Inventory Control & Material Requirements Planning

Chapter 1
Inventory and Materials Management Foundations

Graduate Program in Operation Management (GPOM)
Inventory Control & Material Requirements Planning   •   Graduate

Inventory and Materials Management Foundations

Introduction

Inventory and materials management concerns the deliberate planning, control, movement, and use of materials, components, work in process, finished goods, maintenance supplies, and related information. It is central to operations management because almost every operating system must reconcile two opposing conditions: customers and internal users expect materials to be available, while inventory consumes cash, space, labor, insurance, and management attention.

Inventory is therefore not simply a collection of items in a warehouse. It is a strategic design choice that connects supply, production, distribution, and demand. Decisions about inventory influence customer service, operating flexibility, quality, sustainability, working capital, and exposure to disruption. Graduate-level analysis requires managers to examine both the physical stock and the information, policies, incentives, and risks that create it.

This chapter establishes the conceptual foundation for inventory control and material requirements planning (MRP). It explains inventory types and functions, introduces stock-flow reasoning, examines decoupling and the bullwhip effect, and evaluates the trade-offs among availability, cost, cash, responsiveness, and risk.

Learning Objectives

After studying this chapter, students should be able to:

  1. Classify inventory by stage, purpose, and accounting or operational role.
  2. Explain the principal functions and costs of inventory.
  3. Interpret stock-flow relationships and basic inventory identities.
  4. Explain decoupling points and their role in operational coordination.
  5. Diagnose the causes and consequences of the bullwhip effect.
  6. Evaluate inventory decisions using service, cost, cash, responsiveness, and risk perspectives.
  7. Apply foundational inventory concepts to managerial and MRP decisions.

1. The Meaning and Scope of Inventory

Inventory is a stock of goods or resources held for future use, sale, transformation, maintenance, or contingency. In a manufacturing firm, it may include raw materials, purchased components, partially completed units, finished products, packaging, spare parts, and consumables. In a hospital, inventory includes medicines, surgical supplies, implants, and sterile materials. In a service operation, physical inventory may be limited, but supplies, replacement parts, and consumable resources remain important.

Materials management is broader than inventory control. Inventory control determines how much stock to hold, when to replenish it, and how to monitor it. Materials management also encompasses purchasing, supplier coordination, receiving, storage, issuing, material handling, specification management, and disposal. MRP adds time-phased planning: it translates a production schedule and product structure into requirements for components and materials.

A useful distinction is between independent demand and dependent demand. Independent demand originates outside the organization, such as customer demand for a finished product or demand for a replacement part. Dependent demand is derived from the requirements of another item. For example, the number of wheels required depends on the planned production of bicycles. MRP is particularly suited to dependent demand because it uses the bill of materials, inventory records, and lead times to calculate component requirements.

2. Inventory Classifications

Inventory can be classified in several ways. No single classification is sufficient for managerial analysis because the same item may simultaneously belong to several categories.

2.1 Classification by operational stage

TypeMeaningTypical managerial concern
Raw materialsInputs purchased for transformationSupplier reliability, price, quality, lead time
Work in process (WIP)Items undergoing production or waiting between operationsFlow time, bottlenecks, congestion
Finished goodsCompleted items awaiting shipment or saleForecast accuracy, service level, obsolescence
Maintenance, repair, and operating supplies (MRO)Items supporting operations but not normally incorporated into the productAvailability for maintenance, criticality
Distribution inventoryStock positioned in warehouses or transport networksAllocation, replenishment, transportation cost

2.2 Classification by purpose

Cycle stock is the inventory that results from ordering or producing in batches rather than continuously. If demand is steady and replenishment occurs in equal lots, cycle stock typically rises after receipt and declines as demand is met.

Safety stock is additional inventory held to protect against uncertainty in demand, supply, or processing. It is not a guarantee of availability; it is a risk-buffering policy whose effectiveness depends on lead time, demand variability, replenishment reliability, and the chosen service target.

Anticipation or seasonal stock is accumulated before a predictable peak, such as a holiday season, annual shutdown, or anticipated price increase.

Pipeline inventory is stock that has been ordered or dispatched but has not yet reached its point of use. It is physically moving or waiting in a transportation or administrative process.

Speculative inventory is acquired in expectation of future price changes, scarcity, exchange-rate movements, or supply disruption. It can provide protection but also creates financial and obsolescence exposure.

Decoupling inventory is positioned between stages to allow adjacent processes to operate with some independence. It is discussed in detail below.

2.3 Classification by material status

Inventory records should distinguish usable stock, quality-hold stock, quarantined stock, damaged stock, expired stock, reserved stock, and obsolete stock. Treating all physical units as available can create a misleading inventory position. A more useful planning concept is available inventory, which considers both physical quantity and restrictions on use.

A simple inventory-position relationship is:

IP = OH + SR − BO

where IP is inventory position, OH is on-hand inventory, SR is scheduled or on-order replenishment, and BO is backorders or other committed demand. All terms must be measured in the same units and for the same item and location. The relationship is useful for replenishment decisions, but it does not by itself account for quality holds, expected receipts that are unreliable, or capacity constraints.

3. Why Organizations Hold Inventory

Inventory performs several economic and operational functions.

3.1 Meeting customer demand

Finished-goods inventory can shorten customer response time when production or procurement lead time exceeds the customer’s acceptable waiting time. In make-to-stock environments, availability is often a direct component of the value proposition. However, high availability is not equivalent to high total customer value if inventory causes quality deterioration, obsolete products, or high prices.

3.2 Buffering uncertainty

Demand forecasts are imperfect, suppliers may deliver late or incomplete orders, and production processes may experience downtime or yield loss. Safety stock, capacity flexibility, alternate suppliers, and information sharing are alternative or complementary responses to uncertainty. Inventory is only one form of protection.

3.3 Enabling economic batch sizes

Ordering or producing in batches may reduce setup, ordering, transportation, or administrative costs. The resulting cycle stock is a consequence of an economic trade-off. Larger batches may reduce the number of transactions but increase average inventory, holding cost, obsolescence, and response time.

3.4 Separating processes

Inventory can allow a supplier, production stage, warehouse, or customer-facing operation to work at a different rate or schedule. This separation is valuable when processes have different capacities, reliability, or operating rhythms.

3.5 Exploiting time and price differences

Organizations may purchase materials before expected price increases, protect against currency changes, or consolidate transportation. Such decisions should be evaluated as financial and risk decisions, not automatically regarded as efficient inventory management.

3.6 Supporting maintenance and continuity

MRO inventory can prevent a costly equipment outage. The appropriate quantity depends not only on item demand but also on equipment criticality, failure consequences, repair lead time, technical substitution, and regulatory requirements.

4. The Costs and Risks of Inventory

Inventory creates benefits and costs simultaneously. Relevant costs include:

  • Purchase or production cost: the acquisition or transformation cost of the item.
  • Ordering or setup cost: administrative, transportation, inspection, and changeover costs associated with replenishment.
  • Holding cost: capital cost, storage, handling, insurance, shrinkage, taxes, deterioration, and obsolescence.
  • Shortage cost: lost sales, expediting, line stoppage, contractual penalties, emergency purchasing, and reputational damage.
  • Quality cost: inspection, rework, quarantine, disposal, and failures caused by incorrect or degraded materials.
  • Information and control cost: forecasting, systems, counting, analysis, and governance.

A common planning approximation for annual holding cost is:

H = iC

where H is annual holding cost per unit, i is the annual holding-rate fraction, and C is the unit value. The rate must be stated clearly; for example, i = 0.25 means an annual holding cost of 25% of unit value. This approximation assumes the rate is proportional to inventory value and does not separately model nonlinear risks such as obsolescence or capacity saturation.

The annual carrying cost for an average inventory level is approximately:

CC = ĪH

where CC is annual carrying cost, Ī is average inventory in units, and H is holding cost per unit per year. Unit consistency requires that Ī be in units and H in currency per unit per year.

Inventory also ties up working capital. A simplified inventory investment is:

II = ĪC

where II is inventory investment in currency, Ī is average units, and C is unit cost. This is a stock measure, whereas cash flow is a time-based measure. Reducing inventory may release cash, but the timing and amount depend on purchasing terms, production conversion, sales, and payment conditions.

5. Stock–Flow Relationships

Stock-flow reasoning is fundamental to inventory analysis. A stock is measured at a point in time; a flow is measured over an interval. On-hand inventory is a stock. Receipts, usage, production, shipments, and demand are flows.

The basic inventory balance is:

It = It−1 + Rt − Dt

where It is ending inventory during period t, It−1 is beginning inventory, Rt is receipts during the period, and Dt is demand or usage during the period. The identity assumes that all quantities refer to the same item, location, period, and unit of measure. If losses, returns, transfers, or adjustments occur, they must be added as separate terms.

For a more complete balance:

It = It−1 + Rt − Dt + At − Lt

where At represents approved adjustments or returns and Lt represents losses, scrap, shrinkage, or other reductions.

If beginning inventory is 120 units, receipts are 500 units, and usage is 460 units, ending inventory is:

It = 120 + 500 − 460 = 160 units.

The equation describes what happened; it does not determine whether 160 units is adequate. Adequacy requires comparison with future demand, lead time, service objectives, constraints, and risk.

Flow time and inventory

A central operational relationship is Little’s Law:

L = λW

where L is average inventory or work in process, λ is the average throughput rate, and W is average flow time. Units must be compatible: if throughput is units per day and flow time is days, inventory is units. The relationship assumes a stable system over the measurement period, with long-run average input and output rates equal and no systematic accumulation. It is descriptive, not a direct optimization formula.

For example, a process producing 40 units per day with an average flow time of 3 days has average WIP of L = 40 × 3 = 120 units. Reducing flow time to 2 days at the same throughput would reduce average WIP to 80 units, provided the system remains stable.

6. Lead Time, Service, and the Reorder Point

Lead time is the elapsed time between initiating replenishment and having usable inventory available. It may include order processing, supplier production, transportation, receiving, inspection, and put-away. Managers must define lead time operationally; a quoted supplier lead time may exclude internal activities.

Under constant demand and lead time, a basic reorder point is:

ROP = dL

where d is demand per unit of time and L is replenishment lead time in the same time units. If daily demand is 50 units and lead time is 4 days, the lead-time demand is 200 units.

When uncertainty exists, a safety-stock term may be added:

ROP = dL + SS

where SS is safety stock. This expression is a policy framework rather than a complete statistical model. The appropriate safety stock depends on the demand and lead-time distributions, review system, desired service measure, and dependence between demand and lead time. A manager should not use a generic safety-stock formula without checking these assumptions.

Service also has multiple meanings. Cycle service level is the probability of avoiding a stockout during a replenishment cycle. Fill rate is the proportion of demand supplied immediately from available stock. These measures are not interchangeable: a cycle can experience one small shortage or one very large shortage, producing different fill-rate outcomes despite similar stockout occurrence.

7. Decoupling and Inventory Positioning

A decoupling point is a location in a process or supply network where inventory separates two stages sufficiently for them to operate with partial independence. Examples include raw-material stores before fabrication, WIP buffers between a bottleneck and an assembly line, and finished-goods warehouses near customers.

Decoupling can provide:

  • protection against interruptions;
  • improved utilization of specialized equipment;
  • different production schedules at adjacent stages;
  • shorter customer response time;
  • opportunities to consolidate transportation or production.

Its disadvantages include capital commitment, handling, concealment of quality and process problems, longer flow time, and greater obsolescence. A buffer may stabilize a system, but excessive buffering can prevent managers from seeing the causes of instability.

The location of inventory reflects the organization’s fulfillment strategy. In make-to-stock, finished goods are produced before a specific customer order. In assemble-to-order, common modules are stocked and final configuration occurs after order receipt. In make-to-order, production begins after a customer order. In engineer-to-order, design and production are highly customized. Moving the customer order decoupling point upstream generally reduces finished-goods variety but may increase response time; moving it downstream generally improves responsiveness but requires more finished inventory.

8. The Bullwhip Effect

The bullwhip effect is the amplification of demand variability as information and orders move upstream from customers to retailers, distributors, manufacturers, and suppliers. End-customer demand may be relatively stable while upstream production schedules and orders fluctuate significantly.

Major causes include:

  1. Forecast updating: each stage forecasts using orders received rather than actual consumption.
  2. Order batching: firms accumulate demand to reduce ordering, transport, or setup costs.
  3. Price promotions: temporary discounts encourage forward buying and distort underlying demand.
  4. Shortage gaming: customers inflate orders when they expect allocation during shortages.
  5. Long or variable lead times: delayed feedback encourages large protective decisions.
  6. Poor data quality: inaccurate inventory, delayed transactions, and inconsistent item definitions produce false signals.

Consequences include excess inventory, shortages occurring simultaneously at different locations, unstable production, overtime, expediting, capacity misallocation, and poor supplier relationships.

Mitigation requires more than telling employees to “forecast better.” Effective responses include sharing point-of-sale data, reducing lead times, using smaller replenishment quantities, stabilizing pricing, allocating scarce goods transparently, improving forecast governance, and coordinating replenishment decisions. Vendor-managed inventory, collaborative planning, forecasting and replenishment, and integrated planning systems can help, but technology cannot compensate for conflicting incentives or unreliable master data.

9. Strategic Trade-offs

Inventory decisions should be evaluated as multi-objective decisions rather than single-cost minimization problems.

ObjectiveInventory benefitPotential adverse effect
AvailabilityProtects against stockouts and improves serviceHigher holding, obsolescence, and cash costs
Cost efficiencyLarger batches may reduce ordering or setup costMore cycle stock and less flexibility
Cash conservationLower stock releases working capitalGreater shortage and expediting exposure
ResponsivenessFinished goods or near-customer stock shortens response timeCan reduce customization and increase obsolescence
Risk protectionBuffers supply disruption and uncertaintyCan conceal process weakness and create stranded stock
SustainabilityConsolidated shipments may reduce transport emissionsExcess production, storage, and disposal create environmental burden

A graduate manager should ask: What service promise is being protected? Which uncertainty is being buffered? What is the cost of failure? Can information, capacity, supplier flexibility, postponement, or redesign replace some inventory? What are the consequences if the forecast is wrong?

Inventory turnover and days of supply are useful diagnostic measures. A simplified annual inventory-turnover ratio is:

IT = COGS / Īv

where IT is inventory turnover, COGS is annual cost of goods sold, and Īv is average inventory value. Both numerator and denominator must use compatible valuation conventions. A related approximation is:

DOS = Īu / d

where DOS is days of supply, Īu is average inventory units, and d is average daily demand. High turnover is not automatically good: it may reflect efficient flow, but it may also indicate inadequate stock and frequent shortages. Metrics require interpretation alongside service, quality, lead time, and financial results.

10. Materials Records and MRP Foundations

MRP depends on three central records:

  1. Master production schedule (MPS): specifies what finished products are required, in which quantities, and in which time periods.
  2. Bill of materials (BOM): identifies the components, quantities, and hierarchical relationships required to make an item.
  3. Inventory records: state on-hand balances, scheduled receipts, allocations, lead times, lot-sizing rules, and other planning parameters.

MRP performs demand explosion: it translates parent-item requirements into component requirements. It then nets gross requirements against available inventory and planned receipts, offsets requirements by lead time, and proposes planned order releases.

The conceptual netting relationship is:

NRt = GRt − OHt − SRt + SSt

where NRt is net requirement in period t, GRt is gross requirement, OHt is usable projected on-hand inventory before the requirement, SRt is scheduled receipt available in the period, and SSt is desired ending safety stock. The exact calculation depends on the planning system’s treatment of allocations, lot sizing, scrap, yields, and timing. MRP output is only as reliable as the MPS, BOM, inventory records, lead times, and transaction discipline.

The central managerial danger is false precision. A system may produce detailed planned orders while the underlying data are inaccurate. Governance therefore requires cycle counting, engineering-change control, supplier lead-time review, unit-of-measure discipline, exception management, and accountability for transaction accuracy.

11. Technology, Analytics, and AI

Enterprise resource planning systems integrate purchasing, inventory, production, sales, and finance. Barcode scanning, radio-frequency identification, warehouse-management systems, electronic data interchange, and supplier portals improve visibility and transaction speed. Sensors and Internet-of-Things devices can support condition monitoring and automated replenishment for critical materials.

AI and advanced analytics may assist with demand sensing, anomaly detection, lead-time prediction, classification, and risk monitoring. Their value depends on data quality, explainability, human oversight, and appropriate decision rights. An algorithm trained on past stockouts may learn to overstock if the historical policy systematically protected service with excessive inventory. Automated recommendations should therefore be tested against cost, service, fairness among customers, supplier effects, and operational feasibility.

12. Ethical, Governance, and Sustainability Considerations

Inventory policy has ethical consequences. Allocation rules during shortages can advantage large customers, high-margin products, or powerful business units unless criteria are explicit and defensible. Expired medicines, unsafe components, counterfeit materials, and poor traceability create direct safety risks. Organizations must maintain lot control, recall capability, segregation of nonconforming goods, and compliance with applicable product, customs, environmental, and record-retention requirements.

Sustainability requires attention to total material flow rather than only warehouse efficiency. Excess inventory can become waste, while frequent small deliveries can increase transport emissions. Managers should consider product life, packaging, reverse logistics, repairability, recyclability, and responsible disposal. The appropriate objective is not necessarily minimum inventory; it is reliable service with economically and environmentally responsible resource use.

13. Illustrative Case: Northstar Medical Devices

Background

Northstar Medical Devices assembles a disposable diagnostic instrument. It promises hospitals a 98% line-item fill rate. The product uses a specialized sensor purchased from one supplier with a six-week lead time. Finished instruments are assembled in two days, but demand varies substantially among hospitals.

Problem

Northstar’s operations team reports both shortages and rising inventory. The purchasing department places large sensor orders whenever customer orders increase. Sales representatives also submit optimistic forecasts before quarterly promotions. The supplier experiences abrupt schedule changes, while Northstar holds excess finished instruments that later require reconfiguration.

Analysis

The organization has confused customer orders, forecasts, and actual consumption. It has also placed the decoupling point too far downstream by building finished goods before configuration is known. The long sensor lead time encourages safety stock, but the large batches amplify variability. Inventory records include quality-hold sensors in the available balance, creating misleading planning signals.

Approach

Northstar establishes a cross-functional policy. Point-of-use consumption is shared weekly with the supplier. Sensors are classified as critical purchased components, and quality-hold stock is excluded from usable inventory. The firm moves toward assemble-to-order: common sensor-compatible modules are prepared, while final configuration is delayed. A service target is defined by hospital criticality rather than applied uniformly. Supplier lead-time performance is measured, and orders are released using agreed replenishment rules instead of sales overrides.

Outcome

After implementation, finished-goods variety and reconfiguration waste decline. Sensor inventory remains significant because the lead time is long, but its purpose is explicit and its status is visible. Production schedules become more stable, supplier expedites decrease, and service performance is evaluated using both fill rate and critical shortage incidents.

Learning points

The case illustrates that inventory reduction is not the sole objective. Better segmentation, accurate records, postponement, shared information, and differentiated service policies can improve both responsiveness and control. It also shows that inventory problems frequently originate in incentives and process design rather than in the warehouse alone.

Challenges and Limitations

Inventory models simplify reality. Demand may be intermittent, lead times may be correlated with demand, suppliers may ration during shortages, and products may substitute for one another. Average values can conceal severe variability. Financial metrics may encourage stock reduction that damages resilience. Conversely, resilience programs can become excuses for uncontrolled accumulation.

Managers should therefore combine quantitative analysis with process observation, supplier evidence, scenario analysis, and sensitivity testing. Important questions include how results change under demand surges, transport disruption, supplier failure, engineering change, or product obsolescence. Inventory policy should be reviewed when strategy, product architecture, customer promise, or supply risk changes.

Best-Practice Principles

  1. Define inventory status and ownership precisely.
  2. Separate independent-demand forecasting from dependent-demand planning.
  3. Maintain accurate BOMs, lead times, units of measure, and transaction records.
  4. Segment items by value, criticality, variability, and risk—not value alone.
  5. Distinguish cycle, safety, pipeline, anticipation, and decoupling stock.
  6. Measure service using a clearly defined metric.
  7. Attack uncertainty at its source through quality, information, supplier development, and process improvement.
  8. Use postponement and modularity where product variety is high.
  9. Evaluate inventory with both operational and financial measures.
  10. Govern automated and AI-supported recommendations through human review and documented accountability.

Chapter Summary

Inventory is a stock held to support sale, transformation, maintenance, service, uncertainty absorption, or process coordination. Its main forms include raw materials, WIP, finished goods, MRO, cycle stock, safety stock, pipeline stock, anticipation stock, speculative stock, and decoupling inventory. Inventory creates value by improving availability, enabling batches, separating processes, and protecting against disruption, but it also consumes cash and creates holding, shortage, quality, obsolescence, and sustainability costs.

Stock-flow analysis distinguishes point-in-time stocks from time-based flows. The inventory balance explains changes in on-hand quantity, while Little’s Law links average inventory, throughput, and flow time under stable conditions. Lead time and service objectives guide replenishment decisions, but safety stock must reflect actual uncertainty and policy assumptions.

Decoupling points allow processes to operate with partial independence, while their location shapes responsiveness, customization, and exposure to inventory. The bullwhip effect arises when local decisions amplify demand variability upstream; shared consumption data, shorter lead times, smaller batches, stable pricing, and coordinated planning can reduce it. MRP converts the MPS, BOM, and inventory records into time-phased component plans, but its outputs depend on data integrity and governance.

Effective inventory management is a strategic balancing activity. Availability, cost, cash, responsiveness, risk, and sustainability cannot usually be maximized simultaneously. Strong practice makes trade-offs explicit, uses appropriate metrics, improves the causes of uncertainty, and positions inventory deliberately within the supply network.

Key Terms

Inventory: Stock of goods or resources held for future use, sale, transformation, or support.

Materials management: Coordinated planning, purchasing, movement, storage, use, and control of materials.

Independent demand: Demand originating outside the organization, usually from customers or external users.

Dependent demand: Demand derived from the requirement for another item.

Cycle stock: Inventory created by batch ordering or production.

Safety stock: Additional inventory held against uncertainty.

Pipeline inventory: Stock ordered or dispatched but not yet available for use.

Decoupling inventory: Stock that separates adjacent processes and permits partial operating independence.

Work in process: Partially completed material within a production system.

MRO inventory: Maintenance, repair, and operating supplies supporting operations.

Lead time: Elapsed time from replenishment initiation to usable receipt.

Reorder point: Inventory level at which replenishment is initiated.

Service level: A defined measure of the ability to satisfy demand from available stock.

Fill rate: Proportion of demand supplied immediately from stock.

Bullwhip effect: Amplification of demand variability as orders move upstream.

Inventory position: On-hand stock plus scheduled receipts minus backorders or commitments.

Master production schedule: Time-phased plan for producing finished items.

Bill of materials: Hierarchical specification of components required for an item.

Material requirements planning: Time-phased planning system for dependent-demand materials.

Inventory turnover: Ratio of annual cost of goods sold to average inventory value.

Review Questions

Short Answer Questions

  1. Distinguish cycle stock from safety stock.
  2. What is the difference between a stock and a flow?
  3. Define a decoupling point and state one benefit.
  4. Identify two causes of the bullwhip effect.
  5. Why are accurate BOMs important to MRP?

Long Answer Questions

  1. Explain the operational and financial reasons organizations hold inventory.
  2. Discuss how the location of the customer order decoupling point affects responsiveness and risk.
  3. Explain the bullwhip effect and evaluate four methods for reducing it.
  4. Compare cycle service level and fill rate as measures of inventory performance.
  5. Discuss why inventory reduction should not be treated as an unconditional objective.

Analytical / Application Questions

  1. A warehouse begins a month with 800 units, receives 2,400 units, and issues 2,650 units. Calculate ending inventory and explain why the result alone does not establish whether inventory policy is effective.
  2. A process has throughput of 75 units per day and average flow time of 4 days. Use Little’s Law to calculate average WIP. What operational change would reduce WIP without reducing throughput?
  3. A medical supplier experiences simultaneous stockouts and excess inventory after promotional ordering. Diagnose the likely bullwhip mechanisms and propose an integrated corrective policy.

Multiple Choice Questions with Answers

Question 1

Which inventory category is primarily held to protect against uncertainty in demand or supply?

A. Cycle stock

B. Safety stock

C. Pipeline inventory

D. Speculative stock

Correct Answer: B. Safety stock

Question 2

A system begins with 120 units, receives 500 units, and uses 460 units. What is the ending inventory?

A. 40 units

B. 160 units

C. 580 units

D. 1,080 units

Correct Answer: B. 160 units

Question 3

Which statement correctly describes dependent demand?

A. It is demand generated by external customers only

B. It is demand derived from the requirement for another item

C. It is demand that is always random

D. It is demand that cannot be planned

Correct Answer: B. It is demand derived from the requirement for another item

Question 4

Under stable conditions, Little’s Law is expressed as which relationship?

A. L = λW

B. L = λ ÷ W

C. W = Lλ

D. λ = LW

Correct Answer: A. L = λW

Question 5

Which practice most directly reduces the bullwhip effect?

A. Increasing order batching

B. Hiding point-of-sale data

C. Sharing actual consumption information

D. Extending replenishment lead times

Correct Answer: C. Sharing actual consumption information

Question 6

If average daily demand is 50 units and lead time is 4 days, with no safety stock, what is the basic reorder point?

A. 12.5 units

B. 46 units

C. 200 units

D. 250 units

Correct Answer: C. 200 units

Question 7

Which item is normally included in an MRP system’s core input records?

A. Bill of materials

B. Employee satisfaction survey

C. Advertising slogan

D. Annual tax return

Correct Answer: A. Bill of materials

Question 8

What is a principal disadvantage of excessive decoupling inventory?

A. It eliminates all process flexibility

B. It can conceal process problems and increase carrying cost

C. It guarantees shorter lead times

D. It prevents any production stage from operating independently

Correct Answer: B. It can conceal process problems and increase carrying cost

Question 9

Inventory turnover is most commonly calculated as:

A. Average inventory value divided by sales price

B. Annual cost of goods sold divided by average inventory value

C. Annual demand divided by lead time

D. Holding cost divided by purchase cost

Correct Answer: B. Annual cost of goods sold divided by average inventory value

Question 10

Why should quality-hold inventory generally be excluded from usable inventory calculations?

A. It has already been sold

B. It cannot necessarily be issued to satisfy demand

C. It is always obsolete

D. It is counted twice as finished goods

Correct Answer: B. It cannot necessarily be issued to satisfy demand

Inventory Control & Material Requirements Planning
Chapter 1 of 15