Integrated Practice, Maturity and Future DevelopmentsIntroduction and ContextHybrid project management is not simply the simultaneous use of predictive and agile techniques. It is the deliberate design of a delivery system in which governance, planning, funding, contracting, assurance, leadership and team practices are coordinated across different levels of uncertainty. A hybrid system may use predictive stage gates for regulatory approval, adaptive product development for uncertain requirements, and rolling-wave planning for integration and deployment. Its effectiveness depends less on the number of methods adopted than on the quality of their integration. This chapter addresses the advanced problem of diagnosing hybrid maturity and converting diagnosis into measurable improvement. It also examines lessons learned, sustainable delivery, adaptive governance, autonomous tools and AI-enabled project ecosystems. These developments create significant opportunities, but they also introduce risks involving accountability, transparency, privacy, bias, cybersecurity and professional judgment. Hybrid maturity should be understood as an organizational capability rather than a team-level checklist. It includes the ability to select an appropriate delivery approach, coordinate different cadences, make decisions at the right level, learn from evidence and adapt without losing control of value, risk or compliance. Learning ObjectivesBy the end of this chapter, the reader should be able to: - Diagnose hybrid project-management maturity using evidence rather than method labels.
- Distinguish local process improvement from systemic capability development.
- Design an improvement roadmap with priorities, owners, measures and feedback loops.
- Capture and use lessons learned as organizational knowledge.
- Evaluate sustainable delivery and adaptive governance critically.
- Assess the benefits, limitations and controls required for autonomous tools and AI-enabled project ecosystems.
- Apply these ideas to a complex case involving regulatory, technical and organizational uncertainty.
1. Hybrid Maturity as a System Capability1.1 What maturity meansMaturity is the extent to which an organization can repeatedly produce desired outcomes under varying conditions. It is not equivalent to compliance with a framework, the presence of a project-management office, or the use of Scrum, Kanban or stage-gate terminology. A mature organization can explain why a particular operating model fits a project and can change that model when evidence changes. A useful maturity model examines six mutually reinforcing dimensions: | Dimension | Diagnostic question | Typical evidence |
|---|
| Strategic alignment | Are outcomes and decision rights connected to strategy? | Outcome measures, benefits ownership, portfolio decisions | | Delivery design | Is the predictive-adaptive boundary intentional? | Product decomposition, release plan, stage criteria | | Governance | Are controls proportionate and timely? | Decision logs, escalation rules, assurance records | | Flow and integration | Can work move across teams and cadences? | Dependency maps, integration tests, flow measures | | Learning capability | Does evidence change future behaviour? | Retrospectives, experiment records, reusable guidance | | Enabling environment | Do leadership, procurement and technology support the model? | Funding policies, contracts, tooling, psychological safety |
The dimensions should not be treated as independent scores. For example, highly capable teams may still fail when procurement prohibits incremental delivery. Conversely, a sophisticated governance office cannot compensate for poor integration or unclear outcomes. 1.2 Maturity versus performancePerformance describes what happened in a particular period; maturity describes the capability that makes performance repeatable. A project may meet its deadline through heroic effort while possessing weak maturity. Similarly, a project may experience a temporary delay while demonstrating strong maturity because it identifies emerging risk early, protects quality and makes rational trade-offs. Assessment should therefore use both lagging and leading indicators. Lagging indicators include delivered value, cost variance, escaped defects and benefits realization. Leading indicators include decision latency, unresolved dependencies, aging risks, blocked work, stakeholder participation and the proportion of work linked to a validated outcome. 1.3 A practical maturity scaleA five-level scale can support dialogue, provided it is used as a developmental instrument rather than a ranking device: - Ad hoc: methods depend on individuals; decisions and learning are largely undocumented.
- Repeatable locally: teams have useful practices, but interfaces and governance are inconsistent.
- Integrated: predictive and adaptive elements are deliberately connected through shared outcomes, decision rights and synchronization mechanisms.
- Measured and improving: evidence informs policy, forecasting, investment and continuous improvement.
- Adaptive ecosystem: the organization learns across projects, suppliers and platforms while maintaining ethical and regulatory control.
The scale describes capability, not moral worth. A level-two organization may be appropriate for a small, stable project; a level-four capability may be necessary for a safety-critical transformation. 2. Diagnosing Hybrid Maturity2.1 Evidence-based diagnosisA credible diagnosis combines documentary, behavioural and outcome evidence. Interviews alone reveal perceptions; dashboards alone reveal only what has been measured. A balanced assessment may include: - portfolio and project records;
- observation of planning, review and governance meetings;
- interviews with sponsors, delivery teams, users, suppliers and assurance personnel;
- analysis of defects, risks, decisions, dependencies and change requests;
- sampling of delivered outcomes and benefits;
- a survey of psychological safety, role clarity and decision effectiveness.
The assessor should examine contradictions. For example, a project may report “green” status while its decision log shows repeated unresolved decisions and its integration environment contains untested interfaces. Contradictions are not proof of failure, but they are signals requiring inquiry. 2.2 A weighted diagnostic scoreFor a structured assessment, each dimension may be rated on a scale from 1 to 5 and assigned a weight. The weighted maturity score is: M = ∑(wᵢ rᵢ) / ∑wᵢ Here, M is the overall maturity score, rᵢ is the rating for dimension i, and wᵢ is its importance weight. Ratings are ordinal judgments, so the result should be interpreted as a comparative indicator, not as a precise physical measurement. Weights should reflect organizational purpose and risk. They must be documented, and sensitivity analysis should be performed when a conclusion depends heavily on one weight. Worked example. Suppose an organization rates strategic alignment 3, delivery design 4, governance 2, integration 2, learning 3 and enabling environment 2. Assign weights 2, 2, 3, 3, 2 and 2 respectively. Then: M = (2×3 + 2×4 + 3×2 + 3×2 + 2×3 + 2×2) / (2+2+3+3+2+2) = 38/14 ≈ 2.71 The result suggests a capability between repeatable locally and integrated. However, the low governance and integration ratings are constraints. An average score should never conceal a critical weakness in a safety, legal or cyber-security dimension. 2.3 Maturity diagnosis through simulationSimulation is valuable because hybrid weaknesses often appear at interfaces rather than in documents. A realistic exercise can give participants a changing product backlog, fixed regulatory milestones, supplier delays, operational incidents and competing stakeholder demands. Participants must decide what to re-plan, what to escalate, what to defer and what quality or compliance conditions cannot be compromised. Useful simulation measures include: - time from emerging issue to decision;
- number and age of unresolved dependencies;
- proportion of changes linked to outcomes;
- rework caused by late integration;
- quality and compliance exceptions;
- transparency of assumptions and trade-offs;
- whether decision rights were exercised at the appropriate level.
The purpose is not to reward the team that completes the most tasks. It is to reveal how the system behaves under uncertainty. 3. Designing an Improvement Roadmap3.1 From diagnosis to interventionA maturity assessment has value only when it changes action. An improvement roadmap should identify a small number of capability constraints, define the desired future state, sequence interventions and specify evidence of progress. It should not become a catalogue of every possible training course or software purchase. A strong roadmap contains: - Problem statement: the observable condition and its effect.
- Root cause hypothesis: why the condition persists.
- Target capability: the behaviour or system property required.
- Intervention: policy, coaching, structural, technical or contractual change.
- Owner and decision authority: who is accountable and who must approve.
- Measure and review date: how progress will be assessed.
- Adoption strategy: how people will learn, practise and receive feedback.
- Risks and dependencies: what may prevent improvement.
3.2 Prioritizing interventionsRoadmap priorities should consider value, urgency, feasibility and systemic leverage. A simple prioritization index can be used for discussion: P = (V × U × L) / E V represents expected value, U urgency, L leverage across projects and E effort or complexity. Each factor must be rated using a documented scale; the index is not a universal law and should not override safety, legal or ethical obligations. A low-effort activity with little leverage should not automatically outrank a difficult control that prevents catastrophic harm. Typical high-leverage interventions include clarifying decision rights, establishing an integrated dependency review, changing funding from large irreversible increments to evidence-based investment points, and improving automated integration. Training alone rarely fixes a structural problem. 3.3 Roadmap horizonsA practical roadmap can use three horizons: - Stabilize: make current work visible, clarify roles, reduce critical risks and establish minimum quality and governance controls.
- Integrate: connect product, release, financial, supplier and compliance cadences; improve forecasting and dependency management.
- Evolve: institutionalize learning, adaptive funding, sustainable delivery, data governance and ecosystem-level optimization.
Each horizon should contain experiments rather than a rigid promise that every future condition is known. A quarterly capability review can terminate, scale or redesign initiatives based on evidence. 4. Lessons Learned as Organizational Learning4.1 From retrospective conversation to usable knowledgeA lesson is not merely a statement that “communication should improve.” A useful lesson identifies context, mechanism, evidence and recommended action. It distinguishes an observation from an interpretation and an interpretation from a causal claim. A disciplined learning record may include: | Field | Content |
|---|
| Context | What project conditions existed? | | Event | What happened, and when? | | Consequence | What was the effect on value, time, cost, quality or people? | | Contributing factors | Which conditions enabled or constrained the event? | | Evidence | Which records or observations support the conclusion? | | Action | What should be repeated, changed or tested? | | Applicability | In which contexts is the lesson relevant? | | Owner and review | Who will test or maintain it? |
The “applicability” field is essential. A practice that worked in a co-located team may fail in a regulated, multi-supplier environment. Lessons must be treated as conditional knowledge, not universal slogans. 4.2 Learning loopsSingle-loop learning improves actions within existing assumptions: for example, adding an integration checkpoint. Double-loop learning examines assumptions: perhaps the organization assumes that integration can be postponed because contracts and funding reward component completion. Triple-loop learning examines how the organization learns and who is authorized to challenge its assumptions. Effective learning systems include psychological safety, blameless inquiry where appropriate, traceable evidence and a mechanism for transferring lessons into standards, onboarding, procurement and architecture decisions. A repository without curation, searchability and adoption feedback is an archive, not a learning system. 5. Sustainable DeliverySustainable delivery means meeting present objectives without undermining the environmental, social and economic conditions needed for future value. It extends the project constraint conversation beyond time, cost and scope to include carbon, resource use, accessibility, labour conditions, community effects, resilience and long-term operating cost. Sustainability should be integrated into the business case, product vision, architecture, procurement and acceptance criteria. Examples include: - selecting lower-carbon logistics and infrastructure;
- designing for energy efficiency, repairability and circularity;
- evaluating supplier labour and human-rights practices;
- including accessibility and inclusion in product quality;
- assessing climate and supply-chain resilience;
- measuring operational impacts rather than only construction or implementation impacts.
Trade-offs must be explicit. A cheaper component may increase energy consumption or disposal cost. A rapid release may reduce immediate uncertainty but create technical debt and future emissions. Sustainability metrics should therefore be connected to decisions and benefits, not reported as detached public-relations indicators. A life-cycle perspective is particularly important. For a digital service, the relevant boundary may include data-centre energy, network use, device replacement, model-training costs and end-of-life effects. Measurement is often uncertain; uncertainty should be disclosed rather than hidden behind false precision. 6. Adaptive Governance6.1 Governance and managementManagement coordinates daily work; governance establishes direction, accountability, oversight and legitimate decision rights. Adaptive governance does not mean weak governance. It means that controls are designed to provide timely assurance and are adjusted as uncertainty, risk and evidence change. An adaptive governance design typically includes: - clear outcome ownership and delegated decision rights;
- minimum mandatory controls for safety, law, security and ethics;
- evidence-based review points rather than ceremonial status meetings;
- thresholds for escalation and intervention;
- transparent decision and assumption logs;
- independent assurance proportionate to risk;
- routes for users and affected communities to influence decisions.
A useful distinction is between reversible and irreversible decisions. Reversible decisions can be delegated and tested quickly. Irreversible or high-consequence decisions require stronger evidence, broader consultation and formal approval. This distinction supports speed without treating every decision as equally risky. 6.2 Governance tensionsAdaptive governance faces several tensions. Local autonomy can conflict with enterprise architecture. Experimentation can conflict with regulatory controls. Transparent data can conflict with privacy. Product ownership can become overloaded when accountability for benefits, safety and delivery is concentrated in one role. These tensions should be managed through explicit boundaries, not informal heroics. Governance forums should ask: What decision is required? What evidence is sufficient? Who is accountable for the consequence? What is the cost of delay? What cannot be compromised? 7. Autonomous Tools and AI-Enabled Project Ecosystems7.1 From automation to autonomyAutomation performs a defined action when triggered. An autonomous tool may interpret information, select actions, execute them and learn from feedback with limited direct intervention. In project environments, examples include systems that forecast schedule risk, allocate work, generate status narratives, detect dependency patterns, draft requirements or initiate workflow changes. The distinction matters because autonomy changes the control problem. A calculator does not normally decide project priorities. An AI agent that reprioritizes work, changes a release plan or communicates with suppliers affects value, accountability and stakeholder relationships. 7.2 Potential benefitsAI-enabled ecosystems can: - summarize large project records;
- identify inconsistencies between plans, risks and decisions;
- forecast patterns in flow, defects or resource demand;
- generate alternative scenarios;
- support requirements analysis and traceability;
- reduce administrative effort;
- provide conversational access to approved project knowledge.
These benefits are strongest when data is reliable, context is explicit and humans retain authority over consequential decisions. 7.3 Risks and controlsImportant risks include hallucinated or unsupported content, biased recommendations, automation bias, data leakage, intellectual-property exposure, model drift, cyber compromise, surveillance of workers and unclear liability. AI outputs can appear precise while being based on incomplete or historically biased data. A responsible control framework should include: - Purpose limitation: define what the system may and may not do.
- Data governance: control provenance, access, retention, quality and confidentiality.
- Human accountability: assign a named decision owner; “the algorithm decided” is not an accountability model.
- Traceability: preserve prompts, inputs, outputs, model versions and approvals where proportionate.
- Validation: test accuracy, bias, robustness and failure modes before deployment.
- Permission boundaries: separate advisory, approval and execution privileges.
- Monitoring and challenge: inspect performance, drift and adverse impacts.
- Incident response: define how erroneous or harmful outputs are reported, contained and corrected.
AI should augment professional judgment, not replace responsibility. In high-consequence domains, an apparently efficient autonomous action may be unacceptable if affected people cannot understand, contest or appeal it. 8. Integrated Applied Case: Northstar Service TransformationThe following is an illustrative case, constructed for educational purposes. BackgroundNorthstar, a regional public-service organization, is replacing a legacy case-management platform. The programme has a fixed statutory reporting date in eighteen months, a government cybersecurity standard, three external suppliers and five operational divisions. The regulatory data model and hosting approval are relatively stable, but user workflows and service volumes are uncertain. The programme adopts a hybrid model: predictive architecture, procurement and regulatory gates; adaptive product discovery and incremental releases. ProblemAfter six months, the programme is officially “on track,” but frontline users report that demonstrations do not reflect real work. The architecture team has completed documents, while two product teams have built incompatible identity and notification functions. A supplier contract pays for completed components rather than integrated outcomes. The governance board meets monthly and receives polished reports, but decisions about data ownership remain unresolved. An AI assistant has been introduced to summarize risks; it occasionally combines statements from different projects without clear source references. AnalysisAn assessment rates the programme as follows: | Dimension | Rating | Evidence |
|---|
| Strategic alignment | 3 | Statutory outcome is clear, but operational benefits lack owners | | Delivery design | 3 | Hybrid boundary exists but interfaces are weak | | Governance | 2 | Slow decisions and unclear data accountability | | Flow and integration | 2 | Component completion exceeds integrated release evidence | | Learning capability | 2 | Retrospectives occur but actions are not tracked | | Enabling environment | 2 | Contract and reporting incentives favour local optimization |
Using equal weights, the score is: M = (3+3+2+2+2+2)/6 = 14/6 ≈ 2.33 The score is less important than the pattern: governance, integration and learning are constraints. The AI issue is not primarily a software problem; it is a data provenance and accountability problem. Improvement approachNorthstar creates a cross-functional integration forum with authority to resolve interface decisions within defined boundaries. It introduces an integrated definition of done: a capability is not complete until security, data, operational support, accessibility and end-to-end user validation are evidenced. The contract is amended, where legally possible, to include integrated outcomes and shared dependency management. The governance board changes its monthly meeting. It reviews a small set of irreversible decisions, statutory risks, outcome evidence and exceptions rather than receiving exhaustive activity reports. Product teams retain authority over reversible design experiments. A decision log records the owner, evidence, alternatives considered and review date. The programme establishes a learning loop. Every retrospective action has an owner and due date; recurring patterns are reviewed monthly. A pilot with one operational division tests the new workflow before wider deployment. The AI assistant is restricted to retrieval from approved sources, must provide citations, cannot alter project records and is labelled advisory. A human risk owner validates every AI-generated risk summary. OutcomeAfter two release cycles, Northstar reports fewer late integration defects, faster resolution of data decisions and improved user acceptance. The statutory date remains challenging, but forecasts are more credible because they are based on integrated evidence rather than component completion. The organization also discovers that supplier incentives, not team motivation, were a major cause of local optimization. Learning points- A hybrid label does not create integration; interfaces, decision rights and incentives do.
- Averages conceal constraints, so maturity diagnosis must inspect critical dimensions.
- Governance should be strengthened around high-consequence decisions while delegated experimentation remains fast.
- Lessons become organizational capability only when actions are owned and embedded.
- AI adoption requires provenance, permission boundaries and human accountability.
9. Challenges and LimitationsMaturity models can create false precision, encourage gaming and reward conformity. Ratings may be affected by assessor bias, organizational politics or fear of consequences. Quantitative dashboards can privilege what is easy to count over what matters, such as trust, learning and user dignity. Benchmarking organizations with different missions and risk profiles may be misleading. Hybrid delivery can also become a compromise that inherits the weaknesses of both predictive bureaucracy and poorly disciplined agility. Multiple cadences create coordination cost. Adaptive funding may conflict with accounting rules. Suppliers may resist shared accountability when contracts allocate risk narrowly. Sustainable metrics may be incomplete, and AI systems may magnify existing data and power inequalities. These limitations support several principles: make assumptions explicit; triangulate evidence; protect dissent; distinguish indicators from outcomes; review the model itself; and preserve professional and ethical judgment. 10. Best-Practice Principles- Design the hybrid model from uncertainty, risk, regulatory obligations and value—not from fashion.
- Make the predictive-adaptive boundary visible and review it as evidence changes.
- Establish one integrated view of outcomes, dependencies, quality and risk.
- Delegate reversible decisions and escalate irreversible or high-consequence decisions.
- Measure flow and learning, not merely utilization and task completion.
- Treat contracts, funding and organizational incentives as part of the delivery system.
- Record lessons with context, evidence, applicability and ownership.
- Integrate sustainability into product and investment decisions.
- Use AI with defined purpose, controlled data, traceability and accountable human oversight.
- Reassess maturity after interventions and test whether behaviour, not documentation, has changed.
Chapter SummaryIntegrated hybrid practice requires more than combining agile ceremonies with predictive plans. It requires a coherent system of outcomes, decision rights, cadences, controls, integration mechanisms, incentives and learning loops. Maturity is an organizational capability that should be diagnosed through triangulated evidence and interpreted in relation to project risk and purpose. A weighted maturity score can support structured comparison, but it must not disguise critical weaknesses or imply unjustified precision. Improvement roadmaps should target systemic constraints, assign ownership and use staged experiments. Lessons learned become valuable when they preserve context, distinguish evidence from opinion and are transferred into future decisions. Sustainable delivery broadens success to include environmental, social and long-term economic effects. Adaptive governance balances delegated autonomy with proportionate assurance. Autonomous tools and AI can improve analysis and reduce administrative work, but they require strong controls for provenance, bias, privacy, cybersecurity, traceability and accountability. The future hybrid project ecosystem will therefore depend not only on advanced technology but also on mature judgment, ethical leadership and institutional learning. Key TermsHybrid maturity: The organizational capability to integrate predictive and adaptive delivery appropriately. Maturity assessment: A structured evaluation of delivery capability using evidence and defined criteria. Leading indicator: A measure that signals conditions likely to influence future performance. Lagging indicator: A measure of results observed after activity or delivery has occurred. Integration cadence: The recurring rhythm used to synchronize teams, products, suppliers and governance. Decision rights: Explicit authority to make and approve particular decisions. Adaptive governance: Governance that changes its controls and decision timing in response to risk and evidence. Reversible decision: A decision that can be changed at relatively low cost or risk. Irreversible decision: A decision whose consequences are difficult, costly or dangerous to undo. Roadmap: A sequenced plan for developing capability or delivering outcomes. Double-loop learning: Learning that questions the assumptions underlying an action. Sustainable delivery: Delivery that protects environmental, social and economic capacity for future value. Life-cycle perspective: Evaluation of impacts across creation, use, operation and disposal. Autonomous tool: A system capable of selecting or executing actions with limited direct intervention. AI-enabled ecosystem: A connected project environment in which AI supports analysis, coordination or execution. Data provenance: The traceable origin, history and transformation of data. Automation bias: The tendency to over-trust automated recommendations. Model drift: Change in system performance as data, context or relationships change. Psychological safety: A shared belief that people can raise concerns and challenge assumptions without disproportionate punishment. Outcome ownership: Explicit accountability for achieving and sustaining a desired benefit or result. Review QuestionsShort Answer Questions- Why is maturity different from project performance?
- Name four dimensions that may be used to diagnose hybrid maturity.
- What is the purpose of distinguishing reversible from irreversible decisions?
- Why should lessons learned include an applicability field?
- Identify three controls required for responsible use of AI in projects.
Long Answer Questions- Explain how a hybrid maturity assessment should combine documentary, behavioural and outcome evidence.
- Discuss how contracts, funding and incentives can either support or undermine hybrid delivery.
- Compare single-loop, double-loop and triple-loop learning in a project environment.
- Evaluate the relationship between sustainable delivery and traditional project success criteria.
- Explain how adaptive governance can increase speed without weakening accountability.
Analytical / Application Questions- A programme has strong agile teams but repeated failures at regulatory and supplier interfaces. Diagnose the likely maturity constraints and design a two-horizon improvement roadmap.
- Using the maturity dimensions in this chapter, create a weighted assessment for a project of your choice. Justify the weights and explain why the average score may be misleading.
- Design a governance and control arrangement for an AI agent that forecasts project risks and proposes changes to release priorities. Specify its permissions, human decision points, evidence requirements and incident controls.
Multiple Choice Questions with AnswersQuestion 1Which statement best defines hybrid project-management maturity? A. The number of agile and predictive methods used by a project B. The ability to repeatedly select and integrate delivery practices appropriate to context C. The percentage of planned tasks completed on schedule D. The existence of a project-management office Correct Answer: B. The ability to repeatedly select and integrate delivery practices appropriate to context Question 2In the weighted maturity formula M = ∑(wᵢrᵢ) / ∑wᵢ, what does wᵢ represent? A. The rating for dimension i B. The number of projects assessed C. The importance weight assigned to dimension i D. The time spent conducting the assessment Correct Answer: C. The importance weight assigned to dimension i Question 3Why should a maturity assessment use both leading and lagging indicators? A. To eliminate the need for qualitative evidence B. To measure both conditions influencing future results and results already achieved C. To ensure every project receives the same rating D. To replace stakeholder interviews with dashboards Correct Answer: B. To measure both conditions influencing future results and results already achieved Question 4Which intervention is most likely to address a structural cause of poor integration? A. Adding general training without changing interfaces B. Increasing the number of status-report pages C. Clarifying dependency ownership and establishing integrated acceptance criteria D. Requiring teams to work longer hours Correct Answer: C. Clarifying dependency ownership and establishing integrated acceptance criteria Question 5What distinguishes double-loop learning from single-loop learning? A. Double-loop learning questions the assumptions behind actions B. Double-loop learning records only financial outcomes C. Double-loop learning avoids retrospectives D. Double-loop learning is limited to technical defects Correct Answer: A. Double-loop learning questions the assumptions behind actions Question 6Which is an example of adaptive governance? A. Applying identical approval controls to every decision B. Delegating reversible decisions while escalating high-consequence decisions C. Removing all assurance activities from an agile project D. Allowing an AI system to approve all changes without review Correct Answer: B. Delegating reversible decisions while escalating high-consequence decisions Question 7Sustainable delivery requires project teams to consider: A. Only the implementation cost B. Only the carbon used during construction C. Environmental, social and long-term economic effects across the life cycle D. Only benefits reported at project closure Correct Answer: C. Environmental, social and long-term economic effects across the life cycle Question 8Which control is most directly concerned with knowing where AI-generated information came from? A. Data provenance B. Resource smoothing C. Scope decomposition D. Earned-value calculation Correct Answer: A. Data provenance Question 9Northstar’s component-completion incentives primarily created which problem? A. Local optimization at the expense of integrated outcomes B. Excessive user participation in testing C. Overinvestment in sustainability measures D. Too much delegation of reversible decisions Correct Answer: A. Local optimization at the expense of integrated outcomes Question 10Using equal weights, what is the average of maturity ratings 3, 3, 2, 2, 2 and 2? A. 2.00 B. 2.17 C. 2.33 D. 3.00 Correct Answer: C. 2.33
|