Distribution Network Configuration

Chapter 8
Distribution Center Roles, Capacity and Operations

Post Graduate Program in Logistics
Distribution Network Configuration   •   Post Graduate

Distribution Center Roles, Capacity and Operations

Introduction

A distribution center (DC) is more than a warehouse. It is a strategically positioned node that receives, transforms, consolidates, stores, fulfills, and dispatches inventory. Its design must reflect the role assigned to it within the distribution network. A facility intended for long-term inventory holding requires different space, labor, systems, and material-handling equipment from a cross-dock, e-commerce fulfillment center, returns center, or postponement facility.

Distribution-center decisions therefore connect network strategy with operational execution. Managers must determine what the facility should do, how much capacity it requires, how work will flow through it, and how the design can respond to uncertain demand. Poorly specified roles create excess handling, congestion, unnecessary inventory, low asset utilization, and unreliable customer service. Conversely, a well-configured facility aligns inventory positioning, transportation economics, labor capability, technology, and service commitments.

Learning Objectives

By the end of this chapter, the reader should be able to:

  1. distinguish major distribution-center roles and select an appropriate role for a network;
  2. estimate storage capacity, throughput, labor requirements, and processing capacity;
  3. evaluate receiving, storage, fulfillment, cross-docking, sortation, shipping, and returns processes;
  4. assess layout, material-handling systems, automation, scalability, and resilience;
  5. compare owned, outsourced, and third-party logistics alternatives; and
  6. recommend an operating model using cost, service, risk, technology, and governance criteria.

1. Distribution-Center Roles in the Network

The facility role should be defined before its physical design. A useful role statement specifies the customer or downstream node served, product characteristics, order profiles, service promise, inventory policy, and expected volume.

1.1 Storage and replenishment center

A storage-oriented DC holds inventory close to customers or production sites and replenishes stores, regional facilities, or business customers. It normally emphasizes reserve storage, accurate inventory records, pallet movement, cycle counting, and economical case or pallet picking. Its performance is influenced by inventory turns, cube utilization, replenishment frequency, and transportation consolidation.

1.2 Fulfillment center

A fulfillment center processes customer orders, often in smaller quantities and with greater order-line variability. E-commerce fulfillment commonly requires each-picking, batch or wave picking, automated sortation, packing, value-added services, and returns processing. The central design challenge is not simply storage density; it is the rapid conversion of inventory into accurate, parcel-ready orders.

1.3 Cross-dock

A cross-dock receives inbound goods and transfers them to outbound vehicles with little or no storage. It is appropriate when demand is sufficiently known, inbound and outbound schedules can be synchronized, and product flows are stable. Cross-docking reduces storage and handling but increases dependence on transportation reliability, appointment discipline, information quality, and temporary staging space.

1.4 Break-bulk and consolidation center

A break-bulk facility receives large shipments and divides them into smaller customer or regional consignments. A consolidation center performs the reverse function by combining smaller shipments into economical loads. Both roles can reduce transportation cost, but they add handling and require effective scheduling and shipment visibility.

1.5 Sortation and transshipment hub

A sortation hub rapidly identifies, routes, and dispatches parcels or cartons to destinations. It may hold little inventory. Sortation capacity, induction rate, chute availability, exception handling, and departure cut-off times are critical. Parcel networks often use hubs to exploit transportation scale rather than inventory pooling.

1.6 Postponement, kitting, and value-added center

Some DCs delay final product configuration until demand is clearer. Activities may include labeling, light assembly, customization, kitting, packaging, or regulatory preparation. Postponement can reduce finished-goods variety and inventory risk, but it requires appropriate skills, quality controls, workstations, and bill-of-materials accuracy.

1.7 Returns and reverse-logistics center

A returns facility receives products, verifies condition, determines disposition, repairs or refurbishes items, recycles materials, and returns eligible stock to saleable inventory. Reverse flows are uncertain and often require more inspection than forward flows. The facility should therefore be designed around disposition decisions, not merely around receipt and storage.

RoleDominant flowMain capabilityTypical performance concern
Storage DCInbound to reserve and forward stockPallet/case storage and replenishmentInventory accuracy and space utilization
Fulfillment centerInventory to individual ordersPiece picking, packing, returnsOrder-cycle time and accuracy
Cross-dockInbound directly to outboundScheduling and stagingSynchronization and departure reliability
Sortation hubCartons/parcels to destinationsIdentification and routingInduction and sort capacity
Value-added centerProduct to configured productKitting or postponementQuality and labor productivity
Returns centerCustomer returns to dispositionInspection and recoveryCycle time and recovery value

2. From Network Role to Operating Requirements

A facility role is translated into requirements through five questions:

  1. What enters and leaves? Define SKU dimensions, weight, packaging, temperature, hazard classification, ownership, and unit of movement.
  2. When does work arrive? Analyze arrival patterns, appointment windows, seasonality, order cut-offs, and carrier schedules.
  3. What transformation occurs? Identify receiving, inspection, put-away, replenishment, picking, consolidation, packing, labeling, staging, loading, and returns.
  4. What service is promised? Specify fill rate, order accuracy, same-day or next-day dispatch, delivery windows, and peak commitments.
  5. What constraints apply? Consider labor availability, safety rules, fire protection, food or pharmaceutical regulation, security, data requirements, and site access.

A process map should distinguish physical flow, information flow, and decision points. For example, an order may be released by the warehouse management system (WMS), allocated against available stock, divided into tasks, picked, checked, packed, manifested, and loaded. The physical movement is only one component; the information system determines authorization, sequencing, traceability, and exception control.

3. Capacity: Storage, Throughput, and Resources

Capacity is multidimensional. A DC may have sufficient pallet positions but insufficient dock doors, picking labor, packing stations, battery-charging capacity, or outbound transportation. Capacity analysis should therefore examine at least storage capacity, flow capacity, labor capacity, equipment capacity, and information-system capacity.

3.1 Storage capacity

Theoretical storage capacity is the number of locations physically available. Effective capacity is lower because of safety stock, SKU compatibility, accessibility, blocked locations, damaged stock, seasonality, and operational reserve.

A basic inventory requirement can be estimated as:

Ipeak = Dpeak × L + SS + C

where:

  • Ipeak = peak inventory requirement in units;
  • Dpeak = peak average demand rate in units per time period;
  • L = replenishment lead time in the same time unit;
  • SS = safety stock in units; and
  • C = cycle-stock or other planned inventory in units.

This relationship assumes demand and lead time are represented consistently and that inventory components are additive. It is an approximation, not a replacement for a time-phased inventory simulation.

If each storage location holds q units and the design utilization limit is u—for example, 0.85—required locations are:

Nlocations = Ipeak ÷ (q × u)

The utilization factor prevents a design from assuming that every location is permanently available. A facility requiring 8,000 units, with 20 units per location and an 80% design utilization, requires 8,000 ÷ (20 × 0.80) = 500 locations.

Cube-based analysis is necessary where item sizes vary. If SKU i requires vi cubic metres and the planned quantity is qi, total inventory cube is:

Vinventory = ∑(qi × vi)

The calculation must include packaging and must distinguish usable storage cube from gross building volume. A cube utilization ratio near the physical maximum may be operationally impractical because aisles, beams, sprinklers, clearances, and access paths consume space.

3.2 Throughput capacity

Throughput is the quantity processed per unit time. Depending on the role, it may be measured in pallets received, cases picked, order lines picked, cartons packed, or parcels dispatched. The measurement unit must match the process being evaluated.

For a work center with m parallel resources, each capable of processing r units per hour, and an effective availability a, practical capacity is:

C = m × r × a

Here, a captures breaks, planned downtime, changeovers, minor stoppages, and other availability losses. It should not be used to conceal chronic congestion or poor methods. If demand is λ units per hour, a basic utilization estimate is:

ρ = λ ÷ C

The symbol ρ is utilization. Sustained operation near 100% leaves little protection against variability. In queueing systems, waiting time generally increases sharply as utilization approaches full capacity; therefore, the appropriate design margin depends on variability, service requirements, and the ability to flex labor or equipment.

3.3 Labor capacity

If a process requires t labor-hours per unit and the planning horizon contains Q units, required direct labor-hours are:

Hrequired = Q × t

If each worker supplies h productive hours and the workforce effectiveness is e, required workers are:

W = Hrequired ÷ (h × e)

The effectiveness factor includes breaks, training, walking, meetings, and normal operational loss. The estimate should be separated by skill category and shift because forklift operation, hazardous-material handling, quality inspection, and systems support may not be interchangeable.

Worked Example: Fulfillment Capacity

An illustrative fulfillment center must process 12,000 order lines during a 10-hour shift. Each picker averages 75 lines per productive hour. The planned productive availability is 80%, and management requires a 15% capacity reserve above forecast volume.

Required processing capacity is 12,000 × 1.15 = 13,800 lines. One picker contributes 75 × 10 × 0.80 = 600 lines per shift. Therefore:

13,800 ÷ 600 = 23 pickers.

The result assumes a stable average rate and adequate inventory replenishment, equipment, packing capacity, and order release. If picking is divided among zones, each zone must be checked separately; total labor may be adequate while one zone remains a bottleneck.

4. Operating Processes and Control Points

4.1 Inbound receiving

Receiving includes appointment scheduling, unloading, count verification, condition inspection, identification, data capture, and discrepancy resolution. Advance shipping notices can reduce receiving time, but only when supplier data are accurate. Dock design should separate inbound and outbound movements where possible and provide safe pedestrian controls.

4.2 Put-away and storage

Put-away assigns stock to locations based on product velocity, cube, compatibility, replenishment frequency, and equipment requirements. ABC analysis is useful but incomplete: a low-volume item may be large, hazardous, temperature-sensitive, or strategically important. Slotting should be reviewed after major changes in demand or product mix.

4.3 Order fulfillment

Common picking methods include discrete picking, batch picking, zone picking, wave picking, and waveless or continuous release. The appropriate method depends on order size, SKU commonality, cut-off times, travel distance, and system maturity. Batch picking reduces repeated travel for similar orders but requires accurate sortation or downstream separation.

Order accuracy is affected by location labeling, barcode quality, inventory integrity, task design, training, and exception handling. A low error rate at picking is not sufficient if packing, manifesting, or carrier handoff introduces defects.

4.4 Cross-docking

Cross-docking works best when inbound shipments are pre-allocated to outbound destinations, schedules are synchronized, and product identification is reliable. It should not be treated as a universal substitute for inventory. When demand, transport, or supplier reliability is highly variable, forcing cross-docking can increase missed departures and emergency handling.

4.5 Sortation and shipping

Sortation may be manual, semi-automated, or automated. The design must account for item dimensions, barcode readability, destination count, induction rate, recirculation, exceptions, and dispatch cut-offs. Shipping staging should prevent route mixing, support load sequencing, and provide a controlled reconciliation between system records and physical freight.

4.6 Returns

Returns processes should classify goods into resale, repair, refurbishment, recycling, supplier return, quarantine, or disposal. Clear disposition rules reduce accumulation of uncertain inventory. Financial ownership, warranty obligations, consumer-protection law, product safety, and data erasure may all affect the process.

5. Layout, Material Handling, and Automation

A sound layout minimizes unnecessary travel and crossing flows while preserving safety, visibility, flexibility, and access. Typical zones include receiving, quality hold, reserve storage, forward pick, replenishment, value-added services, packing, outbound staging, returns, offices, maintenance, and battery charging.

Layout decisions should be based on flow intensity rather than visual symmetry. Fast-moving products may be placed near packing or shipping, while bulky products may require floor storage. However, excessive concentration of velocity items can create congestion. A practical design tests alternative slotting and travel assumptions using process simulation or discrete-event modeling when variability is significant.

Material-handling alternatives include pallet racks, shelving, carton flow, conveyors, forklifts, reach trucks, pallet shuttles, automated storage and retrieval systems, autonomous mobile robots, robotic picking, and vertical lift modules. Selection should consider total cost of ownership, not purchase price alone. Relevant costs include maintenance, software integration, energy, training, downtime, spare parts, building modifications, and eventual obsolescence.

Automation is attractive when volume is stable, labor is scarce or expensive, accuracy requirements are high, and the process is sufficiently standardized. Manual or semi-automated solutions may be superior when SKU variety is high, demand is uncertain, or flexibility is more valuable than peak efficiency. Automation also creates dependence on controls software and specialized technical labor.

6. Scalability, Resilience, and Performance Measurement

Scalability is the ability to increase output without proportionate increases in cost or disruption. Sources of scalability include modular workstations, expandable racking, flexible labor pools, multi-purpose equipment, cloud systems, postponement, and standardized operating procedures. A design should identify both normal capacity and surge capacity.

Resilience requires more than spare space. Managers should assess alternative carriers, power continuity, cyber recovery, supplier reliability, labor disruption, extreme weather, fire, flooding, and equipment failure. Contingency plans should identify critical processes, recovery priorities, manual workarounds, communication protocols, and decision authority.

Useful performance indicators include:

DimensionExample measureInterpretation
ServiceOn-time dispatch; order fill rateWhether commitments are met
AccuracyPick accuracy; inventory accuracyQuality of physical and system records
ProductivityLines per labor-hour; cases per hourResource output
FlowDock-to-stock time; order cycle timeSpeed through the facility
Asset useCube utilization; equipment availabilityUse of space and machinery
CostCost per order; cost per caseEconomic performance
SafetyRecordable incidents; near missesRisk control
SustainabilityEnergy per order; packaging wasteEnvironmental performance

Metrics require precise definitions. For example, inventory accuracy may mean location-record agreement, quantity accuracy, or both. A dashboard should combine leading indicators—such as backlog, replenishment shortages, and equipment downtime—with lagging indicators such as cost and service failures.

7. Outsourcing and Third-Party Logistics

A company may operate a DC internally, outsource it to a third-party logistics provider (3PL), or use a hybrid model. A 3PL may provide labor, facilities, transport coordination, systems, value-added services, or complete fulfillment. A fourth-party logistics provider may coordinate multiple providers and manage the network as an integrator.

The decision should evaluate strategic control, required investment, capabilities, volume uncertainty, geographic coverage, switching costs, data access, and contractual risk. Outsourcing can provide expertise, variable capacity, and faster market entry. It can also create dependence, weaker process transparency, service misalignment, and difficulty protecting proprietary knowledge.

Contracts should specify measurable service levels, data ownership, audit rights, cybersecurity, business continuity, labor compliance, liability, inventory shrinkage, change-control procedures, gain-sharing, open-book cost principles where appropriate, and exit assistance. A low unit price is not necessarily a low total cost if it produces claims, expediting, lost sales, or poor customer experience.

8. Technology, Data, and Artificial Intelligence

The WMS is the operational record for locations, inventory, tasks, and execution status. Transportation-management systems support carrier planning and freight visibility, while warehouse-control systems connect automation to operational commands. Integration should preserve transaction accuracy and provide traceability from receipt to shipment.

Artificial intelligence and advanced analytics can support demand forecasting, slotting, labor scheduling, computer vision, predictive maintenance, and exception prioritization. Their value depends on data quality, process stability, explainability, and human oversight. AI should not silently override inventory, safety, employment, or customer-service decisions. Models require monitoring for drift, biased training data, cybersecurity threats, and inappropriate recommendations.

9. Governance, Safety, and Sustainability

DC operations involve occupational safety, hazardous materials, food and pharmaceutical controls, consumer protection, customs, data privacy, and environmental obligations. Governance should assign accountability for inventory, access control, system changes, product quarantine, incident reporting, and regulatory records.

Safety design includes pedestrian segregation, rack protection, traffic rules, ergonomic workstations, lifting controls, emergency exits, fire protection, and training. Sustainability initiatives may include LED lighting, renewable energy, efficient HVAC, right-sized packaging, reusable transport packaging, electric equipment, route consolidation, and waste recovery. These initiatives should be evaluated across the facility life cycle rather than through isolated claims.

10. Illustrative Case: Regional Omnichannel Fulfillment Center

Background

The fictional company Northstar Home Products sells household goods through stores and an online channel. Its existing regional warehouse was designed for pallet and case replenishment. Online demand has grown rapidly, creating small orders, high return volumes, and late-day parcel peaks.

Problem

The facility has adequate average storage but experiences congestion near packing stations, replenishment shortages in the evening, and inconsistent carrier cut-off performance. Management is considering either expanding the building, installing automation, or outsourcing online fulfillment to a 3PL.

Analysis

The facility’s role is no longer purely a storage and store-replenishment center. It now requires a segmented operating model: pallet and case operations for stores, piece-pick fulfillment for online customers, and a dedicated returns process. Combining all flows in one undifferentiated area creates competing priorities and obstructs travel paths.

A capacity study separates demand into order lines, cartons, pallets, and returns. Peak rather than average demand is used for packing and sortation. Slotting analysis places frequently ordered small items near pick modules, while bulky items remain in a pallet or floor-storage zone. Replenishment is scheduled before the parcel peak, and a small forward-stock reserve is established for high-velocity SKUs.

Approach and solution

Northstar adopts a phased design. First, it redesigns zones and operating rules, introduces wave cut-offs for store orders, and releases online orders continuously until the parcel carrier cut-off. Second, it adds modular shelving, carton flow for selected SKUs, barcode verification, and flexible packing benches. Third, it pilots mobile robots in the highest-volume piece-pick zone rather than automating the entire building.

The company retains store fulfillment internally but contracts overflow online fulfillment and selected returns processing to a regional 3PL. The contract includes order accuracy, dispatch performance, inventory accuracy, data access, peak-capacity commitments, and an exit plan.

Outcome

The phased approach increases effective capacity without immediately committing to a large fixed automation investment. It also preserves learning: management can observe SKU velocity, order profiles, labor requirements, and returns characteristics before selecting a permanent system. The 3PL provides surge protection while Northstar retains control of its strategic store network and customer data.

Learning points

The case demonstrates that capacity problems often originate in role conflict rather than absolute space shortage. Segmentation, process discipline, peak-based sizing, selective automation, and contractual flexibility can outperform a single large capital project. It also shows why outsourcing should be designed as a governed operating relationship rather than treated as a simple labor purchase.

Challenges and Limitations

Capacity estimates are sensitive to demand forecasts, product mix, absenteeism, equipment downtime, and process variability. Average rates can conceal queues and bottlenecks. Utilization measures can also mislead: high utilization may indicate efficiency, but it may equally indicate inadequate resilience. Simulation, pilot testing, sensitivity analysis, and scenario planning are appropriate when variability is material.

Technological solutions may create integration complexity and cyber risk. Outsourcing may reduce fixed cost while increasing coordination and switching costs. Sustainability claims can be overstated if they ignore construction, replacement, energy sources, and transport consequences. Finally, a DC should not be optimized independently of transport, inventory policy, procurement, customer promise, and upstream production.

Best-Practice Decision Sequence

A robust design sequence is:

  1. define the network role and customer promise;
  2. characterize demand, products, order profiles, and peak conditions;
  3. map physical and information flows;
  4. calculate storage, throughput, labor, dock, and equipment requirements;
  5. identify bottlenecks and safety constraints;
  6. compare manual, mechanized, automated, and outsourced alternatives;
  7. test scalability, resilience, and sensitivity to uncertainty;
  8. establish governance, metrics, and continuous-improvement routines; and
  9. implement in controlled phases with validated data.

Chapter Summary

Distribution centers must be designed around their network roles. Storage, fulfillment, cross-docking, sortation, value-added processing, and returns operations have different flow characteristics and resource requirements. Capacity includes more than storage locations: throughput, labor, docks, equipment, systems, and peak resilience must all be assessed.

Useful planning relationships estimate peak inventory, location requirements, work-center capacity, utilization, and labor needs, provided that units, assumptions, and design margins are made explicit. Layout and slotting should reduce unnecessary travel while preserving safety and flexibility. Automation is valuable where volume and processes are sufficiently stable, but modular or manual solutions may be better under uncertainty.

Outsourcing and 3PL decisions require analysis of capability, control, risk, data, service levels, total cost, and exit arrangements. Technology and AI can improve visibility and decisions, but they require sound data, cybersecurity, explainability, and human governance. Effective DC design integrates operational, strategic, regulatory, ethical, environmental, and financial considerations.

Key Terms

Distribution center: Facility that receives, processes, stores, and dispatches goods within a supply network.

Cross-docking: Transfer of goods from inbound to outbound flow with minimal storage.

Fulfillment center: Facility designed to process customer orders, often at item or parcel level.

Sortation hub: Facility that identifies and routes cartons or parcels to destinations.

Break-bulk: Process of dividing a large shipment into smaller consignments.

Consolidation: Combining smaller shipments into a larger, economical load.

Postponement: Delaying final product configuration until demand is more certain.

Reverse logistics: Movement and disposition of returned, recovered, repaired, or recycled goods.

Throughput: Quantity processed by a facility or work center per unit of time.

Capacity utilization: Actual or forecast flow divided by available processing capacity.

Peak capacity: Capacity required during a specified high-demand period.

Slotting: Assignment of products to storage or picking locations.

Forward stock: Inventory positioned in an accessible picking area.

Reserve storage: Higher-capacity storage replenishing forward-pick locations.

Warehouse management system: Software controlling inventory locations, tasks, and execution.

Material handling: Movement, storage, protection, and control of goods within a facility.

Third-party logistics provider: External organization performing logistics activities for a client.

Service-level agreement: Contractual specification of measurable service obligations.

Order accuracy: Proportion of orders or order lines fulfilled without error.

Scalability: Ability to increase output or capability without disproportionate cost or disruption.

Review Questions

Short Answer Questions

  1. Why must a distribution-center role be defined before facility layout is designed?
  2. Distinguish storage capacity from throughput capacity.
  3. Identify two conditions under which cross-docking is appropriate.
  4. What factors should be included in a 3PL contract?
  5. Why can average demand be inadequate for sizing packing or sortation capacity?

Long Answer Questions

  1. Compare the operational requirements of a storage DC, fulfillment center, and sortation hub.
  2. Explain how slotting, replenishment, and picking method jointly affect fulfillment performance.
  3. Discuss the advantages and risks of warehouse automation under uncertain demand.
  4. Develop a framework for evaluating an owned DC against a 3PL alternative.
  5. Explain how safety, sustainability, cybersecurity, and regulatory governance should influence DC design.

Analytical / Application Questions

  1. A facility must hold 9,600 units. Each location holds 24 units, and the design utilization limit is 80%. Calculate the required number of locations and explain the assumptions.
  2. A work center has four packing stations, each processing 55 cartons per hour, with an effective availability of 85%. Peak demand is 700 cartons per hour. Determine practical capacity and utilization, then assess whether additional capacity is advisable.
  3. Design a phased operating model for a retailer whose traditional case-pick warehouse is receiving rapidly growing e-commerce orders and returns. Specify role segmentation, metrics, technology, labor, and outsourcing considerations.

Multiple Choice Questions with Answers

Question 1

Which facility role primarily transfers inbound goods to outbound vehicles with minimal storage?

A. Cross-dock

B. Returns center

C. Long-term reserve warehouse

D. Postponement center

Correct Answer: A. Cross-dock

Question 2

A facility requires 8,000 units, each location holds 20 units, and design utilization is 80%. How many locations are required?

A. 320

B. 400

C. 500

D. 640

Correct Answer: C. 500

Question 3

Which measure is most directly associated with order fulfillment productivity?

A. Lines per labor-hour

B. Building rent per square metre

C. Supplier payment days

D. Annual depreciation rate

Correct Answer: A. Lines per labor-hour

Question 4

A work center has three resources, each processing 40 units per hour, with effective availability of 75%. What is practical capacity?

A. 30 units per hour

B. 90 units per hour

C. 120 units per hour

D. 160 units per hour

Correct Answer: B. 90 units per hour

Question 5

Which condition most supports cross-docking?

A. Highly uncertain destinations and unreliable schedules

B. Stable flows with synchronized inbound and outbound schedules

C. Very long-term storage requirements

D. Products requiring extensive inspection before allocation

Correct Answer: B. Stable flows with synchronized inbound and outbound schedules

Question 6

What is the primary purpose of slotting?

A. Assigning products to suitable storage or picking locations

B. Selecting external auditors

C. Calculating corporate tax

D. Determining supplier ownership

Correct Answer: A. Assigning products to suitable storage or picking locations

Question 7

Which factor is a limitation of using average demand for capacity planning?

A. It always overstates peak requirements

B. It can conceal seasonal peaks and process congestion

C. It eliminates the need for safety stock

D. It measures only building height

Correct Answer: B. It can conceal seasonal peaks and process congestion

Question 8

Which contractual provision is especially important when outsourcing critical fulfillment operations?

A. Exit assistance and data-access rights

B. A ban on performance measurement

C. Removal of all service-level definitions

D. Unlimited unilateral price changes

Correct Answer: A. Exit assistance and data-access rights

Question 9

What is a major advantage of postponement?

A. It increases finished-product variety held in advance

B. It delays final configuration until demand is clearer

C. It eliminates all labor requirements

D. It removes the need for inventory records

Correct Answer: B. It delays final configuration until demand is clearer

Question 10

Which statement best describes effective distribution-center capacity?

A. It is limited only by the number of pallet locations

B. It includes storage, labor, equipment, docks, systems, and peak constraints

C. It is always equal to theoretical maximum capacity

D. It excludes information-processing capability

Correct Answer: B. It includes storage, labor, equipment, docks, systems, and peak constraints