International Sales Contracts and IncotermsIntroductionAn international sale is not merely an agreement to exchange goods for money. It is a coordinated legal, logistical, financial and regulatory transaction involving parties located in different jurisdictions. The contract must allocate responsibility for product conformity, transport, customs clearance, insurance, payment, inspection, delay, unexpected events and dispute resolution. Poorly drafted contracts create uncertainty precisely when commercial pressure is greatest: when goods are delayed, damaged, rejected, sanctioned or unpaid. Two instruments are especially important. The United Nations Convention on Contracts for the International Sale of Goods (CISG) supplies a substantive legal framework for many international sales. Incoterms® 2020, published by the International Chamber of Commerce (ICC), standardizes selected delivery obligations, particularly the division of costs, risk and transport responsibilities. They are complementary but not interchangeable. Incoterms do not constitute a complete sales contract, and the CISG does not determine every logistical detail. A sophisticated contract therefore combines an appropriate legal regime with precise commercial drafting. It should identify the goods, price, delivery point, transfer of risk, payment mechanism, documentary requirements, remedies, dispute forum and governing law in language that can be applied by managers, banks, carriers, customs authorities and courts or tribunals. Learning ObjectivesBy the end of this chapter, the reader should be able to: - Explain the formation and interpretation of international sales contracts under the CISG.
- Draft clauses covering offer, acceptance, specifications, delivery, inspection, warranty, force majeure, hardship, dispute resolution and governing law.
- Distinguish transfer of risk from transfer of title and from allocation of transport costs.
- Select and apply the appropriate Incoterms® 2020 rule.
- Analyze contractual risk in a practical cross-border transaction.
- Identify legal, ethical, regulatory and technological issues affecting contract administration.
1. The Architecture of an International Sales ContractAn international sales contract normally contains several layers: - Commercial terms: parties, goods, quantity, price, currency, delivery term and payment.
- Technical terms: specifications, standards, packaging, labeling, tolerances and documentation.
- Performance terms: production, shipment, inspection, acceptance, warranty and remedies.
- Risk-allocation terms: Incoterms, insurance, force majeure, hardship and limitation of liability.
- Legal terms: governing law, dispute resolution, language, notices, assignment and entire agreement.
- Compliance terms: sanctions, export controls, anti-bribery, forced-labor restrictions, product safety and data obligations.
A contract should also establish a hierarchy among documents. For example, a purchase order may conflict with a framework agreement, technical specification or standard terms. A precedence clause can state that the signed agreement prevails over purchase orders, while an agreed technical annex prevails only on technical matters. 1.1 Contract formation: offer and acceptanceUnder the CISG, a proposal is sufficiently definite if it indicates the goods and expressly or implicitly fixes or provides a method for determining quantity and price. A proposal becomes an offer when it indicates an intention to be bound upon acceptance. An offer generally becomes effective when it reaches the offeree and may be revoked unless it indicates irrevocability or revocation would be inconsistent with the circumstances. Acceptance is a statement or conduct indicating assent. Silence alone normally does not constitute acceptance. The CISG applies a modified “mirror image” approach. A reply containing additions, limitations or other modifications may be an acceptance if the changes do not materially alter the offer. Material changes—such as price, payment, quality, quantity, delivery, liability or dispute resolution—normally constitute a counter-offer. This rule is important in electronic commerce. A buyer’s purchase order may be an offer, while the seller’s order confirmation may accept, reject or modify it. Automated acknowledgements should therefore be designed carefully: a message labelled “order received” should not unintentionally create an unconditional acceptance. 1.2 Battle of formsThe “battle of forms” occurs when each party contracts using its own standard terms. Under CISG Article 19, a reply that materially changes the offer is a counter-offer. Non-material modifications may become part of the contract unless the offeror objects without undue delay. Courts and tribunals differ in applying this rule, especially where performance begins despite exchanged conflicting forms. A practical contract should avoid relying on uncertain battle-of-forms analysis. It should state that acceptance is conditional on agreement to specified terms and identify which document controls. Contract managers should preserve version histories, signed annexes and evidence of assent. 1.3 Price, currency and paymentThe contract should specify whether the price includes packaging, export charges, freight, insurance, customs duties, taxes and inspection costs. If the price is adjustable, the formula, reference index, review dates, notice procedure and ceiling or floor should be stated. Payment clauses should identify the method, due date, bank charges, documents required and consequences of late payment. Common mechanisms include advance payment, open account, documentary collection and documentary credit. A documentary credit is governed primarily by its terms and applicable banking rules, such as UCP 600, not simply by the sales contract. The sales contract should nevertheless require the buyer to arrange a credit consistent with the contract and should state what happens if the credit is delayed, discrepant or unavailable. 2. Product Definition, Specifications and ConformityA description such as “industrial valves” is inadequate where performance, safety or regulatory compliance matters. The contract should define: - model, grade, composition and technical standards;
- dimensions, tolerances and permitted variation;
- performance criteria and test methods;
- packaging, marking, shelf life and handling;
- country-of-origin and conformity documents;
- applicable laws and mandatory certifications; and
- approved changes and substitution procedures.
Under the CISG, goods generally must conform to the quantity, quality and description required by the contract and be fit for ordinary or expressly contemplated purposes. The seller may also be responsible for packaging suitable to preserve and protect the goods. Parties may modify these obligations, but exclusions should be clear and should not conflict with mandatory law or fraud restrictions. A good specification separates acceptance criteria from aspirational descriptions. “Premium quality” is difficult to administer; “tensile strength of at least 450 MPa, tested under [identified standard]” is more useful. Test procedures should specify sampling, laboratory competence, calibration, statistical tolerances and the effect of a failed test. 3. Delivery, Risk, Title and Documents3.1 Incoterms® 2020: purpose and limitsIncoterms allocate selected obligations between seller and buyer. They identify the delivery point, the point at which risk transfers, transport responsibilities, insurance duties under certain rules, and export or import clearance responsibilities. They do not determine: - when ownership or title passes;
- the price, payment method or currency;
- remedies for breach;
- product conformity or warranty;
- force majeure or hardship;
- applicable law or dispute resolution; or
- all customs, tax or regulatory consequences.
A correct reference should include the rule, named place and version, for example: “CIP Toronto Distribution Centre, Ontario, Canada, Incoterms® 2020.” The named place must be precise. “FOB China” or “DAP Europe” creates avoidable uncertainty. 3.2 The eleven Incoterms® 2020 rules| Rule | Transport mode | Main delivery/risk concept | Principal observation |
|---|
| EXW | Any mode | Goods placed at seller’s premises at buyer’s disposal | Buyer bears extensive loading, export and transport responsibility; often unsuitable for cross-border shipments where the seller controls export formalities. | | FCA | Any mode | Delivery to buyer’s carrier at named place | Flexible and generally preferable to FOB for containerized or multimodal cargo. | | CPT | Any mode | Risk transfers when goods are handed to first carrier; seller pays carriage to destination | Cost and risk transfer at different points. | | CIP | Any mode | Same risk point as CPT; seller also arranges insurance | 2020 generally requires higher insurance coverage than CIF. | | DAP | Any mode | Goods placed at buyer’s disposal at destination, ready for unloading | Buyer normally handles import clearance and duties. | | DPU | Any mode | Goods delivered and unloaded at named destination | Seller bears unloading responsibility; the only Incoterms rule requiring seller to unload. | | DDP | Any mode | Goods delivered at destination, import-cleared and ready for unloading | Seller bears maximum responsibility, including import formalities and duties, subject to local legal feasibility. | | FAS | Sea/inland waterway | Goods alongside vessel at named port | Appropriate for certain bulk or non-containerized cargo. | | FOB | Sea/inland waterway | Goods delivered on board vessel | Not generally appropriate for containerized cargo handed to a terminal before loading. | | CFR | Sea/inland waterway | Risk transfers on board; seller pays freight to destination port | Seller does not owe cargo insurance. | | CIF | Sea/inland waterway | Risk transfers on board; seller pays freight and minimum required insurance | Insurance obligation is limited unless the contract requires more. |
The central conceptual distinction is between cost and risk. Under CPT and CIP, the seller pays carriage to the named destination, but risk transfers earlier when the goods are delivered to the carrier. Under CFR and CIF, the seller pays ocean freight to the destination port, but risk transfers when the goods are on board at the shipment port. A buyer may therefore bear transit damage even though the seller paid the freight. 3.3 Insurance under IncotermsCIF requires the seller to obtain the minimum level of insurance specified by the rule, traditionally consistent with Institute Cargo Clauses (C) or equivalent cover, unless otherwise agreed. CIP under Incoterms® 2020 generally requires broader cover, commonly associated with Institute Cargo Clauses (A) or equivalent, for at least 110% of the contract price. The parties should still specify insured risks, exclusions, deductibles, claims procedure, currency, beneficiary and policy documentation. Insurance is not a substitute for correct risk allocation. The insured party may face exclusions, delay in claims, inadequate limits or inability to recover consequential losses. 3.4 Transfer of titleIncoterms do not transfer ownership. Title may pass on payment, delivery, identification of goods, issuance of documents or another agreed event, subject to mandatory law. A retention-of-title clause should address identification, resale, proceeds, insolvency and registration requirements. The clause must be checked against the law of the relevant jurisdiction because retention-of-title effectiveness varies significantly. 4. Inspection, Acceptance and WarrantyInspection provisions should identify who inspects, when, where, according to what standard and with what legal effect. Possibilities include: - pre-shipment inspection by an independent surveyor;
- inspection on arrival;
- sampling inspection using an agreed standard;
- documentary verification; or
- testing after installation and commissioning.
A certificate of inspection should not automatically eliminate latent-defect claims unless the parties deliberately and lawfully agree that consequence. The contract should distinguish visible defects, concealed defects, quantity shortages and transport damage. It should also state notice periods. Under the CISG, the buyer generally must examine goods within as short a period as practicable and notify the seller of non-conformity within a reasonable time after discovery, subject to a maximum period of two years from actual handover unless inconsistent with a contractual guarantee period. A warranty clause should define: - duration and commencement;
- covered defects and exclusions;
- remedies—repair, replacement, refund or price reduction;
- response and repair times;
- allocation of removal, return, freight and installation costs; and
- whether the warranty is exclusive or supplements statutory remedies.
A warranty should not promise performance beyond what the seller can control. For complex equipment, commissioning, maintenance, operator training and use conditions should be specified. 5. Breach, Remedies and Limitation of LiabilityThe CISG provides remedies for both parties. A buyer may require performance, seek substitute goods in serious cases, claim damages, reduce the price or declare the contract avoided where the breach is fundamental. A seller may require payment, take delivery, seek damages or avoid the contract in appropriate circumstances. Damages generally include foreseeable loss, subject to the injured party’s duty to mitigate. A fundamental breach is one that substantially deprives the other party of what it was entitled to expect under the contract, unless that result was not reasonably foreseeable. The classification is fact-sensitive. A minor delay in a routine shipment may not be fundamental; delay in delivery of goods needed for a fixed seasonal event may be. Limitations of liability should be drafted with care. They may cap aggregate liability, exclude indirect or consequential loss, or establish liquidated damages for delay. The contract should define whether the cap applies to confidentiality, intellectual property, death or personal injury, fraud, wilful misconduct, sanctions violations and unpaid prices. Some jurisdictions restrict exclusions or penalties, so local legal review is essential. 6. Force Majeure and Hardship6.1 Force majeureForce majeure excuses or suspends performance when an extraordinary event beyond a party’s control prevents performance and the contractual conditions are satisfied. A robust clause should address: - qualifying events, such as natural disasters, war, terrorism, epidemic restrictions, governmental prohibitions, cyber incidents or port closure;
- whether foreseeable events or increased cost qualify;
- causation and the standard of prevention;
- notice and supporting evidence;
- mitigation and alternative performance;
- allocation of costs;
- suspension period; and
- termination after prolonged delay.
The CISG’s Article 79 excuse applies where failure resulted from an impediment beyond the party’s control that it could not reasonably have taken into account, avoided or overcome. It generally excuses damages for the period of the impediment but does not necessarily eliminate other remedies. Parties should not assume that a force majeure clause has the same effect as Article 79; the clause should state its intended consequences. 6.2 HardshipForce majeure usually concerns impossibility or serious prevention, whereas hardship concerns a fundamental alteration of the contractual equilibrium. Examples include extraordinary regulatory change, a sudden and extreme increase in input costs or a prolonged transport disruption that makes performance commercially ruinous but still physically possible. The CISG does not contain a detailed express hardship regime. Tribunals may analyze hardship through Article 79, interpretation, trade usages or domestic law. Contractual drafting is therefore valuable. A hardship clause can require prompt notice, exchange of information, good-faith renegotiation, temporary suspension and escalation to mediation. It should state whether a tribunal may adapt the contract or only terminate it if renegotiation fails. A clause should not permit unilateral price changes without objective criteria and procedural safeguards. 7. Governing Law and Dispute Resolution7.1 Governing lawA governing-law clause identifies the legal system used to interpret the contract. A clause stating “the law of England” may include or exclude the CISG depending on the parties’ intention and applicable rules. If the parties want the CISG, they should state so expressly, for example: “The CISG applies to this contract. Matters outside the CISG are governed by the substantive law of [jurisdiction], excluding its conflict-of-law rules.” If they want to exclude it, they should say: “The CISG is excluded in its entirety.” The clause should also address mandatory law, including product safety, sanctions, customs, competition and employment-related requirements that cannot be contracted away. 7.2 Litigation, arbitration and mediationA dispute-resolution clause should specify negotiation procedures, mediation if required, arbitration or court jurisdiction, seat, institution or rules, number and appointment of arbitrators, language, confidentiality and interim relief. The seat of arbitration is the legal location supervising the arbitration; it is not necessarily the physical venue of hearings. This distinction affects procedural law and annulment proceedings. An arbitration clause may be preferable where parties seek neutrality, enforceability under the New York Convention and confidentiality. Courts may be preferable where urgent injunctive relief, third-party claims or low-value disputes are likely. A tiered clause—negotiation, executive escalation, mediation, then arbitration—should include time limits so that it does not become an obstacle to urgent remedies. 8. Integrated Contract-Drafting FrameworkA practical drafting sequence is: - Identify the transaction, parties, authority and commercial objective.
- Define goods and acceptance criteria.
- Set price, currency, taxes and payment security.
- Select a suitable Incoterms rule and precise named place.
- Allocate export, import, transport, insurance and documentary duties.
- State delivery dates, partial shipment, transshipment and delay consequences.
- Establish inspection, notice, warranty and remedy procedures.
- Draft force majeure, hardship and change-control mechanisms.
- Choose governing law and an enforceable dispute forum.
- Add compliance, confidentiality, intellectual property and data provisions.
- Establish document precedence, amendment formalities and language.
- Test the contract against realistic failure scenarios.
The final step is often neglected. Managers should simulate late shipment, damaged cargo, sanctions affecting the route, a failed inspection, a currency crisis and insolvency of a party. If the answer is unclear, the contract is incomplete. 9. Illustrative Case: Meridian Pumps and NorteAguaBackgroundThis illustrative case concerns Meridian Pumps Ltd., a manufacturer in Singapore, and NorteAgua S.A., a water utility in Chile. NorteAgua orders 20 high-capacity pumps for a desalination project. The pumps are manufactured to a technical annex, shipped in containers and required at the project site by 30 September. The first draft states: “CIF Santiago, delivery 30 September, seller responsible until arrival.” It also provides a 12-month warranty but does not specify inspection, governing law or delay remedies. ProblemThe wording contains several risks. First, CIF is a sea/inland-waterway rule and refers to shipment-port risk transfer, not delivery at the project site. Second, “Santiago” is not a port and does not identify the risk or cost point. Third, “seller responsible until arrival” conflicts with the normal CIF allocation unless clarified. Fourth, the warranty commencement date and acceptance tests are unclear. Finally, no legal regime or dispute forum is selected. Analysis and solutionThe parties determine that Meridian controls export procedures and can arrange international carriage, while NorteAgua can handle Chilean import clearance and local delivery. They select CIP NorteAgua Project Site, Antofagasta Region, Chile, Incoterms® 2020, because the cargo is containerized and multimodal, and the seller can arrange transport and broad cargo insurance. The contract expressly states that risk transfers when the pumps are handed to the first carrier, notwithstanding that Meridian pays carriage to the project site. The technical annex specifies pump capacity, efficiency, materials, testing protocol and allowable tolerances. A pre-shipment factory acceptance test is required, followed by a site acceptance test. Visible damage must be notified within seven days of delivery; latent defects must be notified within a reasonable period after discovery and within the warranty period. The contract also provides: - delivery by 30 September, with a defined grace period;
- liquidated damages for delay subject to a stated cap;
- a 24-month warranty beginning on site acceptance or a long-stop date;
- a force majeure clause covering governmental export restrictions and port closure;
- a hardship procedure requiring executive negotiation for prolonged extraordinary cost increases;
- Singapore law with the CISG expressly included; and
- arbitration under agreed institutional rules, with a specified seat and language.
OutcomeA port closure delays the vessel. Because risk had already transferred at delivery to the first carrier, NorteAgua bears transit risk under the CIP rule, but Meridian remains responsible for contractual delivery obligations and must provide the required insurance documents. The force majeure clause is analyzed separately to determine whether delay damages are excused. The clear allocation prevents the parties from confusing insurance recovery, delivery delay and conformity responsibility. Learning pointsThe case demonstrates that an Incoterms rule must be paired with a precise place and a complete contract. It also shows why cost, risk, title, delivery obligation and insurance are separate legal questions. A short commercial phrase may conceal several inconsistent assumptions. 10. Governance, Technology and Contemporary DevelopmentsElectronic contracting, electronic bills of lading, digital certificates and automated trade platforms can improve speed and traceability. Smart-contract functionality may automate document release or payment triggers, but code cannot reliably determine concepts such as fundamental breach, reasonable notice or hardship without human interpretation. Parties should identify the authoritative record where electronic systems conflict with signed documents. Artificial intelligence can assist with clause comparison, extraction of delivery dates, detection of inconsistent Incoterms references and monitoring of sanctions or regulatory changes. It should not replace legal review. AI systems may misclassify governing law, overlook negotiated amendments, reproduce biased interpretations or expose confidential information. Governance should include access controls, audit trails, human approval and validation against the executed contract. Contemporary contracts also address sustainability and responsible sourcing. Clauses may require emissions data, human-rights due diligence, anti-forced-labor compliance, responsible minerals documentation and audit rights. Such obligations should be measurable and proportionate. Vague ethical language can create disputes, while overly broad audit rights can threaten confidentiality and supplier relationships. Challenges and LimitationsInternational contract administration remains difficult because: - legal systems interpret similar words differently;
- Incoterms rules do not resolve title, payment or remedies;
- customs and tax treatment may differ from contractual assumptions;
- documentary credits impose strict documentary requirements;
- sanctions and export controls can change rapidly;
- supply-chain disruptions may create both legal and commercial hardship; and
- standard terms may be incorporated inconsistently across electronic systems.
No contract eliminates uncertainty. Its purpose is to make uncertainty visible, allocate it deliberately and provide workable procedures when events occur. Best-Practice ChecklistBefore signature, confirm that: - the parties have authority and are correctly identified;
- the CISG is expressly included or excluded;
- goods and technical standards are measurable;
- the Incoterms rule, version and named place are precise;
- risk, cost, title and insurance are separately addressed;
- export and import responsibilities are feasible in practice;
- inspection and defect-notice procedures are workable;
- warranty remedies and limits are clear;
- force majeure and hardship consequences are defined;
- governing law and dispute forum are enforceable;
- document precedence resolves conflicting forms; and
- compliance, sustainability and data obligations are proportionate and auditable.
Chapter SummaryInternational sales contracts coordinate commercial exchange across legal, logistical and regulatory boundaries. Effective drafting begins with a definite offer, reliable acceptance process and clear hierarchy among contract documents. Specifications should establish objective conformity criteria, while inspection and warranty clauses should distinguish visible damage, latent defects, acceptance and statutory remedies. Incoterms® 2020 allocate selected delivery, transport, insurance, customs and risk responsibilities. They do not determine title, payment, governing law or remedies. The most important analytical distinction is that the party paying carriage may not be the party bearing transit risk. CIP and CPT transfer risk at handover to the first carrier; CFR and CIF transfer risk when goods are on board; D rules place delivery risk at destination. The CISG supplies rules on formation, conformity, notice, breach, damages and exemption, but parties should expressly address exclusions, hardship, force majeure and remedies. Governing-law and dispute-resolution clauses determine how disagreements will be interpreted and enforced. Modern contracts must also account for digital documentation, AI-assisted administration, sanctions, sustainability and responsible sourcing. The central professional skill is not selecting an isolated clause but designing a coherent risk-allocation system that remains operational under stress. Key TermsCISG: United Nations Convention on Contracts for the International Sale of Goods. Incoterms® 2020: ICC rules allocating specified delivery, cost, transport, insurance and risk responsibilities. Offer: A sufficiently definite proposal indicating an intention to be bound upon acceptance. Acceptance: Assent to an offer expressed by statement or conduct. Battle of forms: Conflict arising when parties exchange standard terms containing inconsistent provisions. Conformity: Compliance of goods with contractual description, quality, quantity, specifications and intended use. Inspection: Examination or testing of goods against agreed criteria. Warranty: Contractual assurance concerning quality, performance or defect correction. Risk transfer: The point at which responsibility for accidental loss or damage shifts between parties. Title: Legal ownership of goods, which Incoterms do not determine. Named place: The precisely identified location used in an Incoterms reference. Force majeure: Contractual or legal relief connected with extraordinary impediments beyond a party’s control. Hardship: A fundamental alteration of contractual equilibrium that makes performance excessively burdensome. Fundamental breach: A breach substantially depriving a party of expected contractual benefit. Governing law: The legal system selected to interpret and apply the contract. Seat of arbitration: The legal location whose procedural law supervises an arbitration. Documentary credit: A bank undertaking to pay against presentation of complying documents. Retention of title: A clause reserving ownership to the seller until specified conditions, usually payment, occur. Liquidated damages: A contractually predetermined sum or method for compensation following a specified breach. Document precedence: A contractual hierarchy determining which document controls when terms conflict. Review QuestionsShort Answer Questions- What matters do Incoterms® 2020 regulate, and what important matters do they leave unresolved?
- Why is “CIF Santiago” an inadequate delivery reference for containerized goods?
- What is the difference between transfer of risk and transfer of title?
- What is the function of a hardship clause?
- Why should parties expressly include or exclude the CISG?
Long Answer Questions- Explain the principal differences among FCA, CIP, CIF, DAP and DDP, including their risk and customs implications.
- Discuss how the CISG regulates offer, acceptance and modified acceptance in international sales.
- Design a comprehensive inspection and warranty structure for industrial equipment.
- Compare force majeure and hardship and explain why both may be needed in a long-term supply contract.
- Evaluate the advantages and disadvantages of arbitration compared with litigation in international sales disputes.
Analytical / Application Questions- A seller agrees to “CPT Buyer’s Warehouse, Incoterms® 2020.” The goods are damaged after handover to the first carrier but before arrival. Analyze risk, cost, insurance and the seller’s remaining obligations.
- A buyer’s purchase order contains a broad limitation of liability, while the seller’s confirmation contains a different governing-law clause. Using battle-of-forms principles, identify the legal and managerial issues that should be investigated.
- A sudden export prohibition makes performance substantially more expensive but not impossible. Draft an outline response using force majeure, hardship, notice, mitigation and renegotiation principles.
Multiple Choice Questions with AnswersQuestion 1Which matter is not determined by Incoterms® 2020? A. The point at which certain transport risks transfer B. Responsibility for specified export and import formalities C. Transfer of ownership or title D. Certain insurance obligations under CIP and CIF Correct Answer: C. Transfer of ownership or title Question 2Under CIP Incoterms® 2020, when does risk generally transfer from seller to buyer? A. When the goods arrive at the named destination B. When the goods are handed to the first carrier C. When the buyer completes import clearance D. When the buyer pays the final invoice Correct Answer: B. When the goods are handed to the first carrier Question 3Which Incoterms rule is generally designed for sea or inland-waterway transport and transfers risk when goods are on board? A. FOB B. FCA C. DAP D. EXW Correct Answer: A. FOB Question 4What is a likely consequence of a reply that materially changes an offer under the CISG? A. It automatically forms a contract on the original terms B. It is normally treated as a counter-offer C. It is legally ineffective in every circumstance D. It constitutes acceptance by silence Correct Answer: B. It is normally treated as a counter-offer Question 5Which clause most directly determines the legal system used to interpret a sales contract? A. Warranty clause B. Inspection clause C. Governing-law clause D. Packaging clause Correct Answer: C. Governing-law clause Question 6Which statement best distinguishes force majeure from hardship? A. Force majeure concerns only price increases, while hardship concerns only war B. Force majeure usually concerns prevention or impediment, while hardship concerns serious disruption of contractual equilibrium C. They are legally identical in every jurisdiction D. Hardship automatically transfers transit risk to the buyer Correct Answer: B. Force majeure usually concerns prevention or impediment, while hardship concerns serious disruption of contractual equilibrium Question 7Which rule requires the seller to deliver goods unloaded at the named destination? A. DPU B. DAP C. CFR D. FAS Correct Answer: A. DPU Question 8A contract states “CIF Port X, Incoterms® 2020.” Which additional issue should the parties clarify most directly? A. The seller’s obligation to transfer ownership under Incoterms B. The precise insurance coverage and claims requirements C. Whether the CISG creates a corporate entity D. The buyer’s employment policies Correct Answer: B. The precise insurance coverage and claims requirements Question 9What is the principal purpose of a document-precedence clause? A. To determine the exchange rate automatically B. To identify which conflicting contract document controls C. To replace all technical specifications D. To eliminate the need for delivery terms Correct Answer: B. To identify which conflicting contract document controls Question 10Which statement about the CISG is most accurate? A. It automatically resolves every customs and tax issue B. It is a comprehensive replacement for Incoterms C. It provides rules for many international sales issues but can be supplemented by contractual terms D. It applies only to domestic sales between companies in one country Correct Answer: C. It provides rules for many international sales issues but can be supplemented by contractual terms
|