Lean Manufacturing Foundations and EvolutionIntroductionLean manufacturing is both a management philosophy and a socio-technical system for creating customer value with fewer resources, shorter lead times, higher quality, and greater employee participation. Although the term became widely known through studies of the Toyota Production System (TPS), lean is not simply a collection of tools such as kanban, 5S, or value-stream mapping. It is a way of designing and governing work so that value-creating activities flow in response to actual demand while problems become visible and are systematically solved. For graduate students in operations management, lean manufacturing is important for two reasons. First, it provides a coherent explanation of how production systems can improve productivity, quality, flexibility, and delivery simultaneously. Second, it offers a critical lens for evaluating managerial choices. A plant may display kanban cards and conduct improvement workshops yet remain fundamentally non-lean if it relies on unstable processes, excessive expediting, hidden defects, or a command-and-control culture that suppresses employee learning. Lean also has historical roots. Its development can be understood as a progression from mechanization and scientific management, through Fordist mass production, to the integrated production system developed at Toyota under conditions of scarce capital, limited space, variable demand, and intense competitive pressure. The resulting system adapted earlier ideas rather than rejecting them entirely. Learning ObjectivesBy the end of this chapter, the reader should be able to: - Explain the historical development from scientific management and mass production to the Toyota Production System.
- Distinguish lean thinking from operational excellence, agile operations, Six Sigma, total quality management, and just-in-time production.
- Define value, waste, flow, pull, perfection, mura, muri, and related lean terminology.
- Analyze how process instability, excess inventory, and poor problem solving undermine lean performance.
- Apply lean concepts to a practical manufacturing or service-operation case.
- Critically evaluate the benefits, risks, and organizational conditions required for sustainable lean transformation.
Historical FoundationsCraft production and the problem of variabilityBefore industrial mass production, many products were made by skilled craftspeople. Craft production allowed customization and relied on accumulated practical knowledge. Its weaknesses included long production times, high cost, dependence on individual expertise, and substantial variation between units. The absence of standardized methods made quality difficult to predict and capacity difficult to plan. Industrialization introduced specialized machinery, interchangeable parts, formal production planning, and new forms of managerial control. These developments increased output but also created the need to coordinate large numbers of workers, machines, materials, and information flows. Scientific managementFrederick W. Taylor’s scientific management sought to replace informal work practices with systematic analysis. Its central ideas included: - studying tasks and separating planning from execution;
- identifying a “best” method for performing a task;
- selecting and training workers systematically;
- measuring time and output; and
- using management control to coordinate production.
Scientific management contributed important foundations for lean, including standard work, process observation, work measurement, and attention to method. However, its classical form often treated employees primarily as executors of instructions. Lean later expanded the meaning of standardization: a standard is not only a control device but also a baseline from which teams can identify abnormal conditions and improve the process. A graduate-level interpretation should therefore avoid portraying scientific management as simply obsolete. Its analytical discipline remains valuable, while its assumptions about centralized knowledge, narrow job design, and one-way authority may be inadequate in complex and knowledge-intensive operations. Ford and mass productionHenry Ford combined interchangeable parts, product standardization, specialized machinery, moving assembly lines, and high production volumes. Mass production reduced unit cost by distributing fixed costs across large output and by reducing setup and handling time. The assembly line also made the sequence of work visible and measurable. The mass-production model generally assumed relatively stable demand, long production runs, limited variety, and substantial inventories between operations. Efficiency was often pursued locally: each department attempted to maximize machine utilization or labor productivity. This could produce high individual-resource utilization while increasing total lead time, work-in-process inventory, and difficulty responding to changing customer requirements. Lean manufacturing retained standardization, flow, visual control, and disciplined process design, but challenged the belief that large batches and maximum local utilization necessarily create superior system performance. The Emergence of the Toyota Production SystemContextToyota developed its production system gradually after the Second World War. The company faced a domestic market too small to support the product volumes and economies of scale associated with American mass production. Capital was constrained, factory space was limited, and customers required a variety of vehicles. These conditions made large inventories and long production runs unattractive. Taiichi Ohno, Shigeo Shingo, Eiji Toyoda, and many other Toyota leaders developed practices that addressed these constraints. Their system emphasized the elimination of waste, short changeover times, small batches, built-in quality, employee problem solving, and production linked to actual downstream demand. The TPS is commonly represented through two supporting pillars: - Just-in-time (JIT): producing and moving what is needed, when it is needed, and in the quantity needed.
- Jidoka: building quality into the process by detecting abnormalities, stopping when necessary, and separating human judgment from repetitive machine monitoring.
These pillars rest on a foundation of standardized work, workplace stability, visual management, employee involvement, supplier relationships, and continuous improvement. The famous “house” representation is useful, but it can also oversimplify TPS. Toyota’s system is not a checklist. Its effectiveness depends on the relationships among technical practices, managerial routines, skills, leadership behavior, and organizational learning. The two pillars in practiceJIT is often misunderstood as “zero inventory.” In reality, inventory may be necessary to protect customers from unavoidable variation, decouple processes during improvement, or manage supply risk. JIT seeks to expose and reduce the causes of unnecessary inventory rather than treating all inventory as inherently immoral. A pull signal, such as a kanban, authorizes replenishment based on consumption rather than speculative forecasts alone. Jidoka means more than inspection at the end of the line. It involves designing equipment and work systems to detect abnormality, stop or signal the process, contain the problem, and prevent recurrence. A worker who pulls an andon cord to report a defect is not necessarily reducing productivity; the worker is protecting the customer and enabling immediate learning. If management discourages stopping, defects become hidden and downstream rework grows. From TPS to “lean production”The expression “lean production” gained international prominence through the International Motor Vehicle Program at the Massachusetts Institute of Technology and the publication The Machine That Changed the World by James P. Womack, Daniel T. Jones, and Daniel Roos. The term described a production system that appeared to use less inventory, space, labor, and time than conventional mass production while achieving high quality and variety. The international diffusion of lean produced both insight and distortion. The insight was that TPS principles could inform many organizations. The distortion was the belief that isolated tools could reproduce Toyota’s results without comparable attention to capability development, problem solving, supplier relationships, and leadership. Lean Thinking: A Conceptual FrameworkWomack and Jones summarized lean thinking through five principles: specify value, identify the value stream, make value flow, establish pull, and pursue perfection. These principles are best interpreted as a connected logic rather than a one-time implementation sequence. ValueValue is defined from the customer’s perspective. An activity creates value when it transforms the product or service in a way the customer requires and is willing to recognize. In manufacturing, machining a component to the required specification may create value. Moving the component between departments normally does not, even though it may be necessary under the current process design. Value is contextual. A feature that one customer values may be irrelevant to another. Internal convenience, accounting categories, or high machine utilization should not be confused with customer value. Lean analysis therefore begins by identifying the customer, the required outcome, the quality specification, the delivery expectation, and the price or total cost the market can support. Value streamA value stream includes all activities required to deliver a product or service, from receiving the customer requirement through design, production, delivery, and sometimes after-sales support. It includes both material and information flows. A value-stream perspective prevents managers from optimizing a single department while worsening total system performance. Activities are often classified as: | Category | Meaning | Typical example |
|---|
| Value-creating | Directly transforms the product or service in a customer-required way | Welding a component to specification | | Necessary but non-value-creating | Does not create customer value but is currently required by regulation, technology, or process constraints | Required inspection or regulatory documentation | | Pure waste | Consumes resources without creating value and without being presently necessary | Rework caused by an avoidable defect |
The second category should not be accepted permanently. It is a target for redesign, simplification, automation, or risk-based control. WasteTaiichi Ohno identified seven classic forms of waste: - Overproduction: producing earlier, faster, or in greater quantity than required.
- Waiting: people, materials, information, or equipment being idle.
- Transportation: unnecessary movement of materials or products.
- Overprocessing: performing more work or precision than the customer or specification requires.
- Inventory: excess raw material, work in process, or finished goods.
- Motion: unnecessary movement by people.
- Defects: errors, rework, scrap, returns, and corrective effort.
Many contemporary treatments add an eighth waste: unused human talent, meaning failure to use employees’ knowledge, creativity, and problem-solving capability. Some authors also treat environmental waste, unsafe conditions, or underutilized data as extensions of the original categories. Waste is not always visible. Large inventory is visible, but the causes it conceals—unreliable equipment, poor quality, long changeovers, or inaccurate scheduling—may not be. Waste analysis should therefore ask not only “Where is the waste?” but also “What condition permits it to persist?” FlowFlow means that work progresses through a process with minimal interruption, waiting, batching, backtracking, and accumulation. Flow is not equivalent to making every resource busy. A system may have high machine utilization and poor flow if jobs queue for long periods. The relationship between work-in-process, throughput, and lead time is expressed by Little’s Law: L = λW Here, L is average work-in-process, measured in units; λ is average throughput, measured in units per unit of time; and W is average flow time or lead time, measured in units of time. The relationship assumes a stable system over the period considered, with consistent definitions of the system boundary and averages taken over a sufficiently long interval. For example, if a fabrication cell averages 240 units of work-in-process and completes 60 units per hour, average flow time is: W = L ÷ λ = 240 units ÷ 60 units/hour = 4 hours Reducing inventory while maintaining throughput reduces average lead time. However, Little’s Law does not identify the cause of delay, guarantee quality, or imply that inventory can be reduced without affecting stability. It is a diagnostic relationship, not a complete improvement method. PullA pull system authorizes upstream production in response to downstream consumption. In a push system, schedules or forecasts release work whether or not the next process is ready. Pull reduces overproduction and makes replenishment logic visible. A simple kanban-loop relationship is often expressed as: N = D L (1 + α) ÷ C where N is the required number of kanban containers, D is average demand per unit time, L is replenishment lead time, α is a safety factor expressed as a proportion, and C is container capacity. The calculation assumes reasonably stable demand, a defined replenishment lead time, consistent container quantity, and a safety factor that reflects known variation. Since the result may not be an integer, the operational value is rounded up. If demand is 80 units per hour, replenishment lead time is 1.5 hours, the safety factor is 25%, and each container holds 20 units: N = (80 × 1.5 × 1.25) ÷ 20 = 7.5 The system would require at least 8 containers under these assumptions. The formula is a starting point, not a substitute for stabilizing demand, reducing lead time, or reviewing the loop after conditions change. Perfection and continuous improvementPerfection does not mean that a process can literally reach a final state with no variation. It means pursuing continual reduction of waste, defects, delay, risk, and effort while increasing customer value. The Japanese concept of kaizen refers broadly to continuous improvement, often through many small, disciplined changes. Larger breakthrough improvements may also be necessary when technology, product architecture, or market conditions change. A useful improvement cycle is Plan–Do–Check–Act (PDCA): define the problem and hypothesis, test a change on a controlled basis, compare results with the expected condition, and standardize or revise the solution. The cycle is weakened when organizations jump directly to solutions without defining the current condition or measuring the effect. Essential Lean TerminologyMura, muri, and mudaThe three Japanese terms are closely related: - Muda: waste or activity that consumes resources without creating value.
- Mura: unevenness, inconsistency, or irregularity in workload, demand, quality, or performance.
- Muri: overburden placed on people, machines, or systems beyond reasonable capability.
Mura often creates muri, and muri often creates muda. For example, an erratic production schedule may create peaks in workload. Employees and machines become overburdened during peaks, causing fatigue, breakdowns, defects, and rework. The resulting waste is not solved merely by asking employees to work faster; the underlying unevenness must be addressed. Standard workStandard work defines the current best-known method for performing a task safely, consistently, and at the required pace. It normally specifies the sequence of work, the required time or pace, and the standard amount of work-in-process. Standard work is not intended to prevent improvement. Without a baseline, however, it is difficult to determine whether a change has improved or merely altered performance. Takt timeTakt time is the available production time divided by customer demand during the same period: Takt time = Available production time ÷ Customer demand If a shift provides 420 minutes of net available production time and customers require 210 units, takt time is 2 minutes per unit. Takt is a demand rhythm, not a measure of actual cycle time and not necessarily the time required for every individual task. It is applicable when the time period and demand definition are clear and comparable. Cycle time, lead time, and throughputCycle time is the time required to complete one unit or one cycle at a particular process step. Lead time is the elapsed time from request or release to delivery, depending on the defined system boundary. Throughput is the rate at which completed units exit a process. Confusing these terms can lead to poor decisions. A machine may have a short cycle time while customer lead time remains long because of queues and batch transfer. Heijunka and levelingHeijunka is production leveling by volume and mix. Rather than releasing highly variable batches, leveling seeks a more stable sequence that reduces mura and supports predictable work. It does not eliminate genuine demand variation; it manages release and replenishment so that the production system is not repeatedly subjected to avoidable peaks and valleys. Visual management and andonVisual management makes the condition of a process understandable at a glance. Examples include status boards, color coding, production-control displays, standard-work charts, and abnormality signals. An andon is a visual or audible signal that communicates a process condition and may request assistance or trigger a stop. Visual tools are effective only when people respond consistently to the information displayed. Poka-yokePoka-yoke means mistake-proofing. It involves designing products, fixtures, software, or procedures so that an error is prevented or detected immediately. A connector that can be inserted in only one orientation is a simple example. Poka-yoke is generally stronger than relying solely on training or final inspection. Lean and Related Management PhilosophiesLean overlaps with several approaches but should not be treated as identical to them. | Approach | Primary emphasis | Relationship to lean |
|---|
| Lean thinking | Customer value, flow, pull, waste reduction, learning | Broad operating philosophy | | TPS | Integrated Toyota system of JIT, jidoka, standard work, and people development | Historical and operational source of modern lean | | Operational excellence | Sustained superior performance through aligned processes, capabilities, governance, and culture | Broader management ambition; may include lean, quality, reliability, and digital systems | | Six Sigma | Reduction of process variation and defects through structured, data-driven methods | Complementary; often stronger in statistical problem definition and control | | Total Quality Management | Organization-wide quality responsibility and customer focus | Shares prevention, participation, and continuous improvement | | Agile operations | Rapid response to changing customer or market requirements | Emphasizes responsiveness; can complement lean but may increase instability if poorly designed | | Just-in-time | Timely production and replenishment with low unnecessary inventory | A major lean principle and TPS pillar, not the whole system | | Theory of Constraints | Managing the system’s constraint to improve throughput | Compatible with lean; differs in its central analytical focus |
Operational excellence is particularly broad. It concerns the sustained ability of an organization to deliver strategically important outcomes—quality, cost, delivery, safety, compliance, innovation, and customer experience—through disciplined processes and organizational capabilities. Lean may be the dominant improvement logic in one organization, while reliability engineering, Six Sigma, digital operations, or process mining may be more important in another. A critical issue is instrumentalization: using lean vocabulary to justify labor intensification, arbitrary headcount reduction, or inventory cuts without improving process capability. Such practices may produce short-term financial results but damage safety, quality, trust, and long-term learning. Genuine lean treats people as problem solvers and protects the conditions under which problems can be identified. Applying Lean: An Illustrative CaseBackgroundThe following is a fictional illustrative case. Meridian Components manufactures an electrical enclosure in four operations: cutting, bending, painting, and final assembly. Customer demand averages 480 units per eight-hour shift. After breaks and planned meetings, net available production time is 420 minutes per shift. ProblemMeridian reports frequent late deliveries despite adequate installed capacity. Supervisors respond by releasing large batches to keep machines busy. Work-in-process accumulates between cutting and bending, while final assembly frequently waits for painted parts. Defects are discovered at final inspection, and employees often work overtime near the end of the week. AnalysisThe demand rhythm is: Takt time = 420 minutes ÷ 480 units = 0.875 minute per unit This does not mean that every operation must have exactly a 0.875-minute cycle time. It indicates the average rate required to meet demand. A preliminary value-stream study reveals the following conditions: - cutting releases material according to a weekly forecast rather than actual downstream consumption;
- bending has a long changeover and therefore produces large batches;
- painting has unpredictable downtime;
- final inspection detects defects that could have been prevented earlier;
- operators have no common abnormality response process.
The visible problem is late delivery, but the system contains mura, muri, and muda. Forecast-driven release creates overproduction; long changeovers encourage batching; equipment downtime creates unevenness; overtime creates overburden; and final inspection generates rework and waiting. ApproachThe improvement team takes the following steps: - Defines the customer requirement and maps material and information flow.
- Establishes a daily production rhythm based on actual demand.
- Separates changeover activities and applies a structured setup-reduction effort.
- Introduces a supermarket between painting and assembly with replenishment triggered by consumption.
- Adds point-of-process quality checks and simple mistake-proofing at bending.
- Develops standard work and a visual abnormality board.
- Trains operators and supervisors in root-cause analysis rather than instructing them simply to work faster.
- Reviews safety, quality, delivery, cost, and morale measures together.
OutcomeAfter three months, average work-in-process falls from 1,200 to 720 units while throughput remains 480 units per shift. Using Little’s Law with a shift interpreted as 7 hours of effective production time, the approximate flow time changes from: W₁ = 1,200 units ÷ (480 units ÷ 7 hours) = 17.5 hours To: W₂ = 720 units ÷ (480 units ÷ 7 hours) = 10.5 hours These calculations are approximate because the averages and system boundaries must be consistent. The improvement team also reports fewer final-stage defects and less overtime. Importantly, the result is not attributed to inventory reduction alone. Inventory was reduced after process conditions improved, and the new pull loop was supported by changeover reduction, equipment maintenance, quality-at-source, and employee problem solving. Learning pointsThe case illustrates five principles. First, system performance is more important than local utilization. Second, inventory can conceal instability. Third, pull cannot compensate for unreliable processes indefinitely. Fourth, quality must be designed into the process. Fifth, lean improvement is a capability-building process, not a one-time cost-cutting project. Implementation Conditions and LimitationsLeadership and cultureLeaders must create psychological safety for reporting problems, provide time for improvement, and distinguish accountability from blame. If a worker is punished for stopping a defective process, the organization will receive fewer signals about defects. Daily management should connect strategic priorities with frontline conditions through short, evidence-based routines. Measurement and governanceLean performance should be assessed through a balanced set of measures. Useful categories include safety, first-pass yield, customer lead time, on-time delivery, throughput, inventory, employee capability, and financial performance. A single metric can create dysfunctional behavior. For example, maximizing machine utilization may increase batch size and delay customer delivery. Organizations should also define data ownership, measurement rules, escalation authority, and review frequency. Digital dashboards do not create lean management if the data are inaccurate or if no one acts on abnormalities. Supply-chain and resilience considerationsExtreme inventory reduction can increase vulnerability to supplier disruption, geopolitical risk, transport interruption, or demand shocks. Lean should therefore be interpreted as the removal of unnecessary buffers, not the elimination of all buffers. Strategic resilience may require selective safety stocks, dual sourcing, modular product design, or alternative logistics routes. The appropriate buffer depends on risk, cost, recovery time, and customer criticality. Human and ethical considerationsLean systems affect work design, autonomy, skill requirements, workload, and employment security. Ethical implementation requires attention to ergonomics, fatigue, safe staffing, fair participation, and the distribution of gains from productivity improvement. Employee involvement should be substantive rather than symbolic. A kaizen event that extracts unpaid ideas while increasing work intensity without recognition is inconsistent with the social principles of sustainable lean. Technology and artificial intelligenceSensors, manufacturing execution systems, process mining, predictive maintenance, and artificial intelligence can support lean by improving visibility and identifying patterns. For example, machine data may reveal the causes of micro-stoppages that operators cannot easily observe. AI may assist demand analysis or anomaly detection. Technology does not remove the need for process understanding. Poorly defined processes generate poor data, and opaque algorithms can produce recommendations that operators cannot validate. Human oversight, cybersecurity, data governance, explainability, and skill development are necessary. Automation should not merely accelerate a wasteful process; the process should first be simplified and stabilized where possible. Contemporary InterpretationModern lean organizations operate in environments characterized by customization, digitalization, sustainability requirements, global supply risk, and service-based business models. Lean principles apply beyond factories to hospitals, logistics, software delivery, government, and financial services, provided that value and flow are defined appropriately. The contemporary challenge is to integrate efficiency with resilience and innovation. A purely efficiency-oriented system may become fragile, while a system built only for flexibility may tolerate excessive variation and cost. Lean thinking contributes by making trade-offs visible, exposing causes of poor performance, and promoting rapid learning. It does not provide an automatic answer to every strategic problem. A mature lean system therefore combines: - a clear definition of customer and stakeholder value;
- stable and standardized processes where stability is beneficial;
- rapid detection and resolution of abnormalities;
- disciplined use of pull and replenishment;
- development of people and leaders;
- evidence-based experimentation; and
- adaptation to risk, technology, regulation, and environmental responsibility.
Chapter SummaryLean manufacturing evolved from earlier systems rather than appearing without precedent. Scientific management contributed task analysis, standardization, and measurement. Fordist mass production contributed interchangeable parts, specialization, and flow through the assembly line, but often depended on high volume, low variety, and large batches. Toyota adapted these ideas to a resource-constrained environment and developed a system based on just-in-time, jidoka, waste reduction, standard work, problem solving, and respect for people. Lean thinking is commonly organized around value, the value stream, flow, pull, and perfection. Its central waste categories are overproduction, waiting, transportation, overprocessing, inventory, motion, and defects, with unused human capability often added. Muda, mura, and muri describe waste, unevenness, and overburden as interconnected conditions. Takt time expresses the rhythm required by demand, while cycle time, lead time, throughput, and work-in-process describe different aspects of process performance. Lean overlaps with Six Sigma, total quality management, agile operations, operational excellence, and the Theory of Constraints, but each has a different primary emphasis. Successful lean implementation requires process stability, employee involvement, leadership discipline, balanced measurement, and attention to safety and resilience. Tools alone cannot reproduce a management system. The enduring purpose of lean is to create greater customer value while developing the capability of people and processes to learn continuously. Key TermsLean manufacturing: A system for creating customer value with fewer resources through flow, pull, waste reduction, quality, and continuous learning. Toyota Production System (TPS): Toyota’s integrated production and management system centered on just-in-time, jidoka, standard work, and people development. Value: A product or service characteristic that meets a customer requirement and is recognized as worthwhile by that customer. Value stream: All material and information activities required to deliver a product or service. Muda: Wasteful activity that consumes resources without creating value. Mura: Unevenness or inconsistency in demand, workload, quality, or performance. Muri: Overburden placed on people, equipment, or systems. Flow: Movement of work through a process with minimal interruption, batching, and waiting. Pull: Production or replenishment authorized by downstream consumption. Perfection: The continuing pursuit of improved value, quality, flow, and reduced waste. Just-in-time: Producing and moving what is needed, when it is needed, in the quantity needed. Jidoka: Building quality into the process through abnormality detection, stopping, and problem solving. Kaizen: Continuous improvement through systematic, often incremental, changes. Standard work: The current best-known method for performing a task safely and consistently. Takt time: Available production time divided by customer demand for the same period. Cycle time: Time required to complete one unit or cycle at a particular process step. Lead time: Elapsed time from the defined beginning of a request or process to its completion. Kanban: A visual authorization and communication mechanism used to control pull and replenishment. Poka-yoke: Mistake-proofing that prevents or immediately detects errors. Heijunka: Production leveling by volume and product mix. Review QuestionsShort Answer Questions- What limitations of mass production encouraged the development of the Toyota Production System?
- Define value and explain why value must be assessed from the customer’s perspective.
- What is the difference between muda, mura, and muri?
- Distinguish takt time from cycle time.
- Why is jidoka more than final inspection?
Long Answer Questions- Explain the historical progression from scientific management to lean manufacturing. Identify both the contributions and limitations of each stage.
- Discuss the five principles of lean thinking and explain how they form an interconnected system.
- Compare lean thinking, Six Sigma, total quality management, and operational excellence.
- Explain how inventory can both protect an operation and conceal its problems. Use the concepts of flow, pull, and process stability.
- Evaluate the role of employee involvement and leadership behavior in sustaining lean transformation.
Analytical / Application Questions- A process has average work-in-process of 900 units and throughput of 75 units per hour. Use Little’s Law to estimate average flow time. State the assumptions required for your calculation.
- A production line has 360 minutes of net available time per shift and customer demand of 240 units per shift. Calculate takt time and explain how managers should use the result without confusing it with cycle time.
- A factory reduces inventory by 50% but experiences increased expediting, overtime, defects, and supplier shortages. Diagnose the likely lean-system weaknesses and propose a balanced improvement plan.
Multiple Choice Questions with AnswersQuestion 1Which historical condition most strongly encouraged Toyota to develop a production system different from American mass production? A. A domestic market requiring high variety with limited capital and space B. A complete absence of customer demand for automobiles C. Unlimited factory space and abundant financial resources D. A requirement to produce only one standardized model Correct Answer: A. A domestic market requiring high variety with limited capital and space Question 2Which activity is most clearly value-creating from a customer perspective? A. Moving finished goods repeatedly between warehouses B. Reworking a defective product after final inspection C. Machining a component to the customer’s required specification D. Waiting for approval because a schedule is unclear Correct Answer: C. Machining a component to the customer’s required specification Question 3What is the primary purpose of a pull system? A. To maximize the utilization of every machine regardless of demand B. To authorize production in response to downstream consumption C. To increase batch sizes whenever forecasts change D. To eliminate every form of inventory immediately Correct Answer: B. To authorize production in response to downstream consumption Question 4Which pairing is correct? A. Mura—overburden; muri—unevenness; muda—customer value B. Mura—unevenness; muri—overburden; muda—waste C. Mura—quality at source; muri—pull; muda—leveling D. Mura—standard work; muri—flow; muda—takt time Correct Answer: B. Mura—unevenness; muri—overburden; muda—waste Question 5A process has 300 units of average work-in-process and throughput of 50 units per hour. Under Little’s Law, what is the average flow time? A. 0.167 hour B. 6 hours C. 50 hours D. 15,000 hours Correct Answer: B. 6 hours Question 6Which statement best describes jidoka? A. Producing large batches to minimize changeovers B. Inspecting all products only after production is complete C. Detecting abnormalities and building quality into the process D. Replacing all human decisions with automation Correct Answer: C. Detecting abnormalities and building quality into the process Question 7A shift has 420 minutes of net available time and customer demand is 210 units. What is the takt time? A. 0.5 minute per unit B. 1 minute per unit C. 2 minutes per unit D. 210 minutes per unit Correct Answer: C. 2 minutes per unit Question 8Which statement most accurately distinguishes lean from operational excellence? A. Lean focuses on customer value and waste reduction, while operational excellence is a broader performance ambition B. Operational excellence applies only to factories, while lean applies only to services C. Lean is exclusively a statistical method, while operational excellence rejects measurement D. The two terms always have exactly the same meaning Correct Answer: A. Lean focuses on customer value and waste reduction, while operational excellence is a broader performance ambition Question 9Why can reducing inventory without stabilizing processes damage performance? A. Inventory always creates customer value B. Inventory may conceal problems such as downtime, defects, and unevenness C. Lower inventory automatically increases process variation D. Pull systems require unlimited inventory Correct Answer: B. Inventory may conceal problems such as downtime, defects, and unevenness Question 10Which practice is an example of poka-yoke? A. Allowing a connector to fit only in the correct orientation B. Increasing inspection after defects reach the customer C. Producing ahead of demand to keep equipment busy D. Adding an extra approval step to every transaction Correct Answer: A. Allowing a connector to fit only in the correct orientation
|