Subject OverviewMaster Production Scheduling examines how aggregate production plans are converted into feasible, time-phased schedules for finished goods and critical components. The subject integrates demand, inventory, capacity, materials, customer commitments, analytics, enterprise systems and managerial governance in manufacturing and service-related production environments. Learning GoalStudents will be able to design, validate, execute and improve master production schedules; balance demand, materials and capacity; make evidence-based customer and operational decisions; use contemporary planning technologies; and manage scheduling risks, ethics, governance and strategic performance. Syllabus1. Foundations of Master Production SchedulingLearning Objective: Explain the purpose, scope, terminology and evolution of MPS; distinguish forecasts, production plans, master schedules, MRP and detailed shop-floor schedules; identify planning horizons, time buckets and manufacturing environments. Category: foundation 2. Manufacturing Strategy and Planning ArchitectureLearning Objective: Position MPS within business strategy, operations strategy, sales and operations planning, integrated business planning and planning hierarchies; relate scheduling choices to make-to-stock, make-to-order, assemble-to-order and engineer-to-order models. Category: foundation 3. Demand Management and Forecast IntegrationLearning Objective: Integrate forecasts, customer orders, promotions, interplant demand and service-part requirements; apply demand consumption, segmentation, aggregation, disaggregation and forecast-error analysis while preventing double counting. Category: core 4. MPS Data, Records and Schedule ConstructionLearning Objective: Construct time-phased MPS records using beginning inventory, scheduled receipts, lot sizes, safety stock, lead times and projected available balances; select master-scheduled items and establish planning calendars and horizons. Category: core 5. Bills of Material, Product Structures and MRP LinkagesLearning Objective: Interpret bills of material, planning bills, modular bills and low-level coding; explain MPS explosion into material requirements and assess the effects of engineering changes, lead times and data accuracy. Category: core 6. Inventory Policies and Lot-Sizing DecisionsLearning Objective: Evaluate lot-for-lot, fixed-order quantity, economic order quantity, periodic ordering and dynamic lot-sizing policies; balance setup, holding, obsolescence, shortage and working-capital implications. Category: core 7. Capacity Planning and Schedule FeasibilityLearning Objective: Apply rough-cut capacity planning using capacity bills, resource profiles and overall factors; identify bottlenecks, compare finite and infinite capacity assumptions, and reconcile material and capacity constraints. Category: core 8. Time Fences, Schedule Stability and Change ControlLearning Objective: Use frozen, slushy and liquid zones, demand and planning time fences, firm planned orders and schedule-freezing policies; measure nervousness and evaluate cost, service and operational consequences of schedule changes. Category: application 9. Available-to-Promise and Customer Order ManagementLearning Objective: Calculate discrete and cumulative available-to-promise and capable-to-promise quantities; support order promising, allocation, priority setting, backlog management and profitable customer-service decisions. Category: application 10. Uncertainty, Buffers and Scenario PlanningLearning Objective: Manage variability in demand, supply, quality and lead times through safety stock, safety time, hedging, decoupling and alternative sourcing; conduct sensitivity, what-if, simulation and contingency analyses. Category: advanced 11. Advanced Scheduling Models and OptimizationLearning Objective: Formulate scheduling decisions using linear and mixed-integer programming, constraint-based planning, theory of constraints and multi-objective models; evaluate trade-offs among cost, service, utilization, setups and stability. Category: advanced 12. ERP, APS and Digital Planning SystemsLearning Objective: Assess MPS functionality in ERP and advanced planning and scheduling systems; address data integration, master-data governance, system parameters, digital twins, cloud platforms, interoperability and implementation risks. Category: contemporary 13. Analytics, AI and Intelligent SchedulingLearning Objective: Use dashboards, predictive analytics, machine learning and optimization for demand sensing, exception detection, parameter tuning and schedule recommendations; evaluate explainability, human oversight, cybersecurity, bias and data limitations. Category: contemporary 14. Performance, Governance and Strategic ImprovementLearning Objective: Design governance roles, planning routines and KPIs for schedule attainment, stability, service, inventory, capacity and working capital; lead cross-functional reviews, audit decisions, resolve ethical conflicts and build resilient, sustainable and continuously improving planning systems. Category: strategic 15. Emerging Models and Future of Master SchedulingLearning Objective: Critically evaluate Industry 4.0, autonomous planning, real-time replanning, additive manufacturing, servitization, circular production, carbon-aware scheduling and resilient supply networks through cases and implementation roadmaps. Category: contemporary
|