Logistics & Multimodal Transportation

Chapter 2
Logistics Strategy, Service and Total-Cost Management

Post Graduate Program in Operations Management
Logistics & Multimodal Transportation   •   Post Graduate

Logistics Strategy, Service and Total-Cost Management

Introduction and Context

Logistics is not merely the movement and storage of goods. It is a strategic capability through which an organisation creates customer value, controls resources, manages risk and competes across markets. Decisions about inventory, transportation, warehousing, order processing, packaging and information systems influence both the customer experience and the cost structure of the firm.

A logistics strategy translates competitive priorities into operational choices. A firm competing on low price may emphasise standardisation, high vehicle utilisation, consolidated shipments and lean inventories. A firm competing on responsiveness may accept higher transport and inventory costs to provide short delivery windows, high availability and rapid recovery from disruption. The central managerial challenge is not to minimise an individual logistics cost, but to design the total system so that the value delivered to customers exceeds the resources consumed.

This chapter examines the alignment of logistics with competitive strategy, customer-service measurement, order-cycle analysis, cost-to-serve, total logistics cost, trade-offs, postponement, consolidation, and lean and agile logistics.

Learning Objectives

After studying this chapter, a learner should be able to:

  1. Explain how logistics strategy supports competitive strategy.
  2. Distinguish customer-service objectives, measures and standards.
  3. Analyse the order cycle and identify sources of delay and variability.
  4. Calculate and interpret total logistics cost and cost-to-serve.
  5. Evaluate transportation, inventory, warehousing and service trade-offs.
  6. Explain postponement, consolidation, lean logistics and agile logistics.
  7. Recommend a logistics design using quantitative and managerial evidence.
  8. Assess implementation, governance, technology and ethical implications.

1. Logistics Strategy and Competitive Positioning

1.1 From corporate strategy to logistics choices

Corporate strategy answers questions such as which markets to serve and how the organisation will create value. Competitive strategy specifies how the organisation will win customers—for example through cost leadership, differentiation, speed, reliability, flexibility or innovation. Logistics strategy converts these priorities into a coherent pattern of decisions concerning:

  • customer segments and service promises;
  • order fulfilment and delivery channels;
  • inventory positioning and control;
  • transport modes, routes and consolidation;
  • warehouse location and process design;
  • information visibility and exception management;
  • outsourcing, contracts and supplier relationships; and
  • resilience, sustainability and compliance.

A useful principle is strategic fit: the logistics system should reinforce the value proposition rather than contradict it. A premium medical-equipment supplier cannot credibly promise emergency availability while using replenishment policies designed only for minimum cost. Conversely, a stable commodity distributor may destroy value by offering highly customised, time-definite delivery where customers are unwilling to pay for it.

1.2 Service–cost–asset alignment

Logistics performance has at least three dimensions. Service includes availability, speed, reliability, flexibility and information quality. Cost includes transport, inventory, warehousing, order processing, packaging and administration. Assets include inventory, vehicles, facilities, equipment and working capital. Improving one dimension can worsen another. Therefore, strategy should define acceptable service levels and then design the lowest-cost system capable of achieving them, subject to risk and regulatory constraints.

A service promise should be explicit. “Fast delivery” is inadequate unless it specifies the product, customer location, order cut-off, delivery window, reliability target and exclusions. Service policies should also distinguish between the target and the measurement method. For example, a 98% on-time-in-full target requires definitions of “on time,” “in full,” the order population and the treatment of customer-requested date changes.

2. Customer Service as a Logistics Construct

Customer service is the logistics output experienced by the customer. It includes pre-transaction, transaction and post-transaction elements.

Service stageTypical elements
Pre-transactionWritten policies, contact access, technical information, order rules
TransactionAvailability, order accuracy, delivery speed, reliability, condition
Post-transactionReturns, repairs, complaints, tracing, claims and recovery

Important dimensions include:

  • Availability: whether the required item is obtainable when needed.
  • Delivery speed: elapsed time from order release to receipt.
  • Consistency: variation in delivery time across orders.
  • Reliability: probability that the promised service is achieved.
  • Completeness: whether the requested quantity and lines are delivered.
  • Flexibility: ability to handle changes in quantity, location, timing or configuration.
  • Information quality: accuracy and timeliness of status, inventory and exception information.
  • Condition: absence of damage, contamination or deterioration.
  • Recovery: speed and fairness of corrective action when failure occurs.

2.1 Measures and equations

A logistics dashboard should combine outcome, process and financial measures. Common measures include fill rate, order-cycle time, on-time delivery, perfect-order rate, claims rate, inventory turnover and cost per order.

The line fill rate is commonly calculated as:

Line fill rate = (Order lines supplied in full ÷ Total order lines) × 100

The measure is appropriate when each order line is treated as an equal unit. It can overstate customer experience when a missing line is much more important than others. A unit fill rate instead uses quantities:

Unit fill rate = (Units supplied ÷ Units ordered) × 100

A perfect-order measure may require that an order be complete, on time, damage-free and correctly documented. Its exact definition must be stated because organisations often calculate it differently.

Inventory turnover is:

Inventory turnover = Cost of goods sold ÷ Average inventory value

Both numerator and denominator must use the same valuation basis and time period. A high turnover is not automatically superior: it may indicate efficient flow or dangerously low availability.

Service measures must be segmented. A network-wide average can conceal poor performance for strategic customers, remote locations, hazardous products or high-margin items. Managers should examine distributions, variability and failure causes rather than relying solely on averages.

3. Order-Cycle Analysis

The order cycle is the sequence from customer order initiation to acceptable receipt. A typical cycle contains order transmission, order entry and validation, allocation, picking, packing, transport, delivery and, where necessary, acceptance or documentation.

A simple decomposition is:

Torder = Ttransmission + Tentry + Tprocessing + Twaiting + Tpicking + Tpacking + Ttransport + Treceiving

where each component is measured in consistent time units. The equation is additive when the stages occur sequentially. If activities overlap, elapsed cycle time is determined by the process path and cannot be obtained by adding every activity indiscriminately.

For a random order cycle, the expected time can be represented as:

E[Torder] = ∑ E[Ti]

for sequential stages i. Variability matters because customers respond to late orders, not merely average orders. If stage times are independent, the variance of the total cycle is:

Var(Torder) = ∑ Var(Ti)

This variance relationship requires independence. In practice, congestion, weather, labour shortages and system outages can create positive correlation, making total variability greater than an independence-based estimate.

3.1 Service-time design

Suppose a customer requests delivery within a promised time P. A service design should estimate the probability that the cycle completes within P:

Service reliability = Pr(Torder ≤ P)

This is a probability, not a percentage until multiplied by 100. It can be estimated from historical observations or a validated stochastic model. The use of a mean cycle time alone is inadequate because two systems with the same mean may have very different late-delivery risks.

Order-cycle analysis should identify queues and non-value-adding time. Common causes of delay include credit approval, inaccurate master data, batching, stock allocation conflicts, dock congestion, carrier hand-offs, customs clearance and poor exception escalation. Process mapping, time stamps and value-stream analysis help distinguish processing time from waiting time.

4. Total Logistics Cost and Cost-to-Serve

4.1 Total logistics cost

Total logistics cost is a decision-oriented view of costs affected by a logistics policy. A broad formulation is:

TLC = Ctransport + Cinventory + Cwarehousing + Corder + Cpackaging + Cinformation + Chandling + Cfailure

where TLC is total logistics cost and each component is measured for the same product scope and period. Depending on the decision, taxes, duties, carbon costs, obsolescence, stockout consequences and capital charges may also be included. The formula is a framework, not a universal accounting identity: the analyst must define boundaries and avoid double counting.

Inventory cost commonly includes holding, insurance, shrinkage, obsolescence and the opportunity cost of capital. A simplified annual holding-cost model is:

Cholding = Average inventory value × Annual holding-rate

The holding rate is expressed as a decimal per year and should include only relevant cost categories. If average inventory value is 500,000 monetary units and the annual holding rate is 20%, annual holding cost is:

Cholding = 500,000 × 0.20 = 100,000 monetary units per year

This calculation assumes the average inventory value is representative and the rate is constant over the period.

Transportation cost may include fixed and variable components:

Ctransport = Cfixed + (Distance × Cost per distance unit) + Caccessorial

The equation is useful for planning but must reflect actual tariffs, minimum charges, fuel adjustments, handling, waiting, tolls and mode-specific constraints.

4.2 Cost-to-serve

Cost-to-serve assigns relevant logistics and commercial costs to a customer, channel, product, order type or segment. A general expression is:

CTSj = Direct costj + Allocated activity costj + Failure costj

where CTS_j is the cost-to-serve for segment j. Direct costs may include dedicated delivery or special packaging. Activity costs may be assigned using cost drivers such as order lines, deliveries, kilometres, pallets, returns or support contacts. Failure costs include expedited recovery, credits, returns and lost contribution where reliably measurable.

Cost-to-serve analysis often reveals that sales revenue and gross margin do not equal customer profitability. A customer placing many small, urgent, remote and return-intensive orders can be less profitable than a lower-revenue customer with predictable consolidated shipments.

Allocation must be handled carefully. Arbitrary overhead allocation can create misleading profitability rankings. Activity-based costing is more informative when activities and causal drivers can be identified, but it remains dependent on data quality and managerial judgement. Cost-to-serve should support decisions, not be presented as an unquestionable fact.

Worked Example: Comparing Two Delivery Policies

A distributor is comparing two policies for an annual customer segment.

  • Policy A: transport cost = 72,000; warehousing cost = 30,000; inventory holding cost = 48,000; order-processing cost = 20,000; failure and returns cost = 10,000.
  • Policy B: transport cost = 90,000; warehousing cost = 24,000; inventory holding cost = 36,000; order-processing cost = 18,000; failure and returns cost = 4,000.

Using the same cost boundary:

TLCA = 72,000 + 30,000 + 48,000 + 20,000 + 10,000 = 180,000
TLCB = 90,000 + 24,000 + 36,000 + 18,000 + 4,000 = 172,000

Policy B costs 8,000 less annually despite higher transport expenditure. The apparent transport saving in Policy A is offset by inventory, processing and failure costs. If Policy B also provides materially better service, it is strategically preferable, provided its service improvement is valuable and capacity is available.

5. Trade-Off Analysis and Network Decisions

Logistics trade-offs arise because decisions change several cost and service elements simultaneously. Examples include:

  • Faster transport can reduce in-transit inventory and improve responsiveness but increase freight cost.
  • More distribution centres can reduce delivery distance but increase facility, labour and cycle-stock costs.
  • Larger shipment sizes can reduce transport cost per unit but increase inventory and handling exposure.
  • Higher safety stock can improve availability but increase capital, obsolescence and storage cost.
  • Product variety can improve market fit but increase forecasting, picking and inventory complexity.
  • Outsourcing can reduce owned assets but introduce coordination, dependency and governance risks.

A decision should compare alternatives on a common time horizon and scope. Relevant costs are incremental costs that change because of the decision. Sunk costs should normally be excluded unless they affect avoidable cash flows or capacity opportunity. The analysis should also include service penalties, resilience, carbon emissions and regulatory exposure where material.

A basic evaluation can be expressed as:

Net logistics value = Customer value created − Relevant logistics cost − Risk-adjusted consequence

This is a conceptual decision rule rather than a universally measurable accounting formula. Customer value may be estimated through willingness-to-pay, retention, avoided downtime or service-level commitments. Risk-adjusted consequence requires explicit assumptions about probability and impact.

Managers should use sensitivity analysis. If a recommendation changes when fuel price, demand, lead time or failure rate changes modestly, the decision is fragile and should be accompanied by contingency measures.

6. Postponement and Consolidation

6.1 Postponement

Postponement delays product differentiation, final configuration, packaging, labelling or geographic deployment until demand information is more reliable. It separates common upstream activities from market-specific downstream activities.

Forms include:

  • Form postponement: final assembly or configuration is delayed.
  • Time postponement: shipment or deployment is delayed until an order is known.
  • Place postponement: inventory is held centrally until regional demand is clearer.
  • Labelling or packaging postponement: market-specific packaging is completed late.

Postponement is effective when products share common components, demand is uncertain, customisation is feasible late in the process and the response time remains acceptable. It may increase final-stage labour, require flexible equipment and create bottlenecks. It is not suitable when customers require immediate delivery of fully finished goods or when late customisation is technically expensive.

Postponement reduces the risk of holding the wrong finished product, but it does not eliminate uncertainty; it shifts inventory and capability upstream. Its success depends on modular design, accurate information, flexible suppliers and reliable final-stage operations.

6.2 Consolidation

Consolidation combines shipments, orders or flows to exploit economies of scale. It may involve multi-stop routes, less-than-truckload aggregation, cross-docking, scheduled milk runs or shared-user warehouses.

Benefits include lower cost per unit, improved vehicle utilisation, fewer dock events and reduced emissions per unit transported. Costs and risks include waiting for consolidation, additional handling, complex planning, missed cut-offs and reduced flexibility. Consolidation is therefore a service–cost decision rather than an automatic improvement.

The appropriate policy depends on order density, geography, time windows, product compatibility, shipment variability and the relative cost of delay. A hybrid design can consolidate predictable base demand while reserving premium capacity for urgent or uncertain demand.

7. Lean and Agile Logistics

7.1 Lean logistics

Lean logistics applies principles associated with waste reduction, flow, pull, standard work, root-cause analysis and continuous improvement. Waste may include waiting, unnecessary movement, excess inventory, rework, errors, over-processing and avoidable transportation. Lean does not simply mean “low inventory”; it seeks stable, capable processes that expose and remove causes of waste.

Lean methods include process mapping, five-why analysis, visual management, standard operating procedures, cycle-time reduction, supplier synchronisation and error-proofing. Lean is particularly suitable where demand is relatively stable, processes are repeatable and variation can be reduced.

7.2 Agile logistics

Agile logistics emphasises responsiveness to volatile demand, short product life cycles, variety and disruption. It uses flexible capacity, rapid information exchange, postponement, strategic buffers, modular products, multiple sourcing and expedited decision rights.

Agility is not the same as speed alone. It includes the ability to sense change, decide quickly, reconfigure resources and recover service. Agile systems often incur additional cost through reserved capacity, flexible labour, premium transport or redundant supply options.

7.3 Leagile design

Many supply chains require both lean efficiency and agile responsiveness. A decoupling point separates a forecast-driven upstream process from an order-driven downstream process. Upstream operations may be standardised and consolidated; downstream operations may use postponement and flexible fulfilment. The location of the decoupling point is a strategic design choice influenced by demand uncertainty, product modularity, lead-time expectations and capacity economics.

8. Applied Case: NorthStar Medical Devices

This is an illustrative case designed for learning purposes.

Background

NorthStar Medical Devices distributes diagnostic equipment and consumables to hospitals through three regional warehouses. Its marketing proposition emphasises dependable availability and delivery within two business days. Sales growth has increased product variety, small emergency orders and returns. Reported revenue is rising, but operating margin is falling.

Problem

The company measures freight cost per shipment and warehouse cost per pallet, but it does not measure cost-to-serve by customer or order type. It frequently sends partially filled vehicles, holds finished goods in all three warehouses and uses expedited transport when stock is unavailable. Service reports show 96% on-time delivery, but hospital customers complain about incomplete orders and poor status information.

Analysis

An order-cycle study shows that average physical transport time is acceptable, but 38% of cycle time is waiting for allocation and credit release. The company’s “on-time” measure excludes backordered lines, so it overstates the customer’s experience. A cost-to-serve analysis identifies three segments:

SegmentCharacteristicsMain cost driver
Planned hospitalsLarge, predictable weekly ordersInventory positioning
Emergency hospitalsSmall, urgent ordersPremium freight and picking
Remote clinicsLow volume, dispersed locationsDelivery distance and handling

NorthStar also discovers that several products share common components but are held as separate finished variants. Forecast error is high for variants, while common-component demand is relatively stable.

Approach and solution

Management adopts a segmented logistics strategy. Planned hospitals receive scheduled consolidated deliveries and electronic order cut-offs. Emergency hospitals receive a defined premium service with explicit pricing and reserved capacity. Remote clinics are served through regional consolidation days, with exceptions managed through a service agreement.

NorthStar moves selected products to a postponement model: common diagnostic units are stocked centrally, while language-specific labels and accessory kits are added after order confirmation. It reduces finished-goods duplication and retains common components at a central location. A cross-functional team redesigns credit-release rules, introduces automated checks for approved hospitals and establishes an exception queue for genuine risk cases.

The service dashboard is revised to include complete-on-time delivery, order-cycle percentile performance, backorder rate, premium-freight frequency, returns and cost-to-serve. The transport team is evaluated on total delivered cost and service reliability rather than freight cost alone.

Outcome

In the first year, the company reports fewer emergency shipments, lower finished-goods obsolescence and improved completeness. Some customers experience longer standard lead times because consolidation days are enforced, but the policy is disclosed and emergency service remains available. The most important improvement is not a single technology investment; it is the alignment of customer segmentation, service promises, inventory positioning and performance measures.

Learning points

  1. A high on-time percentage can conceal incomplete or split deliveries.
  2. Customer segments should receive differentiated service when their economics and requirements differ.
  3. Postponement is valuable where commonality and late configuration are feasible.
  4. Total-cost analysis can justify higher transport spending when it reduces failure and inventory costs.
  5. Metrics shape behaviour; poorly designed metrics encourage local optimisation.

9. Technology, Data and Governance

Technology supports logistics strategy when it improves decisions and execution. Transport-management systems can compare routes, carriers, rates and delivery performance. Warehouse-management systems improve task sequencing, location control and inventory accuracy. Order-management systems provide allocation and promise-date visibility. Control towers combine data from multiple parties to identify exceptions, although dashboards do not automatically create control.

Artificial intelligence can assist demand sensing, ETA prediction, route planning, anomaly detection and customer segmentation. Its use requires representative data, monitoring for systematic error, human accountability and clear escalation rules. A model that predicts late delivery using historical data may reproduce past service discrimination against remote or lower-volume customers. Automated decisions affecting priority, access or pricing should therefore be auditable and subject to governance.

Data quality is foundational. Product dimensions, locations, calendars, lead times, inventory status, customer dates and carrier events must be accurate and synchronised. Cybersecurity is also a logistics concern because disruption to warehouse, transport or ordering systems can stop physical flows. Access control, backups, incident response and supplier security reviews are essential.

10. Sustainability, Ethics and Regulation

Total-cost decisions should not externalise environmental and social costs. Relevant considerations include fuel use, greenhouse-gas emissions, packaging waste, congestion, noise, worker safety and labour conditions in outsourced operations. A cheaper transport option may impose costs on communities or depend on unsafe working practices.

Organisations should comply with applicable rules concerning dangerous goods, customs, sanctions, product traceability, labour protection, data privacy and transport safety. Governance should define who may change service promises, approve premium freight, override allocation rules and accept regulatory risk.

Sustainable logistics does not mean selecting the lowest-emission option regardless of service or resilience. It requires lifecycle analysis and transparent trade-offs. Consolidation, modal shift, right-sized packaging, renewable energy, network redesign and reverse logistics can reduce impact, but claims should be supported by consistent boundaries and evidence.

11. Implementation Road Map and Limitations

A practical implementation sequence is:

  1. Define the competitive proposition and customer segments.
  2. Document service promises and measurement definitions.
  3. Map order cycles using reliable time stamps.
  4. Establish a total-cost and cost-to-serve boundary.
  5. Identify trade-offs and test alternatives through scenarios.
  6. Pilot postponement, consolidation or segmented service policies.
  7. Align incentives, contracts and dashboards with total-system outcomes.
  8. Review results, customer effects, risks and unintended consequences.

Several limitations must be recognised. Cost-to-serve data may be incomplete or distorted by arbitrary allocations. Customer value is difficult to measure precisely. Average performance can hide tail risk. A model based on historical demand may fail during structural change. Postponement and lean methods can increase workload or vulnerability if flexibility is assumed rather than demonstrated. Outsourcing may reduce visible cost while increasing dependency and loss of capability. Finally, no logistics design is permanently optimal; strategy must be revisited as products, customers, technology, regulation and risk change.

Chapter Summary

Logistics strategy should be derived from competitive priorities and expressed through explicit service promises, operating policies and performance measures. Customer service includes availability, speed, reliability, completeness, flexibility, information, condition and recovery. Order-cycle analysis decomposes elapsed time and exposes queues, variability and failure points.

Total logistics cost evaluates transport, inventory, warehousing, processing, packaging, information, handling and failure costs within a defined boundary. Cost-to-serve reveals how different customers, products and channels consume activities and can prevent revenue or gross-margin measures from masking unprofitable service patterns. Trade-off analysis is essential because local cost reductions can increase total cost or reduce customer value.

Postponement delays differentiation until demand is clearer; consolidation exploits scale but may add waiting and handling. Lean logistics reduces waste and stabilises flow, whereas agile logistics provides responsiveness under volatility. Leagile systems combine efficient upstream operations with flexible downstream fulfilment. Effective implementation requires accurate data, aligned incentives, technology governance, ethical judgement, sustainability assessment and continuous review.

Key Terms

Agile logistics: Logistics designed to sense and respond rapidly to volatile demand or disruption.

Availability: The ability to supply the required product when required.

Consolidation: Combining shipments or flows to improve utilisation and reduce unit cost.

Cost-to-serve: The cost of activities required to serve a specified customer, product, channel or order segment.

Customer service: Logistics performance experienced by the customer, including availability, speed and reliability.

Decoupling point: The point separating forecast-driven operations from order-driven operations.

Fill rate: The proportion of ordered lines or units supplied in full.

Inventory turnover: Cost of goods sold divided by average inventory value.

Lean logistics: Application of flow, pull, waste reduction and continuous improvement to logistics processes.

Logistics strategy: A coordinated pattern of logistics decisions supporting competitive strategy.

Order cycle: The elapsed process from order initiation to acceptable customer receipt.

Perfect order: An order meeting defined requirements for completeness, timeliness, condition and documentation.

Postponement: Delaying final differentiation, configuration or deployment until demand is better known.

Reliability: The probability that a promised logistics outcome is achieved.

Service promise: A defined commitment concerning what service will be delivered, when and under what conditions.

Strategic fit: Alignment between logistics capabilities and the organisation’s competitive priorities.

Total logistics cost: The relevant combined cost of logistics activities within a specified decision boundary.

Trade-off: A situation in which improving one performance dimension affects another.

Review Questions

Short Answer Questions

  1. What is meant by strategic fit in logistics?
  2. Distinguish line fill rate from unit fill rate.
  3. Identify four components of an order cycle.
  4. What is postponement, and why can it reduce finished-goods risk?
  5. State one important difference between lean and agile logistics.

Long Answer Questions

  1. Explain how a firm’s competitive strategy should influence its logistics service policy, inventory positioning and transportation choices.
  2. Discuss the advantages and limitations of total logistics cost analysis.
  3. Explain how cost-to-serve analysis can change customer or channel management decisions.
  4. Compare consolidation and postponement as methods for managing logistics cost and uncertainty.
  5. Describe how technology, data governance and performance measures should be integrated into logistics strategy implementation.

Analytical / Application Questions

  1. A distributor reduces freight cost by 12% but experiences a 25% increase in stockouts and returns. Design an analysis to determine whether the policy improved total logistics performance.
  2. Using the NorthStar case, propose a service policy for planned hospitals, emergency hospitals and remote clinics. Identify the measures needed to prevent local optimisation.
  3. A manufacturer has stable demand for common components but highly uncertain demand for market-specific variants. Evaluate whether a postponement strategy is appropriate and identify the operational conditions required for success.

Multiple Choice Questions with Answers

Question 1

Which statement best describes strategic fit in logistics?

A. Selecting the lowest freight rate for every shipment

B. Aligning logistics capabilities and policies with competitive priorities

C. Maximising inventory turnover regardless of service

D. Using one standard service level for all customers

Correct Answer: B. Aligning logistics capabilities and policies with competitive priorities

Question 2

An order contains 200 units and 190 units are supplied. What is the unit fill rate?

A. 90%

B. 95%

C. 100%

D. 105%

Correct Answer: B. 95%

Question 3

Which measure most directly captures whether an order was delivered complete and on time?

A. Perfect-order performance

B. Inventory turnover

C. Warehouse capacity

D. Transport distance

Correct Answer: A. Perfect-order performance

Question 4

If transport cost is 72,000, warehousing cost is 30,000, inventory cost is 48,000, order-processing cost is 20,000 and failure cost is 10,000, what is total logistics cost?

A. 160,000

B. 170,000

C. 180,000

D. 190,000

Correct Answer: C. 180,000

Question 5

Which condition is most favourable for postponement?

A. Highly specific products with no common components

B. Stable demand for finished variants and no late configuration capability

C. Common components with uncertain market-specific demand

D. Customers requiring immediate delivery of fully finished products

Correct Answer: C. Common components with uncertain market-specific demand

Question 6

What is a likely disadvantage of shipment consolidation?

A. Lower vehicle utilisation

B. Increased waiting before a shipment is dispatched

C. Higher emissions per unit in every case

D. Elimination of planning requirements

Correct Answer: B. Increased waiting before a shipment is dispatched

Question 7

Which statement about total logistics cost is correct?

A. It includes only transportation cost

B. It always excludes inventory cost

C. Its boundary must be defined to avoid omissions and double counting

D. It is identical to revenue less gross margin

Correct Answer: C. Its boundary must be defined to avoid omissions and double counting

Question 8

A company has cost of goods sold of 2,000,000 and average inventory value of 500,000. What is inventory turnover?

A. 2 turns

B. 4 turns

C. 500 turns

D. 2,500 turns

Correct Answer: B. 4 turns

Question 9

Which characteristic is most associated with agile logistics?

A. Responsiveness to volatile demand and disruption

B. Elimination of all safety stock

C. Fixed routes with no exception handling

D. Optimisation of one activity in isolation

Correct Answer: A. Responsiveness to volatile demand and disruption

Question 10

If sequential order-cycle stages have expected times of 2, 3 and 5 hours, what is the expected total cycle time, assuming no overlap?

A. 5 hours

B. 8 hours

C. 10 hours

D. 30 hours

Correct Answer: C. 10 hours