Procurement Strategy and Operating ModelsIntroductionProcurement is no longer confined to obtaining goods and services at the lowest quoted price. In international business, procurement decisions influence market access, innovation, resilience, working capital, geopolitical exposure, carbon emissions, regulatory compliance and the firm’s ability to compete across locations. A procurement strategy therefore translates corporate and business strategy into decisions about what the organization should buy, from whom, where, under what governance arrangements and with what level of internal control. The strategic importance of procurement is especially visible when supply markets are international. A firm may gain cost advantages by sourcing from a low-cost country, but it may also face longer lead times, exchange-rate risk, tariffs, quality variation, intellectual-property exposure and political disruption. Similarly, centralizing procurement may create purchasing leverage, while local autonomy may be necessary for responsiveness, cultural fit and regulatory compliance. The central management challenge is not to select one universally superior model, but to design an operating model that fits the organization’s strategy, category characteristics and risk appetite. This chapter examines the alignment of procurement with corporate strategy; centralized, decentralized, center-led and hybrid models; and make-or-buy, insourcing, outsourcing, offshoring, nearshoring and localization decisions. Learning ObjectivesBy the end of this chapter, you should be able to: - Explain how procurement strategy supports corporate, business and international strategy.
- Distinguish centralized, decentralized, center-led and hybrid procurement operating models.
- Evaluate operating models using economic, organizational, risk and institutional criteria.
- Apply transaction-cost economics, the resource-based view and the Kraljic purchasing portfolio to procurement decisions.
- Analyze make-or-buy, insourcing, outsourcing, offshoring, nearshoring and localization alternatives.
- Recommend governance mechanisms, performance measures and implementation actions for an international procurement organization.
1. Procurement Strategy as a Strategic CapabilityA procurement strategy defines the principles and choices that govern the acquisition of external resources. It normally covers five connected questions: - Scope: Which categories, processes and suppliers fall within procurement’s responsibility?
- Value proposition: Is the primary objective cost reduction, innovation, resilience, speed, quality, sustainability or a combination?
- Supply architecture: Should the organization use global, regional, local, single, dual or multiple sources?
- Operating model: Where should decision rights and execution capabilities reside?
- Governance: How will compliance, risk, performance and relationships be managed?
Procurement strategy should be derived from higher-level strategy rather than developed independently. A differentiation strategy may require suppliers capable of design collaboration, rapid engineering changes and premium quality. A cost-leadership strategy may emphasize scale aggregation, process standardization and global competition. A sustainability-oriented strategy may prioritize traceability, renewable inputs, living wages and supplier decarbonization, even where these choices increase short-term purchase prices. Strategic alignment across levels| Strategic level | Typical question | Procurement implication |
|---|
| Corporate | Where and in which businesses should the firm compete? | Determine global footprint, shared services and group-wide policies | | Business | How will each business unit win customers? | Match supply capabilities to cost, quality, innovation or speed priorities | | International | How should activities be located across countries? | Evaluate trade rules, country risk, tax, logistics and local capability | | Functional | How should procurement create value? | Design category strategies, sourcing processes, systems and talent |
Strategic alignment does not mean uniformity. A multinational may use global standards for cybersecurity and ethical sourcing while allowing local teams to select approved suppliers for culturally specific services. Alignment means that differences are intentional and justified by business requirements. From price management to total valueA purchase price is only one component of economic value. Procurement should consider total cost of ownership (TCO), including acquisition, logistics, inventory, quality failure, administration, maintenance, disposal and risk-related costs. A supplier with a lower quoted price may be more expensive after freight, defects and disruption are included. A simplified TCO expression is: TCO = P + F + I + Q + A + D + R where P is purchase price, F freight and customs cost, I inventory and financing cost, Q quality-related cost, A administrative and transaction cost, D operating or disposal cost, and R expected risk-related cost. All terms must be expressed in a comparable monetary unit and time period. The formula is a decision framework rather than a universal accounting identity; organizations should avoid double counting and should state whether taxes, capital costs and opportunity costs are included. 2. Theoretical Foundations for Procurement DesignTransaction-cost economicsTransaction-cost economics explains why firms sometimes perform activities internally and at other times use markets. External transactions generate costs associated with searching, negotiating, monitoring, adapting contracts and resolving disputes. Internal production avoids some market costs but introduces bureaucracy, fixed investment and managerial overhead. The risk of external contracting increases when assets are highly specific to one relationship, uncertainty is high and transactions occur frequently. Examples include a supplier’s dedicated tooling, proprietary process or location-specific infrastructure. Under these conditions, a long-term contract, strategic partnership, joint venture or internal capability may be preferable to repeated spot-market purchasing. Transaction-cost economics does not imply that internal production is always safer. Internal operations can suffer from weak incentives, limited competition and technological stagnation. The relevant comparison is between the full cost and risk of alternative governance arrangements. Resource-based viewThe resource-based view asks whether a capability is valuable, rare, difficult to imitate and organizationally embedded. If procurement analytics, supplier-development competence or a manufacturing process is strategically distinctive, outsourcing it may weaken competitive advantage. Conversely, routine activities that do not differentiate the firm may be candidates for external provision. The resource-based view is particularly useful for distinguishing an activity’s operational importance from its strategic importance. A category may represent a large spend but offer little differentiation; another may have modest spend but contain critical intellectual property or determine customer value. Kraljic purchasing portfolioThe Kraljic portfolio classifies categories according to two dimensions: profit impact and supply risk. It produces four broad categories: | Category | Characteristics | Typical approach |
|---|
| Non-critical | Low value and low supply risk | Simplify transactions and automate purchasing | | Leverage | High value and low supply risk | Aggregate demand and negotiate competition | | Bottleneck | Low value but high supply risk | Secure availability and develop alternatives | | Strategic | High value and high supply risk | Build partnerships, joint planning and executive governance |
The framework is not a mechanical classification. Supply risk may change because of sanctions, natural disasters, technological shifts or supplier financial distress. Profit impact should also include revenue enablement and customer consequences, not merely annual spend. Institutional and stakeholder perspectivesInternational procurement is shaped by laws, industry norms, labor expectations, environmental standards and stakeholder scrutiny. A decision that is economically attractive may be unacceptable if it relies on forced labor, violates competition law or creates unacceptable environmental harm. Procurement strategy must therefore incorporate legitimacy and responsible-business considerations alongside efficiency. 3. Procurement Operating ModelsAn operating model specifies where procurement work is performed, who has authority, how processes are standardized and how value is coordinated across organizational units. Centralized procurementIn a centralized model, a corporate procurement function controls major sourcing decisions, supplier policies, contracts and often transactional processes. Advantages include aggregated volume, consistent terms, stronger specialist capability, common systems, improved compliance and better visibility of spend. Centralization can also support global supplier negotiations and enterprise-wide risk management. Limitations include slower local response, possible distance from internal users, insufficient understanding of local markets and resistance from business units. Centralization becomes problematic when requirements differ substantially across countries or when local relationships and regulatory knowledge are essential. Decentralized procurementIn a decentralized model, business units, subsidiaries or country organizations control most procurement decisions. Advantages include local responsiveness, ownership by users, cultural and regulatory sensitivity, and rapid adaptation to local supply conditions. Decentralization can be appropriate for locally consumed services, country-specific materials and volatile markets. Limitations include fragmented demand, duplicated effort, inconsistent supplier terms, weak data and reduced negotiating leverage. It may also allow maverick spending outside approved contracts. Center-led procurementA center-led model separates strategic coordination from local execution. A central procurement team establishes policies, category strategies, standards, preferred suppliers, tools and capability development, while local or business-unit teams execute purchases within those parameters. This model attempts to combine scale with responsiveness. It is effective when the organization needs common governance but categories differ in technical or geographical requirements. Its success depends on clearly defined decision rights, reliable data and incentives that encourage local adoption. Hybrid procurementA hybrid model deliberately combines different arrangements by category, geography or process stage. For example, a firm may centralize enterprise software and freight contracts, use regional sourcing for packaging, and delegate local teams to buy facilities services. Hybrid design is often the most realistic approach in multinational organizations, but it is more demanding to govern because boundaries must be explicit. Comparison of operating models| Criterion | Centralized | Decentralized | Center-led | Hybrid |
|---|
| Purchasing leverage | High | Low to moderate | High | Selectively high | | Local responsiveness | Lower | High | Moderate to high | Designed by category | | Standardization | High | Low | High for core processes | Variable but controlled | | Data visibility | Usually high | Often fragmented | High if systems integrate | Depends on architecture | | Implementation complexity | Moderate | Lower initially | High | High | | Best fit | Common global categories | Local and diverse needs | Multinational coordination | Mixed portfolios |
4. Designing Decision Rights and GovernanceAn operating model fails when responsibility and authority are unclear. Governance should specify who owns category strategy, supplier selection, contract approval, purchase-order execution, supplier performance management and exception approval. A responsibility matrix can distinguish: - Accountable: final decision owner;
- Responsible: person or team performing the work;
- Consulted: stakeholder whose expertise is required; and
- Informed: stakeholder receiving information.
Central procurement should normally own policy, category methodology, strategic sourcing standards, supplier-risk architecture and spend analytics. Business units should contribute demand forecasts, technical requirements and performance feedback. Country teams may own local regulatory checks, local supplier knowledge and execution where mandated. Effective governance also requires escalation paths. A supplier that is commercially attractive but presents sanctions or cybersecurity concerns should not be approved solely by a category manager. Material exceptions should receive review from legal, finance, information security, sustainability and risk functions as appropriate. 5. Make-or-Buy and Boundary DecisionsA make-or-buy decision determines whether an activity should be performed internally or obtained from an external provider. It should not be reduced to a comparison of accounting purchase price with internal direct labor cost. Relevant criteria include: - Strategic importance: Does the activity contain distinctive capability or intellectual property?
- Cost structure: What are avoidable internal costs, supplier prices, transition costs and required investments?
- Capacity: Is internal capacity available, or would new assets and skills be required?
- Supply-market capability: Are qualified suppliers available in the required locations?
- Risk and continuity: What are the consequences of supplier failure or internal disruption?
- Flexibility: Which option adapts better to demand or technology changes?
- Control and confidentiality: Does the activity involve sensitive data, quality or regulatory obligations?
- Sustainability and ethics: Which option provides stronger labor, environmental and traceability outcomes?
For short-run decisions, fixed costs that do not change should not be included in the incremental comparison. For long-run decisions, however, capacity, capital expenditure and capability costs become relevant. Worked example: incremental make-or-buy analysisAn industrial firm needs 20,000 units annually. Internal variable production cost is $46 per unit. A supplier offers the units at $51 each. Internal fixed costs are $180,000 annually, but only $60,000 would be avoidable if production stopped. Switching to the supplier would create $25,000 in annual supplier-management and logistics costs. Avoidable internal cost of making: 20,000 × $46 + $60,000 = $980,000 Relevant cost of buying: 20,000 × $51 + $25,000 = $1,045,000 On the stated assumptions, making is cheaper by $65,000 annually. The non-avoidable $120,000 of fixed cost is excluded because it remains after either decision. The result could change if the internal capacity has an alternative use, if supplier quality costs are material, or if buying provides strategic flexibility. 6. Insourcing and OutsourcingInsourcing means performing an activity within the organization, whether through an existing unit or a newly developed internal capability. It supports control, knowledge retention and integration, but may require investment and expose the firm to fixed-cost risk. Outsourcing means assigning an activity to an external supplier. It may provide specialist capability, variable capacity, innovation and lower costs. Its risks include dependency, loss of know-how, contractual disputes, hidden coordination costs and reduced visibility into lower-tier suppliers. Outsourcing should be governed through more than a price contract. Important provisions may include service levels, audit rights, data protection, business-continuity obligations, subcontracting controls, change-management procedures, intellectual-property ownership, termination assistance and transition rights. A useful principle is to outsource activities that are non-core and supplied competitively, while retaining activities that are strategically differentiating, highly asset-specific or difficult to monitor. This is a starting hypothesis, not a universal rule. 7. Location Choices: Offshoring, Nearshoring and LocalizationOffshoringOffshoring relocates an activity to a distant foreign country, often to access lower labor costs, specialized capabilities or supplier ecosystems. Its potential benefits include scale economies and access to global talent. Its risks include longer lead times, inventory exposure, transport emissions, cultural distance, geopolitical risk, tariffs and weaker visibility. NearshoringNearshoring locates supply or operations in a geographically proximate country or region. It generally reduces transit time and facilitates communication and visits, while potentially retaining some cost advantage. It may not eliminate political, regulatory or currency risks, and nearby countries may have limited capacity. LocalizationLocalization places sourcing or production close to the market of consumption. It can improve responsiveness, support local-content requirements, reduce transport dependence and strengthen market legitimacy. However, local suppliers may have higher unit costs or limited technical capability. Location decisions should evaluate the complete landed and risk-adjusted economics rather than wages alone. Relevant factors include duties, freight, inventory, energy, infrastructure, exchange rates, tax, working capital, quality, disruption probability, emissions and market-access benefits. A simple expected-cost representation is: E(C) = C₀ + pL where E(C) is expected cost, C₀ is normal operating cost, p is the probability of a specified disruption within the decision period, and L is the financial loss if that disruption occurs. This is useful only when probability and loss estimates are defined consistently. It does not capture all forms of uncertainty, correlated disruptions or non-monetary consequences. Global, regional and local sourcingA global strategy may be appropriate for standardized categories with substantial scale benefits and manageable logistics. Regional sourcing may balance scale and responsiveness. Local sourcing may be preferred for perishable products, regulated services, market-specific requirements or categories where continuity and stakeholder legitimacy dominate unit-cost savings. The decision should also consider whether multiple locations genuinely diversify risk. Two suppliers in different countries may share the same sub-tier source, port, energy system or geopolitical exposure. Apparent diversification can therefore be misleading without supply-chain mapping. 8. A Decision Framework for International ProcurementA robust decision process can follow eight stages: - Clarify strategic intent. Identify whether the priority is cost, growth, innovation, resilience, speed, compliance or sustainability.
- Segment the category. Assess value, supply risk, substitutability, technical complexity and demand characteristics.
- Map the current system. Document spend, suppliers, contracts, locations, sub-tier dependencies, lead times and performance.
- Define alternatives. Include make, buy, partnership, single source, dual source, global, regional and local options.
- Evaluate total value. Include TCO, expected disruption cost, transition cost, working capital and strategic effects.
- Test constraints. Examine regulation, sanctions, trade controls, data rules, labor standards, intellectual property and environmental requirements.
- Design governance. Allocate decision rights, performance measures, escalation and assurance responsibilities.
- Implement and review. Pilot where possible, monitor outcomes and revise the strategy as conditions change.
A weighted decision matrix can support structured judgment. If criterion weights sum to 1 and each option receives a score from 1 to 5, the weighted score is: Sj = ∑(wi × rij) where S_j is the score for option j, w_i is the weight of criterion i, and r_{ij} is the rating of option j on criterion i. The score is dimensionless. The method helps make assumptions visible but does not transform subjective ratings into objective truth; sensitivity analysis is essential. 9. Case Study: Aster Mobility’s Regional Procurement RedesignThe following is an illustrative case. BackgroundAster Mobility, a multinational producer of commercial electric vehicles, had historically allowed each regional business unit to source battery-enclosure components independently. European operations purchased mainly from regional suppliers, North America used two domestic suppliers, and Asia-Pacific relied on a lower-cost offshore source. Annual spend was approximately $120 million. ProblemThe decentralized model produced inconsistent specifications, duplicate supplier audits and weak visibility of sub-tier aluminum and coating sources. The offshore supplier offered the lowest unit price but had twelve-week lead times and experienced two port-related disruptions. Aster also faced customer pressure to document recycled content and labor standards. AnalysisThe category was strategically important because component quality affected vehicle safety and production continuity. It had high supply risk due to specialized tooling, limited qualified suppliers and dependence on energy-intensive materials. Aster therefore classified it as strategic under the purchasing portfolio. A pure global-centralized model was rejected because regional regulations, customer-content rules and logistics conditions differed. The team compared three options: retain decentralization; centralize all sourcing; and adopt a center-led regional model. Evaluation criteria included TCO, continuity, technical standardization, local-content compliance, carbon visibility and implementation complexity. Approach and solutionAster adopted a center-led model. The global procurement center owned specifications, supplier qualification, sustainability standards, negotiation principles and risk monitoring. Regional teams retained responsibility for local supplier selection, regulatory compliance and operational scheduling within an approved supplier panel. The company implemented dual sourcing for critical components, required disclosure of key sub-tier suppliers and negotiated framework agreements with volume flexibility. It also standardized a digital supplier scorecard covering quality, delivery, capacity, financial health, emissions data and corrective-action closure. A regional supplier-development program was established to qualify a second source near the largest European plant. OutcomeAfter eighteen months, Aster reported lower disruption exposure, improved visibility of recycled content and reduced duplicated audit activity. The lowest quoted unit price was not achieved in every region, but total cost and operational resilience improved. The company also retained local responsiveness for regulatory and customer-specific requirements. Learning points- Strategic categories require more than price competition.
- Center-led governance can coordinate global standards without eliminating local expertise.
- Dual sourcing is valuable only when alternative suppliers have real capacity and independent risk profiles.
- Sustainability data must be incorporated into supplier qualification and performance management, not treated as a separate public-relations exercise.
- The best operating model may differ by category even within the same corporation.
10. Performance Measurement and Digital EnablementProcurement performance should balance financial, operational, strategic and responsible-business outcomes. Useful measures include realized savings, cost avoidance, TCO reduction, contract compliance, supplier on-time delivery, defect rates, lead-time variability, supply continuity, innovation contributions, emissions data completeness, diverse-supplier participation and internal-user satisfaction. Savings should be defined carefully. A price reduction, avoided increase, demand reduction and specification change are different effects. Finance validation is important to prevent overstated benefits. Digital tools can support spend classification, contract analytics, supplier-risk monitoring, e-sourcing and scenario analysis. Artificial intelligence may identify unusual expenditure, classify invoices or summarize contract obligations. However, AI outputs require governance: data quality checks, human review, explainability, access controls and protection of confidential supplier information. Automated recommendations should not bypass competition law, sanctions screening, ethical review or accountable decision ownership. 11. Challenges, Risks and Ethical ConsiderationsOrganizational resistanceBusiness units may perceive central procurement as a loss of autonomy. Change programs should explain the value proposition, involve users in category strategies and measure service quality as well as compliance. Hidden concentration riskAggregating demand with one global supplier may improve price but create systemic exposure. Supplier mapping should extend beyond first-tier relationships where feasible. Regulatory complexityInternational sourcing may involve customs rules, sanctions, export controls, anti-bribery legislation, competition law, tax rules, data-protection requirements and local-content obligations. Legal review should be integrated early rather than added after supplier selection. Responsible sourcingProcurement decisions can affect labor rights, communities and ecosystems. Firms should conduct risk-based due diligence, communicate supplier expectations, provide grievance channels, investigate credible allegations and avoid shifting unreasonable compliance burdens to small suppliers without support. Short-termismA narrow annual-savings target can encourage supplier switching, underinvestment in relationships and excessive inventory reduction. Balanced scorecards and multi-year value measures better support strategic outcomes. 12. Best-Practice Principles- Align procurement choices with the firm’s competitive and international strategy.
- Segment categories before selecting an operating model.
- Compare alternatives using TCO and risk-adjusted value, not quoted price alone.
- Centralize standards and data where scale and control matter; preserve local authority where context matters.
- Define decision rights and escalation routes explicitly.
- Protect strategic capabilities, knowledge and intellectual property.
- Use dual sourcing or other continuity mechanisms where consequences of failure are severe.
- Validate supplier claims through audits, evidence and performance data.
- Treat sustainability, ethics and regulatory compliance as design requirements.
- Review sourcing and operating-model choices as markets, technology and geopolitical conditions change.
Chapter SummaryProcurement strategy translates corporate and international strategy into choices about scope, supply architecture, location, governance and supplier relationships. Its purpose is broader than purchase-price reduction: procurement can create value through resilience, innovation, quality, speed, sustainability and compliance. Centralized, decentralized, center-led and hybrid operating models offer different balances of leverage, standardization, responsiveness and complexity. No model is universally superior. Effective design depends on category characteristics, geography, risk, strategic importance and organizational capability. Make-or-buy decisions should compare avoidable internal costs with the full costs and risks of external supply. Insourcing protects control and distinctive capabilities, while outsourcing can provide expertise and flexibility. Offshoring, nearshoring and localization should be assessed through total landed and risk-adjusted cost, regulatory conditions, resilience, market access and sustainability. Transaction-cost economics, the resource-based view and the Kraljic portfolio provide complementary perspectives. Their use should be supported by clear decision rights, reliable data, responsible sourcing controls and continuous review. The strongest international procurement organizations combine global coordination with context-sensitive execution. Key TermsProcurement strategy: A coordinated plan for obtaining external goods and services in support of organizational objectives. Operating model: The structure defining procurement responsibilities, authority, processes, capabilities and governance. Centralized procurement: A model in which major procurement decisions are controlled by a central function. Decentralized procurement: A model in which business units or local entities control most purchasing decisions. Center-led procurement: A model combining central standards and strategies with local or business-unit execution. Hybrid procurement: A deliberately differentiated model using different arrangements across categories or locations. Total cost of ownership: The complete cost of acquiring, using, managing and disposing of an item or service. Transaction-cost economics: A theory explaining governance choices through the costs and risks of market transactions. Resource-based view: A perspective emphasizing valuable, rare, difficult-to-imitate and organizationally embedded capabilities. Kraljic portfolio: A framework classifying purchasing categories by profit impact and supply risk. Make-or-buy: A decision about whether an activity should be performed internally or obtained externally. Insourcing: Performing an activity within the organization. Outsourcing: Assigning an activity to an external provider. Offshoring: Locating an activity in a distant foreign country. Nearshoring: Locating an activity in a geographically proximate foreign country or region. Localization: Sourcing or producing close to the market of consumption. Center-led governance: Central coordination of policy, standards and strategy combined with distributed execution. Risk-adjusted cost: Cost that incorporates the expected or assessed consequences of disruption and uncertainty. Maverick spending: Purchasing outside approved contracts, processes or supplier arrangements. Responsible sourcing: Procurement that integrates ethical, social, environmental and legal expectations into supply decisions. Review QuestionsShort Answer Questions- What is the difference between procurement strategy and procurement operating model?
- Identify two advantages and two limitations of centralized procurement.
- What are the four categories in the Kraljic purchasing portfolio?
- Why should non-avoidable fixed costs normally be excluded from a short-run make-or-buy decision?
- Distinguish offshoring from nearshoring.
Long Answer Questions- Explain how procurement strategy should be aligned with corporate, business and international strategy.
- Compare centralized, decentralized, center-led and hybrid procurement models, using appropriate organizational contexts for each.
- Discuss how transaction-cost economics and the resource-based view produce different but complementary insights into outsourcing.
- Evaluate the strategic and operational implications of global, regional and local sourcing.
- Explain the governance mechanisms required for a multinational center-led procurement model.
Analytical / Application Questions- A multinational has fragmented purchasing of enterprise software, country-specific facilities services and globally standardized packaging. Recommend an operating model by category and justify the allocation of decision rights.
- A supplier offers a 10% lower unit price from a distant country, but lead time doubles and disruption consequences are substantial. Design a decision analysis using TCO, expected disruption cost and resilience criteria.
- Using the illustrative Aster Mobility case, assess whether dual sourcing alone would be sufficient to manage risk. Recommend additional controls and performance measures.
Multiple Choice Questions with AnswersQuestion 1Which procurement operating model combines central standards and category coordination with local execution? A. Fully decentralized B. Center-led C. Informal purchasing D. Purely transactional outsourcing Correct Answer: B. Center-led Question 2Which category is generally high in profit impact and high in supply risk under the Kraljic portfolio? A. Non-critical B. Leverage C. Bottleneck D. Strategic Correct Answer: D. Strategic Question 3In a short-run make-or-buy analysis, which cost is normally excluded if it remains unchanged under both alternatives? A. Avoidable labor cost B. Supplier logistics cost C. Non-avoidable fixed cost D. Incremental quality cost Correct Answer: C. Non-avoidable fixed cost Question 4A principal concern in transaction-cost economics is: A. The color of supplier packaging B. The cost and risk of conducting market transactions C. Only the annual purchase price D. The number of employees in marketing Correct Answer: B. The cost and risk of conducting market transactions Question 5Which choice places production or sourcing close to the market of consumption? A. Localization B. Offshoring C. Global consolidation D. Distant outsourcing Correct Answer: A. Localization Question 6A firm’s quoted purchase price is $40 per unit, freight is $3, quality cost is $2 and administration is $1 per unit. Ignoring all other costs, what is the TCO per unit? A. $40 B. $43 C. $45 D. $46 Correct Answer: D. $46 Question 7Which statement best describes the resource-based view? A. All activities should be outsourced to the lowest bidder B. Strategically distinctive capabilities may warrant internal retention C. Local suppliers are always superior to global suppliers D. Price is the only basis for procurement decisions Correct Answer: B. Strategically distinctive capabilities may warrant internal retention Question 8What is a major risk of excessive procurement decentralization? A. Greater local responsiveness B. Improved local regulatory knowledge C. Fragmented spend and reduced negotiating leverage D. Faster local decision-making Correct Answer: C. Fragmented spend and reduced negotiating leverage Question 9Which control is especially relevant when outsourcing a strategically sensitive activity? A. Removing all supplier performance measures B. Avoiding intellectual-property clauses C. Including audit, data protection and transition provisions D. Using only verbal agreements Correct Answer: C. Including audit, data protection and transition provisions Question 10If an option’s normal operating cost is $900,000, the disruption probability is 0.1 and the disruption loss is $200,000, what is its simplified expected cost? A. $902,000 B. $920,000 C. $1,000,000 D. $1,100,000 Correct Answer: B. $920,000
|