Hotel Accountancy

Chapter 12
Capital Investment, Financing and Valuation

Post Graduate Program in Hotel Management
Hotel Accountancy   •   Post Graduate

Capital Investment, Financing and Valuation

Introduction

Hotels are capital-intensive enterprises. Their performance depends not only on daily operating decisions but also on long-lived commitments to land, buildings, furniture, equipment, information systems, energy infrastructure and brand standards. A decision to renovate guestrooms, install a property-management system, develop a new resort or replace diesel boilers can commit owners to substantial cash outflows for many years. Hotel accountancy therefore extends beyond recording historical transactions: it supports forward-looking investment, financing and valuation decisions.

Capital investment analysis asks whether a proposed asset or project will create value after considering timing, risk and the opportunity cost of funds. Financing analysis asks how the project should be funded and how debt, equity, leasing and contractual arrangements affect risk and control. Valuation analysis estimates what a hotel, asset or operating interest is worth under specified assumptions.

The central principle is that accounting profit and investment value are not identical. Depreciation reduces reported profit but is not normally a cash outflow in the period recorded. Conversely, an investment may generate strategically important benefits that are not immediately visible in accounting income. Professional analysis therefore integrates accounting data with cash-flow forecasting, financial modelling, market evidence and governance controls.

Learning Objectives

After studying this chapter, the learner should be able to:

  1. Distinguish capital expenditure from operating expenditure and identify relevant project cash flows.
  2. Evaluate hotel renovations, technology projects, sustainability investments and new developments using NPV, IRR, payback and profitability measures.
  3. Estimate a project discount rate and explain the role of the weighted average cost of capital.
  4. Incorporate taxes, inflation, working capital, terminal value, salvage value and risk into investment analysis.
  5. Compare debt, equity and leasing as sources of finance.
  6. Explain how ownership, management contracts, franchises and leases allocate financial risk and control.
  7. Apply income, market and cost approaches to hotel valuation.
  8. Recognise ethical, governance, regulatory and modelling limitations in capital decisions.

1. Capital Investment in the Hotel Industry

Capital investment is expenditure intended to create, acquire, improve or extend the useful life of an asset or capability. Typical hotel capital investments include:

  • land acquisition and construction;
  • acquisition of an operating hotel;
  • guestroom and public-area renovation;
  • kitchen, laundry, HVAC and water-treatment equipment;
  • reservation, revenue-management, cybersecurity and property-management systems;
  • renewable-energy, energy-efficiency and waste-reduction projects; and
  • accessibility, fire-safety and regulatory upgrades.

A useful distinction is between maintenance capital expenditure, which preserves current operating capacity, and growth or strategic capital expenditure, which increases capacity, quality, market reach or resilience. The distinction is managerial rather than absolute. A roof replacement may be essential maintenance, while an upgraded roof with solar panels may contain both maintenance and growth components.

A project should be assessed on incremental after-tax cash flows: cash flows that occur because the project is accepted and that would not occur otherwise. Sunk costs, such as feasibility fees already paid, are excluded. Opportunity costs, such as rental income forgone when an existing facility is converted into a restaurant, are included. Financing costs are generally reflected through the discount rate rather than deducted again from project cash flows when NPV is calculated using the weighted average cost of capital.

Capital expenditure and operating expenditure

Capital expenditure is normally recognised as an asset when future economic benefits are probable and cost can be measured reliably, subject to applicable accounting standards. It is subsequently depreciated or amortised over its useful life. Operating expenditure is charged to the period in which the service or benefit is consumed. Classification must follow accounting standards and substance, not a desire to improve short-term profit.

For investment appraisal, however, accounting classification is not sufficient. A capitalised item still requires a cash payment, and an operating expense may produce tax savings. The analyst must construct a separate cash-flow schedule.

2. Building the Project Cash-Flow Model

A robust hotel investment model normally contains the following stages:

  1. Define the decision, asset boundary, planning horizon and ownership perspective.
  2. Forecast demand, average daily rate, occupancy, departmental revenues and operating costs.
  3. Estimate initial investment, pre-opening costs, working capital and timing of expenditure.
  4. Forecast tax, replacement capital expenditure and terminal proceeds.
  5. Select a discount rate consistent with project risk and cash-flow definition.
  6. Calculate value indicators and perform sensitivity, scenario and risk analysis.
  7. Review non-financial effects, contractual constraints and implementation capacity.

Hotel revenue is often forecast from rooms sold and rate. For a period:

Rooms revenue = Available rooms × Days × Occupancy rate × Average daily rate

Occupancy is expressed as a decimal in the calculation. For example, 200 rooms × 365 days × 0.72 × $150 = $7,884,000 of annual rooms revenue. Total revenue must also consider food and beverage, meetings, spa, parking, ancillary services and discounts. Forecasts should use segment-specific assumptions because leisure, corporate, group and wholesale demand respond differently to price and economic conditions.

A simplified unlevered free cash flow model is:

FCFt = EBITt(1 − T) + Dt − CapExt − ∆NWCt + OtherCashFlowt

Here, FCFt is free cash flow in period t; EBITt is earnings before interest and tax; T is the applicable tax rate; Dt is depreciation and amortisation; CapExt is capital expenditure; ∆NWCt is the increase in operating net working capital; and OtherCashFlowt includes relevant non-operating or terminal cash flows. Depreciation is added back because it is non-cash, while its tax effect is retained through EBITt(1 − T). This formulation assumes cash taxes are approximated by tax on operating profit and that interest is not included in project cash flow.

Working capital deserves special attention. A hotel may need inventory, receivables and cash balances before revenue stabilises. An increase in net working capital is a cash use. If working capital is recovered at project termination, the recovery is a terminal cash inflow, subject to the actual ability to release those funds.

3. Time Value of Money and NPV

Money available today can be invested and is therefore generally worth more than the same nominal amount received later. Net present value discounts future incremental cash flows to the decision date:

NPV = ∑[t=0 to n] CFt ÷ (1 + r)t

CFt is the incremental cash flow at time t, r is the discount rate per period, and n is the final period. CF0 is usually negative because it represents the initial investment. The units of the discount rate and cash flows must match: annual cash flows require an annual effective rate, while monthly cash flows require a consistent monthly rate or an appropriately converted annual rate.

A positive NPV means that, under the stated assumptions and discount rate, the project is expected to earn more than the required return and increase the value of the relevant owner. A negative NPV means it fails to meet that required return. NPV is generally the strongest primary criterion for mutually exclusive projects because it measures absolute value creation and is additive across projects.

Worked example: renovation project

An illustrative hotel renovation requires an initial outlay of $2,000,000 at time 0. It is expected to generate after-tax cash flows of $650,000 in each of years 1–4, including a year-4 residual value of $300,000 in addition to the operating cash flow. The required return is 10%.

The NPV is:

NPV = −2,000,000 + 650,000/1.10 + 650,000/1.10² + 650,000/1.10³ + 950,000/1.10⁴

The present values are approximately $590,909, $537,190, $488,355 and $648,127. Therefore:

NPV ≈ −2,000,000 + 2,264,581 = $264,581

The project is financially acceptable at a 10% required return, subject to risk, strategic fit and implementation feasibility. The residual value must be realistic; it should not simply be inserted to make the project attractive.

4. IRR, Payback and Related Measures

The internal rate of return is the discount rate that makes NPV equal to zero:

0 = ∑[t=0 to n] CFt ÷ (1 + IRR)t

IRR is attractive because it produces a percentage return that can be compared with a hurdle rate. However, it can mislead when cash flows change sign more than once, when projects differ greatly in scale, or when mutually exclusive projects have different timing. In such cases, NPV should normally dominate the decision. Reinvestment assumptions embedded in IRR can also be unrealistic.

The simple payback period is the time required for cumulative undiscounted cash flows to recover the initial investment. If the cumulative amount has been recovered by the beginning of year k and the unrecovered amount is R, while cash flow in year k is CFk, then:

Payback period = k − 1 + R ÷ CFk

Payback is easy to communicate and useful as a liquidity or exposure indicator. It ignores cash flows after payback and, in its simple form, ignores the time value of money. Discounted payback corrects the latter weakness but still ignores later cash flows.

The profitability index is:

Profitability index = Present value of future cash inflows ÷ Initial investment

For a conventional project, a profitability index above 1 indicates a positive NPV. It can assist capital rationing, but it may rank projects differently from NPV when project sizes differ.

5. Cost of Capital and Risk

The discount rate should reflect the risk of the cash flows, not merely the financing mix chosen after the decision. A commonly used weighted average cost of capital is:

WACC = (E ÷ (D + E)) × Re + (D ÷ (D + E)) × Rd × (1 − T)

E is the market value of equity, D is the market value of interest-bearing debt, Re is the required return on equity, Rd is the pre-tax cost of debt, and T is the marginal tax rate. The tax adjustment assumes interest is tax-deductible and that the firm can use the tax shield. Market-value weights are generally preferable to book-value weights for valuation, although practical constraints may require judgement.

The cost of equity is often estimated using the capital asset pricing model:

Re = Rf + βe × (Rm − Rf)

Rf is the risk-free rate, βe is the equity beta measuring systematic risk relative to the market, and Rm − Rf is the market risk premium. The model assumes investors are diversified and that systematic risk is the relevant priced risk. Hotel projects may require adjustments for country risk, size, liquidity, development risk and differences between a listed-company beta and the specific asset.

A project discount rate should be adjusted when project risk differs materially from the existing hotel portfolio. A new resort in an untested destination should not automatically be discounted at the same rate as a stable, franchised city hotel. Alternatives include a risk-adjusted discount rate, certainty-equivalent cash flows, scenario-weighted expected cash flows and simulation. Increasing the discount rate is not a substitute for understanding the source of risk.

Worked WACC example

Assume market-value equity is $60 million and debt is $40 million. The cost of equity is 14%, pre-tax debt costs 8%, and the tax rate is 25%.

WACC = (60/100 × 14%) + (40/100 × 8% × 0.75)
WACC = 8.40% + 2.40% = 10.80%

The 10.80% rate is appropriate only if the project has risk comparable with the business and the assumptions about tax shields, financing and market values are defensible.

6. Risk Analysis for Hotel Investments

Hotel forecasts are exposed to demand, rate, cost, construction, regulatory, climate, technology and financing risks. A professional model should not present a single forecast as if it were certain.

Sensitivity analysis changes one variable at a time, such as occupancy, average daily rate, construction cost or exit yield. It identifies variables to which NPV is most responsive but does not show joint movements.

Scenario analysis changes several linked assumptions. A downside scenario may combine lower occupancy, weaker rate growth, higher wages, delayed opening and a higher exit yield. Scenarios should be economically coherent rather than arbitrary.

Break-even analysis identifies the value of a variable at which NPV becomes zero. For example, management may ask what minimum occupancy is required to justify a renovation. Break-even output is not a forecast; it is a decision boundary.

Simulation assigns probability distributions to uncertain variables and generates a distribution of possible NPVs. Correlations are important: economic recession may reduce occupancy and rate simultaneously, while energy prices may rise when inflation rises. Simulation results are only as credible as the distributions, correlations and model structure used.

Real options provide another perspective. A phased renovation may create an option to expand after observing demand. A land purchase may provide an option to defer construction. Flexibility has value, although estimating it requires careful assumptions and should not become an excuse for speculative forecasts.

7. Sustainability and Technology Investments

Sustainability projects often produce both financial and non-financial returns. Solar generation, efficient chillers, heat pumps, water reuse, insulation and food-waste systems may reduce utility costs, carbon exposure and regulatory risk. Benefits may also include stronger reputation, guest preference, access to green finance and compliance with future standards.

The model should include:

  • capital cost and installation downtime;
  • expected energy, water and waste savings;
  • maintenance and replacement costs;
  • incentives, grants and tax effects;
  • residual value and degradation of equipment performance;
  • carbon prices or regulatory penalties where sufficiently credible; and
  • effects on guest experience and operating reliability.

Technology projects require analysis of licence fees, implementation costs, training, integration, cybersecurity, data migration and vendor dependence. A lower labour cost may be offset by service failures or lower guest satisfaction. Benefits should be linked to measurable indicators such as labour hours per occupied room, conversion rate, forecast accuracy, energy consumption per available room or chargeback losses.

Artificial intelligence can support demand forecasting, price optimisation, preventive maintenance and anomaly detection. It does not eliminate managerial accountability. Data quality, explainability, privacy, cybersecurity, discrimination and human oversight must be included in governance. A model that increases revenue while unlawfully using personal data is not a value-creating investment in the broader professional sense.

8. Financing Choices

Debt finance

Debt can be obtained through term loans, mortgages, bonds, construction facilities or mezzanine instruments. Its advantages include tax-deductible interest in many jurisdictions, preservation of ownership control and potentially lower cost than equity. Its disadvantages include mandatory payments, covenants, refinancing risk, security requirements and the possibility of financial distress during low-demand periods.

Important debt terms include interest rate type, maturity, amortisation, currency, loan-to-value ratio, debt-service coverage ratio, prepayment rights and covenant requirements. A hotel with highly seasonal cash flows requires liquidity planning rather than relying only on annual averages.

Equity finance

Equity absorbs losses before debt and does not require fixed repayment. It is therefore more flexible but generally more expensive because equity investors bear greater risk and require a return. New equity may dilute existing ownership and influence. Preferred equity and joint ventures occupy intermediate positions, depending on contractual rights.

Leasing

Leasing can provide access to vehicles, equipment, technology or sometimes an entire hotel property without immediate ownership of the asset. The analysis must consider lease payments, residual risk, renewal terms, service obligations, purchase options, restrictions and accounting treatment. Under contemporary lease standards, many leases create a right-of-use asset and lease liability for the lessee, although classification and exemptions vary by jurisdiction.

Leasing is not automatically cheaper than borrowing. Compare the present value of lease-related cash flows with the relevant purchase-and-finance alternative, using consistent tax, maintenance, residual-value and risk assumptions.

Owner–operator arrangements

A hotel may be owner-operated, managed under a management contract, franchised, leased to an operator or held through a joint venture. The arrangement determines who supplies capital, who controls operations, who bears downside risk and how cash flows are divided.

A management contract commonly gives the operator a base management fee based on revenue and an incentive fee linked to profit, subject to negotiated performance tests. A franchise permits the owner to operate under a brand in return for fees and compliance with standards. A lease gives the lessee greater operational control but shifts more operating risk to the lessee, depending on rent structure. These arrangements affect valuation: the value of a real estate interest is not identical to the value of an operating business or brand-management platform.

9. Hotel Valuation

Valuation is an estimate of value at a specified date for a specified purpose, such as acquisition, financing, financial reporting, taxation, insurance or dispute resolution. Value depends on the premise: market value, investment value, liquidation value and fair value may differ.

Income approach

The discounted cash-flow approach estimates the present value of expected future cash flows:

V0 = ∑[t=1 to n] FCFt ÷ (1 + r)t + TVn ÷ (1 + r)n

V0 is current value, FCFt is forecast free cash flow, r is the required return and TVn is terminal value at the end of year n. A perpetual-growth terminal value is often expressed as:

TVn = FCFn+1 ÷ (r − g)

where g is the perpetual growth rate. This formula requires r > g, stable long-term conditions and cash flows appropriate to the discount rate. Because terminal value can represent a large proportion of hotel DCF value, modest changes in r or g can materially alter the result.

For a stabilised income stream, a capitalisation approach may be used:

Value = Stabilised NOI ÷ Capitalisation rate

NOI is net operating income before financing costs and often before owner-specific items. The capitalisation rate must be consistent with the property’s risk, growth and physical condition.

Market approach

The market approach compares the subject hotel with recent transactions or trading metrics. Common indicators include value per room, price-to-revenue, price-to-EBITDA and implied capitalisation rate. Comparables must be adjusted for location, brand, age, quality, scale, tenure, renovation status, seasonality and transaction conditions. A simple price-per-room comparison is dangerous when one hotel has materially higher revenue or a different land component.

Cost approach

The cost approach estimates land value plus the cost of reproducing or replacing improvements, less physical deterioration, functional obsolescence and external obsolescence. It is often useful for special-purpose or recently built properties but may not reflect the income-generating potential of an operating hotel.

Valuation should also distinguish enterprise value from equity value. If enterprise value is the value of operations available to all capital providers, then a simplified bridge is:

Equity value = Enterprise value − Debt − Debt-like claims + Excess cash

The exact bridge depends on transaction definitions, working capital, leases, pension obligations and other claims.

10. Illustrative Integrated Case: The Meridian Hotel

This is a fictional illustrative case. The 180-room Meridian Hotel operates in a competitive urban market. Its owners are considering a $4.5 million renovation of rooms and meeting facilities. The project will close floors in phases, is expected to increase average daily rate and meeting revenue, and should reduce maintenance costs. It also includes a digital energy-management system.

Background and problem

Management forecasts incremental after-tax cash flows of $1.15 million in each of years 1–4 and $1.35 million in year 5, including a $0.20 million residual value. Initial expenditure is $4.5 million. The hotel’s existing WACC is 9.5%, but the renovation has execution risk; the investment committee uses 10.5% as a risk-adjusted hurdle rate. The question is whether to proceed, redesign or defer.

Analysis

The NPV is:

NPV = −4.50 + 1.15/1.105 + 1.15/1.105² + 1.15/1.105³ + 1.15/1.105⁴ + 1.35/1.105⁵

Amounts are in millions. The approximate present values are 1.040, 0.941, 0.851, 0.770 and 0.817, giving total inflow value of approximately 4.419 million and NPV of approximately −$0.081 million. On the base case alone, the project narrowly fails the hurdle rate.

Simple payback occurs during year 4: cumulative cash flow after three years is $3.45 million, leaving $1.05 million; $1.15 million arrives in year 4. Thus payback is approximately:

3 + 1.05/1.15 = 3.91 years

Payback appears acceptable, but NPV indicates that later cash flows do not compensate for the required return. The committee then examines scenarios. A negotiated construction saving of $0.25 million would make NPV approximately $0.169 million higher, producing a positive result. Conversely, a six-month delay and weaker rate growth could reduce NPV substantially.

Approach and solution

The committee does not approve the project unchanged. It authorises a phased design with three controls: a fixed-price construction contract with appropriate protections, a pre-opening commercial plan to secure meeting demand, and stage-gate approval before the final floor is closed. The energy system is retained because its savings are relatively resilient and it supports the hotel’s sustainability objectives. Management also establishes measures for rate premium, meeting revenue, energy per occupied room, guest satisfaction, labour productivity and defect costs.

Outcome and learning points

The case demonstrates that a near-zero NPV is not automatically a rejection or acceptance. The decision depends on the reliability of forecasts, strategic necessity, option value from phasing, financing capacity and the cost of delay. However, qualitative benefits should be stated explicitly and governed; they should not be used to conceal an unexplained financial shortfall. The case also illustrates why payback alone is inadequate and why scenario analysis is essential.

11. Governance, Ethics and Limitations

Investment proposals should identify who prepared the forecast, who benefits from approval, which assumptions are judgemental and what evidence supports them. Boards and investment committees should require independent challenge for major developments and acquisitions. Conflicts may arise when operators receive fees linked to project size, when consultants are paid contingent fees or when managers are evaluated on short-term results despite long-term asset consequences.

Common modelling errors include double-counting inflation, treating depreciation as a cash cost, omitting replacement capital expenditure, ignoring working-capital recovery, using nominal cash flows with a real discount rate, applying a corporate discount rate to a riskier project, and including financing cash flows while also discounting at WACC. Tax rules, accounting standards, lease requirements, environmental permits, building codes, labour laws, accessibility rules and data-protection obligations must be verified in the relevant jurisdiction.

Valuation is not precision. A result such as $52.4 million may imply more certainty than the evidence supports. Analysts should provide ranges, key sensitivities, scenario narratives and a clear distinction between observed data and assumptions. Sustainability claims should be measurable and avoid greenwashing. Technology procurement should address cybersecurity, data ownership, vendor lock-in and business continuity.

12. Best-Practice Decision Framework

A high-quality hotel capital decision generally follows these principles:

  • evaluate incremental after-tax cash flows rather than accounting profit alone;
  • use NPV as the primary value criterion and interpret IRR and payback as supplementary measures;
  • match cash-flow timing, inflation basis, tax treatment and discount-rate convention;
  • use market-value financing weights where appropriate and test the ability to service debt;
  • separate base-case forecasts from downside, upside and probability-weighted scenarios;
  • include maintenance capital, working capital, terminal value and exit costs;
  • test the project against operational, legal, sustainability and reputational constraints;
  • assign accountability for assumptions and monitor post-investment performance; and
  • conduct a post-completion review comparing actual occupancy, rate, cost, energy, guest and cash-flow outcomes with the approved case.

Chapter Summary

Hotel capital investment decisions require an integrated understanding of operating forecasts, cash flows, risk, financing and value. The relevant cash-flow model is based on incremental after-tax cash flows and includes capital expenditure, working capital, tax effects, replacement needs and terminal proceeds. NPV discounts those flows at a rate consistent with their risk and is generally the strongest primary measure of value creation. IRR, payback and profitability index provide useful supplementary perspectives but have important limitations.

The cost of capital links project risk and financing markets. Debt may reduce the apparent cost of capital but increases fixed obligations and financial distress risk; equity provides flexibility but can dilute control; leasing changes ownership and residual-risk exposure rather than eliminating economic cost. Management contracts, franchises, leases and owner-operated structures allocate operating control and risk differently.

Hotel valuation may use discounted cash flow, capitalisation, market comparables and cost approaches. Each requires consistent definitions of cash flow, risk, growth and ownership interest. Sustainability and technology projects should include measurable financial, environmental and operational effects, with attention to data, cybersecurity and ethical governance. Sound decisions combine quantitative analysis with strategic judgement, transparent assumptions, scenario testing and post-investment accountability.

Key Terms

Capital expenditure: Spending that creates, acquires or improves a long-lived asset or capability.

Incremental cash flow: Cash flow that occurs because a project is accepted and would not occur otherwise.

Sunk cost: A past cost that cannot be changed by the current decision.

Opportunity cost: The benefit forgone by using a resource in one project rather than its best alternative.

Net present value (NPV): Present value of incremental cash flows, including the initial investment.

Internal rate of return (IRR): Discount rate that makes a project’s NPV equal to zero.

Payback period: Time required for cumulative cash flows to recover the initial investment.

Profitability index: Present value of future inflows divided by the initial investment.

Free cash flow: Cash available after operating requirements, tax, working capital and capital expenditure.

Weighted average cost of capital (WACC): Weighted required return of debt and equity capital.

Cost of equity: Return required by equity investors for bearing the project’s risk.

Debt service coverage ratio: Cash flow available for debt service divided by required debt service.

Terminal value: Value attributed to cash flows beyond the explicit forecast period or to asset disposal.

Capitalisation rate: Rate used to convert stabilised income into an estimated value.

Enterprise value: Value of operating assets available to debt and equity providers.

Equity value: Residual value attributable to owners after relevant debt and claims.

Owner–operator model: Arrangement in which ownership and hotel operation may be performed by the same or different parties.

Sensitivity analysis: Analysis that changes one assumption to observe its effect on the result.

Scenario analysis: Analysis using internally consistent combinations of assumptions.

Real option: Value arising from managerial flexibility to delay, expand, contract or abandon a project.

Review Questions

Short Answer Questions

  1. Why are incremental cash flows used in capital investment appraisal?
  2. State two limitations of the simple payback period.
  3. Define WACC and identify its principal components.
  4. Why must terminal value assumptions be treated cautiously in hotel valuation?
  5. Give two financial and two non-financial factors relevant to a sustainability investment.

Long Answer Questions

  1. Explain how a hotel should construct an after-tax free-cash-flow forecast for a major renovation.
  2. Compare NPV, IRR, payback and profitability index as project-selection measures.
  3. Discuss how debt, equity and leasing affect hotel risk, control and financial flexibility.
  4. Explain the income, market and cost approaches to valuing an operating hotel.
  5. Analyse how management contracts, franchises and leases allocate risk between hotel owners and operators.

Analytical / Application Questions

  1. A hotel requires $3 million today and expects $900,000 annually for four years, including $400,000 of residual value in year 4. Evaluate the project at a 12% discount rate using NPV and explain the decision.
  2. Design a sensitivity and scenario analysis for a hotel energy-efficiency project. Identify at least five uncertain variables and explain how their relationships could affect NPV.
  3. A proposed renovation has a positive IRR but a lower NPV than a smaller competing project. Explain how an investment committee should decide and what additional evidence it should request.

Multiple Choice Questions with Answers

Question 1

Which cash flow should normally be included in a project’s incremental cash-flow analysis?

A. A feasibility cost already paid last year

B. Revenue lost because an existing facility is converted to the project

C. A corporate accounting allocation unaffected by the project

D. Historical depreciation on the existing building

Correct Answer: B. Revenue lost because an existing facility is converted to the project

Question 2

A project requires $2,000,000 and produces $650,000 at the end of each of four years, with an additional $300,000 in year 4. At a 10% discount rate, the approximate NPV is:

A. $264,581

B. $590,909

C. −$264,581

D. $2,264,581

Correct Answer: A. $264,581

Question 3

In a conventional project, a positive NPV means that the project:

A. Has a payback period below one year

B. Earns less than the required return

C. Is expected to increase value at the stated discount rate

D. Has no project risk

Correct Answer: C. Is expected to increase value at the stated discount rate

Question 4

Using market-value equity of $60 million, debt of $40 million, cost of equity of 14%, pre-tax debt cost of 8% and a 25% tax rate, WACC is:

A. 8.40%

B. 10.80%

C. 12.00%

D. 14.00%

Correct Answer: B. 10.80%

Question 5

Which is a principal limitation of simple payback?

A. It always requires a market beta

B. It ignores cash flows received after recovery of the initial investment

C. It cannot be calculated for hotel projects

D. It automatically includes terminal value

Correct Answer: B. It ignores cash flows received after recovery of the initial investment

Question 6

The terminal-value formula TVn = FCFn+1 ÷ (r − g) requires which condition?

A. g > r

B. r = g

C. r > g

D. r = 0

Correct Answer: C. r > g

Question 7

Which financing source normally gives investors a residual claim after debt holders?

A. Senior secured debt

B. Trade credit

C. Ordinary equity

D. Mortgage interest

Correct Answer: C. Ordinary equity

Question 8

Which valuation approach converts stabilised NOI into value using a capitalisation rate?

A. Income approach

B. Cost approach only

C. Historical-cost approach

D. Inventory approach

Correct Answer: A. Income approach

Question 9

What is the main purpose of sensitivity analysis?

A. To change one assumption and observe its effect on the result

B. To guarantee the forecast outcome

C. To eliminate all project risk

D. To replace the need for cash-flow forecasting

Correct Answer: A. To change one assumption and observe its effect on the result

Question 10

Which issue is especially relevant when implementing AI in hotel financial or operational systems?

A. It removes the need for human oversight

B. It guarantees unbiased decisions

C. Data privacy, cybersecurity and explainability

D. It makes capital expenditure irrelevant

Correct Answer: C. Data privacy, cybersecurity and explainability

Hotel Accountancy
Chapter 12 of 15