10. Lean Supply Chains, Logistics and ResilienceIntroduction and ContextLean manufacturing is often introduced through the factory: flow is improved, inventories are reduced, problems are made visible, and work is organized around customer value. Yet a factory cannot be lean in isolation. Its performance depends on the availability, quality, timing, and configuration of materials arriving from suppliers and on the effectiveness of warehouses, transport providers, distributors, and channels through which finished goods reach customers. A production system that operates efficiently inside the plant but experiences shortages, excess stock, unreliable suppliers, or congested distribution is not lean in a strategic sense. Lean supply chain management extends the principles of value, flow, pull, standardization, problem solving, and respect for people across organizational boundaries. It seeks to remove waste from the entire value stream rather than merely transferring waste from one firm to another. For example, reducing a manufacturer's inventory by forcing suppliers to hold large safety stocks is not genuine improvement; it simply relocates cost and risk. At the same time, extreme pursuit of low inventory and tightly synchronized flows can create vulnerability. Natural disasters, geopolitical conflict, cyberattacks, pandemics, transport interruptions, quality failures, and sudden demand changes can interrupt supply. Consequently, contemporary operations managers must balance lean efficiency with resilience, flexibility, and the ability to recover. This chapter examines that balance and develops a managerial approach to supplier development, logistics design, inventory segmentation, lean–agile integration, disruption management, and resilient supply networks. Learning ObjectivesAfter studying this chapter, the learner should be able to: 1. Explain the meaning and strategic scope of a lean supply chain. 2. Distinguish logistics waste from necessary logistics activity and identify sources of non-value-adding work. 3. Evaluate supplier development, collaborative planning, milk runs, point-of-use delivery, and warehouse-flow practices. 4. Segment inventory and supply policies according to demand, value, variability, and risk. 5. Analyze the trade-off between lean efficiency and agile responsiveness. 6. Design a practical framework for supply-chain risk assessment and resilience. 7. Select performance measures that prevent local optimization. 8. Apply lean supply-chain principles to a managerial case. From Lean Production to Lean Supply NetworksA supply chain is a network of organizations, facilities, processes, information flows, and financial relationships involved in sourcing, transforming, storing, transporting, selling, and servicing a product or service. The term value stream emphasizes the sequence of activities required to satisfy a customer, including activities performed outside the focal organization. A lean supply chain delivers customer value with minimal total waste, short and reliable lead times, low process variation, and coordinated material and information flows. Its objective is not simply to minimize inventory. Inventory is one possible buffer against uncertainty, and reducing it without improving the underlying process can increase shortages and expediting. The central question is whether the network is capable, stable, visible, and responsive enough to operate with an appropriate level of inventory. The principal forms of supply-chain waste include: - unnecessary transportation and handling;
- waiting for materials, approvals, vehicles, or information;
- excess inventory and obsolete stock;
- defects, returns, and receiving or shipping errors;
- overprocessing through duplicate paperwork or inspection;
- unnecessary motion in warehouses and plants;
- overproduction caused by speculative purchasing or manufacturing; and
- underuse of supplier, operator, and logistics expertise.
These wastes interact. A supplier delivering in large, infrequent batches may reduce transport frequency but create receiving congestion, storage requirements, counting work, and production shortages between deliveries. A lean redesign considers the total system rather than optimizing one activity in isolation. Push, Pull, and End-to-End FlowIn a push system, replenishment is primarily driven by forecasts, schedules, or supplier production plans. In a pull system, replenishment is authorized by actual consumption or a defined downstream requirement. Kanban is a signaling method that can support pull, but a card or electronic signal alone does not create a pull system. Stable processes, agreed quantities, replenishment rules, and disciplined response are also necessary. End-to-end flow requires alignment among physical flow, information flow, and decision rights. If a plant receives materials according to a pull signal while the supplier continues to produce against an inaccurate monthly forecast, inventory may accumulate upstream. Effective supply-chain lean management therefore includes shared visibility of demand, capacity, quality, schedules, and constraints. The Relational Foundation: Supplier Development and GovernanceTraditional purchasing often emphasizes price negotiation and transactional comparison. Lean sourcing places greater emphasis on total cost, process capability, delivery reliability, problem-solving ability, and long-term improvement. This does not mean that price is irrelevant. It means that purchase price is only one component of total cost, which may also include freight, inspection, downtime, defects, inventory, administration, warranty, and switching costs. Supplier development is the systematic effort to improve a supplier's technical, operational, and managerial capability. It may include joint value-stream mapping, process audits, capability studies, standard-work development, quality-at-source training, layout improvement, maintenance support, and shared problem solving. Development should not become a disguised attempt to impose the buyer's cost on a weaker supplier. A constructive relationship establishes mutual benefit, transparent expectations, and fair treatment. A practical supplier-governance architecture generally includes: - clear specifications and acceptance criteria;
- agreed service-level and quality measures;
- regular performance reviews based on facts;
- escalation rules for recurring problems;
- joint root-cause analysis rather than blame;
- protection of confidential information and intellectual property; and
- contingency arrangements for critical materials.
Supplier segmentation is useful because not every supplier requires the same relationship. A strategic supplier may be critical because of technological uniqueness, high switching cost, or disruption exposure. A leverage supplier may provide a substitutable material with significant purchasing value. Routine suppliers may be managed through standardized catalogues and efficient transactions. Bottleneck suppliers may have modest spend but high operational risk. Segmentation should guide governance intensity, not justify neglect of smaller suppliers. A useful development sequence is to establish basic compliance and capability, stabilize quality and delivery, improve flow and cost jointly, and then pursue innovation and network resilience. Advanced collaboration can include shared design reviews, synchronized product launches, capacity planning, and coordinated investment. Logistics as a Flow-Design ProblemLogistics includes transportation, material handling, storage, order processing, packaging, and associated information. Lean logistics does not seek the fewest possible vehicle movements at any cost. It seeks reliable, economical, safe, and appropriately frequent movement that supports the required production and customer flow. Milk RunsA milk run is a planned route in which one vehicle collects or delivers materials at multiple locations according to a defined schedule. Compared with separate direct deliveries, a milk run can improve vehicle utilization, reduce receiving variability, support smaller and more frequent deliveries, and make replenishment rhythm visible. It is especially suitable where suppliers are geographically clustered and demand patterns are reasonably stable. Milk runs require route design, standard containers, timed collection windows, loading standards, proof of delivery, and contingency plans. Poorly designed routes can increase travel distance, create lateness, or spread a disruption across several suppliers. The decision should therefore consider total landed cost, route reliability, carbon emissions, driver safety, and the criticality of the materials. Point-of-Use Delivery and Line-Side SupermarketsPoint-of-use delivery places materials close to the workstation where they are consumed. It reduces operator walking, searching, and handling, while making replenishment signals and stock abnormalities visible. A line-side supermarket is a controlled replenishment location near production; it may contain a defined quantity of standardized containers and be replenished from a warehouse or supplier. Point-of-use systems must be designed carefully. Excessive line-side stock can obstruct work, hide shortages, and increase obsolescence. Small containers, fixed locations, visual controls, two-bin signals, barcode scans, or radio-frequency identification can support reliable replenishment. Material presentation should be determined by ergonomic requirements, consumption rate, quality sensitivity, and replenishment lead time. Warehouse FlowLean warehousing begins with a clear distinction between storage and movement. Receiving, identification, put-away, picking, packing, staging, and dispatch should follow a logical flow. Cross-docking can reduce storage where inbound goods are already allocated to an outbound requirement. Slotting places high-frequency or urgent items in accessible locations, while slow-moving and bulky items are positioned according to safety and handling constraints. Warehouse improvements should not be judged only by labor productivity. A faster picking rate that increases errors, injuries, or customer returns is not a lean outcome. Relevant measures include order accuracy, dock-to-stock time, pick-cycle time, inventory record accuracy, space utilization, damage, safety incidents, and on-time-in-full delivery. Inventory Segmentation and Policy DesignInventory exists because supply and demand are not perfectly synchronized. It may serve as cycle stock, safety stock, pipeline stock, anticipation stock, decoupling stock, or strategic stock. Each category has a different managerial purpose. Treating all inventory as waste can lead to unsafe reductions; treating all inventory as protection can conceal poor processes. Inventory segmentation assigns different control policies to different items. A simple ABC classification ranks items by annual consumption value, but value alone is insufficient. A low-value component can stop an entire assembly line, and a high-value item may have predictable demand and reliable replenishment. A more useful segmentation considers at least four dimensions: 1. Economic significance: unit cost, annual usage value, and working-capital impact. 2. Operational criticality: effect of shortage on safety, production, customers, and compliance. 3. Demand and supply variability: forecast error, lead-time variation, and process instability. 4. Risk and substitutability: geographic concentration, sole-source dependence, technological uniqueness, and recovery difficulty. Policies can then be differentiated. High-value, predictable items may use frequent replenishment and close parameter control. Critical items with uncertain supply may require qualified alternatives, strategic buffers, or capacity reservations. Low-value routine items may be managed through two-bin systems, vending, or blanket orders. Perishable or obsolete-prone items require age control and smaller replenishment quantities. Inventory parameters should be reviewed when demand, lead time, supplier capability, product design, or risk exposure changes. Safety stock should reflect desired service level and uncertainty, not serve as a permanent substitute for problem solving. In analytical terms, the required buffer is influenced by demand variability, lead-time variability, replenishment frequency, and the consequences of stockout. Exact formulas are useful, but managerial judgment is essential when data are weak or disruption risks are non-stationary. Integrating Lean and Agile Supply ChainsLean and agile are not necessarily opposites. Lean emphasizes stability, waste elimination, standardization, cost efficiency, and predictable flow. Agile emphasizes speed, flexibility, postponement, responsiveness, and the capacity to respond to volatile demand. The appropriate design depends on product characteristics, customer expectations, demand uncertainty, product variety, and the position of the decoupling point. The decoupling point is the location in the supply chain where inventory or capacity separates forecast-driven upstream activity from order-driven downstream activity. In a make-to-stock system it lies near the customer; in a configure-to-order or make-to-order system it lies further upstream. Postponement delays final configuration, packaging, labeling, or differentiation until better demand information is available. A hybrid lean–agile design may use lean methods for stable upstream processes and agile methods near uncertain markets. For example, common components can be produced economically in larger stable flows, while final assembly or packaging is postponed until the customer order is known. This approach requires modular product design, reliable information, flexible capacity, and rapid changeovers. Managers should avoid labeling an entire supply chain simply “lean” or “agile.” Different products, regions, and stages may require different policies. Strategic fit is more important than ideological purity. Resilience, Risk, and Disruption ManagementResilience is the capability of a supply chain to prepare for disruptive events, absorb their effects, recover within an acceptable time, and adapt afterward. It is broader than business continuity. Continuity plans focus on maintaining essential operations; resilience also includes learning, redesign, and improved future readiness. Supply-chain risk can be assessed through a risk register that identifies the hazard, affected node or flow, likelihood, consequence, detectability, existing controls, response owner, and recovery target. Common risks include supplier insolvency, single-source dependence, quality escapes, port or road closure, utility failure, cyberattack, regulatory change, labor disruption, extreme weather, and demand collapse or surge. A risk response portfolio may include: - dual or multi-sourcing for critical materials;
- approved alternative components and qualified suppliers;
- geographic diversification;
- strategic inventory for long-lead or irreplaceable items;
- flexible transportation and alternate routes;
- supplier financial and capacity monitoring;
- emergency communication protocols;
- cyber controls and data recovery;
- business-continuity exercises; and
- post-disruption learning reviews.
Resilience measures have costs. Multiple suppliers may reduce economies of scale, safety stock ties up capital, and alternate routes may increase transport expense. The relevant decision compares the cost of mitigation with the potential operational, financial, safety, and reputational consequences of disruption. Criticality-based resilience is more rational than attempting to protect every item equally. A resilient response follows a sequence of detection, containment, prioritization, stabilization, recovery, and learning. During a shortage, the organization may prioritize products according to contractual, medical, safety, strategic, or customer criteria. Such prioritization should be decided in advance where possible, communicated transparently, and reviewed for ethical and legal implications. Performance Measurement and Digital EnablementSupply-chain metrics should reveal total-system performance. Useful measures include supplier on-time-in-full delivery, first-pass yield, lead-time adherence, replenishment frequency, inventory turns, days of supply, forecast error, order accuracy, dock-to-stock time, logistics cost per unit, premium freight, stockout frequency, cash-to-cash cycle time, recovery time, and recovery point. Resilience dashboards may also track single-source exposure, supplier concentration, alternate qualification status, and overdue risk actions. No single metric is sufficient. Inventory turns can improve while stockouts rise; transport cost can fall while lead time becomes unreliable; supplier price can decline while defects increase. Balanced measures should include service, quality, flow, cost, cash, safety, environmental impact, and risk. Digital technologies can strengthen lean systems when they improve visibility and decision quality. Enterprise resource planning systems coordinate transactions; warehouse-management systems direct storage and picking; transportation-management systems optimize routing; barcode and RFID technologies improve traceability; Internet of Things sensors can monitor location, temperature, vibration, or machine condition; and control towers can provide network-level visibility. Analytics and machine learning may support demand sensing, anomaly detection, supplier-risk monitoring, and scenario analysis. Technology does not correct a badly designed process automatically. Poor master data, unclear ownership, excessive parameter changes, and unstable processes can make advanced systems amplify confusion. Digital implementation should therefore follow process clarification, standardization, data governance, user training, and appropriate cybersecurity controls. Applied Case: Orion Appliances and the Resilient Component NetworkBackgroundOrion Appliances, an illustrative mid-sized manufacturer of commercial refrigeration units, assembled products in one plant and sourced compressors, electronic controllers, sheet-metal parts, and insulation materials from 42 suppliers. The company competed on short delivery promises and product variety. Its plant had introduced kanban and line-side supermarkets, but supply-chain performance remained poor. Situation and ProblemThe assembly line experienced several stoppages each month because electronic controllers arrived late or failed incoming inspection. To protect output, purchasing increased orders and the warehouse expanded safety stock. This reduced some shortages but created obsolete controller inventory when product models changed. Suppliers received irregular forecasts, frequent schedule changes, and expedited requests. Separate trucks arrived from nearby suppliers, producing congestion at the receiving dock. Management initially proposed a further reduction in warehouse inventory to release cash. AnalysisA cross-functional team mapped the value stream from customer order to supplier payment. It found that the principal problem was not simply excess stock. Forecast changes were transmitted without clear frozen and flexible zones; controller specifications changed frequently; the critical supplier had no agreed capacity and recovery plan; incoming inspection detected defects only after shipment; and transport was organized supplier by supplier rather than by total route. ABC analysis had classified controllers as moderately valuable, but a criticality review showed that a controller shortage stopped the complete product. The team segmented materials using value, production criticality, variability, and supply risk. Controllers were classified as high-criticality, high-risk items. Standard sheet-metal fasteners were low-criticality routine items. Common insulation materials were suitable for consolidated replenishment, while customized compressors required closer supplier-capacity coordination. Approach and SolutionOrion adopted a layered strategy. First, it established a supplier-development project with the controller supplier. The two firms reviewed process capability, tested quality at source, and introduced a controlled engineering-change process. A second supplier was qualified for a compatible controller, although it was used initially as a contingency rather than as an immediate full-volume source. Second, Orion replaced its informal forecast with a structured planning rhythm. A longer-term forecast communicated expected capacity, a frozen near-term schedule protected supplier execution, and a flexible window allowed controlled changes. The supplier and Orion reviewed demand, capacity, quality, and risk monthly, with weekly exception management. Third, a milk run was designed for five geographically close suppliers. Standard returnable containers and fixed collection times reduced separate arrivals and supported smaller, more frequent deliveries. Controllers were delivered in sealed, traceable containers to a controlled line-side supermarket, while routine fasteners were replenished through a two-bin system. Fourth, the inventory policy was differentiated. A modest strategic buffer was retained for controllers until the alternate source was fully qualified. Routine items were replenished through consumption signals. Obsolete-prone components were purchased in smaller lots and reviewed through engineering-change governance. The warehouse also introduced cycle counting based on item criticality rather than equal counting frequency for every stock-keeping unit. OutcomeAfter implementation, shortages declined, receiving workload became more level, and the plant reduced emergency freight. The company did not achieve improvement by eliminating all buffers. Instead, it reduced avoidable variation, improved supplier capability, created an alternate source, and retained a deliberately designed buffer for a high-risk item. Management also discovered that the most valuable improvement was a change in governance: purchasing, engineering, production, quality, logistics, and suppliers began making decisions from a common set of facts. Learning PointsThe case demonstrates five principles. First, inventory reduction is not a substitute for supply-chain diagnosis. Second, criticality must be considered alongside annual usage value. Third, supplier development can improve both quality and resilience. Fourth, logistics frequency and route design should support flow rather than minimize trips mechanically. Finally, lean and resilience can coexist when buffers are selective, risks are visible, and processes are continuously improved. Challenges, Governance, and Professional ResponsibilitiesLean supply chains can fail through over-standardization, excessive dependence on a single supplier, unrealistic delivery expectations, or the transfer of risk to smaller suppliers. A buyer that demands frequent deliveries without compensating suppliers for additional transport and handling may create financial fragility in its own network. Supplier scorecards should therefore be used for improvement and fair governance, not merely punishment. Ethical responsibilities include safe working conditions, responsible sourcing, respect for labor and human rights, avoidance of forced labor, truthful reporting, and protection of confidential information. Environmental considerations include transport emissions, packaging waste, empty miles, energy use, and the life-cycle effects of inventory and obsolescence. Regulatory requirements may concern product traceability, safety-critical components, customs, data protection, cybersecurity, and environmental reporting. Common managerial mistakes include treating forecast accuracy as the only demand problem, reducing all safety stock by a fixed percentage, measuring suppliers solely on purchase price, introducing technology before process stabilization, and assuming that a second supplier is automatically a viable alternative. Resilience also requires testing. An untested contingency plan is an assumption, not a capability. Current Developments and Best PracticesRecent supply-chain practice is moving toward network visibility, multi-tier risk monitoring, digital twins, scenario planning, regional or near-shore sourcing for selected components, circular logistics, and lower-carbon transport. Firms are increasingly examining suppliers beyond the immediate tier because a hidden sub-tier dependency can remain a single point of failure. Advanced analytics can model disruption scenarios, but the results depend on data quality and assumptions. Best practice is therefore a combination of disciplined fundamentals and selective innovation: - map critical value streams and dependencies beyond the factory;
- segment suppliers, materials, and flows according to risk and value;
- stabilize specifications, schedules, containers, and replenishment rules;
- develop suppliers through joint problem solving;
- use milk runs and point-of-use delivery where they improve total flow;
- keep buffers deliberately, visibly, and for a defined purpose;
- qualify alternatives for genuinely critical items;
- monitor total-system measures rather than local productivity alone;
- exercise disruption responses; and
- convert every disruption into a structured learning opportunity.
Chapter SummaryLean supply-chain management extends value, flow, pull, standardization, and waste reduction across suppliers, logistics operations, warehouses, and distribution networks. Its purpose is not indiscriminate inventory reduction but the creation of stable, visible, capable, and responsive flows. Supplier development, collaborative planning, milk runs, point-of-use delivery, line-side supermarkets, and lean warehousing are practical mechanisms for achieving this purpose. Inventory should be segmented by value, criticality, variability, and supply risk. Lean and agile principles can be combined through postponement, modularity, flexible capacity, and appropriate placement of the decoupling point. Resilience requires preparation, absorption, recovery, and adaptation. Risk registers, alternate sources, strategic buffers, route flexibility, continuity planning, and learning reviews support this capability. Digital systems enhance visibility and analysis but cannot replace sound process design or governance. Strategic performance depends on balancing service, cost, quality, cash, safety, environmental impact, and disruption exposure. Key TermsLean supply chain: A supply network designed to deliver customer value with minimal total waste and reliable flow. Value stream: The complete sequence of activities and information required to deliver a product or service. Pull system: A replenishment system in which downstream consumption authorizes upstream supply. Supplier development: Structured efforts to improve a supplier’s capability, quality, delivery, cost, or innovation performance. Milk run: A scheduled route serving multiple suppliers or customers through planned collection or delivery stops. Point-of-use delivery: Supplying materials directly or near the workstation where they are consumed. Line-side supermarket: A controlled replenishment location near production containing defined quantities of materials. Cycle stock: Inventory held to support normal replenishment cycles. Safety stock: Inventory held to protect against demand or supply uncertainty. Pipeline stock: Inventory currently in transit or moving through the supply network. Inventory segmentation: Assigning different inventory policies according to value, criticality, variability, or risk. Decoupling point: The location separating forecast-driven activity from order-driven activity. Postponement: Delaying final differentiation or configuration until demand information improves. Supply-chain resilience: The ability to prepare for, absorb, recover from, and learn after disruption. Criticality: The operational or strategic consequence of an item’s failure or shortage. Control tower: A digital or organizational capability providing integrated supply-chain visibility and exception management. Total landed cost: The complete cost of acquiring and delivering an item, including purchase, transport, quality, inventory, and related costs. Recovery time: The time required to restore a process or supply flow after disruption. Review QuestionsShort Answer Questions1. Why is inventory reduction alone not evidence of a lean supply chain? 2. What is the purpose of supplier development? 3. Define a milk run and state one condition that supports its use. 4. What is meant by point-of-use delivery? 5. Distinguish safety stock from cycle stock. Long Answer Questions1. Explain how lean principles can be extended from a factory to an end-to-end supply network. 2. Discuss the role of supplier segmentation and supplier development in operational excellence. 3. Explain how inventory can be segmented using value, criticality, variability, and supply risk. 4. Compare lean and agile supply-chain designs and explain how postponement can integrate them. 5. Describe a comprehensive framework for building supply-chain resilience. Analytical / Application Questions1. A manufacturer has reduced inventory by 30 percent but now experiences frequent line stoppages and premium freight. Diagnose the likely causes and recommend a balanced improvement plan. 2. Design a replenishment and risk policy for three items: a low-value standard fastener, a high-value predictable component, and a low-value sole-source safety-critical component. 3. A group of suppliers is located within a 100-kilometre radius of a plant, but deliveries are currently made independently. Analyze whether a milk run should be introduced and identify the data required before deciding. 22. Multiple Choice Questions with AnswersQuestion 1Which statement best describes a genuinely lean supply chain? A. It minimizes inventory at every node regardless of service consequences. B. It transfers inventory and risk from the focal firm to suppliers. C. It improves total value-stream flow while reducing avoidable waste and variation. D. It uses the lowest-price supplier for every purchase. Correct Answer: C. It improves total value-stream flow while reducing avoidable waste and variation. Question 2A low-value component can stop an entire production line. Which segmentation dimension should prevent it from receiving a low-priority policy? A. Annual purchase price only B. Operational criticality C. Supplier distance only D. Container color Correct Answer: B. Operational criticality Question 3What is the principal purpose of a milk run? A. To eliminate all transportation activity B. To consolidate planned collections or deliveries across multiple locations C. To increase the size of every supplier shipment D. To replace supplier quality management Correct Answer: B. To consolidate planned collections or deliveries across multiple locations Question 4Which practice most directly supports point-of-use delivery? A. Storing all materials in a distant central warehouse B. Using defined line-side locations and replenishment signals C. Increasing batch sizes without changing material presentation D. Removing consumption records Correct Answer: B. Using defined line-side locations and replenishment signals Question 5A firm postpones product labeling until the customer order is known. This is an example of: A. Overproduction B. Postponement C. Supplier substitution D. Cycle counting Correct Answer: B. Postponement Question 6Which action best strengthens resilience for a critical sole-source component? A. Reducing visibility of supplier capacity B. Using a fixed inventory reduction percentage C. Qualifying an alternative source and defining a recovery plan D. Measuring the supplier only on purchase price Correct Answer: C. Qualifying an alternative source and defining a recovery plan Question 7Why can a digital control tower fail to improve supply-chain performance? A. Digital systems cannot display any operational information. B. Poor data and unstable processes may cause the system to amplify confusion. C. Visibility always increases inventory automatically. D. Control towers eliminate the need for governance. Correct Answer: B. Poor data and unstable processes may cause the system to amplify confusion. Question 8Which metric combination is most appropriate for avoiding local optimization in lean logistics? A. Transport cost alone B. Warehouse labor productivity alone C. Service, quality, flow, cost, safety, and risk measures D. Purchase price alone Correct Answer: C. Service, quality, flow, cost, safety, and risk measures Question 9In the Orion case, why was retaining a buffer for controllers consistent with lean thinking? A. All inventory is inherently lean. B. The buffer addressed a defined high-risk exposure while process and sourcing improvements were implemented. C. The company stopped investigating supplier capability. D. The buffer was increased without segmentation. Correct Answer: B. The buffer addressed a defined high-risk exposure while process and sourcing improvements were implemented. Question 10Which situation most strongly supports a hybrid lean–agile supply-chain design? A. Stable demand and no product variety at every stage B. Common components can flow steadily while final configuration must respond quickly to volatile demand C. No information is available about customer orders D. Every product must be completed before demand is observed Correct Answer: B. Common components can flow steadily while final configuration must respond quickly to volatile demand
|