Industrial Management

Chapter 8
Maintenance, Reliability and Asset Management

Bachelors Program in Machine Technology
Industrial Management   •   Bachelor

Maintenance, Reliability and Asset Management

Introduction

Industrial equipment creates value only when it performs safely, consistently and economically. Maintenance is therefore not merely the repair of broken machines; it is a management system for preserving function, controlling risk and obtaining the greatest useful value from physical assets. In machine technology, maintenance decisions affect production capacity, product quality, energy use, occupational safety, environmental performance and total cost of ownership.

Modern maintenance combines engineering analysis with management practices. Engineers must select suitable maintenance policies, calculate reliability and availability, identify failure causes, plan spare parts, use computerized maintenance management systems (CMMS), and evaluate improvement through measures such as overall equipment effectiveness (OEE).

Learning Objectives

By the end of this chapter, students should be able to:

  • distinguish corrective, preventive, predictive and condition-based maintenance;
  • calculate reliability, failure rate, maintainability and availability;
  • explain total productive maintenance (TPM) and OEE;
  • apply root-cause analysis and failure mode and effects analysis (FMEA);
  • evaluate replacement policies and spare-parts decisions;
  • describe the role of CMMS and data analytics in asset management; and
  • recommend a maintenance strategy while considering safety, cost, ethics and sustainability.

1. Maintenance Policies and Their Appropriate Use

Maintenance is the combination of technical, administrative and managerial actions intended to retain an item in, or restore it to, a state in which it can perform a required function. An asset may be a machine, tool, utility, building, software-controlled system or production line.

1.1 Corrective maintenance

Corrective maintenance is performed after a fault has been detected. It may be immediate, when the failure creates a safety or production emergency, or deferred, when repair can be scheduled.

Corrective maintenance is appropriate when failure consequences are minor, repair is quick, spare parts are inexpensive and redundancy exists. It is usually unsuitable for safety-critical equipment, assets with long replacement lead times, or failures that cause extensive collateral damage.

Advantages include low routine-maintenance effort and simple planning. Disadvantages include unpredictable downtime, secondary damage, overtime, emergency purchasing and possible safety risks.

1.2 Preventive maintenance

Preventive maintenance is carried out at predetermined intervals or according to predetermined criteria, regardless of the immediate condition of the equipment. Examples include changing lubricant every 1,000 operating hours, replacing a belt annually and calibrating a sensor every six months.

Time-based replacement is valuable when failure probability increases strongly with age. However, replacing components too early wastes useful life and may introduce installation errors. Preventive tasks should therefore be supported by manufacturer information, failure history and engineering judgment.

1.3 Predictive maintenance

Predictive maintenance uses measurements and analysis to forecast when maintenance will be needed. Typical technologies include vibration analysis, infrared thermography, oil-particle analysis, motor-current signature analysis, ultrasound and performance trending.

Predictive maintenance is an organizational program, not simply the purchase of sensors. It requires data quality, trained personnel, alarm limits, response procedures and integration with work planning.

1.4 Condition-based maintenance

Condition-based maintenance initiates action when evidence shows that an asset is degrading or has reached a defined condition. It may use continuous monitoring, periodic inspection or operator observation. Predictive maintenance is commonly treated as an advanced form of condition-based maintenance because it estimates future condition or remaining useful life.

A practical condition-monitoring sequence is:

  1. identify the failure mode;
  2. identify a measurable degradation indicator;
  3. establish a healthy baseline;
  4. define alert and action limits;
  5. trend the measurement; and
  6. schedule intervention before functional failure.
PolicyTriggerStrengthMain limitation
CorrectiveFunctional failureSimple; low routine costUnplanned downtime and risk
PreventiveTime, cycles or usagePredictable schedulingMay replace parts prematurely
Condition-basedMeasured conditionUses actual equipment stateRequires inspection and interpretation
PredictiveForecasted degradationSupports optimized timingRequires data, skills and reliable models

The best plant normally uses a mixed strategy. Run-to-failure may be rational for a cheap, noncritical guard fan, while vibration monitoring is justified for a high-speed spindle whose failure stops an entire line.

2. Reliability, Maintainability and Availability

2.1 Reliability

Reliability is the probability that an item performs its required function for a specified time under stated conditions. If T is the random time to failure, reliability at time t is:

R(t) = P(T > t)

The formula applies to a defined operating environment and mission time. Reliability is not an inherent constant; loading, temperature, maintenance quality and operating practice affect it.

For an exponential time-to-failure model with constant failure rate λ:

R(t) = e^(−λt)

Here, λ has units of failures per operating hour and assumes a constant hazard rate, statistically independent failures and no aging effect. The mean time to failure (MTTF) is:

MTTF = 1/λ

For a repairable asset, mean time between failures (MTBF) is often used. Strictly, MTBF is the mean elapsed operating time between inherent failures under a defined measurement convention. It should not automatically be interpreted as the life of a nonrepairable component.

For a series system, all components must operate for the system to operate. If component failures are independent:

Rs(t) = ∏ Ri(t)

For two components in parallel, the system works if at least one works:

Rp(t) = 1 − [1 − R1(t)][1 − R2(t)]

These equations assume clearly defined system logic and statistical independence. Common-cause failures can make actual reliability much lower.

2.2 Failure-rate pattern

The classical “bathtub curve” describes three broad regions: early failures caused by defects or installation errors, a useful-life region with approximately random failures, and a wear-out region in which failure rate increases with age. The model is useful for thinking, but real assets may not follow it. Many electronic components have nearly random failures, whereas bearings, cutting tools and seals often exhibit wear-related behavior.

2.3 Maintainability and repair time

Maintainability is the probability that failed equipment can be restored within a specified time using stated procedures and resources. If repair time is exponentially distributed with repair rate μ:

M(t) = 1 − e^(−μt)

The mean time to repair (MTTR) is:

MTTR = 1/μ

MTTR should include the relevant repair interval definition. A narrow technical repair time excludes waiting for diagnosis, access, tools, permits and spare parts; a management availability calculation may include these delays.

2.4 Availability

Availability is the probability that an asset is capable of performing its function when required. In a steady-state repairable system with statistically stable operation:

A = MTBF/(MTBF + MTTR)

The denominator represents average operating time plus average restoration time. This is inherent or operational availability only if the definitions of MTBF and MTTR are consistent. Calendar availability may also include planned shutdowns, while production availability may include logistical delays.

Worked example. A pump operates, on average, 720 hours between failures and requires 8 hours to restore. Its steady-state availability is:

A = 720/(720 + 8) = 0.9890 ≈ 98.90%

If maintenance planning reduces MTTR to 5 hours while MTBF remains 720 hours:

A = 720/(720 + 5) = 0.9931 ≈ 99.31%

The improvement is approximately 0.41 percentage points. This illustrates why tools, access, diagnosis, standard work and spare parts can be as important as preventing failures.

3. Total Productive Maintenance and OEE

Total productive maintenance (TPM) is a company-wide approach in which operators, maintenance personnel, engineers and managers share responsibility for equipment effectiveness. Its commonly recognized practices include autonomous maintenance, planned maintenance, focused improvement, early equipment management, quality maintenance, training and safety/environmental management.

Autonomous maintenance does not mean transferring specialist work to untrained operators. It involves appropriate operator activities such as cleaning, inspection, lubrication, tightening, abnormality identification and escalation.

OEE measures the productive use of scheduled production time:

OEE = Availability × Performance × Quality

The factors are:

Availability = Operating time/Planned production time
Performance = (Ideal cycle time × Total units)/Operating time
Quality = Good units/Total units

All time and quantity definitions must be consistent. Planned breaks may be excluded from planned production time, but the organization must document the rule. OEE is a diagnostic measure, not a universal measure of total business productivity.

Worked example. A shift has 480 minutes, including a 30-minute planned break. A machine experiences 40 minutes of downtime, produces 800 units, has an ideal cycle time of 0.5 minute per unit, and produces 760 good units.

Planned production time = 480 − 30 = 450 minutes.

Operating time = 450 − 40 = 410 minutes.

Availability = 410/450 = 0.9111
Performance = (0.5 × 800)/410 = 0.9756
Quality = 760/800 = 0.9500
OEE = 0.9111 × 0.9756 × 0.9500 = 0.844 ≈ 84.4%

The losses should be separated into downtime, speed loss and quality loss rather than hidden in a single percentage.

4. Failure Analysis and FMEA

Failure analysis seeks to explain what failed, how it failed, why it failed and how recurrence can be prevented. A disciplined investigation distinguishes:

  • symptom: what was observed;
  • failure mode: the manner in which function was lost;
  • physical mechanism: the process producing damage, such as fatigue, corrosion or overheating;
  • root cause: a controllable underlying cause; and
  • escape or system cause: why detection, procedure or management controls did not prevent the event.

Useful tools include the five-whys method, fishbone diagrams, fault-tree analysis, Pareto analysis, trend plots and evidence-based inspection. “Operator error” is rarely a sufficient root cause; the investigation should ask why the procedure, interface, training or supervision permitted the error.

Failure Mode and Effects Analysis

FMEA is a structured, prospective method. For each component or process step, the team identifies the function, failure mode, effect, cause, existing controls and recommended action. Traditional FMEA ratings commonly use severity S, occurrence O and detection D, each often scored from 1 to 10. A risk priority number is then calculated:

RPN = S × O × D

The scores are ordinal judgments, not precise probabilities. Therefore, an RPN should not override a high-severity safety issue merely because its occurrence score is low. Modern practice supplements or replaces RPN with action-priority methods, explicit risk matrices and risk-based engineering review.

5. Replacement Policies and Spare-Parts Planning

5.1 Replacement decisions

A component may be replaced on failure, at a fixed age, or according to condition. Age replacement replaces an item at age T if it has not already failed, and immediately after failure if it has. The best interval balances preventive replacement cost, corrective replacement cost and downtime consequences.

A simplified average-cost model for deterministic planned replacement is:

C(T) = [Cp + Cf F(T)]/[T(1 − F(T)) + ∫₀ᵀ R(t)dt]

Here, Cp is planned replacement cost, Cf is failure replacement cost, F(T) is the probability of failure by age T, and R(t) is reliability. The denominator is the expected operating time per renewal cycle. This model assumes renewal after replacement, identical independent cycles and costs that are appropriately defined. Downtime costs can be included in Cp and Cf, but must not be counted twice.

For an exponential failure distribution, age replacement often provides little benefit because the failure rate is constant; condition, criticality and logistics may still justify a policy.

5.2 Spare-parts planning

A spare is justified by the relationship between failure consequence, demand uncertainty, lead time, repairability and acquisition cost. Classification should consider:

  • criticality to safety and production;
  • failure rate and demand frequency;
  • supplier lead time and obsolescence;
  • interchangeability and standardization;
  • repair or cannibalization options; and
  • storage conditions and shelf life.

For a simple independent-demand inventory model, the economic order quantity is:

Q* = √(2DS/H)

where D is annual demand in units, S is ordering or setup cost per order, and H is annual holding cost per unit. It assumes relatively stable demand, constant lead time, no quantity discounts and immediate replenishment. It is not automatically suitable for expensive, highly intermittent maintenance spares.

A reorder point with variable demand and lead time may be expressed as:

ROP = μL + zσL

where μL is expected demand during lead time, σL is its standard deviation, and z is the selected service-factor quantile. The demand distribution and service target must be justified; a high service level increases inventory cost.

6. Computerized Maintenance Management and Asset Management

A CMMS supports asset registers, preventive-maintenance schedules, work orders, labor and material records, permits, inventory, failure history and performance reporting. A good implementation begins with a consistent asset hierarchy: site, area, line, system, equipment and maintainable component.

A work-order lifecycle commonly includes request, screening, planning, scheduling, execution, testing, close-out and review. Close-out data should record failure mode, cause, remedy, labor, parts, downtime and follow-up recommendations. Poorly designed codes create false precision; too many codes reduce consistency, while too few prevent useful analysis.

Enterprise asset management extends CMMS thinking across the asset life cycle: concept, specification, procurement, commissioning, operation, maintenance, modification and disposal. Life-cycle cost includes acquisition, installation, energy, maintenance, downtime, compliance and end-of-life costs. The cheapest purchase price is not necessarily the lowest-cost asset.

Digital sensors, cloud platforms and machine-learning models can improve anomaly detection and remaining-useful-life estimates. Nevertheless, AI outputs are decision support, not unquestionable diagnoses. Models require representative data, validation, cybersecurity, access control, explainability appropriate to risk and a human response process. Predictive alerts without maintainable workflows merely create alarm overload.

7. Applied Case: Illustrative Packaging-Line Improvement

Background

A fictional food-packaging plant operates a conveyor, filler and sealer. The line is scheduled for 450 minutes per shift. Repeated sealer stoppages cause lost production, and technicians report that emergency repairs are prioritized over planned work.

Problem and analysis

Three months of CMMS records show 18 stoppages. The recorded “sealer fault” description is too general, so the team reviews inspection evidence and interviews operators. The dominant failure mode is heater-cartridge overheating caused by loose terminals and contaminated cooling passages. A second issue is that the correct cartridge is not stocked, producing long waiting time.

An FMEA rates the overheating effect as high severity because it creates quality and fire risk. The team does not rely solely on the numerical RPN; it treats the hazard as requiring immediate controls.

Approach

The plant introduces:

  • torque-controlled terminal inspection during planned shutdowns;
  • cleaning and thermal inspection of cooling passages;
  • a temperature-trend alarm with a defined response;
  • a standardized work instruction and operator abnormality tag;
  • one controlled critical spare, with shelf-life review;
  • a planned job package including tools and permit requirements; and
  • CMMS failure codes distinguishing loose connection, contamination and cartridge failure.

Technicians also conduct a five-whys review of why loose terminals escaped detection. The answer includes vibration, lack of a torque specification and inadequate close-out documentation—not simply technician carelessness.

Outcome

After implementation, emergency stoppages decline, planned work increases and the maintenance team can distinguish recurring causes from isolated failures. OEE improves because availability rises, but management also checks quality and safety indicators. The result is not attributed to a single technology: standard work, data quality, spare availability and cross-functional ownership act together.

Learning points

The case demonstrates that maintenance improvement requires a chain from failure definition to measurable condition, planned response, competent execution and reliable records. A sensor is valuable only when it changes a decision at the correct time.

8. Governance, Safety and Sustainable Practice

Maintenance work involves stored energy, moving machinery, electricity, pressure, chemicals and working at height. Lockout/tagout or an equivalent isolation system, permit-to-work controls, verification of zero energy and competent authorization are essential. Production pressure never justifies bypassing a safety interlock without formal risk assessment and compensating controls.

Ethical maintenance reporting requires truthful downtime, failure and inspection records. Manipulating OEE or closing work orders without evidence can conceal risk and lead to unsafe decisions. Environmental considerations include lubricant leakage, waste segregation, refrigerant handling, energy efficiency and life extension without compromising safety.

Regulatory requirements vary by jurisdiction and industry. Students and practitioners must consult applicable machinery, electrical, pressure-system, occupational-safety and environmental regulations, as well as manufacturer instructions and organizational standards.

9. Best-Practice Implementation Framework

A practical improvement program can proceed as follows:

  1. define asset functions and performance standards;
  2. rank assets by safety, environmental, quality, production and cost consequence;
  3. analyze dominant failure modes;
  4. select the least-cost policy that controls the relevant risk;
  5. establish inspection standards, intervals and acceptance limits;
  6. plan labor, tools, permits and spares before scheduling work;
  7. capture consistent CMMS data;
  8. review MTBF, MTTR, availability, OEE, repeat failures and schedule compliance;
  9. verify that actions removed causes rather than symptoms; and
  10. improve the strategy as operating conditions and evidence change.

A mature maintenance department is not measured by the number of work orders completed. It is measured by safe functional performance, controlled risk, effective use of resources and learning from evidence.

Chapter Summary

Maintenance management preserves asset function and supports safe, economical production. Corrective maintenance responds to failure; preventive maintenance acts at predetermined intervals; condition-based maintenance uses observed condition; and predictive maintenance forecasts degradation. Reliability is the probability of successful operation for a stated mission, while maintainability concerns restoration and availability combines operating and repair time.

The exponential model gives R(t)=e^(−λt) only under a constant-failure-rate assumption. For repairable assets, steady-state availability is MTBF/(MTBF+MTTR). TPM creates shared ownership of equipment, and OEE separates availability, performance and quality losses. Failure analysis and FMEA provide structured methods for preventing recurrence and prioritizing risk.

Replacement and spare-parts decisions must consider failure behavior, consequence, lead time, inventory cost and uncertainty. CMMS and enterprise asset management connect technical work with life-cycle decisions. Sensors and AI can support prediction, but they require trustworthy data, cybersecurity, human judgment and an effective response process. Finally, safety, truthful reporting, regulatory compliance and environmental responsibility are inseparable from professional maintenance practice.

Key Terms

Reliability: Probability that an item performs its required function for a specified time and condition.

Maintainability: Probability that an item can be restored within a specified time.

Availability: Probability or proportion of time that an asset is capable of performing its function.

Corrective maintenance: Maintenance performed after a fault or failure is detected.

Preventive maintenance: Maintenance performed at predetermined intervals or criteria.

Condition-based maintenance: Maintenance triggered by evidence of actual equipment condition.

Predictive maintenance: Condition-based maintenance using analysis to forecast future degradation.

MTBF: Mean time between failures for a repairable asset under a defined convention.

MTTR: Mean time to repair or restore an asset under a defined time boundary.

Failure rate: Rate at which failures occur, commonly denoted by λ.

TPM: Company-wide approach to maximizing equipment effectiveness through shared responsibility.

OEE: Product of availability, performance and quality.

Failure mode: The manner in which an item fails to perform a function.

Root cause: An underlying cause whose removal prevents recurrence.

FMEA: Structured analysis of failure modes, effects, causes and controls.

RPN: Product of severity, occurrence and detection ratings in traditional FMEA.

CMMS: Computerized system for maintenance, work orders, assets and inventory.

Critical spare: Spare part whose absence creates unacceptable risk or delay.

Asset management: Coordinated life-cycle activity that realizes value from assets.

Life-cycle cost: Total cost of acquisition, ownership, operation, maintenance and disposal.

Review Questions

Short Answer Questions

  1. Distinguish preventive maintenance from condition-based maintenance.
  2. Define reliability and maintainability.
  3. What are the three factors in OEE?
  4. Why can a high FMEA RPN fail to represent safety risk adequately?
  5. State two functions of a CMMS.

Long Answer Questions

  1. Compare corrective, preventive, predictive and condition-based maintenance, including suitable applications and limitations.
  2. Explain the bathtub concept and discuss why it should not be applied uncritically to every asset.
  3. Describe TPM and explain how autonomous maintenance supports, rather than replaces, specialist maintenance.
  4. Explain how failure analysis and FMEA can be combined to prevent repeat failures.
  5. Discuss how life-cycle cost and asset management differ from purchase-price-based decision-making.

Analytical / Application Questions

  1. A machine has an MTBF of 600 hours and an MTTR of 12 hours. Calculate steady-state availability and explain one practical way of improving it.
  2. A production shift has 480 minutes, including a 30-minute planned break. Downtime is 35 minutes, total output is 820 units, good output is 779 units and ideal cycle time is 0.5 minute per unit. Calculate availability, performance, quality and OEE.
  3. A critical pump fails unpredictably, has a long spare lead time and creates a major environmental consequence when it leaks. Recommend a maintenance and spare-parts strategy, and justify the condition-monitoring, safety and inventory decisions.

Multiple Choice Questions with Answers

Question 1

Which maintenance policy is triggered primarily by measured equipment condition?

A. Corrective maintenance

B. Condition-based maintenance

C. Run-to-failure maintenance

D. Unplanned emergency maintenance

Correct Answer: B. Condition-based maintenance

Question 2

For a constant failure rate λ, which expression gives reliability at time t?

A. R(t)=λt

B. R(t)=1−e^(−λt)

C. R(t)=e^(−λt)

D. R(t)=t/λ

Correct Answer: C. R(t)=e^(−λt)

Question 3

A repairable machine has MTBF = 900 hours and MTTR = 9 hours. Its steady-state availability is closest to:

A. 90.0%

B. 98.0%

C. 99.0%

D. 99.9%

Correct Answer: C. 99.0%

Question 4

OEE is calculated as:

A. Availability + Performance + Quality

B. Availability × Performance × Quality

C. MTBF ÷ MTTR

D. Good units ÷ planned minutes

Correct Answer: B. Availability × Performance × Quality

Question 5

Which FMEA rating represents the seriousness of an effect?

A. Severity

B. Occurrence

C. Detection

D. Maintainability

Correct Answer: A. Severity

Question 6

In a series system, the system operates only when:

A. At least one component operates

B. All required components operate

C. The component with the lowest cost operates

D. The repair team is available

Correct Answer: B. All required components operate

Question 7

A key purpose of autonomous maintenance in TPM is to enable operators to:

A. Perform all specialist repairs without training

B. Eliminate the maintenance department

C. Clean, inspect, lubricate and identify abnormalities

D. Authorize bypassing safety interlocks

Correct Answer: C. Clean, inspect, lubricate and identify abnormalities

Question 8

Which item is most appropriate for inclusion in a critical-spares decision?

A. Paint color of the equipment

B. Supplier lead time and failure consequence

C. Number of operators on annual leave

D. Machine nameplate font

Correct Answer: B. Supplier lead time and failure consequence

Question 9

A CMMS is primarily used to support:

A. Only product sales forecasting

B. Asset records, work orders, schedules and maintenance history

C. Replacing all engineering judgment

D. Eliminating the need for safety permits

Correct Answer: B. Asset records, work orders, schedules and maintenance history

Question 10

If availability is 0.90, performance is 0.80 and quality is 0.95, OEE is:

A. 0.684

B. 0.720

C. 0.855

D. 2.650

Correct Answer: A. 0.684

Industrial Management
Chapter 8 of 15