Order Fulfillment & Picking Strategies

Chapter 7
Capacity, Labor, and Workforce Management

Graduate Program in Supply Chain Management
Order Fulfillment & Picking Strategies   •   Graduate

Capacity, Labor, and Workforce Management

Introduction

Order fulfillment performance depends not only on inventory availability and warehouse technology but also on the organization’s ability to match labor capacity with changing workload. Picking, replenishment, packing, shipping, returns, and exception handling are labor-intensive activities whose requirements vary by hour, day, season, product mix, order profile, and service promise. Poor workforce planning creates two symmetrical risks: insufficient labor produces lateness, congestion, overtime, and quality failures; excessive labor produces avoidable cost and underutilization.

Workforce management therefore links demand forecasting, engineered labor standards, capacity planning, scheduling, supervision, performance measurement, and employee relations. At graduate level, the central managerial challenge is not merely to calculate how many workers are needed. It is to design a system that is economically efficient, operationally resilient, fair to employees, compliant with law and policy, and capable of learning from changing conditions.

Learning Objectives

By the end of this chapter, the reader should be able to:

  1. Forecast fulfillment workload using volume, content, and time-phased demand.
  2. Convert workload into labor-hour and headcount requirements.
  3. Distinguish theoretical, available, productive, and effective capacity.
  4. Construct defensible engineered labor standards.
  5. Balance labor, equipment, space, and process capacity.
  6. Design shifts, break structures, overtime policies, and flexible staffing arrangements.
  7. Evaluate incentive systems without encouraging unsafe or poor-quality behavior.
  8. Incorporate skills, well-being, inclusion, labor relations, and governance into workforce decisions.
  9. Use technology and analytics responsibly in workforce management.

1. The Capacity Problem in Fulfillment

Capacity is the maximum sustainable output of a resource or process under specified conditions. In fulfillment, capacity is multidimensional. A facility may have enough total labor hours but lack sufficient trained forklift operators, pack stations, dock doors, or cold-chain capability. Thus, capacity must be evaluated by time, activity, skill, equipment, and service requirement.

Important distinctions include:

  • Design capacity: Maximum output under ideal conditions.
  • Effective capacity: Realistic output after planned breaks, maintenance, changeovers, training, and normal operating constraints.
  • Available labor capacity: Paid time scheduled for work.
  • Productive labor capacity: Time actually available for value-adding work after meetings, travel, waiting, and other allowances.
  • Effective capacity: Productive capacity adjusted for expected disruptions, variability, and quality requirements.

A basic utilization measure is:

Utilization = Actual output ÷ Design capacity

Utilization is dimensionless. It is useful for identifying overload or underuse, but a high value is not automatically desirable. As utilization approaches 100%, queues and delays often increase sharply because variability leaves no recovery capacity. A fulfillment operation normally requires a capacity buffer.

A practical capacity buffer can be expressed as:

Capacity buffer = Available capacity − Forecast workload

The result has units such as orders per hour or labor hours per shift. A positive buffer is not necessarily waste: it may protect service during demand uncertainty, absenteeism, equipment failure, or urgent orders.

2. Forecasting Workload Rather Than Just Orders

Order count is an inadequate labor forecast because orders differ in lines, units, travel distance, handling difficulty, packaging requirements, and exception probability. The planning object should be workload by activity and time interval.

For activity j in period t, a simple workload model is:

Wj,t = ∑k=1K Vk,t × aj,k

where:

  • Wj,t = workload for activity j in period t, measured in work units or minutes;
  • Vk,t = forecast volume of demand class k in period t;
  • aj,k = average amount of activity j required per unit of class k;
  • K = number of demand classes.

The model assumes that demand classes are sufficiently homogeneous and that the average activity content is stable for the planning period. It should be recalibrated when product assortment, layout, batch size, technology, or process policy changes.

For example, a picking forecast may separate single-line orders, multi-line orders, bulky orders, and orders requiring controlled handling. A packing forecast may separate standard cartons, non-conveyable items, gift packaging, and hazardous-material documentation. Forecasting by class exposes workload drivers that an order-count forecast hides.

Forecasts should be time-phased. Daily totals can conceal a severe hourly peak caused by carrier cut-off times or promotional releases. A useful hierarchy is:

  1. Strategic: annual and seasonal demand for workforce and facility decisions.
  2. Tactical: weekly and daily demand for staffing plans and labor budgets.
  3. Operational: hourly or sub-hourly demand for shift deployment and reassignment.

Forecast error should be monitored. For a period t, forecast error is:

et = At − Ft

where At is actual workload and Ft is forecast workload, both in the same units. A common scale-free measure is mean absolute percentage error, provided actual values are nonzero:

MAPE = (100 ÷ n) × ∑t=1n |(At − Ft) ÷ At|

MAPE can be misleading when actual demand is very small or zero. In such cases, mean absolute error, weighted absolute percentage error, or forecast bias may be more informative. Forecasting should also distinguish random error from systematic bias. Persistent underforecasting creates recurring overtime and service failure; persistent overforecasting creates unnecessary labor cost.

3. Converting Workload into Labor Requirements

3.1 Labor hours

If workload is measured in minutes and a worker’s standard time per unit is known, required labor hours are:

Required labor hours = (Forecast volume × Standard minutes per unit) ÷ 60

For multiple work elements:

Hj,t = Wj,t ÷ 60

where Hj,t is required labor hours for activity j in period t, assuming Wj,t is expressed in standard minutes.

3.2 Adjusting for productive availability

Paid hours are not equivalent to productive hours. If a shift is 8 hours, includes 30 minutes of breaks, 15 minutes of meetings, and has an expected 10% loss from travel, waiting, and normal interruptions, productive availability must be calculated explicitly.

Let:

  • S = scheduled hours per worker;
  • B = planned nonproductive hours per worker;
  • l = fractional loss rate for normal interruptions;
  • P = productive hours per worker.

Then:

P = (S − B) × (1 − l)

This assumes the interruption loss applies to the time remaining after planned nonproductive time. If an organization defines loss against paid time instead, the formula must be changed; definitions must not be mixed.

Required headcount is:

N = Required labor hours ÷ Productive hours per worker

Because headcount is discrete, the operational staffing requirement is normally rounded upward, subject to skill and coverage constraints.

Worked Example 1: Staffing a Picking Wave

A facility forecasts 4,800 order lines in a four-hour wave. The engineered standard is 2.4 minutes per line. Each worker is scheduled for 4 hours, with 20 minutes of planned breaks and briefing. Normal travel and interruption loss is estimated at 12% of the remaining time.

Required labor hours are:

(4,800 × 2.4) ÷ 60 = 192 labor hours

Productive hours per worker are:

(4 − 20÷60) × (1 − 0.12) = 3.2267 hours approximately

Thus:

N = 192 ÷ 3.2267 = 59.50 workers approximately

The plan requires at least 60 workers if all work must be completed in the wave. A manager may schedule more than 60 if forecast uncertainty, absenteeism, skill restrictions, or a service buffer justify it. The result is not a claim that 60 workers will always produce exactly 4,800 lines; it is a planning estimate under stated assumptions.

4. Engineered Labor Standards

A labor standard is the expected time for a qualified worker to complete a defined task using a specified method, equipment, and workplace condition. A defensible standard must describe the work content and the conditions under which it applies. It should not be an unexplained number derived from the fastest employee’s performance.

Common methods include:

  • Time study: Direct observation and timing of task elements.
  • Work sampling: Statistical observation of activities across time.
  • Predetermined motion-time systems: Standard times assigned to defined motions.
  • Historical analysis: Use of reliable transaction and labor data.
  • Hybrid engineering: Combination of observed times, system data, and expert validation.

A basic observed-time calculation is:

Normal time = Observed time × Performance rating

If observed time is 1.50 minutes and the rating is 1.10, normal time is 1.65 minutes. The rating must be defined consistently; a rating above 1.00 indicates performance judged faster than the reference pace under the selected convention.

A standard time can then be expressed as:

Standard time = Normal time × (1 + Allowance rate)

If normal time is 1.65 minutes and the allowance is 15%, standard time is 1.8975 minutes. The allowance may cover personal needs, fatigue, unavoidable delays, and other approved conditions. Some engineering systems use an allowance factor based on a fraction of total time rather than a percentage added to normal time. These conventions are not interchangeable, so the organization must document which definition it uses.

Standards should be stratified by meaningful drivers such as travel distance, item size, order profile, equipment, replenishment condition, and congestion. A single average standard can be unfair and operationally inaccurate when work content varies substantially.

A standard-setting process should include:

  1. Define task boundaries and output units.
  2. Specify method, equipment, layout, and quality requirements.
  3. Sample representative workers, shifts, products, and conditions.
  4. Remove abnormal observations only with documented justification.
  5. Apply a transparent performance-rating method.
  6. Add formally defined allowances.
  7. Validate the standard against quality, safety, and throughput data.
  8. Review it after process, technology, or assortment changes.

Standards are estimates, not moral judgments. Comparing employees across different work content, congestion levels, equipment conditions, or skill assignments without adjustment produces invalid conclusions.

5. Balancing Resources and Managing Bottlenecks

Labor planning must be integrated with nonlabor resources. A picking team cannot increase output if pack stations, conveyors, printers, replenishment, docks, or inventory accuracy become bottlenecks. The effective process capacity is constrained by the lowest-capacity required resource.

For a serial process with stages i and capacities Ci, a simplified bottleneck relationship is:

Process capacity = min(C1, C2, …, Cm)

This assumes stages are sequential, capacities are measured over the same time interval, and buffers do not permanently alter the limiting rate. Real systems may have parallel paths, rework, finite buffers, and product-specific constraints, so the minimum-capacity rule is a useful first approximation rather than a complete simulation.

A resource-load ratio can be calculated as:

Load ratioi = Required workloadi ÷ Available capacityi

A ratio above 1 indicates overload under the stated conditions. Ratios near 1 indicate vulnerability to variability. Managers should examine whether the best response is additional labor, cross-training, process redesign, slotting, batching, equipment investment, or demand smoothing.

Labor balancing also concerns skills. Suppose a shift needs 40 pickers, 6 reach-truck operators, and 4 problem-solvers. Scheduling 50 general workers does not satisfy the requirement if only two possess the necessary certifications. Skill coverage can be represented through a skills matrix identifying qualification, proficiency, recency of training, and authorization limits.

6. Shift Design and Scheduling

A shift schedule converts workload forecasts into time-specific worker assignments. Good schedules consider demand arrival, order release patterns, carrier cut-offs, replenishment windows, legal limits, employee availability, training, and fatigue.

Common designs include:

  • Fixed shifts, which provide predictability and stable team routines.
  • Staggered shifts, which concentrate labor around peaks.
  • Overlapping shifts, which support handoffs and high-volume windows.
  • Split shifts, which can match two peaks but may reduce employee acceptability.
  • Part-time or contingent shifts, which add flexibility but require governance.
  • Self-scheduling, which may improve autonomy when coverage rules are clear.

A simple scheduling formulation seeks to minimize labor cost while meeting coverage. Let x_{e,t be 1 if employee or labor unit e is scheduled in period t, and 0 otherwise. A conceptual objective is:

Minimize ∑e ∑t ce,t xe,t

subject to:

∑e ae,t xe,t ≥ Rt for every period t

where ce,t is the cost of assigning labor unit e in period t, ae,t is the productive coverage supplied, and Rt is required coverage. Additional constraints may enforce maximum hours, rest periods, availability, skills, consecutive shifts, overtime rules, and fairness. This is a simplified integer scheduling model; actual applications often require mixed-integer programming, heuristics, or workforce-management software.

Scheduling quality should be evaluated by more than labor cost. Relevant criteria include service attainment, overtime, schedule stability, employee preference satisfaction, fatigue exposure, absence, skill coverage, and fairness of undesirable assignments.

7. Incentives, Performance, and Fairness

Incentive systems can reinforce throughput, quality, attendance, teamwork, and continuous improvement. They can also create harmful side effects: rushing, unsafe lifting, mis-scanning, hiding errors, avoiding difficult work, or competing destructively with coworkers.

A balanced performance system should include:

  • Productivity relative to valid standard time.
  • Accuracy and customer-impact measures.
  • Safety compliance and near-miss reporting.
  • Attendance interpreted within lawful and humane policy.
  • Team results where work is interdependent.
  • Training, problem solving, and process improvement.

Performance comparisons require normalization. A worker assigned to bulky, distant, or exception-heavy orders should not be compared directly with one assigned to short-distance single-item picks. Measurement systems should distinguish controllable from uncontrollable time and provide a documented appeal process.

Fairness has at least three dimensions:

  1. Distributive fairness: Are rewards and burdens allocated fairly?
  2. Procedural fairness: Are rules, measurements, and appeals consistent?
  3. Interactional fairness: Are employees treated respectfully and informed about decisions?

Labor standards and algorithmic productivity systems should be auditable. Managers should monitor disparate effects by employment status, shift, gender, disability, age, language, and other legally protected or ethically relevant categories. Data minimization, access controls, retention limits, and transparent communication are essential when collecting location, biometric, or behavioral data.

8. Skills, Well-Being, and Labor Relations

Fulfillment work can involve repetitive motion, lifting, vehicle interaction, noise, cold or heat, time pressure, and psychosocial strain. Workforce management must therefore incorporate ergonomic design, job rotation where appropriate, mechanical assistance, realistic pace, hydration, rest, and effective incident reporting. Rotation is not a substitute for eliminating hazardous exposure or redesigning poor work methods.

Well-being is operationally relevant. Excessive overtime and unstable schedules may increase absence, turnover, accidents, and quality defects. A narrow labor-cost metric can therefore misrepresent total cost. Managers should evaluate the relationship among workload, fatigue, safety, retention, and service performance.

Labor relations require early and structured engagement. Where collective bargaining applies, changes to standards, schedules, technology, incentives, or job classifications may trigger consultation or bargaining obligations. Even where no union is present, employee voice is important. Joint standard review, worker committees, confidential reporting, and transparent change communication can improve both legitimacy and implementation.

9. Technology and AI in Workforce Management

Modern systems can combine forecasts, labor standards, timekeeping, warehouse-control data, skills, and attendance to recommend staffing and reassignment. Machine learning may improve demand forecasts or identify workload patterns, but it does not remove the need for managerial judgment.

Responsible deployment requires:

  • Clear explanation of what data are collected and why.
  • Validation against actual operational outcomes.
  • Human review of consequential decisions.
  • Testing for bias and unequal error rates.
  • Protection against data breaches and unauthorized surveillance.
  • A process for correcting inaccurate records.
  • Separation of planning analytics from punitive automated decisions unless validated and governed.

AI forecasts can fail during promotions, disruptions, new-product launches, or structural changes because historical relationships no longer hold. Scenario analysis and override rules are essential. Technology should support better work design, not simply intensify work.

10. Illustrative Case: NorthRiver Fulfillment Center

Background

NorthRiver is a fictional regional e-commerce fulfillment center shipping household goods and personal-care products. Demand has grown 22% year over year, while late shipments and voluntary turnover have increased. Management currently schedules by total daily orders and uses a single picking productivity target.

Problem

The center receives its largest order release between 14:00 and 18:00, followed by a carrier cut-off at 20:00. Single-item orders are easy to pick, but bulky multi-line orders require longer travel and additional handling. The existing target makes the late shift appear less productive even when it completes more difficult work. Overtime is concentrated among experienced employees, while new hires are assigned without systematic skill coverage.

Analysis

The improvement team first classified demand into four workload classes and calculated standard minutes by class. It then converted the hourly forecast into picking, packing, replenishment, and problem-solving requirements. Analysis showed that picking labor was overloaded from 16:00 to 18:00, but packing capacity became the bottleneck after 18:00. Adding pickers alone would therefore increase work-in-process rather than improve dispatch performance.

A skills matrix showed that forklift certification was insufficient during the 17:00 replenishment window. Absence records also indicated that repeated mandatory overtime was associated with higher subsequent absence, although the relationship was observational and not proof of causation.

Approach and solution

NorthRiver implemented five changes:

  1. It replaced the single target with task-specific standards adjusted for order class and travel conditions.
  2. It introduced staggered starts, adding trained labor before the afternoon release peak.
  3. It cross-trained selected packers in replenishment and problem solving.
  4. It created a team-level incentive requiring accuracy and safety thresholds before productivity rewards were paid.
  5. It established a monthly worker-management review of standards, exceptions, injuries, and schedule fairness.

The scheduling model included minimum skill coverage, maximum weekly hours, rest requirements, and a cap on consecutive undesirable shifts. Supervisors received dashboards showing forecast workload, actual completion, quality, backlog, and available skills rather than productivity alone.

Outcome

After three months, NorthRiver reported fewer late dispatches, lower emergency overtime, and improved coverage during the release peak. Productivity increased modestly, but the larger gain came from reducing bottleneck accumulation and rework. Employee acceptance improved because standards were explained, difficult work was recognized, and appeals were available. Management continued to review results because the trial period included a relatively stable demand pattern.

Learning points

The case illustrates that labor planning is a system problem. Accurate standards cannot compensate for poor release timing; additional pickers cannot solve a packing bottleneck; and incentives cannot substitute for safe work design. Effective workforce management combines quantitative planning with employee participation, skill development, and continuous validation.

11. Implementation Framework and Best Practices

A practical implementation sequence is:

  1. Map fulfillment processes and define measurable outputs.
  2. Segment demand by workload content, not only order count.
  3. Forecast workload by activity and time interval.
  4. Establish and validate engineered standards.
  5. Calculate productive capacity and identify bottlenecks.
  6. Build schedules with skill, legal, fatigue, and fairness constraints.
  7. Deploy labor flexibly through cross-training and staggered coverage.
  8. Monitor service, cost, quality, safety, and employee outcomes together.
  9. Review standards after process or assortment changes.
  10. Govern analytics through transparency, audits, and human oversight.

A useful dashboard should include forecast accuracy, workload by interval, planned versus actual labor hours, utilization, backlog, overtime, absence, turnover, quality, safety events, training coverage, and schedule fairness. No single metric should dominate decision making.

Challenges and Limitations

Workforce models are limited by forecast error, unstable standards, incomplete time data, changing product mix, hidden work, and behavioral adaptation to measurement. Average rates can obscure variability and bottlenecks. Optimization models may produce mathematically efficient schedules that employees reject as unfair or impractical. Historical data can encode prior discrimination or unsafe practices. Finally, labor productivity is not identical to value creation: quality, resilience, learning, and dignity may be undervalued by short-term measures.

Accordingly, capacity plans should use sensitivity analysis. Managers can test demand scenarios, absenteeism levels, productivity ranges, and equipment outages rather than rely on one precise forecast. Robust plans often cost slightly more in normal conditions but perform better under disruption.

Chapter Summary

Capacity, labor, and workforce management connect forecast demand to the people, skills, equipment, and time required to fulfill orders. Workload should be forecast by activity and demand class, then converted into labor hours using documented standards and productive-availability assumptions. Capacity must be distinguished from utilization, and bottlenecks must be identified across the entire fulfillment process rather than within one department.

Engineered standards are most credible when task definitions, methods, allowances, and validation procedures are transparent. Shift schedules should balance service, cost, skill coverage, legal requirements, fatigue, and employee preferences. Incentives require safeguards for quality, safety, and fairness. Well-being, worker voice, labor relations, and responsible data governance are central design requirements, not peripheral concerns. Technology and AI can improve forecasting and scheduling, but human review, bias testing, and clear accountability remain necessary. The strongest systems treat workforce management as a socio-technical process in which operational performance and decent work are mutually reinforcing.

Key Terms

Capacity: The sustainable amount of work a resource or process can perform under stated conditions.

Design capacity: Maximum theoretical output under ideal conditions.

Effective capacity: Realistic capacity after normal constraints and planned losses.

Workload: Quantified work content required to complete forecast demand.

Labor standard: Expected time for a qualified worker to complete a defined task using a specified method.

Time study: Direct observation and timing of task elements.

Work sampling: Statistical observation of how time is distributed among activities.

Allowance: Additional time provided for personal needs, fatigue, and unavoidable delays.

Productive availability: Time available for value-adding work after planned and normal losses.

Utilization: Actual output divided by available or design capacity, according to the stated definition.

Bottleneck: The resource or process stage that constrains overall flow.

Skills matrix: Record of employee qualifications, proficiency, and authorization.

Cross-training: Preparing employees to perform more than one task or role.

Staggered shift: Shift with a start or end time offset from another shift.

Overtime: Work beyond defined regular working hours.

Incentive system: Mechanism linking rewards or recognition to specified outcomes.

Forecast bias: Persistent tendency for forecasts to exceed or fall below actual demand.

Schedule fairness: Equitable distribution of hours, preferences, and undesirable assignments.

Workforce analytics: Use of labor and operational data to support workforce decisions.

Review Questions

Short Answer Questions

  1. Why is order count alone an inadequate measure of fulfillment workload?
  2. Distinguish design capacity from effective capacity.
  3. What is the purpose of an allowance in an engineered labor standard?
  4. Why must skill coverage be considered in addition to total headcount?
  5. Identify two risks associated with poorly designed productivity incentives.

Long Answer Questions

  1. Explain how a fulfillment manager can convert a time-phased demand forecast into labor requirements.
  2. Discuss the methods used to establish labor standards and the conditions required for standards to be fair and valid.
  3. Compare fixed, staggered, overlapping, and flexible shifts for a fulfillment operation with pronounced afternoon peaks.
  4. Explain why workforce management should incorporate safety, well-being, and labor relations rather than focus only on labor cost.
  5. Evaluate the benefits and risks of using AI in staffing and productivity management.

Analytical / Application Questions

  1. A facility forecasts 6,000 order lines requiring 1.8 standard minutes each. Workers are scheduled for 8 hours, including 35 minutes of planned nonproductive time, and normal interruption loss is 10% of the remaining time. Calculate required labor hours and the minimum number of workers. State your assumptions.
  2. A picking department is underloaded from 08:00 to 12:00 but overloaded from 16:00 to 19:00, while packing is overloaded from 18:00 to 20:00. Design a labor-balancing response that addresses both time periods without simply adding permanent headcount.
  3. Critically assess a proposal to rank employees solely by lines picked per hour. Recommend a multidimensional performance system and identify governance safeguards.

Multiple Choice Questions with Answers

Question 1

Which measure best represents the workload required for fulfillment planning?

A. Total number of employees on payroll

B. Order count without regard to order content

C. Time-phased activity workload by demand class

D. Annual labor budget only

Correct Answer: C. Time-phased activity workload by demand class

Question 2

A process has stage capacities of 120, 95, and 110 units per hour in sequence. Under the simplified serial-process assumption, what is its capacity?

A. 95 units per hour

B. 110 units per hour

C. 120 units per hour

D. 325 units per hour

Correct Answer: A. 95 units per hour

Question 3

A wave contains 3,000 lines at 2 minutes per line. What labor time is required?

A. 50 labor hours

B. 60 labor hours

C. 100 labor hours

D. 6,000 labor hours

Correct Answer: B. 60 labor hours

Question 4

Which statement about engineered labor standards is most accurate?

A. They should be based on the fastest employee observed.

B. They are valid regardless of layout or product changes.

C. They should define task conditions, method, output, and allowances.

D. They eliminate the need to measure quality and safety.

Correct Answer: C. They should define task conditions, method, output, and allowances.

Question 5

If a worker has 8 scheduled hours, 0.5 planned nonproductive hours, and a 10% loss applied to the remaining time, productive availability is:

A. 6.75 hours

B. 6.95 hours

C. 7.20 hours

D. 7.50 hours

Correct Answer: B. 6.95 hours

Question 6

What is a principal danger of using only lines picked per hour as an incentive measure?

A. It always reduces throughput.

B. It may encourage rushing and conceal quality or safety problems.

C. It prevents all forms of employee recognition.

D. It measures workload content perfectly.

Correct Answer: B. It may encourage rushing and conceal quality or safety problems.

Question 7

Which scheduling feature directly addresses a shortage of qualified forklift operators?

A. Increasing general headcount without training

B. Removing all breaks

C. Including certification requirements in the skills matrix and schedule

D. Measuring only daily order totals

Correct Answer: C. Including certification requirements in the skills matrix and schedule

Question 8

Why can high utilization be undesirable in a variable fulfillment operation?

A. It guarantees excessive inventory.

B. It leaves little capacity to absorb variability and disruptions.

C. It always indicates low labor productivity.

D. It eliminates the bottleneck.

Correct Answer: B. It leaves little capacity to absorb variability and disruptions.

Question 9

Which is an appropriate governance practice for AI-based workforce decisions?

A. Allowing automated discipline without review

B. Using historical data without testing for bias

C. Providing transparency, human oversight, and an appeal process

D. Collecting all available personal data indefinitely

Correct Answer: C. Providing transparency, human oversight, and an appeal process

Question 10

A facility needs 80 labor hours and each scheduled worker provides 4 productive hours. What is the minimum staffing level before other constraints are considered?

A. 16 workers

B. 20 workers

C. 24 workers

D. 320 workers

Correct Answer: B. 20 workers

Order Fulfillment & Picking Strategies
Chapter 7 of 14