Financial Accounting & Budgeting

Chapter 11
Budgetary Control, Variance Analysis and Performance Management

Post Graduate Program in Brand Management
Financial Accounting & Budgeting   •   Post Graduate

Budgetary Control, Variance Analysis and Performance Management

Introduction and context

A budget is more than a forecast of income and expenditure. It is a quantified expression of an organisation’s strategy, resource priorities and operating assumptions for a defined period. Budgetary control is the systematic process through which actual results are compared with planned results, significant deviations are investigated, corrective action is taken and learning is incorporated into subsequent decisions.

For brand managers, budgetary control is especially important because brand investments often produce both immediate and delayed effects. Advertising, influencer partnerships, packaging redesign, customer experience and distribution support may influence sales, margins and brand equity at different times. A narrow focus on short-term sales can therefore encourage underinvestment in the brand, excessive discounting or the cancellation of strategically important campaigns.

Variance analysis supplies the numerical evidence for control. Performance management gives that evidence organisational meaning by connecting financial outcomes with customer, operational, people and strategic indicators. Used properly, these systems improve accountability and learning. Used mechanically, they can create dysfunctional behaviour, such as manipulating forecasts, delaying necessary expenditure, reducing quality or pursuing local targets at the expense of enterprise value.

Learning objectives

By the end of this chapter, the reader should be able to:

  1. Explain the purpose, principles and limitations of budgetary control.
  2. Calculate and interpret sales, price, volume, cost, efficiency and mix variances.
  3. Distinguish planning variances from operational variances.
  4. Conduct root-cause analysis rather than merely reporting numerical deviations.
  5. Apply responsibility accounting to controllable and non-controllable performance.
  6. Design balanced KPIs and scorecards for brand-related decisions.
  7. Identify ethical risks, dysfunctional behaviour and governance safeguards.
  8. Use variance information to support strategic, operational and learning decisions.

The architecture of budgetary control

A conventional control cycle contains six linked stages:

  1. Strategic translation: strategic objectives are converted into measurable targets.
  2. Budget formulation: sales, production, marketing, staffing, cash and capital budgets are coordinated.
  3. Execution: managers implement approved plans while recording actual activity and expenditure.
  4. Comparison: actual results are compared with an appropriate budget benchmark.
  5. Investigation: material or unusual variances are analysed by cause, responsibility and controllability.
  6. Action and learning: managers correct operations, revise assumptions or redesign the control system.

The budget may be fixed or flexible. A fixed budget is prepared for one planned activity level. A flexible budget adjusts variable costs and related expectations to the actual level of activity. For control purposes, flexible budgets are generally more informative when actual sales volume differs materially from the original plan.

A basic cost model is:

C = F + vQ

where C is total cost, F is fixed cost, v is variable cost per unit and Q is activity volume in units. The model assumes a relevant range in which fixed cost remains fixed and unit variable cost is approximately constant. It is not reliable when there are step costs, nonlinear capacity effects or substantial changes in input prices.

A budget is therefore not an objective truth. It is a model based on assumptions about price, volume, product mix, productivity, exchange rates, media effectiveness and competitor behaviour. The quality of control depends on the quality and transparency of those assumptions.

Important variance terminology

A variance is the difference between an actual result and a benchmark. The benchmark may be the original budget, a flexed budget, a standard cost, a prior period or a revised forecast.

In this chapter, a favourable variance means that the result improves operating profit relative to the benchmark; an adverse variance means that it reduces operating profit. For revenue, actual revenue above budget is normally favourable. For cost, actual cost below budget is normally favourable. This convention must be stated because a positive numerical difference is not automatically favourable.

TermMeaning
Original budgetPlan prepared before the period begins
Flexible budgetBudget adjusted to actual activity volume
StandardExpected price, quantity, rate or efficiency under specified conditions
Planning varianceDifference caused by an unrealistic or changed original plan
Operational varianceDifference caused by execution relative to a realistic plan
Controllable costCost substantially influenced by the responsible manager within the relevant period
MaterialityThreshold beyond which investigation is considered worthwhile
Favourable varianceEffect that increases profit relative to the benchmark
Adverse varianceEffect that decreases profit relative to the benchmark

Sales variance analysis

Sales variances explain why actual sales revenue differs from budgeted revenue. For a single product, the total sales revenue variance is:

Sales revenue variance = Actual revenue − Budgeted revenue

Equivalently:

Sales revenue variance = (AP × AQ) − (BP × BQ)

where AP is actual selling price per unit, AQ is actual quantity sold, BP is budgeted selling price per unit and BQ is budgeted quantity sold. Units must be consistent, such as currency per unit multiplied by units.

The total variance can be separated into a sales price variance and a sales volume variance:

Sales price variance = (AP − BP) × AQ
Sales volume variance = (AQ − BQ) × BP

The price variance uses actual units because it isolates the effect of charging a different price for the units actually sold. The volume variance uses the budgeted price because it isolates the effect of selling a different number of units. Their sum equals the total revenue variance:

Total revenue variance = Price variance + Volume variance

Worked example: single-product sales

A premium skincare brand budgeted sales of 10,000 units at £40 per unit. Actual sales were 11,500 units at £38 per unit.

Budgeted revenue = £40 × 10,000 = £400,000.

Actual revenue = £38 × 11,500 = £437,000.

Total revenue variance = £437,000 − £400,000 = £37,000 favourable.

Sales price variance = (£38 − £40) × 11,500 = £23,000 adverse.

Sales volume variance = (11,500 − 10,000) × £40 = £60,000 favourable.

Net variance = £60,000 favourable − £23,000 adverse = £37,000 favourable.

Interpretation requires more than declaring success. The extra volume may have been generated by discounting, a successful campaign, competitor stock-outs or lower-quality customer acquisition. The price reduction may also affect contribution margin and future reference prices.

Sales mix and volume variances

When an organisation sells several products, total volume may be favourable while the product mix is adverse. A brand portfolio can sell more units overall but sell disproportionately more low-margin products.

Let:

  • AQi = actual quantity of product i;
  • BQi = budgeted quantity of product i;
  • BPi = budgeted selling price per unit of product i;
  • BCMi = budgeted contribution margin per unit of product i;
  • SAQ = total actual quantity sold;
  • BSi = budgeted proportion of total units represented by product i.

The sales volume variance using revenue is:

Sales volume variance = (SAQ − SBQ) × weighted-average budgeted price

For management control, a contribution-based analysis is often superior because it reflects profitability rather than revenue alone. The sales mix variance is:

Sales mix variance = ∑[(AQi − RSQi) × budgeted contribution margini]

where RSQi is the revised standard quantity of product i that would have been sold if the actual total volume had been achieved in the budgeted mix:

RSQi = SAQ × BSi

The sales quantity variance is:

Sales quantity variance = ∑[(RSQi − BQi) × budgeted contribution margini]

Under this contribution approach:

Sales volume contribution variance = Sales mix variance + Sales quantity variance

Worked example: portfolio mix

A brand portfolio budgeted the following sales:

ProductBudgeted unitsBudgeted mixBudgeted contribution per unit
Core6,00060%£12
Premium4,00040%£25
Total10,000100%

Actual sales were 11,000 Core units and 4,000 Premium units, a total of 15,000 units. The revised standard quantities are 9,000 Core units and 6,000 Premium units.

Sales mix variance:

Core = (11,000 − 9,000) × £12 = £24,000 adverse relative to the budgeted mix because Core displaced Premium.

Premium = (4,000 − 6,000) × £25 = £50,000 adverse.

Total mix variance = £26,000 adverse? This direct calculation must be interpreted carefully: the component method above totals £24,000 favourable plus £50,000 adverse = £26,000 adverse. The actual mix is 73.33% Core and 26.67% Premium, so the portfolio is less contribution-rich than planned.

Sales quantity variance:

Core = (9,000 − 6,000) × £12 = £36,000 favourable.

Premium = (6,000 − 4,000) × £25 = £50,000 favourable.

Total quantity variance = £86,000 favourable.

Net volume contribution variance = £86,000 − £26,000 = £60,000 favourable.

The organisation sold 5,000 more units, but the mix diluted contribution. A revenue-only dashboard could conceal this issue.

Cost variances

Cost variance analysis compares actual input cost with a standard or flexible budget. For a material or other variable input:

Total cost variance = (AP × AQ) − (SP × SQ)

where AP is actual input price, AQ is actual input quantity, SP is standard input price and SQ is standard quantity allowed for actual output. A cost above standard is adverse; a cost below standard is favourable.

The price variance is:

Price variance = (AP − SP) × AQ

The usage or quantity variance is:

Usage variance = (AQ − SQ) × SP

Thus:

Total cost variance = Price variance + Usage variance

The price variance uses actual quantity because it examines the price paid for the actual input acquired or consumed, depending on the organisation’s policy. The usage variance uses standard price so that it isolates quantity or efficiency. The chosen basis must be applied consistently, especially where purchases and consumption occur in different periods.

For labour or service inputs, the analogous rate and efficiency variances are:

Labour rate variance = (AR − SR) × AH
Labour efficiency variance = (AH − SH) × SR

where AR is actual rate per hour, SR is standard rate per hour, AH is actual hours and SH is standard hours allowed for actual output.

Worked example: packaging material

A campaign packaging run had a standard of 2 kilograms of material per finished case at £3 per kilogram. Actual output was 1,000 cases. Actual usage was 2,200 kilograms at £3.20 per kilogram.

Standard quantity allowed = 1,000 × 2 = 2,000 kilograms.

Actual cost = 2,200 × £3.20 = £7,040.

Standard cost allowed = 2,000 × £3 = £6,000.

Total cost variance = £7,040 − £6,000 = £1,040 adverse.

Price variance = (£3.20 − £3.00) × 2,200 = £440 adverse.

Usage variance = (2,200 − 2,000) × £3.00 = £600 adverse.

The two components reconcile to £1,040 adverse. Root-cause investigation should ask whether the higher price reflected an approved sustainable material, whether the additional usage resulted from defects, whether the standard was outdated and whether procurement’s cheaper supplier created quality losses.

Planning and operational variances

A comparison with the original budget can combine two distinct effects: the budget may have been unrealistic, and actual operations may have deviated from a realistic expectation. Separating these effects improves fairness and managerial learning.

Suppose a campaign budget assumed media cost of £100,000 based on a cost-per-thousand impressions of £5. Market conditions changed, and a realistic revised rate became £6. The revised planning cost for 20 million impressions is £120,000. Actual cost was £126,000.

Planning variance = £120,000 − £100,000 = £20,000 adverse.

Operational variance = £126,000 − £120,000 = £6,000 adverse.

Total variance against original budget = £126,000 − £100,000 = £26,000 adverse.

The first variance concerns the quality of the original assumption and market change; the second concerns execution against the revised benchmark. Holding an advertising manager responsible for the entire £26,000 could be inappropriate if the market-rate increase was uncontrollable and properly documented.

Root-cause analysis

Variance reports are symptoms, not explanations. Root-cause analysis should connect financial deviations to operational events and strategic consequences. A useful sequence is:

  1. Validate the data. Check whether revenue, returns, accruals, media impressions and volumes are recorded in the same period and on the same basis.
  2. Quantify the variance. Express the amount, percentage and effect on contribution or profit.
  3. Decompose the variance. Separate price, volume, mix, rate, efficiency, timing and planning effects.
  4. Trace the causal chain. For example: supplier change → packaging defects → returns → lower repeat purchase → adverse margin.
  5. Test alternative explanations. Avoid assigning causality solely because two events occurred together.
  6. Assess controllability and materiality. Determine who could reasonably influence the cause and whether investigation costs are justified.
  7. Specify action and owner. Every material investigation should lead to a decision, not merely a commentary.
  8. Monitor consequences. Corrective action should be evaluated through later financial and non-financial indicators.

Tools such as the five-whys method, Pareto analysis, process mapping, driver trees and controlled experiments can support this process. A driver tree might link operating profit to revenue, variable cost, fixed cost, price, volume, mix, conversion, retention and customer acquisition cost. It should remain a causal model rather than a collection of unrelated KPIs.

Responsibility accounting

Responsibility accounting assigns performance information to organisational units and managers. Common responsibility centres are:

CentreMain accountabilityTypical measures
Cost centreCosts incurredControllable cost, service quality, productivity
Revenue centreRevenue generationSales volume, price realisation, retention
Profit centreRevenue and costContribution, operating profit, margin
Investment centreProfit and invested resourcesROI, residual income, economic profit

A manager should be evaluated primarily on controllable factors within the relevant time horizon. However, controllability is rarely absolute. A brand manager may influence media allocation but not exchange rates, platform algorithms or a sudden regulatory ban. Shared-service charges may be useful for company-wide decisions but unfair for evaluating a local manager if the manager cannot change them.

Return on investment is commonly expressed as:

ROI = Operating profit ÷ Average operating assets × 100%

ROI can improve because profit increases, assets decrease or both. This creates a risk: a manager may reject a project whose return exceeds the company’s cost of capital if the project would reduce the manager’s current divisional ROI. Residual income addresses this problem:

Residual income = Operating profit − (Required rate of return × Average operating assets)

Residual income is expressed in currency and encourages investment when the project earns more than the required return. Both measures require careful definition of profit, asset values, capital charges and time periods.

KPIs and the balanced scorecard

Financial outcomes are lagging indicators. They report what happened, but often not why it happened or whether future performance is strengthening. A balanced performance system combines several perspectives:

  1. Financial: contribution margin, profit, cash conversion, return on marketing investment.
  2. Customer and brand: awareness, consideration, preference, retention, net promoter measures, perceived distinctiveness and customer lifetime value.
  3. Internal process: campaign cycle time, on-time launch, media quality, complaint resolution, forecast accuracy and defect rates.
  4. Learning and growth: employee capability, experimentation rate, data quality, innovation pipeline and psychological safety.

A KPI should have a clear definition, owner, data source, frequency, target, tolerance and decision rule. It should also have a documented relationship to strategy. Vanity measures, such as impressions without quality or outcome context, can create the appearance of performance without economic value.

For a customer cohort, a simplified customer lifetime value estimate may be expressed as:

CLV ≈ (m × r) ÷ (1 + d − r) − CAC

where m is periodic contribution margin per customer, r is the retention probability per period, d is the discount rate per period and CAC is customer acquisition cost. This formula assumes a constant margin, constant retention, constant discount rate and an indefinitely continuing geometric series. It is a simplified decision aid, not a complete valuation model; acquisition timing, churn patterns, cross-selling, taxes and capacity constraints may require a more detailed model.

Balanced scorecards should not mean giving every measure equal weight. Measures should reflect strategic priorities, causal relationships and decision usefulness. A brand-building programme may legitimately have short-term adverse profit effects if leading indicators and long-term evidence support the investment. This requires explicit governance rather than informal excuses.

Avoiding dysfunctional behaviour

Control systems influence behaviour. Poorly designed systems may encourage:

  • budgetary slack, in which managers deliberately understate revenue or overstate costs;
  • gaming, such as shifting sales between periods to meet targets;
  • excessive discounting to achieve volume goals;
  • cutting training, maintenance or research to protect current profit;
  • rejecting valuable investment because it harms a short-term ROI measure;
  • manipulating KPI definitions or data quality;
  • creating internal competition that damages customer experience and collaboration.

Safeguards include participative but evidence-based budgeting, rolling forecasts, transparent assumptions, multiple performance measures, threshold and trend analysis, independent data validation, quality and customer gates, post-investment reviews and a clear distinction between learning variance and blame variance. Targets should be challenging but attainable, and managers should be evaluated on decisions and processes as well as outcomes when uncertainty is high.

Ethically, performance reporting must not conceal adverse information, classify ordinary expenditure as capital investment, attribute shared success to one unit without evidence or use customer data beyond legitimate consent and governance requirements. Artificial intelligence can help detect anomalies, forecast demand and identify drivers, but automated systems may reproduce biased data, obscure causal reasoning or produce false confidence. Human review, audit trails, access controls and model validation remain necessary.

Illustrative case: Aurora Beauty’s campaign control system

Background

Aurora Beauty, a fictional mid-sized cosmetics company, launched a premium refillable foundation. The launch budget forecast 50,000 units at £32 revenue per unit. Contribution margin was expected to be £14 per unit. The marketing team planned a high-reach digital campaign and retail sampling programme.

Problem

Actual sales were 60,000 units, but the average realised price was £29. The finance report showed favourable revenue volume but adverse price and contribution results. The brand director initially proposed increasing influencer discounts because unit sales exceeded target.

Analysis

Revenue budget = 50,000 × £32 = £1,600,000.

Actual revenue = 60,000 × £29 = £1,740,000.

Total revenue variance = £140,000 favourable.

Price variance = (£29 − £32) × 60,000 = £180,000 adverse.

Volume variance = (60,000 − 50,000) × £32 = £320,000 favourable.

The contribution analysis showed that the discounted units generated £11 contribution each rather than the planned £14. Actual contribution was therefore approximately 60,000 × £11 = £660,000, compared with budgeted contribution of 50,000 × £14 = £700,000: a £40,000 adverse contribution variance before fixed campaign costs.

Further analysis found three causes. First, retailers required introductory discounts. Second, the campaign generated strong trial among price-sensitive customers but weaker premium-segment conversion. Third, sampling increased returns because colour matching was poorly supported online. The volume KPI had therefore encouraged a decision that looked successful in revenue terms but weakened margin and customer experience.

Approach and solution

Aurora replaced the single volume target with a scorecard containing contribution per acquired customer, full-price repeat purchase, return rate, premium-segment conversion, brand distinctiveness and incremental sales measured against a test-and-control design. Discounts were approved only when their incremental contribution and strategic purpose were documented. The company also introduced a revised forecast separating market-price assumptions from execution responsibility.

Outcome

In the next quarter, unit volume grew more slowly, but realised price improved, returns declined and repeat purchase increased. The company did not conclude that every discount was wrong; it established the conditions under which a discount could be justified.

Learning points

  1. Revenue volume is not equivalent to economic value.
  2. Mix, price and customer quality must be analysed together.
  3. A manager should not be penalised for an external price shock that is separately identified.
  4. Leading indicators and controlled experiments improve interpretation.
  5. Balanced accountability reduces pressure to optimise a single metric.

Implementation guidance

A robust budgetary-control system for brand management should:

  • begin with a driver-based budget linked to strategic choices;
  • document volume, price, mix, media and cost assumptions;
  • use flexible budgets when activity differs from plan;
  • report both absolute and percentage variances, subject to materiality;
  • reconcile revenue variances to contribution and cash effects;
  • separate planning from operational variances where feasible;
  • assign responsibility according to influence and decision rights;
  • include customer, quality, compliance and brand-health measures;
  • use rolling forecasts when uncertainty is high;
  • retain an audit trail for changes, estimates and automated analyses;
  • review whether the control system itself is creating harmful incentives.

Challenges and limitations

Variance analysis is limited by the quality of standards, accounting classifications and causal knowledge. A favourable cost variance may signal cheap but defective inputs. An adverse advertising variance may reflect an intentional investment whose benefits arrive later. Flexible budgets can also create misleading comfort if the assumed cost-volume relationship is unrealistic. Attribution is difficult where several campaigns, channels and market conditions interact. Finally, the pursuit of measurable indicators may crowd out important but less measurable goals such as trust, creativity, resilience and employee capability.

Consequently, variance analysis should support managerial judgement rather than replace it. Numerical discipline and strategic interpretation are complementary, not competing, requirements.

Chapter Summary

Budgetary control converts plans into a cycle of measurement, investigation, action and learning. Flexible budgets provide a more appropriate benchmark when activity differs from plan. Sales revenue variance can be decomposed into price and volume effects; portfolio analysis further separates mix and quantity effects. Cost variances distinguish price or rate changes from usage or efficiency changes. Planning and operational variances clarify whether deviations arose from faulty assumptions or execution.

Root-cause analysis must validate data, identify causal drivers, assess materiality and controllability, and assign corrective action. Responsibility accounting improves fairness when managers are assessed on factors they can influence. ROI and residual income offer different investment-centre incentives. Balanced scorecards combine financial outcomes with customer, process and learning measures. Effective systems guard against slack, gaming, excessive discounting and short-termism through transparent assumptions, multiple measures, governance and ethical oversight. The central managerial principle is that a variance is a starting point for inquiry, not a final explanation of performance.

Key Terms

Budgetary control: A process of comparing actual performance with plans and taking corrective action.

Flexible budget: A budget adjusted to the actual level of activity.

Variance: The difference between an actual result and a benchmark.

Favourable variance: A variance that improves profit relative to the benchmark.

Adverse variance: A variance that reduces profit relative to the benchmark.

Sales price variance: The revenue effect of selling at a price different from the budgeted price.

Sales volume variance: The revenue or contribution effect of selling a different quantity from budget.

Sales mix variance: The effect of selling a product combination different from the planned mix.

Planning variance: A deviation caused by changed or unrealistic planning assumptions.

Operational variance: A deviation caused by execution relative to a realistic plan.

Standard cost: Expected cost of an input under specified operating conditions.

Efficiency variance: The cost effect of using more or fewer input hours or quantities than standard.

Responsibility accounting: Assignment of performance information to organisational responsibility centres.

Controllability: The extent to which a manager can influence a cost, revenue or outcome.

Cost centre: A unit accountable primarily for costs.

Profit centre: A unit accountable for revenues and costs.

Residual income: Profit less a capital charge based on required return and operating assets.

Balanced scorecard: A performance framework combining financial, customer, process and learning perspectives.

Dysfunctional behaviour: Actions that improve a local target while harming wider organisational objectives.

Root-cause analysis: Systematic investigation of the underlying causes of a performance deviation.

Review Questions

Short Answer Questions

  1. Why is a flexible budget generally more useful than a fixed budget when actual volume differs from planned volume?
  2. State the formulas for sales price variance and sales volume variance.
  3. What is the distinction between a planning variance and an operational variance?
  4. Why can a favourable sales volume variance coexist with an adverse sales mix variance?
  5. Identify two safeguards against dysfunctional behaviour in performance management.

Long Answer Questions

  1. Explain the budgetary-control cycle and evaluate its usefulness for brand-management decisions.
  2. Discuss the role of responsibility accounting and the importance of controllability in managerial performance evaluation.
  3. Explain how sales, price, volume, mix, cost and efficiency variances should be interpreted together rather than in isolation.
  4. Compare ROI and residual income as measures for investment-centre performance.
  5. Evaluate the balanced scorecard as a framework for combining short-term financial control with long-term brand building.

Analytical / Application Questions

  1. A brand budgets 8,000 units at £50 but sells 9,500 units at £47. Calculate total revenue variance, price variance and volume variance, and explain what further information is needed before judging performance.
  2. A portfolio’s total unit sales increase by 20%, but premium products fall from 40% to 25% of the mix. Design a contribution-based variance analysis and explain the likely managerial implications.
  3. A marketing manager exceeds the media budget by 8%, while awareness, full-price conversion and repeat purchase improve. Propose a balanced evaluation using financial and non-financial KPIs, and identify possible ethical or governance risks.

Multiple Choice Questions with Answers

Question 1

A product has a budgeted price of £40 and budgeted volume of 10,000 units. Actual volume is 11,500 units at £38. What is the sales price variance?

A. £23,000 adverse

B. £23,000 favourable

C. £60,000 favourable

D. £37,000 favourable

Correct Answer: A. £23,000 adverse

Question 2

In sales price variance analysis, why is actual quantity used?

A. To isolate the effect of selling a different quantity

B. To measure the price effect on the units actually sold

C. To eliminate the budgeted price

D. To calculate fixed cost absorption

Correct Answer: B. To measure the price effect on the units actually sold

Question 3

Which benchmark is most appropriate for controlling costs when actual activity differs substantially from plan?

A. The original fixed budget only

B. The prior year’s actual cost only

C. A flexible budget adjusted to actual activity

D. The highest cost incurred by any competitor

Correct Answer: C. A flexible budget adjusted to actual activity

Question 4

Actual material usage is 2,200 kg at £3.20 per kg, while the standard for actual output is 2,000 kg at £3 per kg. What is the usage variance?

A. £440 adverse

B. £600 adverse

C. £600 favourable

D. £1,040 adverse

Correct Answer: B. £600 adverse

Question 5

What does a sales mix variance primarily measure?

A. The effect of changing the overall market size

B. The effect of selling a different product combination from the planned mix

C. The difference between actual and budgeted fixed costs

D. The effect of changes in accounting policy

Correct Answer: B. The effect of selling a different product combination from the planned mix

Question 6

Which item is normally a characteristic of an investment centre?

A. Accountability only for office supplies

B. Accountability for profit and invested assets

C. No responsibility for revenues

D. Responsibility only for employee attendance

Correct Answer: B. Accountability for profit and invested assets

Question 7

A manager rejects a project earning above the company’s required return because it would reduce the manager’s current divisional ROI. Which measure can reduce this incentive?

A. Residual income

B. Sales volume only

C. Budgeted advertising impressions

D. Purchase price variance only

Correct Answer: A. Residual income

Question 8

Which is a likely dysfunctional behaviour caused by an excessive short-term volume target?

A. Improved data validation

B. More accurate standard setting

C. Excessive discounting that reduces contribution

D. Better separation of planning and operational variances

Correct Answer: C. Excessive discounting that reduces contribution

Question 9

Which balanced-scorecard perspective most directly includes employee capability and experimentation?

A. Financial

B. Customer and brand

C. Internal process

D. Learning and growth

Correct Answer: D. Learning and growth

Question 10

What is the first appropriate step in investigating a material variance?

A. Immediately penalise the responsible manager

B. Validate that the data and comparison basis are reliable

C. Delete the variance from the report

D. Replace all non-financial KPIs with revenue

Correct Answer: B. Validate that the data and comparison basis are reliable

Financial Accounting & Budgeting
Chapter 11 of 14