeks to expose and reduce the causes of variability, shorten replenishment intervals and make remaining buffers visible and deliberate. 2. Push and Pull Control Systems2.1 Push systemsA push system releases material based primarily on a forecast, master production schedule, material requirements plan or centrally calculated order. Requirements are translated into planned releases before actual downstream consumption occurs. Material is therefore “pushed” toward the next process. Push systems are useful when: - demand is forecastable and production must be planned in advance;
- long procurement or production lead times require early commitments;
- products are made in economic or campaign batches;
- capacity, labour or transport must be levelled centrally; or
- regulatory, seasonal or strategic requirements justify anticipation.
Their weaknesses include forecast error, schedule instability, expediting, excess work-in-process and the tendency for local departments to optimise their own utilisation rather than total flow. 2.2 Pull systemsA pull system authorises replenishment in response to actual downstream consumption or a defined signal of need. The consuming process withdraws material, and the supplying process replaces what has been withdrawn. Pull does not mean that planning is unnecessary. Forecasts, capacity plans, supplier agreements and exception management remain important; the distinction is that routine replenishment is triggered by use rather than by an unconsumed forecast alone. Pull systems are most effective when consumption is reasonably repetitive, replenishment lead time is controlled, item specifications are stable, containers and locations are standardised, and suppliers can respond reliably. They are less suitable for highly intermittent, unique or long-lead-time items unless supported by carefully designed buffers. 2.3 Push–pull boundariesMany practical systems are hybrid. A firm may push long-lead-time components into a strategic decoupling point and pull final assembly or distribution from that point. The position of this boundary is a major design decision. Moving it upstream usually increases responsiveness to customer variety but may increase finished-goods lead time. Moving it downstream may improve delivery speed but increase the risk of obsolete finished goods. | Dimension | Push | Pull |
|---|
| Trigger | Forecast or planned release | Actual consumption or authorised signal | | Main risk | Overproduction and excess inventory | Stockout if response is too slow | | Information emphasis | Schedule accuracy | Consumption visibility and replenishment reliability | | Best fit | Variable plans, long lead times, batch processes | Repetitive demand and stable processes | | Management focus | Plan adherence and capacity | Flow, response time and signal discipline |
3. Just-in-Time and Lean ReplenishmentJIT is a production and supply philosophy in which materials, components and products are available close to the time and quantity required. It integrates small-lot replenishment, short setup times, quality at source, reliable equipment, standard work, supplier coordination and continuous problem solving. JIT is not merely a purchasing policy and is not synonymous with “buying as little as possible.” A purchasing department cannot create JIT if production batches are large, receiving is unreliable, suppliers receive erratic schedules or quality problems interrupt flow. JIT requires system-wide alignment. 3.1 JIT operating principlesImportant principles include: - Takt alignment: production pace is related to customer demand. Takt time is calculated as available production time divided by required customer quantity. Both numerator and denominator must use compatible periods, and planned breaks or downtime should be excluded from available time where appropriate.
- Continuous flow: items move between operations with limited queueing and batch transfer.
- Small lots: smaller lots reduce cycle stock and reveal problems sooner, but may increase ordering or setup frequency.
- Quality at source: defects are prevented or detected immediately rather than passed downstream.
- Reliable equipment: preventive maintenance and rapid recovery reduce unplanned interruptions.
- Supplier partnership: suppliers receive stable standards, clear signals, quality feedback and appropriate commercial arrangements.
- Heijunka or production levelling: demand and product mix are smoothed where feasible to avoid abrupt schedule changes.
3.2 JIT limitations and riskJIT can become fragile when managers remove inventory without reducing variability. A single unreliable supplier, port closure, cyberattack, quality incident or inaccurate inventory record may stop the line. Therefore, modern lean practice combines flow efficiency with resilience. Appropriate responses may include dual sourcing, strategic safety stock, alternate transport, supplier development, geographical diversification and documented recovery procedures. 4. Kanban SystemsKanban is a visual or electronic signalling method used to authorise production or movement. A kanban may be a card, container label, electronic message, barcode scan or RFID event. The signal normally represents a defined quantity and destination. A basic loop works as follows: - The user withdraws a standard container from a supplying supermarket or point of use.
- The empty container or electronic signal is returned to the supplying process.
- The supplier replenishes the quantity specified by the signal.
- Replenished material is placed in the standard location for the next withdrawal.
A common design equation for the number of kanban containers is: n = (D × T × (1 + α)) ÷ C where n is the required number of containers, rounded up to the next whole container; D is average demand per unit of time; T is replenishment lead time in the same time unit; α is the planned protection factor expressed as a decimal; and C is the quantity per container. The assumptions are reasonably stable demand, a defined replenishment lead time, consistent container quantity and a protection factor that adequately represents known variability. The formula gives a starting design, not a substitute for monitoring. Worked example. A line consumes 240 components per day. Replenishment takes 0.5 day. Management provides a 20% protection factor, so α = 0.20. Each container holds 30 components. n = (240 × 0.5 × 1.20) ÷ 30 = 4.8 The number of containers must be rounded upward: five containers. The associated circulating quantity is 150 components. If demand or lead time rises, the system may stock out unless the cause is corrected or the signal quantity is temporarily revised under controlled authority. Kanban is not appropriate when container quantities are unknown, demand is highly sporadic, replenishment lead time is extremely long or item identity and location controls are poor. In those settings, planning systems, reorder-point logic or a hybrid design may be more appropriate. 5. Two-Bin ReplenishmentTwo-bin control is a simple pull method. Stock is divided into two physically or electronically identified bins. The first bin supplies normal use. When it becomes empty, its signal triggers replenishment while the second bin covers consumption. Once the replacement arrives, the bins are restored and the cycle repeats. The quantity in the reorder bin should cover expected demand during replenishment lead time plus an appropriate protection allowance. A general reorder-point relationship is: ROP = dL + SS where ROP is the reorder point in units, d is average demand per unit of time, L is replenishment lead time in the same time unit, and SS is safety stock in units. The equation assumes that average demand and lead time are suitable planning approximations. It does not calculate safety stock by itself. For example, if daily demand is 18 units, lead time is 3 days and safety stock is 12 units, then: ROP = (18 × 3) + 12 = 66 units Two-bin systems are inexpensive, intuitive and effective for low-value, high-use, standard items. They can be unreliable for expensive items, irregular demand, shared stock, items with shelf-life constraints or materials requiring lot and serial traceability. Physical separation must be maintained; otherwise, users may consume the replenishment reserve without generating a signal. 6. Vendor-Managed InventoryUnder VMI, the supplier is given visibility of the customer’s inventory and consumption and assumes responsibility for deciding when and how much to replenish within agreed parameters. Ownership may remain with the customer, or a separate ownership arrangement may apply; VMI and consignment are therefore not identical. A sound VMI arrangement specifies: - data frequency, format and ownership;
- inventory locations and item identification;
- target, minimum and maximum levels;
- service-level and fill-rate expectations;
- order authority and exception rules;
- ownership, invoicing and liability;
- obsolete, damaged and expired stock treatment;
- confidentiality, cybersecurity and audit rights; and
- escalation procedures for shortages and excess.
VMI can reduce administrative transactions, improve replenishment frequency and use the supplier’s product knowledge. However, it may merely transfer inventory rather than reduce it. The supplier may also optimise its own production or delivery cost at the expense of the customer unless objectives and performance measures are aligned. A useful governance principle is to measure total-system outcomes: availability, inventory turns, emergency deliveries, obsolescence, forecast bias, quality and total landed cost—not only supplier shipment volume. 7. Consignment StockConsignment stock is inventory held at or near the customer’s facility but owned by the supplier until the customer uses it or a contractually defined event occurs. The customer gains access without paying immediately for the stock. The supplier gains proximity to demand and may improve service. Consignment is attractive when: - demand is regular enough to justify local availability;
- the supplier has sufficient financial strength;
- inventory can be identified and protected;
- usage can be recorded accurately; and
- ownership, shrinkage, obsolescence and insurance are contractually clear.
Consignment does not automatically reduce total supply-chain inventory. It may reduce the customer’s working capital while increasing the supplier’s exposure. Financial reporting and taxation treatment depend on applicable accounting standards, contracts and jurisdiction; organisations should obtain professional advice rather than assume that physical possession determines accounting ownership. 8. Postponement and the Decoupling PointPostponement delays product differentiation until demand information is more reliable. Generic components or semi-finished products are held upstream, and final configuration, packaging, labelling or localisation occurs after a customer order or clearer demand signal. Postponement is particularly useful when product variety is high, common components can serve multiple markets and final customisation is relatively quick. Examples include final packaging of consumer goods, late-stage configuration of electronics and delayed labelling for different regulatory markets. The design decision involves a trade-off. Upstream generic inventory may be less obsolete and more flexible, but it may require additional final-stage capacity, equipment and skills. The postponement point should be selected after analysing demand variety, conversion time, component commonality, customer lead-time expectations and total cost. 9. Measuring Flow and Finding BottlenecksLean improvement begins with observation rather than assumptions. A value-stream map can show material and information flows, inventories, queues, processing times, changeovers, transport and decision points. A spaghetti diagram can reveal unnecessary movement. A physical gemba observation helps distinguish documented procedures from actual practice. 9.1 Bottleneck analysisA bottleneck is a resource whose effective capacity constrains system throughput. It may be a machine, supplier, inspection station, warehouse dock, approval, information system or skilled person. Increasing output at non-bottleneck resources does not increase total throughput and may create more work-in-process before the constraint. Useful questions include: - Where does work accumulate?
- Which resource has the highest sustained utilisation relative to effective capacity?
- Which delay causes downstream starvation or upstream blocking?
- Is the constraint physical, informational, quality-related or policy-related?
- Does the apparent bottleneck move after an intervention?
Effective capacity should account for planned maintenance, breaks, changeovers, quality losses and availability. A simple utilisation measure is: Utilisation = Actual Load ÷ Effective Capacity Both numerator and denominator must use the same units, such as machine-hours per day. Utilisation near 100% may be unsafe in a variable system because there is little recovery capacity; maximum local utilisation is not always the same as maximum system performance. 9.2 Lead-time improvement leversCommon interventions include: - reducing approval and release delays;
- removing duplicate data entry;
- locating frequently used items near the point of use;
- standardising containers, labels and locations;
- reducing setup time through external preparation;
- improving supplier schedule reliability;
- combining or eliminating unnecessary inspections;
- introducing quality at source;
- balancing work to the required takt;
- reducing batch sizes where total cost permits;
- improving route frequency and milk-run design; and
- using real-time exception alerts rather than expediting every order.
Every intervention should be validated against service, quality, total cost, safety and resilience. A reduction in warehouse inventory that increases line stoppages is not a lean improvement. 10. Technology, Data and Artificial IntelligenceBarcode scanning, RFID, warehouse management systems, electronic kanban, supplier portals and enterprise resource planning systems can improve transaction accuracy and signal visibility. Internet-of-Things sensors may report container movement, equipment status or temperature. Technology is valuable when it makes a sound process more reliable; it cannot compensate for undefined ownership, inaccurate master data or uncontrolled exceptions. Analytics can identify demand patterns, supplier lead-time variation, inventory anomalies and bottleneck recurrence. Machine-learning models may support forecasting or predictive maintenance, but forecasts should not automatically override consumption signals or expert judgement. Governance should address data quality, model drift, explainability, cybersecurity, access rights and human accountability. Automated replenishment must include limits, exception review and a safe fallback process. 11. Implementation FrameworkA practical implementation sequence is: - Define customer service requirements and critical materials.
- Map the current material and information flow.
- Segment items by value, demand pattern, criticality, shelf life and supply risk.
- Stabilise item master data, locations, units of measure and inventory records.
- Measure demand, lead-time variability, quality and actual consumption.
- Select the appropriate control method—planning, Kanban, two-bin, VMI, consignment or a hybrid.
- Set replenishment quantities and protection levels using documented assumptions.
- Pilot in a bounded area with trained users and clear visual standards.
- Measure service, inventory, flow time, waste and exceptions.
- Improve causes of variability before simply increasing buffers or signal quantities.
- Extend the design to suppliers and adjacent processes.
- Establish periodic review, audit and continuous improvement.
Change management is essential. Operators, warehouse personnel, buyers, planners and suppliers must understand what a signal means, who owns the decision and how abnormalities are escalated. A system that depends on one experienced employee is not a robust system. Applied Case: Illustrative Case of an Industrial Pump ManufacturerBackgroundAn illustrative industrial pump manufacturer assembled three standard pump families. It held approximately 18 days of purchased component inventory, yet assembly experienced frequent shortages of seals and fasteners. Buyers responded with emergency orders, while suppliers complained that schedules changed repeatedly. Problem and analysisA value-stream study found that demand averaged 420 seal sets per week. Supplier lead time averaged 2.5 days, but receiving and inspection added another 1.5 days. Orders were released weekly from a forecast, even though assembly consumed material continuously. The total replenishment lead time was therefore four working days. The process also had poor location discipline, and inventory records differed from physical counts. Management calculated a starting two-bin reorder point. Average daily demand was 84 seal sets, lead time was four days and approved safety stock was 80 sets: ROP = (84 × 4) + 80 = 416 seal sets The team selected two standard containers of 210 sets each. When the first container was emptied, the container label became the replenishment signal and the second container covered expected consumption. This design was used only after confirming that the physical capacity and supplier pack size were compatible. Approach and solutionThe company introduced daily electronic consumption signals, fixed storage locations, barcode scanning at issue, supplier delivery windows and a small supermarket beside assembly. It also moved inspection responsibility toward supplier quality assurance for approved suppliers, retaining periodic audits and receiving checks based on risk. A weekly forecast remained in use for capacity planning, but routine seal replenishment became consumption-driven. The firm did not apply the same method to every item. High-value castings continued under planned purchasing because demand was intermittent and supplier lead time was long. Packaging labels were postponed until the final customer destination was known. A strategic safety stock was retained for a single-source electrical component. Outcome and learning pointsAfter the pilot, emergency orders decreased, assembly shortages fell and inventory records became more reliable. The improvement did not result from reducing stock indiscriminately. It resulted from separating routine replenishment from long-range planning, shortening information delay, standardising containers and addressing data accuracy. The company also established a monthly review of service, inventory, supplier reliability and exception causes. The case demonstrates that lean systems are designed by item and process characteristics. A two-bin system was suitable for repetitive seals but unsuitable for intermittent castings. The appropriate objective was dependable flow at total-system cost, not the elimination of every buffer. Challenges, Ethics and GovernanceLean systems can create employee stress if targets are increased without involving workers or providing recovery capacity. Visual performance boards should support problem solving, not public humiliation or unsafe pressure. Employees should be able to stop a process for safety or quality concerns. Supplier relationships require fairness. Transferring inventory ownership or variability to a financially weaker supplier through VMI or consignment may create hidden risk and unethical commercial pressure. Contracts should clarify payment, liability, data use, audit rights and termination arrangements. Material traceability, product safety, environmental handling and legal retention requirements must not be bypassed in the name of speed. Digital replenishment systems must protect commercial and personal data, restrict access and provide auditable transaction histories. Sustainability analysis should include transport frequency, packaging, emissions, waste and the risk that smaller deliveries increase environmental impact despite lower inventory. Chapter SummaryLean materials flow seeks to deliver value with less waiting, excess inventory, movement, error and information distortion. Push systems release material from forecasts or schedules, whereas pull systems replenish in response to actual consumption. Most organisations require a hybrid boundary between push planning and pull execution. JIT is a system-wide philosophy involving flow, small lots, quality at source, reliable equipment, supplier coordination and continuous improvement. Kanban and two-bin systems are practical pull mechanisms, but their quantities must reflect demand, replenishment time, container size and controlled protection. VMI delegates replenishment responsibility to a supplier, while consignment changes ownership timing; neither automatically reduces total supply-chain inventory. Postponement delays differentiation so that generic inventory can respond to uncertain final demand. Little’s Law, process cycle efficiency, reorder-point logic and Kanban calculations support diagnosis, but each depends on stated assumptions. Bottleneck analysis must focus on total system throughput rather than isolated local utilisation. Successful implementation requires accurate data, standard work, supplier governance, resilience, ethical treatment of employees and suppliers, and continuous review of service, cost, quality and risk. Key TermsLean management: A management philosophy focused on customer value, flow and systematic waste reduction. Materials flow: The physical movement and transformation of materials through a supply network. Push system: A control system in which releases are primarily based on forecasts or planned schedules. Pull system: A control system in which replenishment is triggered by downstream consumption or an authorised signal. Just-in-time: A system for supplying materials close to the time and quantity required. Kanban: A visual or electronic signal authorising production or material movement. Two-bin system: A replenishment method using one bin for active use and another as a replenishment signal or reserve. Vendor-managed inventory: An arrangement in which the supplier monitors customer inventory and manages replenishment. Consignment stock: Inventory located at or near the customer but owned by the supplier until use or another agreed event. Postponement: Delaying final product differentiation until demand information is more certain. Cycle stock: Inventory created by replenishing in batches. Safety stock: Inventory held to protect against demand or supply uncertainty. Pipeline stock: Inventory currently moving through the supply or production network. Bottleneck: A resource or condition that constrains system throughput. Takt time: Available production time divided by required customer quantity. Lead time: Elapsed time from requirement release to availability for use. Value-stream map: A representation of material and information flow, including processing and waiting. Process cycle efficiency: Value-adding time divided by total lead time. Decoupling point: The location where forecast-driven activity changes to order- or consumption-driven activity. Review QuestionsShort Answer Questions- What is the principal difference between a push system and a pull system?
- Identify four categories of waste relevant to materials management.
- Why is JIT more than a policy of low inventory?
- Distinguish VMI from consignment stock.
- What is the purpose of a decoupling point?
Long Answer Questions- Compare push, pull, Kanban and two-bin control, including their assumptions and limitations.
- Explain how supplier reliability, quality at source and setup reduction support JIT.
- Discuss the advantages and risks of VMI and consignment stock from both customer and supplier perspectives.
- Explain postponement and analyse the factors that determine the appropriate postponement point.
- Develop an implementation framework for a lean replenishment programme in a multi-site organisation.
Analytical / Application Questions- Daily demand for an item is 150 units, replenishment lead time is 2 days, safety stock is 90 units and each container holds 60 units. Calculate the reorder point and the minimum number of containers needed if the Kanban protection factor is 20%.
- A warehouse has average inventory of 1,200 units and throughput of 300 units per day. Using Little’s Law, calculate average flow time and identify two operational questions that should be investigated before concluding that the result represents improvement.
- A firm proposes removing all safety stock after installing electronic Kanban. Critically evaluate the proposal, considering variability, bottlenecks, supplier risk, data quality, resilience and governance.
Multiple Choice Questions with AnswersQuestion 1Which condition most strongly supports a routine pull replenishment system? A. Highly repetitive demand and controlled replenishment lead time B. Unique items with no standard container quantity C. Unknown item identity and unreliable inventory records D. Demand that occurs once every several years Correct Answer: A. Highly repetitive demand and controlled replenishment lead time Question 2In a push system, material release is primarily triggered by: A. Actual downstream consumption only B. A forecast or centrally planned schedule C. An empty two-bin reserve only D. A supplier’s ownership transfer Correct Answer: B. A forecast or centrally planned schedule Question 3Using L = λW, what is average inventory when throughput is 400 units per week and flow time is 0.5 week? A. 200 units B. 400 units C. 800 units D. 20 units Correct Answer: A. 200 units Question 4Daily demand is 100 units, replenishment lead time is 3 days, and safety stock is 50 units. What is the reorder point? A. 150 units B. 250 units C. 300 units D. 350 units Correct Answer: B. 250 units Question 5In the Kanban equation, why is the calculated number of containers rounded upward? A. Containers must be purchased in pairs B. A fractional container cannot provide the full planned quantity C. Rounding upward eliminates all variability D. The supplier always requires a larger order Correct Answer: B. A fractional container cannot provide the full planned quantity Question 6Which statement correctly distinguishes consignment stock from VMI? A. Consignment concerns ownership timing, while VMI concerns replenishment responsibility B. Consignment always means the customer manages replenishment C. VMI always means the supplier owns the inventory D. They are exactly the same arrangement Correct Answer: A. Consignment concerns ownership timing, while VMI concerns replenishment responsibility Question 7What is the principal purpose of postponement? A. To complete all products before receiving orders B. To delay final differentiation until demand information improves C. To eliminate all component inventory D. To increase finished-goods variety in advance of demand Correct Answer: B. To delay final differentiation until demand information improves Question 8Which activity is most directly associated with a bottleneck? A. A resource that constrains total system throughput B. Any resource with the lowest purchase price C. A warehouse location with the newest barcode D. A process with zero waiting under all conditions Correct Answer: A. A resource that constrains total system throughput Question 9A process has 2 hours of value-adding time and 20 hours of total lead time. What is its process cycle efficiency? A. 5% B. 10% C. 20% D. 40% Correct Answer: B. 10% Question 10Which is a sound governance practice for automated replenishment? A. Allowing the system to change all parameters without review B. Ignoring master-data errors because the system is electronic C. Using exception limits, audit trails and human accountability D. Removing supplier performance measures after automation Correct Answer: C. Using exception limits, audit trails and human accountability
|