Managerial Economics

Chapter 11
Decisions under Risk, Uncertainty and Time

Executive Post Graduate Program in Management (EPGPM)
Managerial Economics   •   Post Graduate

Decisions under Risk, Uncertainty and Time

Introduction

Managerial decisions often involve consequences that occur in the future, depend on uncertain events, and require resources that cannot easily be recovered. A firm may need to choose whether to launch a product, enter a market, build capacity, acquire another company, invest in a technology, or wait for more information. These decisions cannot be evaluated adequately by comparing immediate accounting profits alone.

Managerial economics provides a disciplined framework for such choices. Under risk, probabilities of relevant outcomes are known or can be estimated. Under uncertainty, probabilities are unavailable, contested, or highly unreliable. Time matters because a monetary amount received today is generally more valuable than the same amount received later. Irreversibility matters because an investment may be partly or wholly sunk once made. Together, these features require the use of expected value, expected utility, decision trees, Bayesian updating, simulation, sensitivity analysis, discounted cash flow, net present value, and real-options reasoning.

The central principle is not that quantitative models eliminate uncertainty. Rather, they make assumptions explicit, expose trade-offs, improve consistency, and clarify where managerial judgment is most important.

Learning objectives

After studying this chapter, the reader should be able to:

  1. Distinguish certainty, risk, ambiguity and uncertainty.
  2. Calculate expected monetary value and explain its limitations.
  3. Apply expected utility and risk preferences to managerial decisions.
  4. Construct and interpret decision trees, including the value of information.
  5. Update beliefs using Bayes’ theorem.
  6. Use simulation and sensitivity analysis to assess uncertain outcomes.
  7. Discount future cash flows and calculate net present value.
  8. Explain how irreversibility, flexibility and waiting create real-option value.
  9. Integrate financial, strategic, ethical and governance considerations in major investment decisions.

1. Certainty, risk and uncertainty

A decision has several elements: available actions, uncertain states of the world, probabilities assigned to those states, and consequences associated with each action–state combination.

Under certainty, the relevant state and consequence are known. Under risk, the possible states are known and probabilities can be assigned with reasonable confidence. Under uncertainty, either the possible states are incompletely known or their probabilities are not credible. Ambiguity is a particularly important form of uncertainty in which different reasonable models or probability assessments produce different conclusions.

For example, an insurer may have extensive historical data on automobile claims and therefore operate largely under risk. A firm considering a novel biotechnology platform may face uncertainty because there is little relevant history and the state space itself may be unclear.

ConditionStates known?Probabilities credible?Typical managerial response
CertaintyYesNot requiredDirect comparison of consequences
RiskYesGenerally yesExpected value, utility, simulation
UncertaintyPartly or noNoScenarios, robust strategies, learning
AmbiguityYes or partlyMultiple plausible probabilitiesModel comparison and sensitivity analysis

Risk is not necessarily undesirable. A risky project may have a high expected return. What matters is the relationship among expected payoff, dispersion, downside exposure, liquidity, and the firm’s capacity to absorb losses.

2. Expected monetary value

Let an action a produce monetary outcome Xᵢ in state i, with probability pᵢ. The expected monetary value (EMV) is:

EMV(a) = ∑ᵢ₌₁ⁿ pᵢXᵢ

Here, pᵢ ≥ 0, ∑pᵢ = 1, and Xᵢ is measured in a common monetary unit. EMV is applicable when probabilities are meaningful and when the decision maker is risk neutral, or when outcomes are sufficiently diversified that only their mean matters.

Worked example: project selection

Suppose a firm is choosing between two projects. Project A produces a profit of ₹12 million in a strong market and ₹4 million in a weak market. Project B produces ₹20 million in a strong market and a loss of ₹2 million in a weak market. The probability of a strong market is 0.6.

For Project A:

EMV(A) = 0.6(₹12) + 0.4(₹4) = ₹7.2 + ₹1.6 = ₹8.8 million

For Project B:

EMV(B) = 0.6(₹20) + 0.4(−₹2) = ₹12 − ₹0.8 = ₹11.2 million

A risk-neutral decision maker selects B. However, B also exposes the firm to a possible ₹2 million loss. EMV alone does not show whether that downside threatens solvency, violates a debt covenant, or is unacceptable to stakeholders.

Expected value is linear: the expected value of a mixture of actions equals the corresponding mixture of their expected values. This property is useful for portfolio analysis, but it can be misleading for a single irreversible project. A firm cannot spend an average outcome; it experiences one realized outcome.

3. Risk preferences and expected utility

Expected utility incorporates attitudes toward risk. If U(X) is the utility of monetary outcome X, expected utility is:

EU(a) = ∑ᵢ₌₁ⁿ pᵢU(Xᵢ)

A risk-averse decision maker has a concave utility function, meaning that the marginal utility of wealth decreases as wealth rises. Formally, risk aversion is associated with U′(W) > 0 and U″(W) < 0, where W is wealth. A risk-neutral decision maker has a linear utility function, U″(W) = 0. A risk-seeking decision maker has a convex utility function, U″(W) > 0, over the relevant range.

A common illustrative utility function is logarithmic utility:

U(W) = ln(W), W > 0

The function is increasing and concave. Its use is illustrative, not universal; the appropriate utility function depends on wealth, risk capacity, objectives and institutional context.

Certainty equivalent and risk premium

The certainty equivalent (CE) is the certain wealth level that gives the same utility as the risky prospect:

U(CE) = EU

The risk premium is:

Risk premium = EMV − CE

For a risk-averse decision maker, the risk premium is normally positive. The decision maker would sacrifice up to that amount to replace the risky prospect with a certain payment.

Consider a project with equal probabilities of outcomes ₹4 million and ₹16 million. Its EMV is ₹10 million. With U(W) = √W, expected utility is:

EU = 0.5√4 + 0.5√16 = 0.5(2) + 0.5(4) = 3

The certainty equivalent satisfies √CE = 3, so CE = ₹9 million. The risk premium is ₹10 − ₹9 = ₹1 million. Thus, a risk-averse decision maker would regard a certain ₹9 million as equivalent to the gamble.

Risk should be measured in relation to the decision maker’s wealth and exposure. A ₹1 million loss may be immaterial to a large diversified corporation but catastrophic to a small enterprise. This is one reason why capital constraints, liquidity and correlation among projects must be included in practical analysis.

4. Decision trees and sequential decisions

A decision tree represents choices and uncertain events in chronological order. Decision nodes are usually shown conceptually as squares; chance nodes as circles; terminal branches as outcomes. The tree is solved by working backward, a procedure called rollback analysis.

At a chance node, calculate the probability-weighted value of successor branches. At a decision node, select the branch with the highest value, subject to strategic, legal and operational constraints.

Illustrative decision tree

A firm may launch immediately or conduct a market test costing ₹1 million. If it launches immediately, a strong market with probability 0.6 yields ₹10 million and a weak market yields ₹2 million. If it tests, the test is accurate 80% of the time. The test produces a positive signal with probability 0.56 and a negative signal with probability 0.44. The firm then launches or abandons.

Without testing, the expected payoff before the launch cost is:

0.6(₹10) + 0.4(₹2) = ₹6.8 million

If the test is positive, the posterior probability of a strong market is:

P(S | +) = [P(+ | S)P(S)] / P(+)
= [0.8 × 0.6] / 0.56
= 0.8571

If the test is negative:

P(S | −) = [P(− | S)P(S)] / P(−)
= [0.2 × 0.6] / 0.44
= 0.2727

After a positive result, launching has expected payoff 0.8571(₹10) + 0.1429(₹2) = ₹8.857 million, so launch. After a negative result, launching has expected payoff 0.2727(₹10) + 0.7273(₹2) = ₹4.182 million. If abandonment has payoff ₹0, the firm still launches in both cases. The test therefore adds information but does not change the action; its value is unlikely to justify its cost in this particular design.

This example illustrates an important principle: information has economic value only if it changes, or improves, decisions. Accurate information that confirms an action already preferred may have little decision value.

5. Bayesian updating and the value of information

Bayesian analysis updates prior beliefs after observing evidence. For a state S and signal E:

P(S | E) = [P(E | S)P(S)] / P(E)

P(S) is the prior probability, P(E | S) is the likelihood of observing E if S is true, P(E) is the total probability of E, and P(S | E) is the posterior probability.

For mutually exclusive states S₁,…,Sₙ:

P(E) = ∑ⱼ P(E | Sⱼ)P(Sⱼ)

Bayesian updating is useful for market research, credit assessment, fraud detection, medical technology adoption and demand forecasting. Its quality depends on the prior distribution, the likelihood model and the independence assumptions used.

Expected value of information

The expected value with sample information (EVSI) is the expected value after observing an imperfect signal, before paying for it. The expected value of perfect information (EVPI) is:

EVPI = E[maxₐ X(a,S)] − maxₐ E[X(a,S)]

The first term is the expected payoff if the correct action can be selected after the state is revealed. The second is the best expected payoff when the action must be selected before learning the state. EVPI is an upper bound on what any information system can be worth. An information purchase is economically justified only if its net value, after acquisition and implementation costs, is positive.

6. Simulation and sensitivity analysis

Monte Carlo simulation

When a project has several uncertain inputs—such as price, volume, cost, exchange rate and completion time—calculating a small number of discrete scenarios may be inadequate. Monte Carlo simulation assigns probability distributions to uncertain inputs, draws random values repeatedly, calculates the resulting outcome, and summarizes the distribution of outcomes.

A basic procedure is:

  1. Define the decision model and output, such as NPV.
  2. Identify uncertain inputs and plausible distributions.
  3. Specify dependencies and correlations among inputs.
  4. Generate random draws using a reproducible seed where appropriate.
  5. Recalculate the output for many trials.
  6. Report the mean, median, standard deviation, percentiles and probability of loss.
  7. Test whether conclusions are robust to alternative distributions and correlations.

Simulation does not create knowledge from nothing. Its output is conditional on model structure and input assumptions. False precision can arise when a model reports a probability such as 63.27% despite weak evidence for the underlying distributions.

Sensitivity analysis

Sensitivity analysis changes one or more assumptions to determine their effect on the decision. One-way sensitivity analysis varies one input while holding others constant. Two-way analysis varies two inputs. Scenario analysis changes a coherent set of assumptions—for example, recession, base case and expansion. Break-even analysis identifies the value of an input at which the decision changes.

If NPV is zero at a sales volume of 80,000 units but positive above that level, management can compare the break-even volume with realistic market capacity. Tornado diagrams, although not essential to the mathematics, can rank variables by their influence on the output.

Sensitivity analysis is especially important when a project’s conclusion depends on a narrow margin. It also reveals which information would most improve the decision.

7. Time value of money

A monetary amount has a time value because funds can earn a return, inflation changes purchasing power, and future receipts are uncertain. Discounting converts future cash flows into present values.

The present value of a single future cash flow is:

PV = CFₜ / (1 + r)ᵗ

CFₜ is the cash flow at time t, r is the per-period discount rate expressed as a decimal, and t is the number of periods. The rate and period must be consistent: a monthly cash flow requires a monthly rate, unless an appropriate effective conversion is made.

For multiple cash flows:

PV = ∑ₜ₌₀ⁿ CFₜ / (1 + r)ᵗ

The time-zero cash flow is not discounted because its t value is zero. Discounting is not the same as simply reducing nominal amounts for inflation; the discount rate may incorporate opportunity cost, risk and inflation.

For a level perpetuity with first payment one period from now:

PV = C / r

For a level annuity with n payments:

PV = C[1 − (1 + r)⁻ⁿ] / r

These formulas require level payments and a constant per-period rate. Growing cash flows require a different expression and must satisfy the condition r > g for a growing perpetuity.

8. Net present value and investment choice

Net present value is the present value of incremental cash inflows minus the present value of incremental cash outflows:

NPV = ∑ₜ₌₀ⁿ CFₜ / (1 + r)ᵗ

A conventional project is financially attractive when NPV > 0, assuming the discount rate appropriately reflects the risk of the cash flows and the firm can undertake the project. NPV measures value added in present monetary terms. It is generally preferred to payback period because it recognizes the time value of money and all relevant cash flows.

Worked NPV example

A machine costs ₹10 million today and generates ₹4 million at the end of each of the next three years. Its required return is 10% per year. Ignoring taxes, salvage value and working-capital effects:

NPV = −10 + 4/1.10 + 4/(1.10)² + 4/(1.10)³
= −10 + 3.636 + 3.306 + 3.005
= approximately ₹−0.053 million

The project is approximately ₹53,000 below the required return and would be rejected on a strict NPV rule. Rounding should be controlled because a small apparent difference may be economically immaterial relative to forecast error.

Relevant cash flows are incremental after-tax cash flows, including opportunity costs, externalities, changes in working capital, salvage proceeds and avoided costs. Sunk costs are excluded because they cannot be changed by the current decision. Financing flows are normally excluded when the discount rate is a weighted average cost of capital; otherwise, double counting can occur.

9. Risk-adjusted discount rates and certainty equivalents

Two broad approaches adjust for risk. The risk-adjusted discount-rate method uses a higher rate for riskier cash flows. The certainty-equivalent method converts each risky cash flow into a risk-free-equivalent amount and discounts at a risk-free rate. These methods are conceptually distinct and should not be mixed without care.

A single higher discount rate may be inappropriate when project risk changes over time or differs across cash flows. For example, early construction cash flows may be relatively predictable while terminal demand is highly uncertain. In such cases, scenario-weighted cash flows, certainty equivalents, or a probability model may be more transparent.

The discount rate should not be used to hide operational uncertainty. Management should separately model demand, costs, timing, competition and strategic responses wherever practical.

10. Irreversibility and real options

A conventional NPV calculation often assumes that the firm commits now and follows a fixed plan. Real-options analysis recognizes that managers may have valuable flexibility. A real option is the right, but not the obligation, to take a future business action.

Important real options include:

  • Option to defer: wait for better information before investing.
  • Option to expand: increase capacity if demand is strong.
  • Option to contract: reduce scale if demand is weak.
  • Option to abandon: sell assets or exit a project.
  • Option to switch: change inputs, outputs or technologies.
  • Option to stage: invest sequentially rather than all at once.

Irreversibility creates an opportunity cost of committing early. Even if a project’s static NPV is slightly negative, waiting may have value because uncertainty can resolve while the firm retains the opportunity to invest. Conversely, delay may destroy value if competitors move first, learning curves are important, or the resource is perishable.

A simple expansion option illustrates the logic. Suppose a firm can make a small pilot investment today and retain the right to expand only if demand proves strong. The pilot’s direct NPV may be modest, but it creates an asymmetric payoff: the firm can participate in upside while limiting downside. The value of flexibility is not automatically positive in every situation; preserving flexibility may require technology, contracts, excess capacity or organizational capabilities that have real costs.

Real-options analysis can use decision trees, dynamic programming or option-pricing analogies. Financial option models should not be transferred mechanically because real assets may be non-traded, exercise may be managerial rather than automatic, and markets may be incomplete. The analogy is useful when there is an underlying asset, a right to act, uncertainty, a time window and an exercise cost.

11. Integrated applied case: a battery-storage investment

Background

The following is an illustrative case. Meridian Power, a regional electricity company, is considering a ₹120 million battery-storage facility. The facility can reduce peak-energy purchases and earn ancillary-service revenue. Its operating life is five years, and the company uses a 10% annual discount rate for cash flows of comparable risk.

Problem

Expected annual after-tax cash flow is uncertain:

ScenarioProbabilityAnnual cash flow
High demand0.30₹45 million
Base demand0.50₹30 million
Low demand0.20₹12 million

The facility has no terminal value in this simplified analysis. Management must decide whether to build immediately or first run a ₹5 million, one-year pilot. The pilot provides a useful demand signal and permits cancellation before the full investment, but delays construction by one year.

Analysis without the pilot

The expected annual cash flow is:

E(CF) = 0.30(45) + 0.50(30) + 0.20(12) = ₹30.9 million

The present value of five annual expected cash flows, beginning one year from now, is:

PV = ₹30.9[1 − (1.10)⁻⁵] / 0.10
= approximately ₹117.30 million

Therefore:

NPV = ₹117.30 − ₹120 = approximately ₹−2.70 million

A static expected-value analysis rejects immediate construction.

Pilot and staged commitment

Suppose the pilot has a 70% probability of producing a favourable signal. After a favourable signal, management estimates a 60% probability of high demand and a 40% probability of base demand. After an unfavourable signal, it estimates a 10% probability of high demand, 40% base demand and 50% low demand. Management will build after a favourable signal and abandon after an unfavourable signal.

The expected annual cash flow conditional on a favourable signal is:

0.60(45) + 0.40(30) = ₹39 million

The present value at the end of the pilot of five operating-year cash flows is approximately:

₹39[1 − (1.10)⁻⁵] / 0.10 = approximately ₹148.00 million

The investment cost at the end of the pilot is ₹120 million, giving an end-of-year-one NPV of approximately ₹28 million conditional on a favourable signal. Discounting that amount one year gives approximately ₹25.45 million today. Weighting by the 0.70 favourable-signal probability gives approximately ₹17.82 million. Subtracting the ₹5 million pilot cost gives an approximate pilot strategy value of ₹12.82 million, before modelling any detailed construction-price changes or operating interactions.

This result is materially better than the static immediate-investment NPV because the pilot creates a valuable abandonment option. The numerical result is illustrative and depends strongly on signal quality, timing, the assumed discount rate and whether the five operating years begin after the pilot.

Governance and implementation

Before approval, Meridian should validate the signal model against external evidence, specify pilot success criteria in advance, conduct downside stress tests, examine grid and environmental regulation, and identify who may authorize expansion. It should also assess battery degradation, fire safety, data integrity, cyber risk and the distributional effect of electricity pricing.

Learning points

  1. Expected cash flow can hide downside exposure and flexibility value.
  2. Information is valuable when it changes the investment action.
  3. Staged investment can convert an irreversible commitment into a sequence of smaller commitments.
  4. Real-options value must be supported by operationally credible rights and capabilities.
  5. Governance determines whether analytical flexibility is actually preserved.

12. Ethical, regulatory and governance considerations

Uncertain decisions affect employees, customers, communities, lenders and investors. Managers should not manipulate probabilities or discount rates to obtain approval for a preferred project. Assumptions, data sources, model limitations and conflicts of interest should be documented.

Important controls include independent model review, version control, approval thresholds, scenario stress tests and post-investment comparison of forecasts with outcomes. Probabilities should not be presented as objective facts when they are subjective judgments. Sensitive information used in Bayesian or AI-supported forecasting must be collected and processed lawfully, with attention to privacy, bias and explainability.

Regulation may impose capital, safety, environmental, competition or consumer-protection requirements. A project with positive NPV may still be unacceptable if it creates unpriced environmental harm, violates rights, or exposes the organization to intolerable systemic risk. Conversely, ethical obligations may require investments whose financial returns alone are inadequate, such as safety improvements or accessibility measures. Such choices should be made transparently rather than disguised through manipulated financial assumptions.

13. Contemporary developments and best practice

Digital twins, real-time market data, machine-learning forecasts and automated scenario engines can improve monitoring and updating. However, predictive accuracy does not guarantee decision quality. Models trained on stable historical conditions may fail during structural breaks, pandemics, geopolitical shocks or technological discontinuities.

Best practice combines quantitative and qualitative analysis:

  • define the decision and its timing before building the model;
  • separate facts, estimates and value judgments;
  • use probability distributions rather than a single forecast where justified;
  • model dependencies and correlations explicitly;
  • report downside measures, not only expected returns;
  • test alternative discount rates and scenarios;
  • identify the value of additional information;
  • preserve flexibility through staged commitments where appropriate;
  • assign accountability for assumptions and implementation;
  • conduct post-decision reviews without confusing bad outcomes with bad decisions.

A good decision can produce a poor outcome because of bad luck; a poor decision can produce a good outcome by chance. Evaluation should therefore consider the information available and the process used at the time of decision.

Challenges and limitations

These methods face several limitations. Probabilities may be estimated from small or non-stationary samples. Outcomes may be correlated, making independent simulation invalid. Utility functions are difficult to elicit, particularly for organizations with multiple stakeholders. Discount rates are contestable and may embed systematic optimism. Decision trees can become unwieldy when there are many stages. Real-options models may overstate flexibility if managerial action is slow, constrained or costly.

Models can also create behavioural risks. Anchoring on a single EMV, overconfidence in precise forecasts, confirmation bias in selecting scenarios, and strategic manipulation of assumptions are common. Robust decision-making therefore requires model comparison, sensitivity analysis, transparent documentation and informed judgment.

Chapter Summary

Managerial decisions under risk and uncertainty require more than a comparison of expected profits. Expected monetary value is appropriate for risk-neutral settings with credible probabilities, while expected utility incorporates risk preferences and produces concepts such as certainty equivalents and risk premiums. Decision trees organize sequential choices and uncertain events, and rollback analysis identifies optimal actions conditional on information. Bayesian updating revises prior beliefs using new evidence, while EVPI and EVSI clarify the economic value of information.

Simulation represents distributions of uncertain inputs and produces a distribution of outcomes; sensitivity and scenario analysis identify the assumptions that matter most. Discounting converts future cash flows to present values, and NPV provides a disciplined criterion for value creation when cash flows and the discount rate are appropriately specified. Irreversibility and managerial flexibility create real options to defer, expand, contract, abandon, switch or stage investment. Finally, quantitative analysis must be supported by governance, ethical judgment, regulatory compliance and careful recognition of model limitations.

Key Terms

Risk: A condition in which possible outcomes are known and credible probabilities can be assigned.

Uncertainty: A condition in which outcomes, probabilities or both are incompletely known.

Ambiguity: Uncertainty arising from multiple plausible models or probability assessments.

Expected monetary value: The probability-weighted average of monetary outcomes.

Expected utility: The probability-weighted average of utilities associated with outcomes.

Risk aversion: Preference for a certain outcome over a risky outcome with the same expected value.

Certainty equivalent: The certain amount providing the same utility as a risky prospect.

Risk premium: The difference between expected monetary value and certainty equivalent.

Decision tree: A chronological representation of decisions, chance events and consequences.

Rollback analysis: Solving a decision tree by working backward from terminal outcomes.

Bayesian updating: Revision of prior beliefs after observing evidence.

Prior probability: Belief assigned to a state before new evidence is observed.

Posterior probability: Updated belief after evidence is observed.

Expected value of information: The improvement in expected decision value attributable to information.

Monte Carlo simulation: Repeated random sampling from input distributions to estimate an output distribution.

Sensitivity analysis: Examination of how changes in assumptions affect a decision outcome.

Discount rate: The per-period rate used to convert future cash flows into present values.

Net present value: Present value of incremental cash inflows minus present value of incremental outflows.

Real option: A right, but not an obligation, to undertake a future operating or investment action.

Irreversibility: The extent to which an investment cannot be recovered or reversed once made.

Review Questions

5 Short Answer Questions

  1. Distinguish risk from uncertainty and ambiguity.
  2. What assumptions are required for expected monetary value to be a reliable decision rule?
  3. Define certainty equivalent and risk premium.
  4. Why is the value of information limited when it does not change the preferred action?
  5. State two reasons why NPV is generally superior to the payback period.

5 Long Answer Questions

  1. Explain expected utility theory and show how concavity of utility represents risk aversion.
  2. Describe the construction and rollback solution of a sequential decision tree.
  3. Explain Bayesian updating and discuss the managerial importance of prior probabilities and signal quality.
  4. Compare simulation, sensitivity analysis and scenario analysis, including their limitations.
  5. Explain real options and critically assess why a static NPV may undervalue an irreversible investment with managerial flexibility.

3 Analytical / Application Questions

  1. A project has outcomes of ₹6 million and ₹18 million with probabilities 0.7 and 0.3. Calculate its expected monetary value. If utility is U(W) = √W, calculate expected utility and the certainty equivalent.
  2. A firm can invest ₹50 million today to receive ₹22 million annually for three years. If the discount rate is 12%, calculate NPV and recommend an action, stating relevant assumptions.
  3. Design a decision tree for a new-product launch that includes a paid market test, Bayesian updating, and the option to abandon. Explain what data would be required to estimate the value of the test.

Multiple Choice Questions with Answers

Question 1

Which condition most directly characterizes decision-making under risk?

A. All future outcomes are certain

B. Possible outcomes are known and credible probabilities can be assigned

C. Neither outcomes nor probabilities can be identified

D. The decision maker has no objectives

Correct Answer: B. Possible outcomes are known and credible probabilities can be assigned

Question 2

A project pays ₹10 million with probability 0.6 and ₹2 million with probability 0.4. What is its expected monetary value?

A. ₹5.2 million

B. ₹6.0 million

C. ₹6.8 million

D. ₹8.0 million

Correct Answer: C. ₹6.8 million

Question 3

For a risk-averse decision maker, the utility function over wealth is generally:

A. Convex

B. Concave

C. Constant and decreasing

D. Undefined

Correct Answer: B. Concave

Question 4

What is the correct Bayesian expression for the posterior probability of state S after evidence E?

A. P(S)P(E)

B. P(E|S) ÷ P(S)

C. P(S|E) = P(S) ÷ P(E|S)

D. P(S|E) = P(E|S)P(S) ÷ P(E)

Correct Answer: D. P(S|E) = P(E|S)P(S) ÷ P(E)

Question 5

The value of perfect information is best described as:

A. The cost of collecting any market data

B. The expected value of choosing after the state is known minus the value of choosing before it is known

C. The difference between accounting profit and revenue

D. The discount rate applied to uncertain cash flows

Correct Answer: B. The expected value of choosing after the state is known minus the value of choosing before it is known

Question 6

A cash flow of ₹121 received two years from now is discounted at 10% per year. Its present value is approximately:

A. ₹90

B. ₹100

C. ₹110

D. ₹133

Correct Answer: B. ₹100

Question 7

Which item is normally excluded from an incremental NPV calculation?

A. Opportunity cost of using an existing asset

B. Additional working-capital investment

C. A sunk cost already incurred

D. After-tax salvage proceeds

Correct Answer: C. A sunk cost already incurred

Question 8

Which real option gives a firm the right to wait before making an irreversible investment?

A. Option to defer

B. Option to abandon

C. Option to contract

D. Option to switch

Correct Answer: A. Option to defer

Question 9

What is the principal purpose of Monte Carlo simulation in project analysis?

A. To guarantee the correct forecast

B. To replace all managerial judgment

C. To estimate the distribution of outcomes from uncertain inputs

D. To eliminate correlation among variables

Correct Answer: C. To estimate the distribution of outcomes from uncertain inputs

Question 10

A project costs ₹100 today and produces ₹60 at the end of each of two years. At a 10% discount rate, its NPV is approximately:

A. ₹4.13

B. ₹8.26

C. ₹10.00

D. ₹20.00

Correct Answer: B. ₹8.26

Managerial Economics
Chapter 11 of 15