Demand, Order Profiles, and Service RequirementsIntroductionOrder fulfillment begins long before a picker enters a storage aisle. It begins with understanding what customers demand, how that demand arrives, which products and quantities are involved, and what service promise the organization has made. A fulfillment system designed without this knowledge may achieve high labor productivity while still failing customers through stockouts, late shipments, excessive split orders, or uneconomic handling. Demand analysis therefore connects commercial strategy with warehouse and distribution design. It translates market requirements into operational requirements for inventory, storage, picking, packing, transportation, information systems, and labor. The central managerial question is not simply “How much demand exists?” but rather: What types of orders must be fulfilled, at what frequency, in what quantities, through which channels, within what time window, and at what cost? This chapter examines demand variability, order lines, SKU velocity, seasonality, sales channels, service-level agreements, lead times, and customer segmentation. It also shows how these factors should be combined to define fulfillment requirements rather than analyzed independently. Learning ObjectivesBy the end of this chapter, readers should be able to: - Distinguish demand volume, demand variability, and demand uncertainty.
- Analyze order profiles using orders, order lines, units, cube, weight, and value.
- Classify SKUs by velocity, demand regularity, and operational criticality.
- Explain how seasonality and channel structure affect fulfillment capacity.
- Interpret service-level agreements and translate them into operational requirements.
- Calculate basic lead-time and service metrics accurately.
- Segment customers in ways that support differentiated fulfillment policies.
- Integrate demand and service information into picking-strategy decisions.
- Evaluate the limitations, governance risks, and ethical implications of demand analytics.
1. Demand as a Fulfillment Design InputDemand is the requirement for products or services over a specified time interval. In fulfillment analysis, demand must be described at an appropriate level of detail. Annual sales may be useful for strategic capacity planning, but it is insufficient for deciding whether a facility needs batch picking, zone picking, dedicated fast-pick locations, or extended operating hours. A useful demand description includes: - Volume: total units, orders, order lines, weight, cube, or monetary value.
- Timing: hourly, daily, weekly, monthly, and seasonal arrival patterns.
- Variability: the degree to which demand differs from its average.
- Mix: the distribution of products and quantities within orders.
- Location: customer geography and delivery destination.
- Channel: retail, wholesale, e-commerce, marketplace, subscription, or internal demand.
- Service requirement: required availability, cutoff time, delivery promise, and order completeness.
The same unit volume can produce very different fulfillment workloads. Ten thousand units in ten wholesale orders may require pallet handling and limited picking. Ten thousand units in 5,000 e-commerce orders may require tens of thousands of order-line touches, individual packaging, and parcel sorting. Demand measuresLet: - Dt = demand during period t, measured in units;
- n = number of observed periods;
- Ȳ = mean demand per period.
The arithmetic mean is: Ȳ = (∑Dt) ÷ n The mean is appropriate for summarizing a stable series, but it can conceal peaks and intermittent demand. Demand variability is often summarized by the sample standard deviation: s = √[∑(Dt − Ȳ)² ÷ (n − 1)] The denominator n − 1 is used when the observations are treated as a sample from a broader demand process. The standard deviation has the same units as demand. A dimensionless measure, the coefficient of variation, is: CV = s ÷ Ȳ The coefficient of variation is meaningful only when Ȳ > 0. A high CV indicates that variability is large relative to average demand. It is useful for comparing products with different demand scales, although it becomes unstable when average demand is very small. Worked example: variabilitySuppose daily demand over five days is 80, 100, 90, 130, and 100 units. The mean is: Ȳ = (80 + 100 + 90 + 130 + 100) ÷ 5 = 100 units per day. The squared deviations are 400, 0, 100, 900, and 0. Thus: s = √(1,400 ÷ 4) = √350 ≈ 18.7 units per day. The coefficient of variation is: CV = 18.7 ÷ 100 ≈ 0.187. This demand is moderately variable. However, an operational planner should still examine whether the 130-unit observation reflects a recurring weekly peak, a promotion, or an exceptional event. 2. Order Profiles and the Work Content of FulfillmentAn order profile describes the structure of customer orders. The most important measures are related but not interchangeable. | Measure | Meaning | Fulfillment significance |
|---|
| Orders | Number of customer orders | Drives order release, packing, and shipping activity | | Order lines | Distinct SKU entries across orders | Often drives picker travel and item retrieval | | Units | Total quantity requested | Drives handling and replenishment volume | | Units per line | Quantity requested for each SKU line | Helps distinguish each-pick from case or pallet work | | Cube | Physical volume of goods | Affects storage, vehicle capacity, and packaging | | Weight | Mass of goods | Affects ergonomics, equipment, and transport | | Order value | Monetary value | Supports prioritization and profitability analysis | | Lines per order | Average number of distinct SKUs in an order | Influences batching and consolidation |
If order i contains li order lines and qi units, then average lines per order and average units per order are: Average lines per order = (∑li) ÷ N Average units per order = (∑qi) ÷ N where N is the number of orders in the analysis period. These averages should be accompanied by distributions or percentiles. An average of five lines per order could represent nearly all orders having five lines, or a mixture of many single-line orders and a small number of 50-line orders. The two situations require different picking designs. The distinction between orders, lines, and unitsConsider two daily workloads: - Scenario A: 1,000 orders, each containing 1 line and 1 unit.
- Scenario B: 100 orders, each containing 10 lines and 10 units.
Both scenarios involve 1,000 lines and 1,000 units, but Scenario A creates ten times as many order containers, labels, packing transactions, and shipment confirmations. Scenario B creates more complex picking and consolidation requirements. Therefore, capacity models should not use units alone. A useful workload vector is: W = (orders, lines, units, cube, weight, value). This vector should be calculated by channel, customer segment, time period, and fulfillment node where data permits. Order-profile distributionsManagers should examine: - percentage of single-line orders;
- percentage of orders with more than ten lines;
- units per line;
- proportion of full-case or full-pallet quantities;
- percentage of orders requiring special handling;
- order cutoff-time concentration;
- split-order frequency;
- returns and exception frequency.
Percentiles are often more informative than averages. For example, the 90th percentile of lines per order indicates a level below which 90% of orders fall. Designing every process around the maximum order may create excessive capacity, while designing around the mean may cause congestion during normal high-percentile workloads. 3. SKU Velocity, Demand Regularity, and SlottingSKU velocity is the frequency or quantity with which a stock-keeping unit moves through the fulfillment system. It may be measured in units per period, order lines per period, picks per period, or another operational measure. The appropriate measure depends on the decision. - Units velocity is useful for replenishment and handling-volume analysis.
- Line velocity is often more relevant to picker visits and location access.
- Order frequency helps identify products that commonly co-occur with other items.
- Contribution margin or value velocity supports economic prioritization.
A high-unit, low-line SKU may be sold in large quantities and require case picking. A low-unit, high-line SKU may generate frequent each-picks and substantial travel. Consequently, line velocity is often the better input for forward-pick slotting. ABC classificationABC analysis ranks SKUs by an annual usage measure. A common measure is annual dollar usage: Annual dollar usage = Annual unit demand × Unit cost SKUs are then ordered from highest to lowest usage and assigned cumulative percentages. A typical policy might classify the first 70–80% of annual dollar usage as A items, the next 15–25% as B items, and the remainder as C items. These percentages are conventions, not universal laws. ABC analysis is valuable but incomplete. A product can be low in annual value yet operationally critical, legally required, hazardous, temperature-sensitive, or essential to a key customer. A second dimension should therefore be added, such as demand regularity, physical characteristics, or service criticality. Multi-criteria classificationA practical matrix may classify products by: - velocity: fast, medium, slow;
- variability: predictable or volatile;
- criticality: ordinary or mission-critical;
- physical profile: small, bulky, fragile, hazardous, or temperature-controlled;
- demand relationship: independent or commonly ordered with other SKUs.
For example, a fast and predictable SKU may be placed in a highly accessible forward location. A fast but bulky SKU may need floor-level storage near shipping. A slow but critical SKU may require high availability despite low movement. A volatile promotional SKU may be kept in flexible reserve space rather than permanently occupying premium pick faces. 4. Seasonality, Promotions, and Demand RegimesSeasonality is systematic variation associated with calendar time, weather, holidays, institutional cycles, or cultural events. It should be distinguished from trend, random variation, and one-time shocks. Seasonality affects fulfillment through: - temporary increases in order volume;
- changes in SKU mix;
- shorter customer tolerance for delay;
- increased labor competition;
- replenishment and storage congestion;
- greater transportation and parcel-network pressure;
- elevated returns after seasonal peaks.
A monthly demand series may be decomposed conceptually as: Dt = levelt + seasonalt + irregulart, although the appropriate forecasting model may instead use multiplicative structure, explanatory variables, or hierarchical methods. The decomposition is a diagnostic framework rather than a guarantee that the components can be estimated independently. Operational planning should distinguish: - base demand: recurring demand under normal conditions;
- event demand: promotions, launches, holidays, or campaigns;
- surge demand: unusually high demand caused by external events;
- lifecycle demand: introduction, growth, maturity, decline, and discontinuation.
Promotions should not be treated as ordinary historical demand. A promotion can alter both volume and order profile. For example, a discount may increase units per order, attract new low-frequency customers, or create bundles that change SKU co-occurrence. Marketing, merchandising, procurement, transportation, and fulfillment teams should therefore share a promotion calendar and a jointly owned demand assumption. 5. Channels and Their Operational ConsequencesSales channels differ in order size, demand timing, product mix, customer promise, and transaction economics. | Channel | Typical profile | Fulfillment implications |
|---|
| Retail replenishment | Larger, scheduled orders | Case/pallet picking, appointment control, compliance requirements | | E-commerce direct-to-consumer | Many small orders | Each-picking, packing variability, parcel integration | | Marketplace | Variable seller and customer requirements | Fast confirmation, data integration, seller-specific rules | | Wholesale | Fewer, larger orders | Order minimums, allocation, case handling, customer-specific labeling | | Subscription | Repeating baskets | Wave planning, predictable co-occurrence, cancellation management | | Spare parts/service | Low-volume, high-criticality demand | Availability, traceability, expedited shipment |
Channel conflict may arise when several channels draw from the same inventory. A high-priority customer order may compete with a lower-margin but faster-growing e-commerce stream. Policies for allocation, inventory reservation, and substitution should be explicit rather than decided informally during shortages. Omnichannel fulfillment adds complexity because customers may expect ship-from-store, click-and-collect, ship-from-warehouse, or returns to any location. Inventory visibility must distinguish physical stock from available-to-promise stock. Otherwise, the organization may promise inventory that is already committed, damaged, misplaced, or operationally inaccessible. 6. Service Requirements and Service-Level AgreementsA service-level agreement (SLA) specifies measurable performance obligations between a provider and a customer or internal stakeholder. In fulfillment, an SLA may define: - order cut-off time;
- order acknowledgment time;
- promised ship time;
- promised delivery time;
- fill rate or order completeness;
- maximum backorder duration;
- inventory availability;
- damage and error tolerance;
- tracking and proof-of-delivery requirements;
- returns processing time;
- escalation and remedy provisions.
Service must be defined precisely. “Next day” may mean shipment by the next business day, delivery the next calendar day, or delivery within 24 hours. These are materially different requirements. Cycle service level and fill rateTwo commonly confused measures are cycle service level and fill rate. - Cycle service level is the probability that no stockout occurs during a replenishment cycle.
- Fill rate is the proportion of total demand fulfilled immediately from available stock.
A system can have a high cycle service level but a lower fill rate if occasional stockouts are severe. Conversely, a system can have a reasonable fill rate while experiencing frequent stockout events if each shortage is small. Performance should also be measured at the order level. An order with nine correct lines and one missing line may be incomplete from the customer’s perspective. Useful measures include perfect-order percentage, on-time-in-full (OTIF), order-line fill rate, and promised-date adherence. Translating service promises into process requirementsA two-hour order-to-ship promise requires more than rapid picking. It may require: - real-time order release;
- inventory accuracy sufficient for immediate allocation;
- pre-defined pick paths and locations;
- labor coverage during the entire promise window;
- packing capacity;
- carrier cutoff alignment;
- exception escalation;
- reliable event timestamps.
The service promise must therefore be evaluated end to end. Improving pick speed alone may not improve customer delivery if packing or transportation is the bottleneck. 7. Lead Times and Time-Based Fulfillment DesignLead time is the elapsed time between defined start and end events. It must be specified carefully. Supplier lead time, replenishment lead time, order processing time, pick-to-ship time, and customer delivery lead time are different measures. For a fulfillment order: Order-to-delivery lead time = Order release time − Order receipt time + Transportation time More precisely, if tr is order receipt, ts is shipment confirmation, and td is delivery confirmation, then: Order processing time = ts − tr Transit time = td − ts Order-to-delivery time = td − tr The timestamps must use a common time zone and consistent business-calendar rules. If orders are received outside operating hours, the organization should state whether the clock continues or begins at the next business opening. When demand during lead time is approximately independent across periods, its mean is: μL = μ × L where μ is mean demand per period and L is lead time in periods. If demand standard deviation per period is σ and periods are independent, lead-time standard deviation is: σL = σ√L The independence assumption is important. If demand is correlated across periods, or if lead time is variable, this expression may understate risk. With independent demand and independent lead time, a commonly used variance relationship is: Var(DL) = E[L]σ² + μ²Var(L) where DL is demand during random lead time. This formula assumes demand periods are identically distributed and independent of lead time. It illustrates why unreliable replenishment lead time can create inventory risk even when average demand is stable. 8. Customer Segmentation for Fulfillment DecisionsCustomer segmentation divides customers into groups with sufficiently similar needs to justify differentiated policies. Segmentation should not be based solely on revenue. A large customer may generate high sales but impose costly delivery windows, frequent changes, special labeling, or low-margin returns. Relevant segmentation dimensions include: - profitability and contribution margin;
- order frequency and basket size;
- service criticality;
- geographic location;
- delivery urgency;
- channel behavior;
- product complexity;
- return propensity;
- forecastability;
- contractual obligations.
A practical customer-service matrix might include: | Segment | Typical requirement | Possible fulfillment policy |
|---|
| Critical service customer | Very high availability and rapid recovery | Reserved inventory, priority allocation, dedicated escalation | | Standard commercial customer | Reliable, economical service | Normal allocation and carrier options | | Convenience-oriented customer | Flexible delivery acceptable | Consolidated shipments, economy service | | High-variability customer | Uncertain volume or frequent changes | Flexible capacity, tighter confirmation rules |
Differentiation must be transparent and commercially defensible. It should not produce unlawful discrimination or conceal service degradation. Customer data should be used proportionately, with access controls and documented decision rules. 9. Integrating the Analysis into Fulfillment RequirementsThe objective is to convert demand and service evidence into design decisions. A useful sequence is: - Define the unit of analysis. Specify SKU, order, line, customer, channel, node, and time period.
- Clean and validate data. Address cancellations, returns, substitutions, duplicate orders, stockout-censored demand, and timestamp errors.
- Profile demand. Calculate volume, variability, intermittency, seasonality, and event effects.
- Profile orders. Analyze lines, units, cube, weight, co-occurrence, and cutoff concentration.
- Classify SKUs. Combine velocity with variability, criticality, and physical characteristics.
- Segment customers and channels. Identify distinct promises and economics.
- Translate SLAs into capacity. Estimate labor, locations, equipment, packing, systems, and transport requirements.
- Stress-test peaks. Test high-percentile demand, promotions, absenteeism, and carrier disruption.
- Select fulfillment methods. Compare discrete, batch, zone, wave, cluster, goods-to-person, or automated approaches.
- Monitor and revise. Track whether the design is producing the promised service at acceptable cost.
The correct picking strategy follows from the profile. Single-line, high-volume orders may suit discrete picking with conveyor induction. Many small orders with overlapping SKU combinations may suit batch or cluster picking. Large, stable, multi-line orders may suit zone or wave processes. Highly urgent and heterogeneous orders may require dynamic release rather than rigid waves. Applied Case: Northstar Home SuppliesThe following is an illustrative case, created for instructional purposes. BackgroundNorthstar Home Supplies operates one distribution center serving retail stores, its own website, and two marketplace channels. Management planned to introduce a same-day shipping promise for orders received before 14:00. The warehouse currently measured performance primarily in units shipped per labor hour. ProblemAlthough unit productivity was rising, customer complaints were increasing. Website orders were frequently shipped late, marketplace penalties were growing, and retail replenishment orders were competing with direct-to-consumer work. Management initially proposed purchasing faster picking equipment. AnalysisA six-month analysis produced the following profile: | Measure | Retail | Direct-to-consumer | Marketplace |
|---|
| Average orders per day | 80 | 1,200 | 300 | | Average lines per order | 18 | 2.4 | 1.8 | | Average units per order | 42 | 3.1 | 2.2 | | Main service promise | Scheduled | Ship same day | Ship within 24 hours |
The analysis showed that retail accounted for most units but relatively few orders. Direct-to-consumer accounted for most order lines and packing transactions. Demand also peaked between 12:00 and 15:00 because of customer behavior and campaign timing. Twenty percent of SKUs generated 78% of e-commerce order lines, but several high-line-velocity products were bulky and poorly located. The organization also discovered that its reported “on-time” measure used shipment confirmation rather than carrier handoff. Orders confirmed before the cutoff were sometimes staged overnight and handed to the carrier the next morning. Approach and solutionNorthstar adopted four changes: - It separated channel-level service measures and defined the same-day promise as carrier handoff by 20:00.
- It created a forward-pick area for high line-velocity SKUs, while retaining bulky fast movers in floor-level locations.
- It used batch picking for small marketplace and website orders, followed by put-wall sorting and dedicated packing lanes.
- It reserved afternoon labor capacity for direct-to-consumer demand and scheduled retail waves earlier in the day.
The company also introduced an exception dashboard showing inventory discrepancies, late releases, packing queues, and carrier handoff risk. A governance rule required promotional campaigns to include an expected order-profile change, not merely a unit forecast. OutcomeIn the subsequent evaluation period, same-day handoff performance improved, but unit productivity declined slightly because the operation handled more small orders and additional quality checks. Management accepted the trade-off because customer-level service and channel profitability improved. The case demonstrates why units per hour alone can reward the wrong behavior. Learning points- Workload must be measured in orders, lines, units, and process touches.
- Channel promises should be explicit and measured against meaningful timestamps.
- Slotting should reflect line velocity and physical constraints.
- Capacity must be protected for predictable peaks.
- Productivity and service should be evaluated jointly, not sequentially.
Challenges, Limitations, and GovernanceDemand data is not a neutral representation of reality. Observed sales may be lower than true demand because stockouts prevented purchases. Promotions may create artificial relationships between SKUs. Returns can distort apparent demand timing. New products lack sufficient history, while discontinued products create misleading averages. Forecasts and classifications also create false precision. A SKU labeled “fast” may move rapidly only during a short event. A customer labeled “high value” may become unprofitable after special handling and returns are included. Models should therefore report uncertainty, refresh classifications, and retain human review for exceptional products and customers. Ethical and governance issues include: - protecting customer and employee data;
- limiting access to personally identifiable information;
- documenting automated allocation and prioritization rules;
- avoiding discriminatory service decisions;
- validating algorithmic recommendations against operational reality;
- ensuring that performance metrics do not encourage unsafe speed;
- preserving audit trails for SLA and claims decisions.
Artificial intelligence can assist with demand sensing, anomaly detection, slotting recommendations, and labor forecasting. However, AI does not eliminate the need for causal reasoning. A model may interpret a one-time viral event as permanent demand, or use historical service patterns that reflect past bias. Human approval, monitoring, explainability, and controlled experimentation remain necessary. Best-Practice ChecklistA fulfillment requirements analysis should: - use a sufficiently granular time bucket;
- separate demand from observed sales lost to stockouts;
- report distributions, not only averages;
- distinguish order lines from units;
- classify SKUs using velocity and operational criticality;
- identify seasonal and promotional regimes;
- analyze each channel separately before aggregation;
- define SLA clocks and timestamps precisely;
- include lead-time variability;
- segment customers using service and economic dimensions;
- test peak and disruption scenarios;
- align performance measures with customer outcomes;
- review data quality and governance controls regularly.
Chapter SummaryFulfillment requirements are determined by the structure and timing of demand, not by aggregate volume alone. Demand analysis should measure average volume, variability, seasonality, intermittency, and event effects. Order profiles must distinguish orders, lines, units, cube, weight, and value because each drives different forms of work. SKU velocity is useful for slotting and replenishment, but line velocity, demand regularity, physical characteristics, and criticality should also be considered. Channels create distinct operational patterns, while promotions can change both demand quantity and order composition. Service-level agreements must be translated into precise process clocks, capacity requirements, and measurable outcomes. Cycle service level, fill rate, OTIF, and perfect-order performance are related but distinct. Lead-time analysis requires clear timestamps and explicit assumptions. Customer segmentation enables differentiated policies, but it must be economically justified, transparent, lawful, and governed. Finally, demand and service analysis should culminate in an integrated fulfillment design that is stress-tested under peaks and monitored continuously. The strongest design is not necessarily the fastest picking system; it is the system that reliably meets the right customer promise at sustainable cost and risk. Key TermsDemand variability: Fluctuation in demand around its average level. Order profile: The structural characteristics of orders, including lines, units, cube, weight, and value. Order line: A distinct SKU entry within a customer order. SKU velocity: The frequency or quantity with which a SKU moves through a fulfillment system. Line velocity: The number of order-line occurrences associated with a SKU during a period. Coefficient of variation: Standard deviation divided by the mean, used as a relative measure of variability. ABC analysis: Classification of items according to cumulative contribution to a chosen usage measure. Seasonality: Systematic demand variation associated with calendar or recurring environmental effects. Demand regime: A period or condition characterized by a distinct demand pattern. Sales channel: The route through which a customer order is received and fulfilled. Service-level agreement: A documented and measurable service commitment. Fill rate: The proportion of demand fulfilled immediately from available inventory. Cycle service level: The probability of no stockout during a replenishment cycle. OTIF: On-time-in-full performance against a customer order promise. Lead time: Elapsed time between defined operational start and end events. Forward-pick location: An accessible storage location positioned for frequent picking. Customer segmentation: Grouping customers with similar service, economic, or operational requirements. Order co-occurrence: The frequency with which products appear together in orders. Demand censoring: The distortion of observed demand when stockouts prevent requested purchases. Perfect order: An order completed accurately, completely, on time, and without damage according to the defined standard. Review QuestionsShort Answer Questions- Why are order lines often more useful than units for estimating picker travel?
- Distinguish cycle service level from fill rate.
- What assumptions underlie the expression σL = σ√L?
- Identify three ways in which sales channels can differ operationally.
- Why should SKU criticality supplement ABC classification?
Long Answer Questions- Explain how demand variability, seasonality, and promotions affect fulfillment capacity planning.
- Discuss how a service-level agreement should be translated into warehouse and transportation requirements.
- Compare the implications of high-unit, low-line velocity with low-unit, high-line velocity.
- Evaluate the benefits and limitations of customer segmentation for fulfillment policy.
- Describe an integrated process for converting demand and order-profile data into a picking strategy.
Analytical / Application Questions- A facility processes 600 orders per day averaging 3.5 lines and 4.2 units per order. Calculate daily order lines and units. Explain why both results are needed for capacity planning.
- A product has mean daily demand of 50 units and standard deviation of 15 units. Compare its relative variability with a product having mean demand of 200 units and standard deviation of 40 units using the coefficient of variation. Interpret the result.
- Design a fulfillment policy for a channel with many single-line orders, a strict same-day shipping promise, highly seasonal demand, and a high percentage of returns. Identify required data, picking approach, staffing implications, and performance measures.
Multiple Choice Questions with AnswersQuestion 1Which measure most directly represents the number of distinct SKU retrievals generated by orders? A. Total units B. Order lines C. Order value D. Shipment weight Correct Answer: B. Order lines Question 2A demand series has a mean of 100 units and a standard deviation of 20 units. What is its coefficient of variation? A. 0.02 B. 0.20 C. 5.00 D. 80.00 Correct Answer: B. 0.20 Question 3Which SKU is generally the strongest candidate for a forward-pick location? A. A slow, bulky, noncritical SKU B. A fast, predictable SKU requiring frequent each-picks C. A discontinued SKU with remaining stock D. A hazardous SKU prohibited from the facility Correct Answer: B. A fast, predictable SKU requiring frequent each-picks Question 4What does fill rate measure? A. The probability of no stockout during a replenishment cycle B. The proportion of demand fulfilled immediately from available inventory C. The percentage of orders shipped before the carrier cutoff regardless of completeness D. The average number of units per order Correct Answer: B. The proportion of demand fulfilled immediately from available inventory Question 5Which statement best distinguishes retail replenishment from direct-to-consumer fulfillment? A. Retail replenishment usually involves fewer, larger orders, while direct-to-consumer usually involves many smaller orders B. Retail replenishment never requires scheduled delivery C. Direct-to-consumer orders always contain more lines than retail orders D. The two channels have identical fulfillment requirements Correct Answer: A. Retail replenishment usually involves fewer, larger orders, while direct-to-consumer usually involves many smaller orders Question 6If mean demand is 40 units per day and lead time is 3 days, under the stated constant-mean assumption, mean lead-time demand is: A. 13.3 units B. 40 units C. 120 units D. 1,200 units Correct Answer: C. 120 units Question 7Which factor is a limitation of using historical sales as demand? A. Historical sales always include all unmet demand B. Stockouts can censor observed demand below true customer demand C. Historical sales cannot be measured by time period D. Historical sales are never affected by promotions Correct Answer: B. Stockouts can censor observed demand below true customer demand Question 8What is the main purpose of defining an SLA clock precisely? A. To eliminate the need for inventory accuracy B. To ensure that performance is measured against an unambiguous start and end event C. To guarantee that transportation time is zero D. To replace all operational metrics with one measure Correct Answer: B. To ensure that performance is measured against an unambiguous start and end event Question 9Why can units per labor hour be an inadequate sole productivity measure? A. It ignores the existence of units B. It may reward processing large, easy orders while service and order complexity deteriorate C. It measures customer satisfaction directly D. It cannot be calculated in a warehouse Correct Answer: B. It may reward processing large, easy orders while service and order complexity deteriorate Question 10Which customer-segmentation approach is most appropriate for fulfillment design? A. Segment only by customer name alphabetically B. Segment solely by annual revenue and ignore service cost C. Combine economic, service, operational, and geographic characteristics D. Use a single universal policy for all customers Correct Answer: C. Combine economic, service, operational, and geographic characteristics
|