Logistics & Supply Chain Management

Chapter 3
Supply Chain Processes and Integration

Post Graduate Programme in Materials Management
Logistics & Supply Chain Management   •   Post Graduate

Supply Chain Processes and Integration

Introduction and Context

A supply chain is not merely a sequence of firms through which materials move. It is an interdependent system of processes that transforms information, resources and customer requirements into products and services, and then manages returns, recovery and learning. Supply-chain performance therefore depends not only on functional excellence in purchasing, production, warehousing or transport, but also on the quality of connections between them.

The central managerial problem is integration. A purchasing decision that reduces unit price may increase inventory, quality failures or production disruption. A sales promotion may improve revenue while creating shortages, overtime and transport premiums. A warehouse may achieve high local productivity by shipping in large batches, while customers experience longer replenishment times. These outcomes arise because local decisions alter flows elsewhere in the system.

This chapter uses the SCOR process architecture, process mapping and systems thinking to explain how supply-chain processes can be designed and integrated. It also examines cross-functional coordination, collaborative relationships and the bullwhip effect—the amplification of order variability as one moves upstream.

Learning Objectives

After studying this chapter, the reader should be able to:

  1. Explain source, make, deliver, return and enable processes in an end-to-end supply chain.
  2. Apply the SCOR framework to structure process analysis and performance measurement.
  3. Construct and interpret process maps, SIPOC diagrams and value-stream views.
  4. Analyse supply chains as systems of interacting flows, feedback loops and constraints.
  5. Design cross-functional coordination mechanisms and collaborative relationships.
  6. Diagnose the bullwhip effect and evaluate methods for reducing it.
  7. Critically assess implementation, governance, technology and ethical issues in supply-chain integration.

1. The Process View of Supply Chains

A functional view divides an organisation into purchasing, manufacturing, sales, logistics, finance and information technology. This division supports specialisation but can conceal the customer-facing process. A process view follows an outcome across organisational boundaries—for example, from a customer order to delivery and payment, or from a forecast to supplier replenishment.

A process has five basic elements:

  • Trigger: an event that initiates work, such as an order or shortage signal.
  • Inputs: materials, information, labour, capacity or funds.
  • Activities: transformation, movement, decision or control.
  • Outputs: product, service, information, status or financial result.
  • Customer: the next process or the final user of the output.

Processes may be classified as core, enabling and governance processes. Core processes directly create customer value. Enabling processes—such as information management, human resources, finance, compliance and asset maintenance—make core processes possible. Governance processes establish policy, risk controls, performance standards and accountability.

End-to-end performance should be evaluated through dimensions such as reliability, responsiveness, agility, cost, asset utilisation, quality, safety and sustainability. A useful principle is that a process is not effective merely because each activity is efficient; it is effective when the complete customer outcome is achieved.

2. SCOR as a Supply-Chain Reference Model

The Supply Chain Operations Reference (SCOR) model provides a common language for describing, analysing and improving supply-chain operations. Its traditional process categories are Plan, Source, Make, Deliver and Return, supported by Enable processes. Recent versions have expanded the model’s emphasis on orchestration, resilience and sustainability, but the five operational categories remain widely used in education and practice.

2.1 Plan

Plan processes balance aggregate demand, supply capability, inventory, lead times, cash and risk. They include demand planning, supply planning, master production scheduling, network planning, inventory policy and sales and operations planning (S&OP).

Planning is not simply forecasting. It is a negotiated decision process in which commercial, operational, financial and risk perspectives are reconciled. Its outputs may include a consensus demand plan, capacity decisions, sourcing requirements and inventory targets.

2.2 Source

Source processes obtain goods and services required by the network. They include supplier qualification, contracting, ordering, inbound transport, receiving, inspection, invoice matching and supplier performance management.

Strategic sourcing distinguishes total cost from purchase price. Total cost may include transport, duties, inspection, quality failure, inventory carrying, disruption and disposal costs. Supplier integration can involve shared forecasts, vendor-managed inventory, joint quality improvement and early supplier involvement in product design.

2.3 Make

Make processes convert materials and information into finished goods or services. They include production scheduling, material issuing, processing, assembly, testing, packaging, maintenance and release.

Important integration issues include batch size, setup time, capacity constraints, quality at source, production sequencing and the relationship between make-to-stock, assemble-to-order and make-to-order strategies. Lean methods attempt to remove non-value-adding activities, but lean flow must be matched to demand characteristics and supply risk.

2.4 Deliver

Deliver processes fulfil customer requirements. They include order management, allocation, picking, packing, transportation, customs documentation, installation, invoicing and proof of delivery.

Delivery performance is multidimensional. On-time delivery alone may conceal incomplete or damaged shipments. A useful service measure is perfect-order fulfilment, which requires the correct product, quantity, condition, documentation and timing. Delivery design must also consider postponement, channel structure, last-mile cost and customer returns.

2.5 Return

Return processes manage reverse flows from customers or downstream partners. They include return authorisation, collection, inspection, repair, replacement, recycling, resale, disposal and financial credit.

Returns are not solely a cost centre. They provide information about design defects, packaging, supplier quality and customer expectations. In circular supply chains, returned products may be refurbished, remanufactured or harvested for components. Effective returns require clear ownership, product traceability and disposition rules.

2.6 Enable

Enable processes support and govern the other categories. They include master-data management, performance measurement, information security, compliance, workforce capability, asset management, risk management, finance and sustainability reporting.

Enable is often underestimated because it does not always create a visible physical output. Inaccurate item masters, inconsistent units of measure or weak access controls can disrupt every operational process. Enable processes therefore represent the infrastructure of integration.

2.7 SCOR performance attributes

SCOR commonly groups performance measures into attributes such as reliability, responsiveness, agility, cost and asset management efficiency. Organisations should select a balanced hierarchy of strategic, tactical and operational measures.

AttributeIllustrative questionExample measure
ReliabilityWas the promised outcome achieved?Perfect-order fulfilment
ResponsivenessHow quickly was it achieved?Order fulfilment cycle time
AgilityHow well can the chain respond to change?Upside supply-chain flexibility
CostWhat resources were consumed?Total supply-chain management cost
Asset efficiencyHow effectively are assets used?Cash-to-cash cycle time

A measure must have a defined numerator, denominator, time period, data owner and decision purpose. For example, inventory turnover is commonly expressed as:

Inventory turnover = Cost of goods sold ÷ Average inventory at cost

Cost of goods sold and average inventory must use the same currency and accounting basis. The measure is meaningful for comparing periods or similar operations, but it should not be interpreted alone: high turnover can result from excellent flow or dangerously low stock.

Cash-to-cash cycle time is often expressed as:

C2C = Days inventory outstanding + Days sales outstanding − Days payable outstanding

The terms must be calculated on a consistent day basis. A shorter C2C may improve liquidity, but aggressive payment delays or stock reductions can damage suppliers and service.

3. Process Mapping and Process Architecture

Process mapping makes work visible. A high-level map establishes boundaries and interfaces; a detailed map identifies decisions, queues, rework and control points. Useful techniques include SIPOC, swimlane maps, value-stream maps, BPMN-based models and service blueprints.

A SIPOC map identifies Suppliers, Inputs, Process, Outputs and Customers. It is useful at the beginning of analysis because it prevents premature concentration on internal activities. A swimlane map assigns activities to functions or organisations, exposing handoffs. A value-stream map adds material and information flows, inventory, lead times and processing times.

A robust mapping method is:

  1. Define the customer outcome and process boundary.
  2. Identify the trigger, inputs, outputs and process owner.
  3. Observe actual work rather than relying only on procedures.
  4. Record handoffs, queues, approvals, exceptions and rework.
  5. Separate value-adding time from waiting and control time.
  6. Identify failure points and measures.
  7. Design a future state with explicit ownership and feedback.
  8. Pilot, measure and revise.

Process maps should distinguish physical flow from information flow. For example, a purchase order may move electronically in seconds while the physical material takes weeks. If the information is inaccurate, faster transmission merely accelerates a wrong decision.

Process architecture connects maps at different levels. A level-one map may show Plan–Source–Make–Deliver–Return. Level-two maps decompose Source into supplier selection, ordering, receiving and payment. Level-three maps describe tasks, decision rules and system transactions. Excessive detail can make a map unusable; insufficient detail hides the cause of performance problems.

4. Systems Thinking and Supply-Chain Integration

Systems thinking treats the supply chain as an open, dynamic system rather than a collection of independent departments. It emphasises interdependence, feedback, delays, non-linearity and unintended consequences.

Three flows interact:

  • Material flow: movement and transformation of products, components, packaging and returns.
  • Information flow: forecasts, orders, inventory records, capacity data, status and performance signals.
  • Financial flow: invoices, payments, credit, working capital and risk transfer.

A delay between demand observation and replenishment creates the possibility of overreaction. A local safety-stock decision changes inventory investment and may alter supplier production patterns. A transport disruption can trigger emergency orders, which increase congestion and cause further delay.

A simple inventory balance illustrates system logic:

It+1 = It + Rt − Dt

where It is inventory at the end of period t, Rt is received supply during period t and Dt is demand or consumption during the period. The relationship assumes that inventory is measured consistently and that losses, rejects and backorders are either included in the terms or modelled separately. If It+1 becomes negative, the result should normally be interpreted as a shortage or backorder rather than physical negative stock.

Integration does not mean that every decision is centralised. It means that decisions are coordinated around shared objectives, compatible data and known dependencies. Structural integration may involve network design and common planning processes. Information integration involves shared visibility and data standards. Relational integration involves trust, communication and joint problem solving.

5. Cross-Functional Coordination

Coordination mechanisms can be formal or relational. Formal mechanisms include S&OP, integrated business planning, common master data, standard operating procedures, service-level agreements, escalation rules and cross-functional key performance indicators. Relational mechanisms include trust, reciprocity, frequent communication and joint learning.

S&OP typically follows a monthly cycle:

  1. Data and demand review.
  2. Statistical forecast and exception analysis.
  3. Supply and capacity review.
  4. Reconciliation of demand, supply, inventory and finance.
  5. Executive decisions on priorities, constraints and scenarios.

The value of S&OP lies less in the meeting itself than in the quality of assumptions, decision rights and follow-through. A forecast owned solely by sales may be biased toward targets; one owned solely by operations may ignore market opportunities. A consensus plan does not eliminate uncertainty, but it makes assumptions visible.

Cross-functional measures should discourage suboptimisation. Examples include total landed cost, perfect-order fulfilment, forecast bias, schedule adherence, inventory availability and cash-to-cash performance. Incentives must be examined carefully: a buyer rewarded only for purchase-price variance may favour large batches, while a sales team rewarded only for revenue may generate unstable promotions.

RACI matrices clarify who is Responsible, Accountable, Consulted and Informed. They are particularly useful for exceptions such as supply shortages, product recalls and demand surges. However, RACI cannot replace judgement; accountability must be supported by authority, skills and timely information.

6. Collaborative Relationships Across the Network

Collaboration ranges from transactional exchange to strategic partnership. The appropriate level depends on supply risk, switching cost, innovation importance, volume, market power and mutual dependence.

Common collaborative practices include:

  • Collaborative planning, forecasting and replenishment (CPFR): partners jointly develop forecasts, identify exceptions and agree replenishment actions.
  • Vendor-managed inventory (VMI): the supplier monitors agreed inventory information and manages replenishment within defined limits.
  • Continuous replenishment: replenishment responds to consumption and agreed policies rather than infrequent large orders.
  • Joint product development: suppliers contribute technical knowledge early in design.
  • Supplier development: the buyer supports improvements in quality, capability, safety or sustainability.

Collaboration requires governance. Agreements should specify data ownership, confidentiality, forecast status, inventory ownership, service expectations, dispute resolution, cybersecurity and exit conditions. Information sharing without aligned incentives can merely transfer risk or expose commercially sensitive data.

Trust should be treated as an organisational capability, not as an assumption. It develops through reliable behaviour, transparent measurement, fair allocation of gains and credible remedies when commitments fail. Power asymmetry creates ethical risks: a dominant buyer may impose unrealistic lead times or payment terms and describe the resulting instability as supplier underperformance.

7. The Bullwhip Effect

The bullwhip effect is the tendency for variability in orders to exceed variability in actual customer demand as one moves upstream. It produces excess inventory, shortages, unstable production schedules, overtime, obsolete stock and poor capacity utilisation.

The effect can arise even when each participant is acting rationally using locally available information. Major causes include:

  • demand forecasting based on orders rather than consumption;
  • order batching to reduce transaction or transport cost;
  • temporary price discounts and forward buying;
  • rationing and shortage gaming;
  • long replenishment delays;
  • independent safety-stock policies;
  • poor data quality and limited visibility;
  • forecast bias and infrequent revision.

A basic variability measure is the variance of demand or orders. For observations x1, x2, …, xn, the sample variance is:

s² = ∑(xi − x̄)² ÷ (n − 1)

where x̄ is the sample mean and n is the number of observations. The bullwhip ratio may be defined as:

Bullwhip ratio = Variance of orders ÷ Variance of customer demand

A ratio greater than 1 indicates order variability amplification under this definition. The ratio is meaningful only when the compared data have the same time bucket, product scope and measurement basis. It is not a complete performance measure: a ratio below 1 may result from inventory depletion or delayed ordering rather than good coordination.

Worked illustration

Suppose weekly customer demand is 100, 110, 90 and 100 units. The mean is 100 units. The sample variance is:

s²d = [(0² + 10² + (−10)² + 0²) ÷ 3] = 66.67 units²

Suppose the retailer’s orders to the distributor are 80, 140, 60 and 120 units. Their mean is 100 units, and the sample variance is:

s²o = [((−20)² + 40² + (−40)² + 20²) ÷ 3] = 1,600 units²

Thus:

Bullwhip ratio = 1,600 ÷ 66.67 ≈ 24.0

This small illustrative dataset shows substantial amplification. It does not prove causation; the analyst would investigate replenishment lead time, promotions, order minimums, service constraints and inventory policies.

Reducing the bullwhip effect

Effective countermeasures address causes rather than merely increasing stock:

  1. Share point-of-sale and inventory data. Upstream partners should see consumption where possible, not only downstream orders.
  2. Reduce replenishment delay. Shorter physical and decision lead times reduce the need for large protective reactions.
  3. Use smaller, more frequent orders. Electronic ordering, standard containers and consolidated transport can lower transaction cost.
  4. Stabilise pricing. Everyday-low-price policies or carefully governed promotions reduce forward buying.
  5. Allocate scarce supply using consumption data. Allocation based on historical orders can reward inflated requests.
  6. Coordinate replenishment policies. Partners should agree on order-up-to levels, review periods, safety stock and exception rules.
  7. Measure forecast bias and order variance. Accuracy without bias analysis can conceal systematic over- or under-forecasting.
  8. Use collaborative planning. Joint forecasts and exception management improve interpretation of market signals.

Technology helps but does not automatically solve the problem. A shared dashboard with inconsistent item codes can create a more visible disagreement. Data governance, process discipline and incentives remain essential.

8. Integrated Technology and Data Governance

Enterprise resource planning (ERP) systems integrate transactions such as purchasing, inventory, production and finance. Warehouse management systems, transportation management systems, customer-order platforms, supplier portals and advanced planning tools extend this architecture. Application programming interfaces and event-based integration can improve visibility across organisational boundaries.

Artificial intelligence can support demand sensing, anomaly detection, ETA prediction, inventory segmentation and root-cause analysis. Its usefulness depends on data quality, stable process definitions and appropriate human oversight. A model trained on order history may reproduce the bullwhip effect if orders—not consumption—are treated as demand. Promotion changes, disruptions and structural breaks can also invalidate historical relationships.

Important governance controls include:

  • common item, location, supplier and customer identifiers;
  • controlled units of measure and conversion factors;
  • timestamps and clear data lineage;
  • role-based access and segregation of duties;
  • cybersecurity and incident response;
  • model validation, monitoring and explainability;
  • retention and privacy rules;
  • audit trails for planning overrides.

Digital integration should be judged by improved decisions and outcomes, not by the number of connected systems. Automation of a defective process can increase the speed and scale of failure.

9. Implementation Roadmap and Limitations

Integration programmes commonly fail when they begin with software procurement rather than process diagnosis. A practical roadmap is:

  1. Establish the business problem and customer outcome.
  2. Map the current state and quantify delay, variability, cost and failure.
  3. Identify process owners, decision rights and external dependencies.
  4. Define a small set of shared measures and data standards.
  5. Design the future state, including exceptions and controls.
  6. Pilot with a product, site or supplier segment.
  7. Evaluate operational, financial, relational and behavioural outcomes.
  8. Scale through training, governance and continuous improvement.

Limitations must be acknowledged. SCOR is a reference model, not a complete strategy; it does not decide the appropriate network, technology or competitive position. Process maps are representations and may omit informal work. Collaboration can be costly and inappropriate for every supplier. Shared information may create security and competition concerns. Lean inventory can increase vulnerability when lead times are uncertain or disruption probability is high. Finally, aggregate metrics can hide unequal effects on workers, small suppliers, communities or the environment.

Sustainability should therefore be integrated into process decisions. Firms should examine emissions, energy, packaging, labour standards, forced-labour risk, responsible sourcing, waste and product end-of-life. Ethical integration means that efficiency is not achieved by transferring unacceptable risk to less powerful participants.

Illustrative Case: Integrating a Consumer-Electronics Supply Chain

Background

A fictional consumer-electronics manufacturer sells through retailers and an online channel. It experiences frequent stockouts during promotions, followed by excess finished goods after the promotion. Suppliers complain about abrupt schedule changes, while the factory reports low schedule adherence and expensive overtime.

Problem

The company’s sales system records retailer orders but does not routinely share point-of-sale consumption. Retailers place larger orders when they expect shortages. The manufacturer forecasts independently, production uses weekly batches, and suppliers receive revised schedules with a short frozen horizon. Procurement rewards unit-price reduction, encouraging large inbound lots.

Analysis

A cross-functional process map identifies four interacting causes: order data are mistaken for market demand; promotion information is not translated into a time-phased supply plan; minimum order quantities encourage batching; and no common exception process exists. The bullwhip ratio, calculated over matched weekly data, is substantially above one. Inventory is high in aggregate but poorly positioned by model and channel.

Approach

The firm establishes a monthly S&OP cycle and a weekly promotion-control meeting. Retailers share point-of-sale data and planned promotions under confidentiality agreements. The manufacturer introduces a common item hierarchy, separates baseline demand from promotional uplift, and creates a short frozen production horizon. Selected suppliers receive a rolling forecast with agreed flexibility bands. Replenishment frequency increases for high-volume items, while slow-moving items use postponement and smaller finished-goods commitments.

Performance measures include perfect-order fulfilment, forecast bias, schedule adherence, inventory by channel, supplier schedule stability and total landed cost. A supplier council reviews whether benefits and risks are fairly distributed.

Outcome

In the pilot category, order variability declines, production changes become less frequent and promotional availability improves. Inventory does not simply fall; it is repositioned toward items and periods with verified demand. The outcome is attributed to combined process, information and relationship changes—not to a single software installation.

Learning points

The case demonstrates that integration begins with shared definitions and process ownership. Visibility is valuable only when partners trust the data and have agreed responses. Cross-functional measures prevent a reduction in one local metric from damaging total performance. Finally, collaboration must include governance for commercial confidentiality, service expectations and equitable risk allocation.

Chapter Summary

Supply-chain integration is the coordinated management of interconnected Plan, Source, Make, Deliver, Return and Enable processes. SCOR provides a reference architecture and performance language, while process mapping reveals handoffs, queues, rework and ownership. Systems thinking explains why local decisions generate network-wide consequences through material, information and financial flows.

Cross-functional integration requires shared objectives, decision rights, reliable master data, S&OP and balanced measures. Inter-organisational collaboration may use CPFR, VMI, continuous replenishment and joint development, but it requires trust, governance and fair incentives. The bullwhip effect results when order variability is amplified by forecasting, batching, promotions, shortages, delays and fragmented information. Data sharing, shorter lead times, stable pricing, coordinated policies and consumption-based replenishment can reduce it.

Technology and AI can strengthen visibility and analysis, but neither replaces process discipline, data governance or managerial judgement. Effective integration is therefore socio-technical: it combines architecture, measurement, systems, relationships, ethics and continuous improvement.

Key Terms

Bullwhip effect: Amplification of demand variability in orders as they move upstream.

Cash-to-cash cycle time: Time between payment for inputs and collection of cash from customers.

Collaboration: Joint planning, decision-making or improvement by supply-chain partners.

CPFR: Collaborative planning, forecasting and replenishment among trading partners.

Enable: SCOR processes that support, govern and provide infrastructure for operations.

Integration: Coordination of processes, information, decisions and relationships across boundaries.

Master data: Authoritative data about items, locations, suppliers, customers and related definitions.

Perfect-order fulfilment: Delivery that meets requirements for product, quantity, condition, documentation and timing.

Process map: Structured representation of activities, flows, decisions, handoffs and controls.

Return: Reverse movement and disposition of products, materials or packaging.

SCOR: A reference model for describing and improving supply-chain processes and performance.

S&OP: Cross-functional process for reconciling demand, supply, inventory and financial plans.

Source: Processes for acquiring and receiving goods and services.

Systems thinking: Analysis of interdependence, feedback, delays and unintended consequences in a system.

Total landed cost: Full cost of acquiring and positioning an item, including purchase, logistics, duties, quality and related costs.

Value-stream map: Map showing material and information flow, processing, waiting and inventory.

VMI: Arrangement in which a supplier manages replenishment using agreed customer inventory information.

Variance: A statistical measure of dispersion around a mean, expressed in squared units.

Review Questions

Short Answer Questions

  1. What are the five traditional operational process categories in SCOR?
  2. Why should material flow and information flow be mapped separately?
  3. Define the bullwhip effect.
  4. What is the purpose of an S&OP process?
  5. State two governance requirements for inter-organisational data sharing.

Long Answer Questions

  1. Explain how SCOR can be used to diagnose integration problems across a supply chain.
  2. Compare functional management with an end-to-end process view.
  3. Discuss the role of systems thinking in understanding inventory and service trade-offs.
  4. Evaluate the benefits and risks of CPFR and VMI.
  5. Explain the causes of the bullwhip effect and assess methods for reducing it.

Analytical / Application Questions

  1. A distributor’s demand variance is 400 units² and its orders to a supplier have variance 1,000 units². Calculate the bullwhip ratio and interpret it, stating the data conditions required for a valid comparison.
  2. Design a SIPOC and high-level SCOR process map for an online retailer experiencing late deliveries and high returns. Identify at least three enabling processes.
  3. A firm wants to reduce inventory by 20% while maintaining service during uncertain supply. Propose an integrated programme involving process redesign, collaboration, measurement, risk controls and technology; justify possible trade-offs.

Multiple Choice Questions with Answers

Question 1

Which SCOR category primarily includes supplier qualification, ordering, receiving and inbound transport?

A. Plan

B. Source

C. Make

D. Return

Correct Answer: B. Source

Question 2

What is the principal purpose of a SIPOC diagram?

A. To calculate production costs

B. To identify suppliers, inputs, process, outputs and customers

C. To optimise vehicle routing

D. To determine product selling price

Correct Answer: B. To identify suppliers, inputs, process, outputs and customers

Question 3

A supply chain has demand variance of 50 units² and order variance of 150 units². What is the bullwhip ratio?

A. 0.33

B. 1.50

C. 3.00

D. 200

Correct Answer: C. 3.00

Question 4

Which action most directly reduces bullwhip caused by order batching?

A. Increasing minimum order quantities

B. Using smaller, more frequent replenishment orders

C. Hiding point-of-sale data

D. Extending replenishment lead time

Correct Answer: B. Using smaller, more frequent replenishment orders

Question 5

In the inventory balance It+1 = It + Rt − Dt, what does Rt represent?

A. Revenue in period t

B. Returns authorised in period t

C. Received supply during period t

D. Required safety stock

Correct Answer: C. Received supply during period t

Question 6

Which measure most comprehensively evaluates whether a shipment met product, quantity, condition, documentation and timing requirements?

A. Purchase-price variance

B. Perfect-order fulfilment

C. Inventory turnover alone

D. Machine utilisation

Correct Answer: B. Perfect-order fulfilment

Question 7

What is a central purpose of S&OP?

A. To reconcile demand, supply, inventory and financial plans

B. To eliminate all uncertainty from forecasting

C. To replace every operational meeting

D. To transfer all inventory ownership to suppliers

Correct Answer: A. To reconcile demand, supply, inventory and financial plans

Question 8

Which is an enabling process?

A. Customer picking

B. Assembly

C. Master-data management

D. Outbound loading

Correct Answer: C. Master-data management

Question 9

Why can sharing order data fail to eliminate the bullwhip effect?

A. Order data are always more accurate than consumption data

B. Inconsistent definitions, incentives or policies may remain

C. Information cannot affect replenishment decisions

D. Shared data always reduce supply-chain responsiveness

Correct Answer: B. Inconsistent definitions, incentives or policies may remain

Question 10

Which statement best describes systems thinking in supply-chain management?

A. Optimising each department independently

B. Studying interdependence, feedback, delays and unintended consequences

C. Replacing human decisions with automation

D. Measuring only transportation cost

Correct Answer: B. Studying interdependence, feedback, delays and unintended consequences

Logistics & Supply Chain Management
Chapter 3 of 15