6. Total Productive Maintenance and Lean ReliabilityIntroduction and ContextMaintenance management has traditionally been viewed as a technical function concerned with repairing equipment after failure or preventing failure through planned servicing. Modern production systems require a broader perspective. Equipment availability, process quality, operating speed, safety, energy use, and employee involvement are interconnected. A machine that is technically reliable but poorly operated may still produce defects, suffer frequent minor stoppages, or fail to deliver its designed output. Total Productive Maintenance (TPM) addresses this wider performance problem by making equipment effectiveness a shared responsibility of production, maintenance, engineering, quality, and management. TPM is closely related to lean production because both seek to remove waste and create stable, predictable processes. Lean reliability extends this relationship by treating reliable equipment as a prerequisite for flow, just-in-time production, short lead times, and consistent quality. TPM does not mean that operators become substitute maintenance technicians. Rather, it establishes appropriate ownership: operators care for basic equipment conditions and detect abnormalities, while maintenance specialists perform diagnosis, technical restoration, improvement, and asset-management activities. The central managerial question is therefore not simply, “How can a failed machine be repaired quickly?” It is, “How can the production system prevent losses, expose abnormal conditions early, and continuously improve the capability of people and equipment?” This chapter develops the concepts, practices, measures, and implementation logic required to answer that question. Learning ObjectivesAfter studying this chapter, students should be able to: 1. Explain the philosophy, objectives, and pillars of TPM. 2. Distinguish autonomous maintenance from specialist maintenance. 3. Apply 5S, standard work, visual controls, and abnormality management to equipment care. 4. Calculate and interpret Overall Equipment Effectiveness (OEE). 5. Analyse the six major equipment losses and select suitable improvement actions. 6. Design focused-improvement and lean-reliability initiatives. 7. Evaluate managerial, technological, ethical, and organizational issues in TPM implementation. 8. Recommend an implementation approach for a production facility. From Reactive Maintenance to Total Productive PerformanceReactive maintenance restores an asset after failure. Although sometimes unavoidable, excessive dependence on reactive work creates emergency overtime, uncertain delivery, secondary damage, safety exposure, and unstable quality. Preventive maintenance reduces the probability of failure through time- or usage-based tasks. Predictive or condition-based maintenance improves this further by using evidence about actual equipment condition. TPM adds a socio-technical dimension: equipment performance depends on design, operating discipline, maintenance capability, workplace conditions, problem-solving, and management systems. The word “total” has three related meanings. First, total effectiveness concerns the entire equipment performance equation, not merely uptime. Second, total productive maintenance involves all departments that influence equipment performance. Third, total participation requires involvement from senior managers, engineers, maintenance personnel, supervisors, and operators. TPM is thus a management system, not a collection of housekeeping activities. A useful distinction is between failure and loss. A failure is a condition in which equipment cannot perform its required function. A loss is any factor that prevents the equipment from delivering its ideal productive capability. A machine may be running and yet creating losses through reduced speed, short stops, excessive setup time, defects, or startup instability. Lean reliability focuses on these hidden losses as well as visible breakdowns. The TPM ArchitectureDifferent institutions describe TPM using slightly different pillar arrangements. A widely used framework contains the following eight pillars: 1. Autonomous maintenance: Operators perform routine inspection, cleaning, lubrication, tightening, and early detection of abnormalities. 2. Planned maintenance: Maintenance work is organized through preventive, predictive, corrective, and improvement activities based on risk and equipment condition. 3. Focused improvement: Cross-functional teams remove chronic losses using structured problem-solving and data analysis. 4. Early equipment management: Reliability, maintainability, operability, safety, and lifecycle cost are considered during equipment design and procurement. 5. Quality maintenance: Equipment conditions are controlled so that defects are prevented rather than detected only after production. 6. Training and education: People acquire the technical, analytical, and leadership capabilities required for reliable operation. 7. Safety, health, and environment: Equipment improvement must reduce risk and protect employees, communities, and the environment. 8. TPM in administrative and support functions: Planning, purchasing, stores, finance, and information systems remove administrative losses that restrict production performance. These pillars should not be implemented as isolated programmes. For example, autonomous maintenance may identify a recurring leak, but planned maintenance must provide the technical response; focused improvement must investigate the cause; training must develop operator competence; and purchasing may need to improve spare-parts quality. The pillars form a connected operating system. Autonomous Maintenance and Operator OwnershipAutonomous maintenance is a structured transfer of selected routine care activities to trained operators. Its purpose is not to reduce the maintenance department’s importance. It is to ensure that those closest to the process can preserve basic conditions, recognize deviations, and escalate problems before they become failures. A typical progression includes the following stages: - Initial cleaning and inspection: Cleaning is used to expose leaks, looseness, cracks, contamination, unusual noise, and other abnormalities.
- Elimination of sources of contamination: The team removes causes of dust, chips, oil leakage, water ingress, and difficult-to-access areas.
- Establishment of cleaning and lubrication standards: Responsibilities, locations, methods, frequencies, and acceptance criteria are documented.
- General inspection: Operators learn basic principles of hydraulics, pneumatics, electrical systems, fasteners, bearings, sensors, and safety devices.
- Autonomous inspection: Operators conduct routine checks and record abnormalities using visual standards or digital forms.
- Workplace organization and standardization: Inspection, production, quality, and safety routines are integrated into normal work.
- Self-management: Teams review trends, improve standards, and participate in loss elimination.
The quality of autonomous maintenance depends on competence and boundaries. Operators should not perform work involving hazardous energy, specialized diagnosis, or statutory authorization unless properly qualified. Lockout/tagout or equivalent energy-isolation requirements remain mandatory. A clear escalation system should define what the operator can correct, what must be reported, and the expected response time. Operator ownership is strengthened when workers can see the effect of their actions. Boards or digital displays may show minor-stop frequency, lubrication compliance, first-pass yield, and open abnormalities. However, measures should support learning rather than create blame. If operators are punished for reporting abnormalities, the organization will receive fewer reports while actual equipment conditions deteriorate. 5S, Visual Management, and Standard Work5S—sort, set in order, shine, standardize, and sustain—is often introduced as housekeeping. In TPM, its deeper value is abnormality detection and maintenance of basic equipment conditions. A clean, organized workplace makes oil leaks, missing fasteners, damaged guards, unusual wear, and misplaced tools more visible. It also reduces search time and unsafe improvisation. Visual management converts an expected condition into something that can be assessed quickly. Examples include marked lubrication points, transparent guards, direction arrows, colour-coded gauges, line markings, shadow boards, inspection windows, and tags for unresolved abnormalities. A visual control is effective only when the user can understand the condition and the required response without lengthy interpretation. Standard work defines the best currently known method for performing a task safely, consistently, and efficiently. For equipment care, a standard should identify the point to inspect, the method, frequency, acceptable condition, required tool, safety precaution, and escalation route. Standards must be practical. A checklist that is too long, ambiguous, or disconnected from the work process will be completed mechanically or ignored. Standardization does not prevent improvement. It creates a reference condition from which deviations and improvements can be evaluated. When a better method is validated, the standard is revised, training is updated, and the new practice becomes the baseline. Focused Improvement and Loss AnalysisFocused improvement uses small, cross-functional teams to address a defined loss. The team should state the problem in measurable terms, establish a baseline, observe the process, identify causes, test countermeasures, and confirm results. Common methods include Pareto analysis, the five-whys technique, cause-and-effect diagrams, stratification, time observation, failure-mode analysis, and statistical process control. The six major equipment losses are conventionally grouped as follows: 1. Breakdowns: Complete loss of the equipment’s required function. 2. Setup and adjustment: Time lost during product changeovers, tooling changes, parameter adjustment, and startup preparation. 3. Idling and minor stoppages: Short interruptions or empty running that may not appear as major failures. 4. Reduced speed: Operation below the designed or demonstrated standard speed. 5. Process defects and rework: Output that fails specification or requires correction because of equipment or process conditions. 6. Startup and yield losses: Losses occurring while the process stabilizes after startup, changeover, repair, or extended stoppage. The classification must be agreed locally. For example, a stop lasting less than a defined threshold may be classified as a minor stoppage, while a longer event may be recorded as a breakdown. The purpose of classification is not administrative perfection; it is consistent visibility of loss patterns. A useful improvement sequence is: select the largest or most consequential loss, define the phenomenon, contain immediate risk, collect time- and condition-based evidence, distinguish symptoms from causes, implement a countermeasure, and verify whether the loss has genuinely reduced. Teams should avoid jumping directly from a symptom to a preferred solution. A sensor, spare part, or training course is not automatically a root-cause solution. Measuring Effectiveness: OEE and Its InterpretationOverall Equipment Effectiveness combines availability, performance, and quality: OEE = Availability × Performance × Quality where: Availability = Operating Time / Planned Production Time Performance = (Ideal Cycle Time × Total Count) / Operating Time Quality = Good Count / Total Count Planned production time excludes periods when production is not scheduled. Operating time is planned production time minus downtime from breakdowns, setups, adjustments, and other recorded stops. Performance reflects speed loss and minor stoppages. Quality reflects defective output and rework according to the organization’s agreed definition. Consider a shift with 480 minutes available, 30 minutes of planned break, 40 minutes of breakdown and setup losses, 800 units produced, an ideal cycle time of 0.45 minutes per unit, and 24 defective units. Planned production time is 450 minutes, and operating time is 410 minutes. Therefore: - Availability = 410/450 = 91.1 percent.
- Performance = (0.45 × 800)/410 = 87.8 percent.
- Quality = 776/800 = 97.0 percent.
- OEE ≈ 91.1 × 87.8 × 97.0 = 77.6 percent.
The OEE figure is less important than its components and the losses behind them. Two lines may have identical OEE but require entirely different interventions: one may suffer breakdowns, while the other may run slowly with high quality. OEE should not be used as a universal ranking mechanism without considering product mix, operating context, planned downtime, safety, cost, and customer requirements. OEE also has limitations. It can be distorted by inaccurate time definitions, optimistic ideal cycle times, unrecorded micro-stops, or incentives to classify losses favourably. It is primarily an equipment effectiveness measure, not a complete measure of factory productivity, profitability, sustainability, or customer value. Complementary measures may include mean time between failures, mean time to repair, schedule compliance, maintenance cost, energy intensity, first-pass yield, safety indicators, and delivery performance. Planned Maintenance and Lean ReliabilityPlanned maintenance should be risk-based rather than calendar-driven alone. A maintenance plan normally combines: - preventive tasks performed at defined intervals;
- condition-based tasks triggered by vibration, temperature, oil condition, electrical signatures, or other indicators;
- corrective work that restores an identified defect before functional failure;
- breakdown maintenance for unpredictable or low-consequence events; and
- improvement maintenance that eliminates recurring design or process weaknesses.
Lean reliability seeks the minimum total effort required to deliver dependable performance. Over-maintenance can introduce human error, consume resources, and create unnecessary downtime. Under-maintenance increases risk and hidden degradation. The appropriate policy depends on failure consequences, detectability, failure behaviour, equipment criticality, redundancy, safety, environmental exposure, and the economics of intervention. Reliability-centred reasoning asks what functions the asset must perform, how it can fail, what causes each failure, what consequences result, and which task or design change is technically and economically justified. TPM and reliability-centred maintenance are complementary: TPM builds broad ownership and basic conditions, while reliability analysis helps determine technically appropriate maintenance strategies. Implementing TPM as a Management SystemTPM implementation should begin with leadership alignment and a clear business problem, not with ceremonial activities. Senior management must define the purpose, provide time for improvement, remove cross-functional barriers, and review results. A practical implementation pathway is as follows: 1. Assess the current state: Examine breakdown history, OEE losses, maintenance maturity, skills, safety risks, data quality, and employee involvement. 2. Select a model area: Choose a line or asset with meaningful losses, visible leadership support, and manageable complexity. 3. Restore basic conditions: Clean, inspect, lubricate, tighten, repair safeguards, and tag abnormalities. 4. Establish standards and ownership: Define operator and maintenance responsibilities, inspection criteria, escalation routes, and response expectations. 5. Measure losses consistently: Align definitions, data collection, downtime codes, ideal cycle times, and quality records. 6. Run focused-improvement projects: Prioritize chronic, costly, unsafe, or strategically important losses. 7. Develop capability: Use classroom instruction, hands-on coaching, qualification matrices, and problem-solving practice. 8. Audit and expand: Verify adherence and results, revise standards, and transfer learning to other assets. Implementation commonly fails when TPM is treated as a short campaign, when targets are imposed without resources, when maintenance and production compete for authority, or when audits reward paperwork rather than improved equipment conditions. Sustainability requires management routines: daily tier meetings, abnormality follow-up, weekly loss reviews, periodic restoration audits, and visible closure of assigned actions. Technology, Data, and Digital TPMDigital tools can improve TPM when they strengthen observation and decision-making. Computerized maintenance management systems can schedule work, manage history, control spare parts, and report compliance. Industrial sensors can monitor vibration, temperature, pressure, current, lubrication condition, or cycle behaviour. Edge devices and manufacturing execution systems can connect machine states with production and quality records. Analytics can identify recurring failure patterns or estimate the probability of degradation. Artificial intelligence may support anomaly detection, image-based inspection, remaining-useful-life estimation, and automatic classification of downtime events. Nevertheless, predictive models depend on reliable data, stable operating definitions, representative failure examples, and appropriate human review. A model that produces frequent false alarms may create alert fatigue; a model trained on one product mix may fail when conditions change. Digitalization should not be used to conceal weak fundamentals. If lubrication points are unidentified, downtime codes are inconsistent, or operators are not trained to respond, additional sensors may produce more data without more reliability. Cybersecurity, access control, data ownership, system interoperability, and privacy should be addressed when equipment becomes connected. Managerial, Ethical, and Professional ConsiderationsTPM changes work design and can alter perceptions of status and responsibility. Managers must avoid using operator involvement as a disguised labour-reduction programme. Participation should be supported by training, realistic workload, recognition, and safe procedures. Employees should have the authority to stop or escalate unsafe conditions without fear of retaliation. Maintenance decisions have ethical consequences. Deferring work on a safety-critical asset to protect short-term output may expose workers and the public to unacceptable risk. Records must accurately represent inspections, failures, overrides, and defects. Falsifying checklists or manipulating OEE undermines both safety and organizational learning. Regulatory requirements concerning machinery guarding, electrical safety, pressure systems, environmental control, and hazardous energy take precedence over production targets. Professional judgement is also required in setting maintenance intervals. Excessive intervention wastes resources, while insufficient intervention transfers risk to operators, customers, and society. Decisions should therefore consider lifecycle cost, risk, sustainability, and the consequences of failure rather than only monthly maintenance expenditure. Illustrative Case: Improving Reliability on a Packaging LineBackgroundThe following case is illustrative. A food-packaging plant operated a high-speed filling and sealing line for three shifts. The line frequently met its weekly production target only through overtime. Operators reported that the equipment was “always running,” yet maintenance records showed repeated short stops and frequent adjustments. Situation and ProblemA four-week baseline showed planned production time of 8,640 minutes. Downtime from breakdowns and changeovers was 1,080 minutes. The line produced 410,000 packs, with an ideal cycle time of 1.0 seconds per pack; 17,000 packs were rejected or reworked. OEE was calculated as follows: - Availability = (8,640 − 1,080)/8,640 = 87.5 percent.
- Performance = (410,000 seconds)/(7,560 × 60 seconds) ≈ 90.4 percent.
- Quality = 393,000/410,000 = 95.9 percent.
- OEE ≈ 75.9 percent.
Pareto analysis showed that the largest losses were film-feed minor stops, lengthy format adjustments, and seal-temperature defects. Operators also found oil contamination and loose sensor brackets during informal checks. AnalysisThe team mapped the film path and discovered that cleaning standards differed between shifts. A worn guide caused intermittent misalignment, but it was not replaced because it had not yet produced a complete breakdown. Sensor brackets were adjusted repeatedly without a standard reference position. Changeover work was not separated into internal tasks requiring the machine to stop and external tasks that could be prepared in advance. The team initially proposed installing additional sensors. Further analysis showed that basic conditions, standard settings, and changeover discipline had not been established. The immediate problem was therefore not lack of technology but inadequate control of known conditions. Approach and SolutionProduction, maintenance, quality, and engineering created a model-area TPM team. Operators performed initial cleaning and tagged abnormalities. Maintenance restored the guide, corrected lubrication leakage, secured sensor brackets, and documented reference settings. A visual standard identified cleaning points, acceptable film alignment, sensor position, and seal-temperature limits. The team introduced a short autonomous inspection at the beginning of each shift and a weekly technical inspection by maintenance. Changeover tasks were classified as internal or external, tools were prepared in a shadow board, and the first-piece approval method was standardized. A focused-improvement team then studied minor stops using time observation rather than relying only on operator memory. OutcomeAfter eight weeks, the line’s breakdown and adjustment losses fell substantially, first-pass quality improved, and operators reported abnormalities earlier. OEE increased to 84 percent in the model area. The improvement was not attributed to one intervention; it resulted from restoration of basic conditions, visual standards, operator capability, technical maintenance, and focused loss removal. The plant then adapted—not copied—the standards for a second line. Learning PointsThe case demonstrates that high-level reliability improvement often begins with disciplined observation and restoration. OEE identified the scale of the problem, but loss analysis identified the response. Operator ownership was effective because responsibilities and limits were explicit. Finally, a digital solution would have had greater value after the process had reliable standards and trustworthy data. Common Challenges and Best PracticesImportant challenges include resistance from employees who perceive TPM as additional work, conflict between production output and maintenance access, weak downtime data, excessive focus on audit scores, inadequate technical training, and failure to close abnormalities. Small stops are particularly difficult because they are frequent, normalized, and often omitted from records. Best practice is to begin with a clearly bounded process, involve the people who perform the work, define loss categories before measuring, and distinguish restoration from improvement. Use visual standards, verify actual conditions at the workplace, and require countermeasures to be tested rather than assumed effective. Combine leading indicators—such as abnormality closure, inspection quality, and training qualification—with outcome indicators such as OEE, failure frequency, quality, cost, and safety. Most importantly, treat TPM as a continuing management discipline rather than a one-time housekeeping project. Current Developments and Emerging DirectionsTPM is increasingly connected with smart manufacturing, energy management, sustainability, and resilient supply networks. Energy losses can be analysed alongside availability and quality, especially for compressed-air systems, thermal equipment, drives, and refrigeration. Digital work instructions can provide visual guidance and capture evidence at the point of work. Mobile collaboration can connect operators with remote specialists, while advanced analytics can compare assets across plants. At the same time, organizations are reconsidering the assumption that maximum equipment utilization is always desirable. Flexible capacity, modular equipment, maintainability, circularity, and low-carbon operation may be strategically more valuable than simply increasing running time. The future of lean reliability will therefore combine technical performance with human capability, cyber-physical awareness, lifecycle thinking, and responsible resource use. Chapter SummaryTotal Productive Maintenance is an integrated approach to maximizing equipment effectiveness through participation across the organization. Its eight pillars connect autonomous maintenance, planned maintenance, focused improvement, early equipment management, quality maintenance, training, safety, and support-function improvement. Autonomous maintenance gives trained operators responsibility for basic conditions and early abnormality detection, while specialist maintenance addresses technical diagnosis, restoration, and improvement. 5S, visual management, and standard work make normal conditions visible and create a foundation for disciplined care. Focused improvement uses data and structured problem-solving to attack the six major losses: breakdowns, setup and adjustment, minor stoppages, reduced speed, defects and rework, and startup losses. OEE combines availability, performance, and quality, but its components and underlying loss data are more useful than the aggregate percentage alone. Lean reliability requires risk-based maintenance, reliable data, competent people, and attention to safety, lifecycle cost, and sustainability. Digital tools can improve condition monitoring and analysis, but they cannot replace basic equipment care or sound management practices. Successful TPM is sustained through leadership, clear responsibilities, training, honest measurement, employee involvement, and continuous learning. Key TermsTotal Productive Maintenance (TPM): An organization-wide system for maximizing equipment effectiveness through involvement of all relevant functions. Lean reliability: The achievement of dependable equipment performance with minimum waste, risk, and lifecycle cost. Autonomous maintenance: Routine equipment-care and inspection activities performed by trained operators. Planned maintenance: Maintenance scheduled or triggered through preventive, predictive, corrective, or improvement logic. Focused improvement: A structured, cross-functional effort directed at a specific, measurable loss. Overall Equipment Effectiveness (OEE): A composite measure calculated as availability multiplied by performance and quality. Availability: The proportion of planned production time during which equipment is operating. Performance: The extent to which equipment runs at its ideal speed, including the effect of minor stoppages. Quality: The proportion of total output that is good output according to the defined specification. Six major losses: The categories of breakdown, setup, minor stops, reduced speed, defects, and startup losses. 5S: A workplace-organization method involving sort, set in order, shine, standardize, and sustain. Visual management: The use of visible information to communicate normal conditions, abnormalities, and required action. Standard work: The documented best currently known method for performing a task safely and consistently. Abnormality: A deviation from a defined normal condition requiring correction, investigation, or escalation. Condition-based maintenance: Maintenance initiated by evidence of actual equipment condition. Early equipment management: The incorporation of reliability, maintainability, safety, and lifecycle considerations during equipment design or acquisition. Quality maintenance: Control of equipment conditions so that defects are prevented at their source. Mean time between failures (MTBF): Average operating time between functional failures of an asset or system. Mean time to repair (MTTR): Average time required to restore an asset after a failure. Loss analysis: Systematic examination of time, speed, quality, and process losses to identify improvement priorities. Review QuestionsShort Answer Questions1. What is meant by the “total” in Total Productive Maintenance? 2. Distinguish autonomous maintenance from planned maintenance. 3. Name the six major equipment losses. 4. State the formula for OEE and its three components. 5. Why is visual management important in TPM? Long Answer Questions1. Explain the eight TPM pillars and show how they support one another. 2. Describe the stages of autonomous maintenance and discuss the conditions needed for successful operator ownership. 3. Explain how focused improvement can be used to reduce chronic minor stoppages. 4. Calculate and interpret OEE, and discuss the limitations of using OEE as a performance target. 5. Discuss how a manufacturing organization can implement TPM while maintaining safety, employee trust, and technical accountability. Analytical / Application Questions1. A line has high availability but low performance and quality. Design a loss-analysis approach to identify the likely causes and priorities. 2. A plant proposes installing sensors on every critical machine, although lubrication, downtime coding, and operator inspection standards are weak. Evaluate the proposal and recommend a sequence of actions. 3. Develop a TPM plan for a packaging or machining work centre that experiences frequent changeovers, recurring minor stops, and operator-maintenance conflict. Include measures, responsibilities, and review routines. 22. Multiple Choice Questions with AnswersQuestion 1Which situation best demonstrates the purpose of autonomous maintenance? A. An operator performs specialized vibration analysis on a gearbox without authorization. B. An operator cleans, inspects, lubricates designated points, and escalates an abnormal leak. C. A maintenance engineer replaces all parts at fixed intervals regardless of condition. D. A supervisor excludes operators from maintenance decisions to protect technical standards. Correct Answer: B. An operator cleans, inspects, lubricates designated points, and escalates an abnormal leak. Question 2A machine has planned production time of 450 minutes and operating time of 410 minutes. What is its availability? A. 87.8 percent B. 91.1 percent C. 94.0 percent D. 97.0 percent Correct Answer: B. 91.1 percent Question 3Which loss is most directly represented by operation below the ideal cycle speed while the machine continues running? A. Breakdown loss B. Setup loss C. Reduced-speed loss D. Startup yield loss Correct Answer: C. Reduced-speed loss Question 4Why should OEE generally be analysed through its components and underlying losses? A. The OEE formula excludes quality entirely. B. Identical OEE values can result from different operational problems. C. OEE can only be calculated for maintenance departments. D. Availability, performance, and quality are unrelated measures. Correct Answer: B. Identical OEE values can result from different operational problems. Question 5Which action most closely reflects focused improvement? A. Replacing equipment without studying the loss pattern B. Conducting a cross-functional analysis of recurring film-feed stops and testing countermeasures C. Increasing preventive-maintenance frequency for every asset D. Improving the appearance of the maintenance office Correct Answer: B. Conducting a cross-functional analysis of recurring film-feed stops and testing countermeasures Question 6What is the principal TPM value of 5S in an equipment area? A. It eliminates the need for planned maintenance. B. It makes abnormalities and deviations from normal conditions easier to detect. C. It guarantees that OEE will exceed a fixed benchmark. D. It transfers all maintenance responsibility to operators. Correct Answer: B. It makes abnormalities and deviations from normal conditions easier to detect. Question 7Which statement about digital TPM is most accurate? A. Sensors automatically solve reliability problems even when standards are absent. B. Artificial intelligence removes the need for professional judgement. C. Digital tools are most effective when basic conditions, definitions, and data quality are reliable. D. Connected equipment makes cybersecurity irrelevant. Correct Answer: C. Digital tools are most effective when basic conditions, definitions, and data quality are reliable. Question 8A plant records many short stops as normal running because they last less than one minute. What is the most likely consequence? A. Performance losses will be hidden and improvement priorities will be distorted. B. Quality will automatically improve. C. Availability will become a direct measure of ideal speed. D. Planned production time will increase without schedule changes. Correct Answer: A. Performance losses will be hidden and improvement priorities will be distorted. Question 9Which maintenance decision is most consistent with lean reliability? A. Perform every maintenance task as frequently as possible. B. Defer all work until functional failure occurs. C. Select maintenance actions using failure consequences, detectability, condition, and lifecycle cost. D. Choose the lowest monthly maintenance expenditure regardless of risk. Correct Answer: C. Select maintenance actions using failure consequences, detectability, condition, and lifecycle cost. Question 10In the illustrative packaging-line case, why was installing additional sensors not the first priority? A. Sensors cannot be used on packaging equipment. B. The main causes involved weak basic conditions, standards, and changeover discipline. C. The line had no quality losses. D. OEE cannot identify equipment problems. Correct Answer: B. The main causes involved weak basic conditions, standards, and changeover discipline.
|