Lean Materials Flow and Production IntegrationIntroduction and contextLean materials management is the coordinated design of material, information and production flows so that customers receive the required product, in the required quantity, at the required time, with minimum waste. It is not simply a policy of holding very little inventory. A lean system combines stable processes, short replenishment intervals, visual control, reliable suppliers, disciplined quality management and rapid response to abnormal conditions. Traditional materials systems often push large batches through a plant on the basis of forecasts and departmental schedules. This can create excess work-in-progress, long queues, hidden defects and poor visibility of actual demand. Lean systems attempt to replace this with a pull relationship: downstream consumption authorises upstream replenishment. The objective is flow, but flow must be designed with appropriate protection against variability and disruption. For an advanced diploma production manager, the central challenge is therefore one of balance. Excessive inventory conceals problems and increases cost; insufficient protection can stop production when demand, quality, transport or supply conditions change. Lean materials flow is successful when waste is removed without making the system unnecessarily fragile. Learning objectivesAfter completing this chapter, the learner should be able to: - Explain the relationship between lean production, Just-in-Time (JIT), pull systems and production integration.
- Design and calculate a basic Kanban and supermarket replenishment system.
- Evaluate lot-size reduction, line-side supply and supplier integration decisions.
- Explain vendor-managed inventory and distinguish it from supplier-owned inventory.
- Identify the eight common forms of waste in materials flow.
- Balance lean efficiency with resilience, risk controls and ethical supply-chain governance.
- Select practical performance measures for implementing and sustaining lean flow.
1. Foundations of lean materials flow1.1 Value, flow and pullLean thinking begins with customer value. An activity is valuable when it changes the product or service in a way the customer requires and is done correctly the first time. Activities that consume resources but do not create customer value are waste, although some non-value-adding activities may be temporarily necessary for legal, safety or technical reasons. Three connected principles are especially important: - Flow: materials move through processes with minimal waiting, interruption and backtracking.
- Pull: production and replenishment are triggered by actual downstream consumption rather than by production of speculative stock.
- Standardisation: the agreed method, quantity, timing and responsibility are made visible and repeatable.
A pull system does not mean that every process responds directly to the final customer order. In a complex factory, controlled supermarkets, decoupling points and production schedules may be used. The essential principle is that replenishment signals originate from consumption and are not freely generated by upstream departments. 1.2 JIT as an operating philosophyJust-in-Time means supplying the right material, in the right quantity, at the right time and place. It includes purchasing, transportation, production sequencing, quality assurance, equipment reliability and workforce capability. JIT is therefore broader than reducing warehouse stock. Important JIT requirements include: - dependable equipment and preventive maintenance;
- stable and documented work methods;
- small, economical transfer and production batches;
- rapid changeovers;
- supplier quality at source;
- accurate bills of material and inventory records;
- short, frequent and reliable deliveries;
- empowered employees who can stop and correct abnormal conditions.
JIT exposes weaknesses that large inventories previously concealed. A defective incoming component, for example, becomes visible quickly when only a small quantity is available. This exposure is useful only if the organisation responds through root-cause analysis rather than blaming operators or adding emergency stock permanently. 1.3 The eight wastes in materials flowThe classic wastes are often remembered as TIMWOODS: | Waste | Materials-flow example | Typical countermeasure |
|---|
| Transportation | Repeated movement between distant stores | Point-of-use storage and better layout | | Inventory | Excess raw material or work-in-progress | Pull control and smaller lots | | Motion | Walking to collect frequently used parts | Ergonomic line-side presentation | | Waiting | Operators waiting for kits or approval | Synchronous replenishment and standard work | | Overproduction | Making components before demand exists | Production authorisation by pull signal | | Overprocessing | Rechecking or handling caused by poor quality | Quality at source and process capability | | Defects | Wrong, damaged or incomplete materials | Poka-yoke and supplier quality assurance | | Skills unused | Ignoring operator improvement knowledge | Team problem-solving and suggestion systems |
Waste reduction should not be confused with indiscriminate cost cutting. Removing a safety inspection, maintenance activity or emergency capability without risk analysis may reduce visible cost while increasing total operational risk. 2. Pull systems, Kanban and supermarkets2.1 Push and pull comparedA push system releases work according to a central plan, forecast or available capacity. A pull system releases work when a downstream process, customer or authorised consumption event requests it. Most practical factories use a hybrid: long-term planning is forecast-driven, while short-term replenishment between controlled points is pull-driven. | Feature | Push control | Pull control |
|---|
| Trigger | Forecast, plan or upstream decision | Actual consumption or authorised withdrawal | | Main risk | Overproduction and excess stock | Starvation if variability is unmanaged | | Information emphasis | Schedule accuracy | Signal discipline and visibility | | Typical control | MRP order or dispatch list | Kanban, e-kanban or withdrawal signal | | Best use | Long-lead planning and capacity decisions | Repetitive, stable replenishment loops |
2.2 KanbanKanban is a visible or electronic authorisation to produce, move or replenish a defined quantity of a specified item. A kanban may be a card, bin, barcode transaction, electronic message or other controlled signal. It is not merely an inventory label: it represents permission within a defined operating rule. Common types include: - Withdrawal kanban: authorises movement from a supermarket to a consuming process.
- Production kanban: authorises the supplying process to make a replacement quantity.
- Supplier kanban: communicates an external replenishment requirement.
- Signal kanban: triggers a batch or setup when a defined threshold is reached.
A basic kanban quantity calculation is: N = (D × T × (1 + S)) ÷ C where: - N = required number of containers or kanban cards;
- D = average demand rate, in units per time period;
- T = replenishment lead time, in the same time period;
- S = safety factor expressed as a decimal, such as 0.10 for 10%;
- C = standard container quantity, in units.
The result is rounded up to the next whole container or card because a partial container cannot normally function as a standard replenishment unit. The formula assumes reasonably stable demand, a known replenishment lead time, consistent container quantity and a safety factor that adequately represents variability. It should be reviewed when demand, lead time, quality yield or service requirements change. The total stock represented by the loop is approximately N × C, although actual stock may differ because of open transactions, damaged containers, counting errors and material in transit. Worked example. A workstation consumes 480 components per eight-hour shift. Replenishment takes 0.25 shift, the standard container holds 30 components and the policy includes a 12% protection factor. Thus: N = (480 × 0.25 × 1.12) ÷ 30 = 4.48 Rounding up gives five containers or kanban cards. Nominal loop capacity is 5 × 30 = 150 components. The production manager should validate the result during a pilot: if the line repeatedly starves, the cause may be inaccurate demand, excessive picking delay, poor quality or an unrealistic safety factor—not necessarily a need for permanent excess stock. 2.3 SupermarketsA supermarket is a controlled, replenished inventory point located between processes or between a supplier and a consuming operation. It contains defined items and quantities, and withdrawal creates the signal for replenishment. A supermarket decouples processes sufficiently to absorb small differences in pace while preserving pull control. A well-designed supermarket has: - fixed locations and clear maximum quantities;
- item identification and standard container sizes;
- FIFO lanes where age or shelf life matters;
- transaction discipline at withdrawal and replenishment;
- visual indication of normal and abnormal conditions;
- ownership for counting, housekeeping and escalation.
Supermarkets are not a justification for unlimited stock. Their purpose is controlled decoupling. If every process has a large supermarket, the factory may appear orderly while reproducing the same waste as a conventional warehouse. 2.4 Limits of KanbanKanban is most effective for repetitive demand, relatively stable product designs, short or dependable replenishment lead times and manageable item variety. It is less suitable as the sole control method for highly erratic demand, one-off engineered products, extremely long lead times, hazardous materials or items with severe shelf-life constraints. In such situations, a hybrid system may use MRP for planning, supplier commitments for capacity and kanban for the final repetitive loop. 3. Lot-size reduction and flow economicsLarge lots can reduce the number of setups and may provide purchasing discounts, but they increase cycle stock, queue time, obsolescence exposure and the delay before quality problems are detected. Smaller lots improve responsiveness but can increase setup frequency, handling and transaction effort. The managerial task is to reduce the total system cost, not to minimise lot size mechanically. For a repeating production cycle, average cycle stock is commonly approximated by: Icycle = Q ÷ 2 where Q is the lot or replenishment quantity in units. This special-case relationship assumes relatively constant demand, immediate replenishment or a triangular depletion pattern, and no additional safety stock. If safety stock is held, average inventory is approximately Q ÷ 2 + SS, where SS is safety stock in units. Smaller lots can be achieved through: - separating internal and external setup work;
- preparing tools, materials and instructions before the machine stops;
- using quick-release fixtures and standard settings;
- improving first-piece approval;
- developing multi-skilled changeover teams;
- simplifying product and packaging variation;
- scheduling families with sequence-dependent setups.
A useful operational measure is setup time as a percentage of available production time. However, a lower setup time is valuable only if it improves flow, service or total cost. Teams should also monitor first-pass yield after changeover, because rapid but error-prone setups create defects. Worked application: lot-size decisionA component is consumed at 200 units per day. A current lot is 1,000 units, so the approximate cycle stock is 500 units. If setup improvement makes a 400-unit lot practical, cycle stock becomes 200 units. The reduction is approximately 300 units, or 60% of the former cycle stock. If the component costs £8 per unit, the average capital tied up in cycle stock falls by approximately £2,400, before considering space, handling and obsolescence effects: (500 − 200) × £8 = £2,400 This calculation does not prove that the smaller lot is economically superior. The organisation must also assess additional setup labour, energy, quality risk, scheduling complexity and supplier constraints. 4. Line-side supply and production integrationLine-side supply places materials close to the point of use in a controlled presentation that supports the operator’s work. It should reduce searching, walking, lifting and decision-making during assembly—not turn the production line into an unregulated warehouse. 4.1 Design principlesA line-side system should define: - Point of use: the exact workstation and orientation in which the component is used.
- Presentation quantity: the amount that supports work without excessive accumulation.
- Replenishment method: two-bin, milk-run, tugger, gravity rack, kitting or automated delivery.
- Packaging standard: container size, ergonomic weight, labelling and return procedure.
- Escalation rule: what happens when material is missing, damaged, wrong or late.
- Safety requirements: manual-handling limits, aisle clearance, fire access and segregation of hazardous materials.
4.2 Kitting, batching and sequencingKitting delivers a grouped set of components for a specific order or operation. It can reduce line-side variety and picking errors, but it introduces kit preparation work and creates a risk that one missing item stops the entire kit. Sequenced delivery supplies components in the order of assembly, reducing line-side inventory but increasing dependence on schedule accuracy and transport reliability. The appropriate method depends on product variety, takt requirements, component size, defect risk and the physical layout. High-volume, repetitive items commonly suit line-side supermarkets or two-bin replenishment. High-variety, low-volume assembly may benefit from kitting, provided kit completeness is verified. 4.3 Takt time and integrationTakt time expresses the available production time per period divided by customer demand for that period: takt = Tavailable ÷ Dcustomer where Tavailable is net available production time in the period, after planned breaks and other defined exclusions, and Dcustomer is required good output in the same period. Both variables must use consistent time and unit definitions. Takt is a demand pace, not the guaranteed cycle time of every operation. Example. Net available time is 420 minutes per shift and required output is 210 good units. Takt time is: takt = 420 ÷ 210 = 2 minutes per unit Material delivery must support the work sequence at this pace. If a delivery route arrives only once per hour and a station consumes 40 units per hour, the route must deliver at least the appropriate quantity with protection against route variation. The materials plan cannot be separated from the production schedule, standard work and quality plan. 5. Vendor-managed inventory and supplier integrationVendor-managed inventory (VMI) is an arrangement in which the supplier uses agreed customer inventory and consumption data to determine replenishment timing and quantity, subject to contractual limits. The customer still owns the commercial relationship and defines service expectations; the supplier assumes greater responsibility for replenishment decisions. VMI should be distinguished from consignment inventory. Under consignment, the supplier may retain ownership until the customer consumes the material. VMI concerns replenishment responsibility, whereas consignment concerns ownership and payment timing. The two may be combined but are not identical. 5.1 Conditions for effective VMIEffective VMI requires: - accurate, timely and mutually understood consumption data;
- agreed minimum, maximum and target inventory levels;
- defined ownership, title transfer and liability for damage or obsolescence;
- service-level and quality agreements;
- clear rules for engineering changes and discontinued items;
- exception management rather than constant manual expediting;
- cybersecurity and access controls for shared information.
A simple target inventory policy may be stated as: Target inventory = demand during replenishment lead time + agreed protection stock This is a policy relationship rather than a universal optimisation formula. Protection stock should reflect demand variation, lead-time variation, supply risk and the required service level. It should not be set solely by a supplier seeking to increase shipments or by a customer seeking to transfer all risk. 5.2 Governance and performanceVMI contracts should specify forecast ownership, data frequency, forecast changes, delivery windows, quality claims, obsolete stock, emergency orders and dispute resolution. Performance should be measured jointly using service, inventory, quality and total-cost indicators. A supplier that achieves high on-time delivery by holding excessive stock at the customer is not necessarily creating a lean outcome. 6. Balancing lean efficiency with disruption resilienceLean systems can become vulnerable when managers interpret lean as “zero inventory” or “single sourcing at the lowest price.” Resilience means the ability to anticipate, absorb, recover from and adapt to disruption. Lean and resilience are not opposites: standardisation, visibility, short feedback loops and problem-solving can strengthen resilience. However, resilience sometimes requires deliberate redundancy, alternative sources or strategic buffers. 6.1 Risk-based protectionA practical risk review considers: - probability and severity of supply interruption;
- time required to qualify an alternative source;
- component substitutability;
- regulatory and safety implications;
- geographic, logistical and geopolitical exposure;
- demand volatility and forecast error;
- recovery time for equipment or tooling.
Possible controls include dual sourcing, approved substitutes, regional suppliers, capacity reservations, strategic safety stock, emergency transport agreements, cross-training and supplier business-continuity plans. These controls should be targeted at critical vulnerabilities rather than applied uniformly to every item. 6.2 Inventory and service trade-offsInventory provides a buffer, but it also creates carrying cost, obsolescence and concealment of process problems. A useful decision asks: what failure does the inventory protect against, how long must it protect the operation, and what other control could reduce that failure? For example, a second qualified supplier may reduce the need for a large buffer, while a small buffer may still be justified during qualification or transport uncertainty. A common service metric is the fill rate: the proportion of demand supplied immediately from available stock. It must be defined precisely, because line-fill rate, order-line fill rate and unit fill rate are different measures. A high fill rate for common items can coexist with repeated shortages of critical items. 7. Measurement and digital enablementLean flow should be managed through a balanced set of indicators, including: - inventory turns or days of supply;
- work-in-progress quantity;
- lead time and queue time;
- schedule adherence;
- kanban shortages and excess signals;
- supplier on-time, in-full delivery;
- incoming and process first-pass yield;
- changeover time;
- line stoppage minutes caused by materials;
- premium freight and expediting frequency;
- safety incidents and ergonomic observations.
Inventory turns may be calculated as: Inventory turns = annual cost of goods sold ÷ average inventory value The numerator and denominator must use compatible valuation bases and the same period. Turns are an aggregate indicator; a high value is not automatically good if it results from shortages or excessive risk. Digital tools can strengthen lean control through barcode scanning, RFID, electronic kanban, real-time location systems, supplier portals and analytics. Artificial intelligence may help detect abnormal consumption, predict late deliveries or identify patterns preceding shortages. It should support—not replace—physical process observation and human accountability. Poor master data, biased historical records or automated replenishment rules can amplify errors at high speed. 8. Implementation roadmapA practical implementation can proceed in stages: - Map the current flow: include physical movement, information signals, queues, ownership and failure points.
- Segment materials: classify items by demand stability, value, criticality, lead time and supply risk.
- Stabilise the process: correct master data, standardise containers, improve quality and address equipment reliability.
- Select the control method: choose kanban, supermarket, kitting, scheduled delivery or a hybrid system.
- Pilot one loop: define quantities, cards, locations, replenishment routes and escalation rules.
- Measure before and after: include service, inventory, quality, labour, safety and disruption performance.
- Reduce the causes of protection stock: improve setups, supplier reliability, maintenance and process capability.
- Audit and improve: verify signal discipline, physical quantities, data accuracy and adherence to standard work.
Change management is essential. Operators, warehouse personnel, planners, buyers and suppliers must understand why the system is changing and what to do when the standard fails. A kanban card without disciplined replenishment, or a supermarket without ownership, is only a visual display of confusion. Applied case: illustrative automotive component flowBackgroundThe following fictional case illustrates the integration of lean flow and resilience. Meridian Components assembles electrical modules in two shifts. A high-volume connector is supplied by a regional vendor. The plant holds ten days of connector inventory because shortages had previously stopped the line. ProblemA value-stream review found that actual consumption was relatively stable, but the material travelled through a central warehouse, was picked in large batches and was delivered to the line twice per shift. The plant experienced excess inventory, frequent urgent requests and occasional shortages caused by inaccurate transactions. A single supplier was used, and no formal disruption assessment existed. AnalysisAverage consumption was 1,200 connectors per day. The supplier’s normal replenishment lead time was two days, but delivery variation ranged from two to four days. The team identified three different problems: excessive internal batch movement, inaccurate inventory signals and genuine external lead-time risk. Simply reducing the ten-day stock would have been unsafe. The team created a point-of-use supermarket with standard containers of 100 connectors. A withdrawal scan generated an electronic kanban, and a milk-run delivered replenishment four times per shift. The warehouse and line quantities were jointly controlled. Supplier performance data were shared daily, and a second supplier was qualified for emergency and future volume. Approach and solutionThe internal replenishment loop was sized using the kanban relationship. At a replenishment cycle of 0.5 day and a 10% protection factor: N = (1,200 × 0.5 × 1.10) ÷ 100 = 6.6 The operational quantity was rounded up to seven containers, subject to a pilot and a separate risk buffer for supplier disruption. The plant did not treat this seven-container loop as sufficient protection for every risk; instead, it maintained a specifically governed strategic buffer while reducing uncontrolled line-side and warehouse stock. OutcomeAfter three months, internal replenishment became more frequent and predictable. Line-side shortages declined, inventory accuracy improved and the plant reduced routine expediting. The second-source qualification increased resilience, although it required engineering validation and a modest unit-cost premium. The project team continued monitoring quality, supplier capacity and emergency stock rather than declaring the system permanently complete. Learning points- A pull loop controls replenishment; it does not eliminate the need for risk analysis.
- Shorter internal response time can reduce operational stock without reducing resilience.
- Supplier qualification is a strategic control, not merely a purchasing exercise.
- Inventory reduction should be measured alongside service, quality and disruption outcomes.
Challenges, ethics and governanceLean programmes can create harmful pressure if productivity targets are imposed without regard to safety, workload or process capability. Employees must be able to report shortages, defects and unsafe conditions without retaliation. Material presentation must respect ergonomic limits, and line-side storage must not obstruct emergency routes. Supplier relationships also require ethical governance. VMI and shared data should not be used to shift unreasonable forecasting risk, impose concealed costs or pressure suppliers into unsafe labour practices. Procurement decisions should consider quality, continuity, environmental impact, labour standards and total cost, not price alone. Data exchanged through electronic kanban and supplier portals should be protected through access control, authentication, retention rules and clear ownership. Environmental performance is relevant because smaller lots may increase transport frequency and packaging use. A lean design should therefore examine route consolidation, reusable containers, load utilisation, emissions and packaging recovery. The best solution minimises total system waste rather than optimising one local metric. Chapter SummaryLean materials flow integrates JIT, pull control, supermarkets, Kanban, small lots, line-side supply and supplier collaboration. Pull systems use consumption to authorise replenishment, while supermarkets provide controlled decoupling between processes. Kanban quantity can be estimated from demand, replenishment time, protection factor and container quantity, but the result depends on reliable data and disciplined operation. Lot-size reduction lowers cycle stock and improves responsiveness when supported by rapid changeovers and stable quality. Line-side supply must improve the operator’s work without creating a hidden warehouse. VMI assigns replenishment responsibility to the supplier and requires accurate data, contractual clarity and joint performance management. Lean efficiency must be balanced with resilience through risk-based buffers, alternate sources, continuity planning and transparent governance. Measurement should include inventory, flow, service, quality, safety and disruption performance. Technology and AI can improve visibility and prediction, but they cannot compensate for poor standards, inaccurate data or weak accountability. Key TermsAndon: A visual or electronic signal indicating normal operation, an abnormal condition or a request for assistance. Cycle stock: Inventory held because replenishment occurs in lots rather than continuously. First-pass yield: The proportion of output that meets requirements without rework or repair. JIT: An operating philosophy of supplying required material in the required quantity, time and place. Kanban: A controlled signal authorising production, movement or replenishment. Line-side supply: Presentation of materials close to the point where they are consumed. Lot size: The quantity produced, purchased or moved as one batch. Milk run: A planned route that collects or delivers materials at regular intervals. Poka-yoke: Mistake-proofing that prevents or immediately detects error. Pull system: A system in which downstream consumption triggers upstream replenishment. Push system: A system in which production or movement is released by a plan or upstream decision. Resilience: The ability of a system to absorb, recover from and adapt to disruption. Safety stock: Inventory held as protection against uncertainty in demand, supply or replenishment time. Supermarket: A controlled inventory point from which authorised withdrawals trigger replenishment. Takt time: Available production time divided by required customer output. Total cost: The combined cost of purchasing, ordering, setup, holding, handling, quality, shortage and other relevant activities. Value stream: The sequence of activities and information required to deliver a product or service. Vendor-managed inventory: An arrangement in which the supplier uses agreed customer data to manage replenishment. Visual management: Making status, standards and abnormalities readily visible. Waste: Resource consumption that does not create required customer value or is not necessary for compliance or safety. Review Questions5 Short Answer Questions- What is the principal difference between a push system and a pull system?
- Define a supermarket in the context of materials management.
- State two conditions under which Kanban is likely to be effective.
- Distinguish vendor-managed inventory from consignment inventory.
- Why can large production lots conceal quality problems?
5 Long Answer Questions- Explain how JIT, standard work, quality at source and preventive maintenance support one another.
- Discuss the advantages and limitations of line-side supermarkets, kitting and sequenced delivery.
- Explain how rapid changeover enables lot-size reduction and improved materials flow.
- Describe the data, contractual and governance requirements for a successful VMI arrangement.
- Evaluate the argument that lean production is incompatible with resilience.
3 Analytical / Application Questions- A workstation consumes 720 units per shift. Replenishment takes 0.4 shift, the container quantity is 24 units and the protection factor is 15%. Calculate the required number of Kanban containers, showing the rounding decision and stating two assumptions.
- A plant has frequent shortages despite high total inventory. Analyse at least four possible causes and propose a diagnostic and improvement plan.
- Design a lean-but-resilient materials policy for a critical component supplied by one distant vendor. Include replenishment control, risk protection, supplier governance, performance measures and an escalation process.
Multiple Choice Questions with AnswersQuestion 1Which event should normally trigger replenishment in a pull system? A. The upstream department completing its daily plan B. Actual authorised consumption by the downstream process C. A supplier offering a quantity discount D. The warehouse reaching its annual budget limit Correct Answer: B. Actual authorised consumption by the downstream process Question 2A workstation consumes 480 units per shift. Replenishment takes 0.25 shift, each container holds 30 units, and the protection factor is 12%. Using N = (D × T × (1 + S)) ÷ C, how many containers are required after rounding up? A. 3 B. 4 C. 5 D. 6 Correct Answer: C. 5 Question 3What is the primary purpose of a supermarket in a lean materials system? A. To maximise the quantity stored between every process B. To replace all production planning C. To provide controlled decoupling while withdrawals trigger replenishment D. To eliminate the need for inventory records Correct Answer: C. To provide controlled decoupling while withdrawals trigger replenishment Question 4Which action most directly supports smaller economical lot sizes? A. Increasing queue sizes B. Improving changeover time C. Reducing preventive maintenance D. Increasing inspection after shipment Correct Answer: B. Improving changeover time Question 5Net available time is 420 minutes per shift and required output is 210 good units. What is the takt time? A. 0.5 minute per unit B. 2 minutes per unit C. 210 minutes per unit D. 630 minutes per unit Correct Answer: B. 2 minutes per unit Question 6Which statement correctly distinguishes VMI from consignment inventory? A. VMI concerns replenishment responsibility; consignment concerns ownership and payment timing B. VMI always means the customer owns the stock; consignment never involves suppliers C. They are exactly the same contractual arrangement D. Consignment concerns production scheduling, while VMI concerns machine maintenance Correct Answer: A. VMI concerns replenishment responsibility; consignment concerns ownership and payment timing Question 7If a repeating lot size is reduced from 1,000 units to 400 units, what happens to approximate cycle stock under Icycle = Q ÷ 2, assuming no safety stock change? A. It increases from 500 to 800 units B. It decreases from 1,000 to 400 units C. It decreases from 500 to 200 units D. It remains at 500 units Correct Answer: C. It decreases from 500 to 200 units Question 8Which is the best reason not to interpret lean as zero inventory? A. Inventory has no cost B. Some targeted protection may be justified by supply and demand risk C. Large inventories always improve quality D. Zero inventory eliminates all disruption Correct Answer: B. Some targeted protection may be justified by supply and demand risk Question 9Which measure is most directly concerned with the proportion of output meeting requirements without rework? A. First-pass yield B. Inventory turns C. Takt time D. Supplier lead time Correct Answer: A. First-pass yield Question 10Which practice is most appropriate when demand is highly erratic and replenishment lead time is very long? A. Use Kanban as the only planning method without review B. Use a hybrid system combining planning, risk analysis and controlled replenishment C. Remove all safety stock immediately D. Allow every department to create independent signals Correct Answer: B. Use a hybrid system combining planning, risk analysis and controlled replenishment
|