7. Manufacturing Layout DesignIntroduction and ContextManufacturing layout design is the systematic arrangement of machines, workstations, people, materials, storage areas, inspection points, utilities, and information flows within a production facility. It translates a production strategy into a physical operating system. A layout therefore affects much more than the distance travelled by a component. It influences throughput, work-in-process inventory, lead time, labour productivity, quality, safety, flexibility, maintenance access, employee communication, and the cost of future expansion. The central design question is not simply, “Where should each machine be placed?” It is, “How should resources be positioned and connected so that the required product mix can be produced safely, economically, reliably, and responsively?” The answer depends on volume, variety, demand stability, product architecture, process technology, routing, labour skills, and the strategic importance of flexibility. A high-volume, standardised product may justify a product layout with dedicated stations arranged in sequence. A low-volume environment producing many customised jobs may require a process layout in which similar machines are grouped together. Between these extremes lie cellular layouts, hybrid arrangements, and reconfigurable systems. Fixed-position layouts are appropriate when the product is too large, heavy, fragile, or complex to move. Layout design is closely connected with production planning, material handling, work measurement, lean management, supply-chain design, maintenance, ergonomics, and facilities location. It is also a decision under uncertainty: demand changes, product designs evolve, technology becomes obsolete, and disruptions expose dependencies that were not visible in the original design. Consequently, layout design at postgraduate level must be treated as both an engineering problem and a managerial decision involving trade-offs. Learning ObjectivesAfter studying this chapter, the learner should be able to: 1. Explain the logic, characteristics, and appropriate uses of product, process, cellular, fixed-position, hybrid, and reconfigurable layouts. 2. Relate layout choice to volume, variety, product life cycle, routing, demand variability, and production strategy. 3. Apply takt time, cycle time, line balancing, precedence relationships, adjacency analysis, and flow-efficiency measures. 4. Compare alternative layouts using quantitative and qualitative criteria. 5. Design an appropriate layout for a manufacturing situation and justify the design to managerial stakeholders. 6. Identify implementation risks, ergonomic and safety issues, digital applications, and governance requirements. 7. Evaluate how layout design supports lean operations, resilience, sustainability, and future reconfiguration. The Design Logic of a Manufacturing LayoutA layout converts a production flow into spatial relationships. The flow may be physical, such as the movement of raw material, or informational, such as the release of a production order or a quality signal. Good design attempts to make necessary flow short, visible, safe, and controllable while eliminating avoidable movement, waiting, backtracking, and handling. The traditional volume–variety relationship provides an initial guide. High volume and low variety favour dedicated product layouts; low volume and high variety favour process layouts. However, volume and variety alone are insufficient. Two products with the same annual volume may require different layouts if one has a stable routing and the other has frequent engineering changes. Similarly, a product with moderate volume may warrant a cellular layout if families of parts share machines and processing sequences. Five design variables are particularly important: - Volume: the quantity required over a planning period.
- Variety: the number and diversity of products or components.
- Routing: the sequence of operations and the alternatives available.
- Demand pattern: the stability, seasonality, and predictability of demand.
- Strategic priority: whether the organisation competes primarily on cost, speed, flexibility, quality, customisation, or resilience.
A layout must also respect physical constraints. Columns, doors, floors, loading docks, building services, fire exits, hazardous areas, crane coverage, ventilation, noise, vibration, and clean-room boundaries can restrict the theoretical design. The result is usually a compromise between an ideal flow arrangement and a feasible facility plan. Important terminologyA workstation is a defined location where one or more tasks are performed. Cycle time is the elapsed time between completed units at a process or station under normal operating conditions. Takt time is the rate at which a product must be completed to satisfy customer demand, calculated as available production time divided by required demand. Takt time is a demand-based rhythm; cycle time is a process capability measure. A line can meet demand only when its effective capacity is consistent with takt time. Throughput is the quantity completed by a system during a period. Work-in-process (WIP) is inventory between the start and completion of production. Lead time is the elapsed time from order release to completion or delivery. Bottleneck is the resource whose capacity most constrains system output. Precedence expresses the required order of tasks. Adjacency describes the desirability of placing two departments, activities, or work areas near one another. Material handling includes moving, protecting, storing, and controlling materials throughout the facility. The load–distance score estimates movement burden by multiplying the quantity or frequency of movement between two locations by the distance separating them. A from–to chart records movement between departments or work areas. A relationship chart captures both quantitative flow and qualitative closeness requirements. Spaghetti analysis maps actual movement paths to reveal unnecessary travel. Flow efficiency commonly compares value-adding processing time with total lead time; low flow efficiency indicates that waiting, transport, inspection, or storage dominates the production experience. The Principal Layout ConfigurationsProduct layoutIn a product layout, resources are arranged according to the sequence of operations required to make a product or product family. Assembly lines, bottling lines, and many mass-production systems are examples. Material generally moves in one direction through dedicated or semi-dedicated stations. The major advantages are short travel distances, low handling, high visibility, simplified scheduling, and the possibility of highly efficient repetitive work. WIP can be controlled through line design and paced production. The disadvantages include vulnerability to interruptions, limited flexibility, capital intensity, monotony, and the risk that a problem at one station will stop the line. Product layouts are most suitable where demand is sufficiently high and stable to justify dedicated capacity. A product layout should not be confused with an uninterrupted straight line. U-shaped, S-shaped, looped, and modular lines may provide better communication, reduced walking, and more efficient use of space. The sequence of work remains the defining characteristic, not the geometric shape. Process layoutA process layout groups similar functions together: turning machines in one department, milling in another, heat treatment in a separate area, and inspection in another. Jobs follow different routes according to their process requirements. This arrangement is common in job shops, repair facilities, hospitals, tool rooms, and low-volume custom manufacturing. Its principal strength is flexibility. General-purpose equipment can serve many products, and changes in routing do not necessarily require a complete physical redesign. The cost is greater movement, complex scheduling, higher WIP, longer lead times, and more difficult coordination. Queues may develop before high-demand machines, while underused resources remain elsewhere. Process layouts require strong dispatching, capacity planning, route control, and visual management. Cellular layoutA cellular layout groups dissimilar machines into a compact cell capable of processing a family of parts or products. The logic is based on group technology: items with similar design features, processing requirements, or routings are grouped into families. A cell may resemble a small product line, but it generally handles a family rather than one standard product. Cells reduce travel and WIP while retaining more variety than a dedicated line. They can improve ownership, quality feedback, and accountability because a relatively stable team manages a complete family. Difficulties arise when family formation is inaccurate, demand is unbalanced, machines are expensive or shared across cells, or product mix changes substantially. Cell design therefore requires careful analysis of part–machine incidence, routing similarity, demand, setup requirements, and shared-resource policies. Fixed-position layoutIn a fixed-position layout, the product remains stationary and people, tools, equipment, and materials move to it. Shipbuilding, aircraft assembly, large construction projects, power-plant installation, and some heavy engineering activities use this arrangement. The layout is appropriate when movement of the product is impractical or uneconomic. The challenge is coordination. Many temporary work areas compete for access to the product, and materials may accumulate around the work site. Detailed logistics planning, installation sequencing, kitting, safety zoning, crane planning, and project scheduling are essential. In effect, the facility becomes a temporary network of resources around a changing product. Hybrid and mixed layoutsMost real facilities use hybrid layouts. A plant may contain a product-flow assembly line supplied by process-oriented fabrication departments and cellular subassemblies. A fixed-position final assembly area may receive modules from several cells. Hybrid design enables each part of the system to reflect its own volume, variety, and technology. Hybrid layouts are often superior to forcing a single configuration throughout a plant. Their risk is the creation of boundaries between subsystems. Interfaces must be managed through standard containers, supermarket locations, pull signals, shared scheduling rules, and clearly defined ownership. Reconfigurable layoutsA reconfigurable layout is designed for rapid and economical modification when products, volumes, technology, or process routes change. It may use modular equipment, movable utilities, quick-connect services, flexible material-handling systems, digital layout models, and standardised floor grids. Reconfigurability has a cost. Modular equipment may have lower specialised efficiency, and frequent rearrangement can disrupt production. The appropriate objective is not maximum flexibility under every possible future but economically valuable flexibility under credible scenarios. Scenario analysis should examine likely product introductions, demand changes, capacity additions, automation decisions, and supply disruptions. Analytical Foundations for Layout DesignTakt time and line balancingFor a repetitive line, takt time is calculated as: Takt time = Net available production time / Required customer demand If a shift provides 420 productive minutes and demand is 210 units, takt time is 2 minutes per unit. This does not mean every task must take exactly 2 minutes. Rather, the average effective output of the line must meet the required pace. Suppose total task work content is 18 minutes and takt time is 2 minutes. The theoretical minimum number of stations is: Minimum stations = Total work content / Takt time = 18 / 2 = 9 Because stations must respect precedence and tasks cannot usually be divided arbitrarily, the actual number may be greater. Line efficiency can be expressed as: Line efficiency = Total task time / (Number of stations × Cycle time) × 100 Balance delay is the unused proportion of station time. A manager should avoid pursuing efficiency at the expense of flow. Excessively tight balancing can reduce resilience, make quality checks difficult, and leave no capacity for minor variation. Line balancing methods include ranked positional weight, largest candidate rule, trial-and-error assignment, and optimisation models. The ranked positional weight method gives each task a weight equal to its own time plus the times of all successor tasks. Tasks are assigned to stations in descending order, subject to precedence and station-time limits. In practice, the method should be supplemented by ergonomic judgement, quality requirements, learning effects, and the need to protect bottlenecks. Precedence and mixed-model linesA precedence diagram represents tasks as nodes and dependencies as directed links. It prevents an apparently efficient assignment from violating the actual production sequence. Mixed-model lines introduce another challenge: different models may have different task times and option content. Planning must consider model sequence, component availability, changeover, operator skill, and workload variation. A good mixed-model sequence smooths workload rather than merely repeating models in a convenient order. Heijunka, or production levelling, may be used where demand and product options permit. However, levelling is not a substitute for resolving capacity shortages or unstable processes. Group technology and cell formationCell formation can be performed through production-flow analysis, classification and coding, similarity coefficients, clustering, or optimisation models. A simple production-flow analysis lists parts against machines and identifies clusters with similar processing patterns. A machine used by many families may become an exceptional or shared resource; locating it in every cell may be uneconomic. The design decision is not purely mathematical. A cell may be technically coherent but operationally poor if it creates excessive labour walking, difficult maintenance access, unsafe material presentation, or excessive duplication of expensive equipment. Cell boundaries should also support accountability and quality ownership. Adjacency and relationship analysisNot all important relationships are measured in material quantity. Engineering may need close communication with prototyping; quality may need access to production; maintenance may need proximity to critical equipment; hazardous processes may need separation despite high interaction. A relationship chart can use ratings such as A (absolutely necessary), E (especially important), I (important), O (ordinary), U (unimportant), and X (undesirable). These ratings should be supported by reasons rather than assigned casually. A systematic layout procedure converts closeness ratings into a block layout, tests alternative placements, and then considers aisle, utility, safety, and expansion constraints. Quantitative flow and qualitative adjacency should be evaluated together. Optimising distance alone can produce a layout that is efficient for material movement but poor for supervision, quality communication, or safety. Flow efficiency and waste analysisFlow efficiency is often expressed as: Flow efficiency = Value-adding processing time / Total elapsed lead time × 100 For example, if a component receives 45 minutes of actual processing during a 15-hour elapsed time, flow efficiency is 5 percent. The low value does not imply that all non-processing time can be eliminated; some inspection, transport, curing, or queue time may be necessary. It does indicate that improvement should focus on waiting, batch transfer, unreliable equipment, poor synchronisation, and unnecessary movement. Value-stream mapping, spaghetti diagrams, WIP analysis, queue analysis, and simulation can reveal the causes. A layout change is effective only when it changes the underlying flow, not when it merely makes the drawing appear more compact. A Practical Design ProcedureLayout design normally proceeds iteratively. First, define the design basis: products, demand, forecasts, routings, processing times, equipment, workforce, quality requirements, utilities, regulatory constraints, and expected changes. Second, analyse the current state using process maps, from–to data, travel observations, WIP levels, safety incidents, and operator knowledge. Third, select the appropriate layout logic for each product family or process segment. Fourth, calculate capacity, takt, cycle times, bottlenecks, staffing, and equipment requirements. Fifth, develop alternative block layouts using flow and adjacency information. Sixth, convert promising blocks into detailed layouts showing machines, aisles, storage, inspection, utilities, emergency access, and operator zones. Seventh, test alternatives. Evaluation should include material-handling distance, throughput, WIP, lead time, flexibility, labour requirements, safety, ergonomics, capital cost, operating cost, maintainability, expansion potential, and disruption during implementation. Weighted scoring can support comparison, but weights must reflect strategic priorities and should be tested through sensitivity analysis. Eighth, validate the chosen design through walk-throughs, mock-ups, discrete-event simulation, digital twins, or pilot cells. Finally, implement in stages, measure actual performance, and revise standard work. Layout design is not complete when equipment is moved; it is complete when the new arrangement produces the intended operational results. Illustrative Case: Reconfiguring a Pump-Assembly FacilityBackgroundThe following is an illustrative case. A medium-sized manufacturer produces industrial pumps in six product families. Demand has increased, but the plant experiences long lead times, high WIP, and frequent movement between machining, cleaning, assembly, testing, and dispatch. The facility currently uses a process layout. Machining centres are grouped by technology, assembly benches are located in another area, and testing is shared by all families. Situation and problemA value-stream study shows that a pump spends approximately 20 minutes in value-adding work but remains in the facility for several days. Operators report that urgent jobs frequently interrupt normal priorities. Large batches are moved by forklift, and completed machining lots wait for cleaning or inspection. Management is considering either expanding the building or redesigning the existing space. AnalysisPart-family analysis reveals that four pump families share similar machining, cleaning, assembly, and test sequences. Two specialised families require different impellers and a larger test stand. Demand data indicate stable requirements for the four common families but considerable variety within the specialised families. A product layout for the entire plant would be inappropriate because of the specialised routes and variable demand. A pure process layout would preserve flexibility but would not address the dominant movement and queue problems. The proposed concept is a hybrid arrangement. Two cellular areas will handle the common families, each with machining support, cleaning, component presentation, assembly, and a dedicated test interface. The specialised families will remain in a flexible process area, but their material presentation and test scheduling will be redesigned. The largest test stand will remain a shared resource and will be managed as a capacity-constrained bottleneck. Approach and solutionTakt calculations are used for the common families, and work is divided among assembly stations according to precedence. A small supermarket is positioned between machining and assembly to decouple minor variation without permitting uncontrolled batch accumulation. Point-of-use storage replaces distant component racks. A relationship chart places quality inspection close to assembly and testing, while maintaining required separation for cleaning chemicals. The design team creates a floor mock-up using tape and temporary racks. Operators test reach distances, replenishment routes, emergency access, and maintenance removal paths. A simulation tests different product sequences and the effect of test-stand downtime. The implementation is phased: one cell is piloted while the other family continues under the old arrangement. OutcomeThe case does not assume a universal numerical result; performance is assessed through agreed measures. The target indicators are reduced travel, lower WIP, shorter lead time, fewer forklift movements, improved schedule adherence, and no deterioration in first-pass yield or safety. The pilot demonstrates that the main benefit comes not from moving every machine but from synchronising machining, assembly, testing, and replenishment around product families. Learning pointsThe facility required a hybrid rather than an ideologically pure layout. Takt and line balancing were useful for stable family flows, while process flexibility remained necessary for specialised products. The shared test stand had to be treated as a bottleneck, not hidden inside a visually attractive cell. Operator participation and physical simulation exposed problems that would not have been visible on a two-dimensional drawing. Managerial, Safety, and Technology ConsiderationsLayout decisions commit capital and shape daily behaviour. Senior management should establish decision criteria before selecting a preferred design. A low-cost layout may increase labour walking; a highly automated layout may reduce flexibility; a compact layout may restrict maintenance; and a high-utilisation design may lack resilience. Total cost of ownership and strategic risk are more useful than initial investment alone. Safety and ergonomics are design requirements, not post-installation corrections. A layout must separate pedestrians and vehicles where necessary, maintain emergency exits, control hazardous energy and chemicals, provide suitable reach and lifting conditions, manage noise and vibration, and permit safe maintenance. Regulatory requirements vary by jurisdiction, so the design must be reviewed against applicable occupational safety, fire, environmental, building, and machinery standards. Digital tools increasingly support layout design. Computer-aided layout systems can test dimensions and utilities; discrete-event simulation can examine queues and bottlenecks; three-dimensional models and virtual reality can support operator walk-throughs; warehouse and manufacturing execution systems can provide movement and production data; and sensors can reveal actual travel, utilisation, and congestion. Artificial intelligence may assist with clustering, demand scenarios, and layout optimisation, but its recommendations require validated data and human review. A mathematically optimal arrangement based on inaccurate routings is not a reliable design. Data governance is important when location tracking, wearable devices, or video analytics are used. Employees should understand the purpose of data collection, access should be controlled, and performance data should not be used in ways that undermine trust or encourage unsafe work. Digital models should also be protected against unauthorised changes, because an incorrect layout master can affect production, safety, and maintenance decisions. Challenges, Limitations, and Common ErrorsA common error is designing from the drawing outward rather than from demand and process facts inward. Another is treating average demand as the only requirement. Peaks, product introductions, downtime, absenteeism, and quality losses can make an apparently adequate line incapable of meeting real demand. Designers also frequently underestimate aisles, pallets, containers, maintenance clearance, inspection space, and operator movement. Other errors include confusing utilisation with flow, assigning machines to cells without considering shared resources, ignoring information flow, separating quality from the process, and assuming that a shorter distance automatically means lower lead time. Layouts can fail because replenishment routes cross pedestrian paths, because maintenance cannot remove equipment, or because changeover activities were excluded from the analysis. Implementation itself creates risk. Moving equipment may interrupt supply, damage utilities, create temporary congestion, or reduce morale. A transition plan should define stages, temporary capacity, communication, training, commissioning tests, and rollback arrangements. After implementation, the organisation should verify whether promised improvements were achieved and whether new problems have appeared. Emerging Directions and Best PracticesContemporary layouts increasingly combine lean flow with resilience. Plants are designing modular cells, flexible utility connections, scalable automation, and multiple sourcing or routing options. Collaborative robots can support variable tasks, but their value depends on safe human–machine interaction and stable process design. Autonomous mobile robots and automated storage can reduce repetitive transport, though they may also create traffic and integration issues. Sustainable layout design reduces travel, energy losses, packaging, scrap, and unnecessary handling. It considers daylight, ventilation, heat recovery, equipment power demand, repairability, remanufacturing flows, and the eventual reuse or relocation of assets. Circular production may require reverse logistics areas for inspection, disassembly, repair, and material recovery. Best practice is to: - begin with customer demand and product families rather than available floor space;
- involve operators, maintenance, quality, logistics, safety, and finance in design reviews;
- use both quantitative flow data and qualitative adjacency requirements;
- distinguish takt time from actual process capability;
- protect bottlenecks and test variation through scenarios;
- design for ergonomics, maintenance, expansion, and emergency access;
- validate alternatives physically or digitally before committing capital;
- implement in controlled phases with measurable performance indicators; and
- treat the layout as a managed system that must evolve with products and technology.
Chapter SummaryManufacturing layout design aligns physical resources with product flow, demand, technology, and strategic priorities. Product layouts support high-volume, stable sequences; process layouts provide routing flexibility; cellular layouts combine product-flow advantages with family-level variety; fixed-position layouts keep large products stationary; and hybrid or reconfigurable layouts address mixed and changing requirements. Effective design uses takt time, cycle time, precedence, line balancing, group technology, adjacency analysis, from–to data, load–distance measures, and flow-efficiency analysis. Layout alternatives should be compared not only on distance and capital cost but also on throughput, WIP, lead time, flexibility, safety, ergonomics, maintainability, resilience, sustainability, and future change. Digital simulation and three-dimensional modelling improve validation, but sound decisions still depend on reliable data and cross-functional judgement. The most effective layout is not necessarily the most compact or automated; it is the arrangement that delivers the required flow and strategic capability with acceptable risk and life-cycle cost. Key TermsAdjacency: The desirable physical closeness between two activities, departments, or resources. Bottleneck: A resource whose limited capacity constrains the output of the entire system. Cellular layout: An arrangement in which dissimilar resources are grouped to process a family of similar products or parts. Cycle time: The elapsed time between completed units at a process or workstation. Fixed-position layout: A layout in which the product remains stationary while workers, materials, and equipment move to it. Flow efficiency: The proportion of total elapsed lead time spent in value-adding processing. From–to chart: A matrix recording the quantity or frequency of movement between locations. Group technology: The practice of identifying and managing families of products or parts with similar characteristics or routings. Hybrid layout: A facility arrangement combining two or more layout configurations. Line balancing: Assigning tasks to workstations so that precedence and capacity constraints are respected and idle time is controlled. Load–distance score: A movement measure obtained by combining flow quantity with travel distance. Process layout: An arrangement that groups similar machines or functions together. Product layout: An arrangement of resources according to the sequence of operations for a product or family. Reconfigurable layout: A layout designed for economical and rapid modification as products, volumes, or technologies change. Takt time: The available production time divided by required customer demand. Throughput: The quantity completed by a production system during a specified period. Work-in-process: Items that have entered production but are not yet finished. Spaghetti analysis: A visual mapping of actual movement paths used to identify unnecessary travel and crossing flows. Review QuestionsShort Answer Questions1. Distinguish between takt time and cycle time. 2. What conditions favour a process layout rather than a product layout? 3. Explain the purpose of a from–to chart. 4. What is meant by a hybrid layout? 5. Why is operator participation important in layout validation? Long Answer Questions1. Compare product, process, cellular, fixed-position, and reconfigurable layouts with respect to volume, variety, flexibility, flow, and managerial control. 2. Explain the procedure for balancing a mixed-model production line, including precedence, takt time, station assignment, and sequence considerations. 3. Discuss how group technology supports cellular layout design and identify the problems caused by shared machines. 4. Explain how quantitative flow analysis and qualitative adjacency analysis can be integrated in facility layout planning. 5. Evaluate the role of simulation, digital modelling, and data analytics in contemporary manufacturing layout design. Analytical / Application Questions1. A line has 480 available minutes per day and a demand of 240 units. Total work content is 16.5 minutes. Calculate takt time and the theoretical minimum number of stations. Explain why the actual number may be higher. 2. A plant produces four stable product families and two highly customised products. Recommend a layout strategy and justify how material flow, shared resources, and flexibility should be managed. 3. A proposed layout reduces travel distance by 30 percent but places maintenance access behind several machines and leaves no room for demand growth. Critically evaluate the proposal and recommend decision criteria for selecting an alternative. 22. Multiple Choice Questions with AnswersQuestion 1Which situation most strongly supports the use of a product layout? A. High product variety with unpredictable routing B. Stable demand for a standardised product with a known sequence C. Large products that cannot be moved economically D. Custom jobs requiring different general-purpose machines Correct Answer: B. Stable demand for a standardised product with a known sequence Question 2A factory has 420 net production minutes and demand for 210 units per shift. What is the takt time? A. 0.5 minute per unit B. 1 minute per unit C. 2 minutes per unit D. 4 minutes per unit Correct Answer: C. 2 minutes per unit Question 3The primary purpose of line balancing is to: A. Place all identical machines in one department B. Assign tasks to stations while respecting precedence and capacity limits C. Maximise the distance between departments D. Eliminate the need for work measurement Correct Answer: B. Assign tasks to stations while respecting precedence and capacity limits Question 4Which feature best distinguishes a cellular layout from a process layout? A. A cell groups resources for a product or part family B. A cell requires every product to follow exactly the same route C. A process layout always uses automated equipment D. A process layout cannot handle customised products Correct Answer: A. A cell groups resources for a product or part family Question 5A load–distance score is primarily used to estimate: A. Employee satisfaction B. The cost or burden associated with material movement C. The reliability of a machine D. The quality yield of a process Correct Answer: B. The cost or burden associated with material movement Question 6In a fixed-position layout, which statement is correct? A. The product moves through dedicated stations B. Similar machines are grouped by function C. Workers, tools, and materials move to a stationary product D. All products must have identical routings Correct Answer: C. Workers, tools, and materials move to a stationary product Question 7If total task time is 18 minutes and takt time is 2 minutes, the theoretical minimum number of stations is: A. 6 B. 8 C. 9 D. 36 Correct Answer: C. 9 Question 8Why should adjacency analysis supplement material-flow analysis? A. Some important relationships, such as safety or communication, are not captured by flow quantity alone B. Material flow data are never useful in layout design C. Adjacency analysis eliminates all capacity constraints D. It guarantees that the shortest layout is always best Correct Answer: A. Some important relationships, such as safety or communication, are not captured by flow quantity alone Question 9A shared testing machine limits the output of several proposed cells. It should be treated primarily as: A. A non-value-adding storage area B. A bottleneck requiring capacity and scheduling control C. An unnecessary resource to be removed immediately D. A reason to convert the entire plant to fixed-position layout Correct Answer: B. A bottleneck requiring capacity and scheduling control Question 10Which is the most appropriate reason for validating a proposed layout with a physical mock-up or simulation? A. To avoid collecting any process data B. To confirm that spatial, flow, ergonomic, and capacity assumptions work under realistic conditions C. To ensure that all machines are placed in a straight line D. To replace safety and maintenance reviews Correct Answer: B. To confirm that spatial, flow, ergonomic, and capacity assumptions work under realistic conditions
|