Energy Measurement, Instrumentation and Data QualityIntroductionEnergy management depends on evidence. An energy audit may identify an inefficient motor, overloaded transformer, compressed-air leakage, or poorly controlled heating system, but the credibility of that conclusion depends on the quality of the measurements supporting it. Measurement is therefore not a separate activity performed after engineering analysis; it is the basis for establishing energy baselines, calculating savings, verifying performance, allocating costs, and making investment decisions. Energy measurement includes electrical quantities such as voltage, current, power, power factor, energy and harmonics; thermal quantities such as temperature and heat flow; and process quantities such as pressure, flow, speed and production rate. Instruments must be selected for the physical quantity, range, environment, accuracy, safety category and required time resolution. Measurements must then be recorded, checked, documented and interpreted with appropriate attention to uncertainty. A technically sophisticated meter does not automatically produce reliable data. Incorrect installation, unsuitable sensors, poor calibration, electromagnetic interference, time-clock errors, missing records and unverified assumptions can all invalidate an otherwise precise-looking dataset. Learning ObjectivesAfter studying this chapter, the reader should be able to: - Distinguish energy, power, demand and related measured quantities.
- Select suitable electrical, thermal, flow and process instruments.
- Explain the operation and limitations of common sensors and meters.
- Design a basic measurement plan and submetering system.
- Evaluate calibration, accuracy, precision, resolution and uncertainty.
- Choose appropriate sampling intervals and identify data-quality problems.
- Apply safe measurement practices in electrical and industrial environments.
- Interpret measured data for energy audits and savings verification.
1. Measurement Concepts for Energy Audits1.1 Energy, power and demandEnergy is the capacity to perform work. In electricity, the SI unit is the joule (J), although kilowatt-hour (kWh) is commonly used for billing and energy management. Power is the rate at which energy is transferred or consumed. P = dE/dt Here, P is power in watts (W), E is energy in joules (J), and t is time in seconds (s). For constant power, the relation becomes: E = P t When P is in kilowatts and t is in hours, E is obtained in kilowatt-hours. A 20 kW motor operating for 5 h consumes 100 kWh if its input power remains constant. Electrical demand is usually the average power over a specified interval, often 15 or 30 minutes. It is not necessarily the instantaneous maximum power. For an interval of duration ∆t: Pavg = ∆E/∆t Demand charges may depend on the highest interval average during a billing period. Consequently, a facility can reduce its electricity bill by controlling short periods of high demand even when its total energy consumption changes little. 1.2 Real, reactive and apparent powerFor sinusoidal single-phase systems, real power is: P = V I cosφ where V is rms voltage in volts, I is rms current in amperes, and φ is the phase angle between voltage and current. Real power is measured in watts. Reactive power is: Q = V I sinφ and apparent power is: S = V I with units of var and VA, respectively. The power factor is: PF = P/S = cosφ These equations assume sinusoidal voltage and current. With significant harmonics, true power factor includes both displacement and waveform distortion; a power analyzer should then be used rather than relying on a simple phase-angle meter. For a balanced three-phase system: P = √3 VL IL PF where V_L is line-to-line rms voltage and I_L is line current. This expression assumes a balanced system and a consistent definition of line voltage and current. For unbalanced or distorted systems, a three-phase analyzer should measure each phase and calculate total power directly. 1.3 Measurement terminologyAccuracy describes closeness to the accepted reference value. Precision describes repeatability. Resolution is the smallest displayed or recorded increment. Sensitivity is the change in output per unit change in input. Range is the interval over which an instrument is intended to operate. Span is the difference between upper and lower range limits. Drift is a change in indication over time under unchanged conditions. An instrument may have high resolution but poor accuracy. For example, a display reading to 0.01 kW does not imply that the measurement is accurate to 0.01 kW. The manufacturer’s accuracy specification, installation conditions and calibration record must be considered. 2. Electrical Measurement Instruments2.1 Digital multimetersA digital multimeter (DMM) measures voltage, current, resistance and often frequency, continuity and capacitance. It is useful for spot checks, control-circuit diagnosis and verification of nominal supply conditions. A DMM is not normally a substitute for a power analyzer because it does not necessarily measure phase relationships, waveform distortion or interval energy. Input impedance matters. A high-impedance voltage input reduces loading of control circuits, while a low-impedance mode can help identify ghost voltages caused by capacitive coupling. Current must be measured using the correct terminal and range; placing a current-input meter across a voltage source can create a short circuit and a serious arc-flash hazard. 2.2 Clamp meters and current transformersA clamp meter measures current without opening the conductor. The most common clamp uses a magnetic core and current transformer (CT). Hall-effect clamps can measure direct current as well as alternating current. The conductor must be centred in the jaw when accuracy is important, and the clamp must enclose only the intended conductor. Enclosing both outgoing and returning conductors may cause cancellation and a misleading reading. A CT produces a secondary current proportional to primary current. Its ratio may be written as 400:5, meaning 400 A primary corresponds nominally to 5 A secondary. CT polarity, phase identification and burden loading are important in power and energy measurements. A conventional CT secondary should never be left open while the primary is energized, because a dangerously high secondary voltage can develop. Shorting links or manufacturer-approved test blocks are required during maintenance. 2.3 Wattmeters and power analyzersA wattmeter measures real power by combining voltage and current measurements. A modern power analyzer may measure: - rms voltage and current;
- real, reactive and apparent power;
- energy and demand;
- power factor;
- frequency;
- voltage and current imbalance;
- harmonics and total harmonic distortion;
- transients, dips and interruptions.
Power analyzers require correct phase association. For a three-phase system, voltage channel L1 must correspond to current channel L1, and so forth. Reversed CT polarity can produce negative real power or an incorrect power factor. The instrument configuration must also match the system: wye or delta connection, line-to-line or line-to-neutral voltage, CT ratio and frequency. Total harmonic distortion for a voltage waveform is commonly expressed as: THDV = (√(V2² + V3² + ... + Vn²))/V1 × 100% where V₁ is the rms value of the fundamental component and V₂ through Vₙ are harmonic rms components. The selected upper harmonic order n and the instrument’s bandwidth must be stated. THD is not itself a complete diagnosis of power quality; the source, phase distribution and consequences for equipment must also be investigated. 2.4 Energy meters and demand metersAn energy meter integrates power over time: E = ∫ P(t) dt For sampled measurements, the integral is approximated by summing interval energy: E ≈ ∑_(k=1)N Pk ∆tk where P_k is representative power during interval k and ∆t_k is the interval duration. The approximation is more reliable when the sampling interval is short enough to capture relevant load changes. Revenue meters are subject to legal metrology requirements and may have stricter installation and verification procedures than temporary audit meters. A portable analyzer can be excellent for diagnosis but should not automatically be treated as a billing-grade instrument. 3. Thermal, Flow and Process Instrumentation3.1 Temperature measurementResistance temperature detectors (RTDs) use the temperature dependence of electrical resistance, commonly platinum. They offer good stability and accuracy. Thermocouples generate a small voltage related to the temperature difference between the measurement junction and reference junction. They have wide temperature ranges and rapid response but lower signal levels and potentially greater susceptibility to noise. Thermistors have a large resistance change with temperature and are useful over limited ranges. Infrared thermometers and thermal cameras measure emitted radiation without physical contact. Their readings depend on emissivity, reflected radiation, viewing angle, atmospheric absorption and surface condition. Shiny metal surfaces are particularly difficult to measure reliably without correction or a suitable reference treatment. For a temperature sensor, the measured value is affected by response time. A sensor with a first-order response may be represented by: τ dy/dt + y = K x where x is the input temperature, y is sensor output, K is static sensitivity and τ is the time constant. After a sudden step, the sensor reaches approximately 63.2% of its final response after one time constant. A slow sensor may miss short process events even if its static accuracy is good. 3.2 Flow measurementFlow meters are selected according to fluid, pipe size, pressure, temperature, cleanliness, conductivity, required turndown and installation geometry. Common types include: - differential-pressure meters, such as orifice plates and averaging pitot tubes;
- turbine and positive-displacement meters;
- electromagnetic meters for conductive liquids;
- ultrasonic meters for liquids and gases;
- vortex meters for steam and gases;
- thermal mass meters for gases;
- variable-area rotameters for local indication.
Volumetric flow rate is related to average fluid velocity by: Qv = A v where Q_v is volumetric flow rate in m³/s, A is pipe cross-sectional area in m² and v is average velocity in m/s. For a circular pipe: A = πD²/4 where D is internal diameter. Mass flow is: ṁ = ρ Qv where ṁ is mass flow in kg/s and ρ is fluid density in kg/m³. Density varies with temperature, pressure and composition, so a volumetric reading cannot be converted accurately to mass flow without appropriate conditions. Compressed-air flow is particularly sensitive to reference conditions. A value reported in actual cubic metres per minute is not equivalent to a value reported at standard or normal reference conditions. The reference temperature, pressure and humidity must be documented. 3.3 Heat and thermal energyFor a fluid heated without phase change, heat transfer is commonly estimated by: Q̇ = ṁ cp (Tout − Tin) where Q̇ is heat-transfer rate in watts, ṁ is mass flow rate in kg/s, c_p is specific heat capacity in J/(kg·K), and T_out and T_in are outlet and inlet temperatures in °C or K. Temperature differences have the same numerical value in °C and K. This equation assumes that kinetic and potential energy changes are negligible, the fluid properties are adequately represented by c_p, and heat losses or gains outside the measured boundary are either negligible or separately considered. For steam, refrigerants and phase-changing fluids, enthalpy differences are generally more appropriate: Q̇ = ṁ (hout − hin) where h is specific enthalpy in J/kg. 4. Data Loggers, Sampling and Submetering4.1 Data loggersA data logger records sensor outputs at specified times. Important specifications include input type, channel count, resolution, memory, sampling rate, timestamp accuracy, isolation, battery life, communications and environmental rating. A logger may accept voltage, current-transformer output, pulse signals, thermocouples, RTDs or industrial signals such as 4–20 mA. A 4–20 mA signal is widely used because a live zero permits detection of a broken wire or loss of power. If a 0–100 °C transmitter maps 4 mA to 0 °C and 20 mA to 100 °C, the indicated temperature is: T = (I − 4 mA)/(16 mA) × 100 °C where I is the measured loop current. This linear conversion applies only when the transmitter has been configured with that range. 4.2 Sampling interval and aliasingSampling frequency determines which variations can be observed. The Nyquist condition states that a sinusoidal component can theoretically be represented without aliasing only when the sampling frequency f_s is greater than twice the highest frequency f_max of interest: fs > 2 fmax In practical systems, anti-alias filtering and additional margin are required. Energy monitoring often uses one-minute or fifteen-minute intervals, whereas transient power-quality analysis may require thousands or millions of samples per second. The appropriate interval depends on the decision being made. A fifteen-minute logger may be adequate for monthly energy benchmarking but inadequate for detecting a ten-second compressor short cycle. 4.3 Submetering architectureA submetering system normally includes sensors or meters, signal conditioning, communications, a gateway or data concentrator, a database and visualization or analysis software. Meter boundaries should correspond to meaningful loads or processes: production lines, HVAC systems, data centres, compressed-air plants or tenant areas. Good submetering design begins with questions: What decision will the data support? What resolution is required? Who will use the data? How will missing data be detected? How will meters be maintained? Installing many meters without a data-governance plan can create cost and confusion rather than insight. A useful energy balance compares the main meter with submeters: Emain ≈ ∑ Esubmeters + Eunmetered + Elosses The difference is not automatically an error. It may represent unmetered loads, transformer losses, meter timing differences or measurement uncertainty. Large unexplained residuals require investigation. 5. Calibration and Measurement Uncertainty5.1 Calibration practiceCalibration compares an instrument with a reference standard under specified conditions. Calibration does not necessarily adjust the instrument; it may simply document its error. A calibration certificate should identify the instrument, serial number, reference standards, conditions, measurement points, results, uncertainty and traceability. Calibration intervals should reflect risk, stability, usage, environmental exposure and historical drift. Instruments used for safety decisions, regulatory reporting or financial settlement require stronger control than instruments used for preliminary screening. Field verification may include zero checks, comparison with a trusted reference, loop checks, phase checks and plausibility checks. A meter that passes laboratory calibration can still produce wrong site data if a CT ratio is configured incorrectly or a temperature probe is installed in a poor location. 5.2 Error and uncertaintyMeasurement error is the difference between a measured value and the accepted reference value, although the true value is never known perfectly. Uncertainty expresses the doubt associated with the measurement result. For independent quantities combined by addition or subtraction, a common approximation for standard uncertainty is: uy = √(ux1² + ux2² + ... + uxn²) For a product or quotient, relative standard uncertainties may be combined approximately as: (uy/|y|) = √[(ux1/x1)² + (ux2/x2)² + ... + (uxn/xn)²] These expressions assume independent input quantities and small, approximately random uncertainties. Correlation, large nonlinearities and systematic effects require more careful treatment. Worked Example: Heat-transfer uncertaintyAn air-heating coil has measured mass flow of 2.00 kg/s with standard uncertainty 0.04 kg/s. The specific heat is 1.005 kJ/(kg·K), treated as exact for this illustration. The measured temperature rise is 25.0 K with standard uncertainty 0.5 K. The heat-transfer rate is: Q̇ = 2.00 × 1.005 × 25.0 = 50.25 kW The relative standard uncertainty is: uQ̇/Q̇ = √[(0.04/2.00)² + (0.5/25.0)²] = √(0.02² + 0.02²) ≈ 0.0283 Thus, the standard uncertainty is approximately 2.83% of 50.25 kW, or 1.42 kW. The result may be reported as approximately 50.3 ± 1.4 kW at one standard uncertainty, subject to the stated assumptions. This example shows that accurate temperature sensors alone cannot guarantee an accurate heat calculation if flow uncertainty is significant. 6. Data Quality and IntegrityA defensible dataset should be complete, valid, consistent, timely and traceable. Quality checks include: - range checks for physically impossible values;
- rate-of-change checks for implausible jumps;
- flat-line checks for failed sensors;
- comparison with independent meters;
- phase and channel consistency checks;
- timestamp and daylight-saving verification;
- identification of missing, duplicated or out-of-order records;
- comparison of energy totals with utility bills;
- reconciliation of main meters and submeters.
Data should not be silently replaced. Missing values must be flagged and any imputation method documented. A short gap may be estimated from adjacent operating periods, but a long gap during an unusual production event should normally remain identified as uncertain. Raw data should be retained as read-only evidence, while corrected or calculated fields should be separately labelled. A measurement record should include the instrument identity, location, channel, units, scale factors, timestamp convention, sampling interval, calibration status, operator, installation notes and quality flags. Cybersecurity is also relevant: networked meters require access control, secure configuration, backup and protection against unauthorized alteration. 7. Safety in MeasurementMeasurement on energized equipment can expose personnel to electric shock, arc flash, arc blast, unexpected motor start, hot surfaces, pressure, moving machinery and hazardous process fluids. Safety procedures must take precedence over data collection. Before measurement, identify the circuit, voltage level, fault energy, isolation points, available protective devices and required personal protective equipment. Use appropriately rated instruments and test leads. Verify the instrument on a known source before and after testing where practicable. Maintain approach boundaries, use barriers and avoid working alone where site rules prohibit it. Current transformers, capacitors, rotating equipment and pneumatic systems can retain hazardous energy after disconnection. Lockout/tagout or an equivalent isolation procedure is required for work that exposes personnel to hazardous energy. Non-contact or permanently installed sensors may reduce exposure, but they do not remove the need for risk assessment. 8. Applied Case: Submetering a University Engineering BuildingBackgroundThis illustrative case concerns a three-storey engineering building with a monthly electricity consumption of approximately 180,000 kWh. The main meter showed high evening demand, but the facilities team could not determine whether laboratories, HVAC equipment or computing loads were responsible. ProblemThe building had no submeters. A preliminary walk-through found variable-speed air-handling units, electric reheat coils, laboratory exhaust fans, compressed-air equipment and server rooms. Spot measurements suggested that several systems operated after teaching hours, but spot measurements could not establish duration or coincident demand. Analysis and approachThe audit team defined four measurement boundaries: HVAC, laboratory exhaust, process equipment and information technology. A three-phase power analyzer was installed temporarily at each major distribution board. Portable current transformers were selected with ranges suitable for both normal and peak currents. Voltage leads were fused and connected using an approved procedure. The analyzer was configured for the building’s three-phase, four-wire system and checked for correct phase sequence and CT polarity. Measurements were logged at one-minute intervals for fourteen days, covering weekdays, weekends, examinations and a holiday period. Temperature and occupancy schedules were recorded alongside electrical data. The team compared analyzer totals with the utility meter and applied quality flags to periods affected by a temporary communications failure. FindingsHVAC accounted for approximately 46% of measured energy. Laboratory exhaust represented 19%, information technology 17%, and other loads 18%. The highest demand occurred between 18:00 and 21:00, when exhaust fans continued operating after laboratory occupancy had ended. Several reheat coils were energized while supply-air flow was low, indicating a control-sequence problem. The total of temporary submeters differed from the main meter by 4.5%. Investigation found unmetered lighting, distribution losses and a small difference in meter time alignment. The difference was considered reasonable after reconciliation, but it was retained as an uncertainty in the energy balance. Solution and outcomeThe facilities team introduced occupancy-linked exhaust control, corrected the reheat sequence and installed permanent meters for HVAC and laboratory exhaust. A demand alarm was configured for evening operation. After implementation, twelve months of normalized data showed a 14% reduction in building electricity use and a 22% reduction in evening peak demand. The savings claim was supported by retained raw data, calibration certificates, control-change records and comparison with occupancy-adjusted baseline conditions. Learning pointsThe case demonstrates that measurement boundaries should match operational decisions. Interval data revealed the timing and coincidence of loads, which spot measurements could not. It also shows that a discrepancy in a meter balance is a diagnostic signal, not proof that one instrument is wrong. Finally, submetering created continuing operational value because the data remained available after the audit. 9. Limitations, Governance and Contemporary PracticeEvery instrument has limitations. A thermal camera may show a surface temperature rather than internal temperature. A clamp meter may be affected by conductor position and nearby magnetic fields. A flow meter may require long straight pipe lengths. A data logger may have excellent resolution but inaccurate timestamps. These limitations should be stated in the audit report. Measurement and verification should follow a documented plan defining the baseline, boundary, variables, duration, adjustment factors, calculation method and uncertainty. Standards and local regulations may specify requirements for electrical safety, calibration, metering, privacy and reporting; engineers must consult the applicable jurisdiction and sector requirements rather than assuming that one universal rule applies. Modern systems increasingly combine smart meters, wireless sensors, cloud platforms and automated analytics. Artificial intelligence can identify abnormal load profiles, detect missing data and forecast demand, but it cannot correct an incorrectly installed CT or an invalid measurement boundary. Models should be tested against known events, and automated corrections should remain auditable. Energy data may also reveal occupancy patterns or production information, so access control and responsible data governance are essential. Best-Practice Checklist- Define the measurement question before choosing the instrument.
- Select range, accuracy, response time and environmental rating for the application.
- Confirm wiring configuration, CT ratio, polarity and phase association.
- Use traceable calibration and retain certificates.
- Record units, timestamps, scale factors and installation details.
- Choose a sampling interval that captures the phenomenon of interest.
- Compare independent sources and reconcile meter totals.
- Flag missing and corrected data rather than hiding it.
- Estimate uncertainty when measurements support financial or performance claims.
- Apply electrical and process safety procedures before installation or testing.
Chapter SummaryEnergy auditing is fundamentally a measurement activity. Power is the rate of energy transfer, while energy is obtained by integrating power over time. Electrical instruments range from multimeters and clamp meters to power-quality analyzers and revenue meters. Correct phase association, CT polarity, configuration and installation are as important as instrument accuracy. Temperature, flow and heat-transfer measurements require attention to sensor response, fluid properties, installation conditions and reference states. Data loggers and submeters must be designed around the decision they support, with sampling intervals appropriate to the dynamic behaviour of the load. Calibration establishes traceability, while uncertainty describes the doubt associated with a result. Reliable energy data are complete, valid, consistent, timely and traceable. Range checks, reconciliation, timestamp control and documented treatment of missing data protect the integrity of an audit. Finally, measurement must never compromise safety: electrical isolation, appropriate instrument ratings, lockout procedures and risk assessment are essential professional responsibilities. Key TermsAccuracy: Closeness of a measured value to an accepted reference value. Aliasing: Misrepresentation of a varying signal caused by inadequate sampling. Calibration: Comparison of an instrument with a reference standard under specified conditions. Current transformer (CT): A transformer that produces a scaled secondary current proportional to primary current. Demand: Average power measured over a specified interval. Drift: Change in instrument indication over time under unchanged conditions. Energy: Capacity for doing work, commonly measured in joules or kilowatt-hours. Harmonic: Sinusoidal component whose frequency is an integer multiple of the fundamental frequency. Instrument uncertainty: Quantified doubt associated with a measurement result. Load profile: Variation of power or energy use with time. Power analyzer: Instrument that measures electrical power and often power quality. Power factor: Ratio of real power to apparent power. Precision: Repeatability of measurements. Resolution: Smallest increment distinguished by an instrument or data system. Sampling interval: Time between successive recorded measurements. Submeter: Meter installed downstream of a main meter to measure a defined load or process. Thermocouple: Temperature sensor based on thermoelectric voltage at dissimilar-metal junctions. Traceability: Property linking a measurement result to reference standards through documented calibrations. True rms: Root-mean-square value that correctly represents heating-equivalent magnitude for nonsinusoidal waveforms. Review QuestionsShort Answer Questions- Distinguish energy, power and demand.
- Why must a conventional CT secondary not be left open while energized?
- State two limitations of infrared temperature measurement.
- What is the purpose of calibration?
- Why should missing data be explicitly flagged?
Long Answer Questions- Explain the operating principles, applications and limitations of DMMs, clamp meters, energy meters and power analyzers.
- Discuss the factors that determine the selection of a flow meter for an industrial process.
- Explain how sampling interval and aliasing affect an energy-monitoring system.
- Describe a complete calibration and data-quality procedure for a temporary electrical measurement campaign.
- Discuss safety hazards and control measures associated with measurements on energized electrical equipment.
Analytical / Application Questions- A balanced three-phase load operates at 415 V line-to-line, 80 A and power factor 0.92. Calculate its real power using the balanced-system equation and state the assumptions made.
- Design a two-week submetering plan for a manufacturing plant containing motors, compressed air, HVAC and electric heating. Specify measurement boundaries, instruments, sampling intervals and data-quality checks.
- A heat exchanger’s calculated heat rate disagrees with its fuel-meter result by 12%. Develop a structured investigation covering sensors, calibration, flow conditions, timestamps, heat losses and uncertainty.
Multiple Choice Questions with AnswersQuestion 1Which quantity is obtained by integrating power over time? A. Voltage B. Energy C. Power factor D. Frequency Correct Answer: B. Energy Question 2A conventional current transformer secondary should not be left open when its primary is energized because A. the primary current becomes zero B. the secondary may develop dangerously high voltage C. the frequency doubles D. the CT ratio becomes one Correct Answer: B. the secondary may develop dangerously high voltage Question 3For a balanced three-phase system, which expression gives real power? A. P = V_L/I_L B. P = √3 V_L I_L PF C. P = V_L + I_L + PF D. P = I_L²/V_L Correct Answer: B. P = √3 V_L I_L PF Question 4A 4–20 mA transmitter is configured for 0–100 °C. What temperature corresponds to 12 mA? A. 25 °C B. 40 °C C. 50 °C D. 75 °C Correct Answer: C. 50 °C Question 5Which instrument is most appropriate for measuring harmonics and voltage disturbances? A. Resistance thermometer B. Power-quality analyzer C. Rotameter D. Basic continuity tester Correct Answer: B. Power-quality analyzer Question 6If a pipe has cross-sectional area 0.02 m² and average fluid velocity 3 m/s, the volumetric flow rate is A. 0.006 m³/s B. 0.02 m³/s C. 0.06 m³/s D. 0.60 m³/s Correct Answer: C. 0.06 m³/s Question 7A measurement with many displayed decimal places but poor closeness to the reference value has A. high resolution but poor accuracy B. high accuracy but no precision C. zero uncertainty D. perfect calibration Correct Answer: A. high resolution but poor accuracy Question 8The main purpose of an energy submeter is to A. replace all safety procedures B. measure a defined downstream load or process C. increase the supply frequency D. eliminate transformer losses Correct Answer: B. measure a defined downstream load or process Question 9According to the basic Nyquist condition, the sampling frequency should be A. less than the highest signal frequency B. equal to half the highest signal frequency C. greater than twice the highest signal frequency D. independent of signal frequency Correct Answer: C. greater than twice the highest signal frequency Question 10Which action best protects the integrity of audit data? A. Silently deleting abnormal readings B. Changing raw readings without a record C. Retaining raw data and documenting corrections D. Ignoring timestamp differences Correct Answer: C. Retaining raw data and documenting corrections
|