Product Planning, Prioritization and Portfolio Decisions

Introduction

Product strategy explains where an organisation intends to compete and how it expects to create value. Product planning converts that strategic intent into a sequence of decisions: what outcomes matter, which customer problems deserve attention, what should be built, when investment should occur, and what should deliberately be excluded. In digital products, these decisions are complicated by uncertainty, rapid technological change, network effects, platform dependencies, regulatory obligations and the low marginal cost of releasing software. A product team can therefore fail not because it lacks ideas, but because it funds too many ideas, measures activity rather than impact, or treats prioritization as a one-time ranking exercise.

This chapter develops an integrated approach to planning and prioritization. It connects strategy to objectives and key results (OKRs), explains roadmap designs, distinguishes feature-level prioritization from portfolio allocation, and applies RICE, Kano, MoSCoW, value-versus-effort and cost-of-delay methods. It also considers evidence quality, AI-enabled products, governance and the limitations of scoring models.

Learning objectives

By the end of the chapter, the reader should be able to:

  1. Translate strategy into measurable product objectives and key results.
  2. Distinguish outputs, outcomes, impact and assumptions.
  3. Construct and communicate outcome-oriented roadmaps.
  4. Apply RICE, Kano, MoSCoW, value-versus-effort and cost-of-delay techniques appropriately.
  5. Evaluate evidence and uncertainty when comparing opportunities.
  6. Make portfolio decisions across products, horizons and risk classes.
  7. Recognise ethical, regulatory and governance implications in prioritization.
  8. Critically assess the limitations of quantitative prioritization models.

From strategy to product objectives

A useful planning chain is:

Organisational strategy → strategic choices → product objectives → opportunities and hypotheses → initiatives → deliverables → measured outcomes.

The chain prevents a common error: beginning with a solution, such as “build an AI assistant,” before establishing the customer or business outcome it is intended to produce.

Outputs, outcomes and impact

An output is something the team delivers, such as a recommendation model, onboarding flow or API. An outcome is a change in user behaviour or experience, such as a higher activation rate or fewer support contacts. Impact is the broader organisational or societal value produced by outcomes, such as sustainable revenue, improved access or reduced operational risk.

Outputs are relatively controllable; outcomes are only partially controllable; impact is influenced by many external factors. A mature plan therefore does not equate shipping with success. “Release a budgeting feature” is an output. “Increase the proportion of new users who create a first budget from 35% to 50% within two quarters” is an outcome-oriented target.

Objectives and key results

An objective states a significant direction or desired condition. It should be understandable, motivating and strategically relevant. A key result (KR) is a measurable indicator of progress toward that objective. Good KRs usually describe outcomes rather than the completion of tasks.

For example:

  • Objective: Make the first experience valuable for new customers.
  • KR1: Increase first-week activation from 42% to 55%.
  • KR2: Reduce median time to first successful task from 18 minutes to 8 minutes.
  • KR3: Increase the proportion of activated users retaining after 30 days from 28% to 36%.

The mathematical change in a metric can be expressed as:

∆M = M₁ − M₀

where M₀ is the baseline metric and M₁ is the later measurement. If a relative percentage change is reported, it is:

Relative change = (M₁ − M₀) ÷ M₀ × 100%

These calculations assume that the metric definitions, population, observation window and measurement method remain comparable. A rise in activation is not necessarily causal evidence of product success if marketing mix, seasonality or eligibility rules changed simultaneously.

A KR should specify its metric, baseline, target, population, time period and source. Teams should also identify guardrail metrics. For example, increasing conversion while increasing fraud, complaints or cancellation may represent a poor trade-off. A complete objective might therefore include a primary KR and constraints on safety, reliability, fairness or cost.

The logic of assumptions

Every initiative rests on assumptions, often in four categories:

  1. Desirability: customers experience the problem and value the proposed improvement.
  2. Viability: the organisation can create and capture sufficient value.
  3. Feasibility: the product can be built and operated with available capabilities.
  4. Responsibility: the product is lawful, safe, fair and socially acceptable.

An assumption is not evidence. Customer interviews, behavioural analytics, usability tests, experiments, operational data and market research provide varying degrees of evidence. Planning should make uncertainty visible instead of hiding it in a precise-looking score.

Product planning as a decision system

Product planning is not merely the production of a list of features. It is a recurring decision system with five activities:

  1. Frame: clarify the strategic objective, customer segment, constraints and decision horizon.
  2. Discover: generate and investigate opportunities, problems and risks.
  3. Evaluate: compare alternatives using value, evidence, effort, urgency and risk.
  4. Sequence: determine dependencies, learning order, release timing and capacity allocation.
  5. Inspect and adapt: compare results with objectives and revise investment.

The quality of prioritization depends on the quality of the opportunity set. If important regulatory, reliability or accessibility work is absent from the list, even a mathematically elegant ranking produces a bad plan.

Opportunity framing

A concise opportunity statement identifies a target user, context, unmet need and consequence. For example: “For small retailers who reconcile payments manually at the end of each day, reduce uncertainty about settlement status so that they can close accounts confidently.” This statement does not prescribe a solution. Possible responses may include a dashboard, notifications, workflow integration or a process change.

A product discovery repository may contain:

  • customer problems and desired outcomes;
  • evidence and confidence level;
  • affected segments and estimated reach;
  • strategic theme;
  • risks, dependencies and regulatory constraints;
  • candidate experiments or solutions;
  • decision owner and review date.

Roadmaps: communicating intent over time

A roadmap is a communication and coordination instrument, not a contractual promise that every feature will ship on a specified date. Its design should reflect uncertainty.

Roadmap types

Roadmap typeMain questionAppropriate useMain risk
Feature roadmapWhat will be delivered?Near-term coordinationEncourages output thinking
Outcome roadmapWhat customer or business change is sought?Strategy alignmentRequires disciplined measurement
Now–Next–LaterWhat is current, upcoming and exploratory?Communicating uncertaintyTime boundaries may be vague
Theme roadmapWhich strategic themes receive attention?Portfolio communicationCan hide concrete dependencies
Release roadmapWhen are increments likely to become available?Marketing and operationsFalse precision

A professional roadmap normally distinguishes committed, forecast and exploratory work. Committed work has sufficient evidence and capacity; forecast work is plausible but dependent on learning; exploratory work represents an area of investigation rather than a promise.

Roadmaps should include rationale, expected outcome, confidence, dependencies and review conditions. A date should be used when timing has genuine external significance—for example, a regulatory deadline or a contractual migration window—not merely to create an appearance of certainty.

Sequencing principles

Prioritization and sequencing are related but different. A high-value item may need to wait because it depends on a platform capability. Conversely, a lower-value technical investment may come first because it unlocks several high-value opportunities. Sequencing should consider:

  • dependency and critical path;
  • learning value and reversibility;
  • customer and market timing;
  • operational readiness;
  • risk reduction;
  • capacity and skills;
  • migration and adoption costs.

A useful rule is to conduct the cheapest credible learning activity before making an expensive irreversible commitment.

Prioritization frameworks

No single framework is universally correct. Each makes certain dimensions visible and leaves others implicit. The product manager’s responsibility is to choose a method appropriate to the decision and to explain the assumptions behind it.

RICE scoring

RICE is commonly used for comparing opportunities where reach, impact, confidence and effort can be estimated. Its standard form is:

RICE score = (Reach × Impact × Confidence) ÷ Effort

Reach is the number of users, accounts or transactions affected during a defined period. Impact estimates the magnitude of effect per reached unit, often using an ordinal scale such as 0.25, 0.5, 1, 2 and 3. Confidence is represented as a proportion between 0 and 1, such as 0.8 for 80%. Effort represents person-months, person-weeks or another consistently defined unit of total work.

The formula is dimensionally a weighted reach-per-effort index rather than a monetary forecast. It is useful when alternatives have comparable measurement definitions. It should not be interpreted as a precise prediction of return.

Worked example. Suppose Initiative A may reach 10,000 users, has impact 2, confidence 0.8 and requires 4 person-months:

RICEA = (10,000 × 2 × 0.8) ÷ 4 = 4,000

Initiative B may reach 4,000 users, have impact 3, confidence 0.6 and require 2 person-months:

RICEB = (4,000 × 3 × 0.6) ÷ 2 = 3,600

On this scoring model, A ranks above B. However, B may still be selected if it addresses a contractual commitment, a critical safety issue or a strategic capability not captured by reach.

RICE weaknesses include subjective impact scales, unstable reach estimates, false precision and the possibility that a high-confidence low-value item outranks a strategically essential uncertain bet.

Kano model

The Kano model classifies product attributes according to their relationship with satisfaction:

  • Must-be attributes: their absence causes strong dissatisfaction, but their presence may be taken for granted.
  • One-dimensional attributes: more performance generally creates more satisfaction.
  • Attractive attributes: unexpected features that delight when present but do not dissatisfy when absent.
  • Indifferent attributes: customers perceive little effect.
  • Reverse attributes: some customers may dislike the attribute.

Kano is especially useful for understanding customer perception and preventing teams from treating delight features as substitutes for basic reliability. Categories are not permanent: an attractive feature can become a must-be expectation as competitors and norms change. Kano research often uses paired functional and dysfunctional questions, but results should be interpreted with segment awareness and adequate sample quality.

MoSCoW

MoSCoW classifies requirements as:

  • Must have: essential for the release or obligation; without it the release is not viable.
  • Should have: important but there is a workable alternative or temporary workaround.
  • Could have: beneficial if capacity permits.
  • Won’t have this time: explicitly excluded from the current scope.

MoSCoW is valuable for release negotiation and scope control. Its weakness is inflation: if everything is labelled “Must,” the framework loses meaning. A Must should have a stated consequence of omission, such as legal non-compliance, inability to perform the core workflow or a severe safety risk.

Value-versus-effort analysis

A simple two-dimensional matrix compares expected value with relative effort. Value may combine customer benefit, business contribution, strategic fit and risk reduction. Effort may include design, engineering, data, operations, support, migration and change management.

The matrix is useful in workshops because it is fast and visual. It is not a substitute for analysis: estimates can be biased by seniority, anchoring or optimism. Teams should record why an item was placed in a quadrant and revisit estimates after delivery.

Cost of delay and duration

Cost of delay (CoD) represents the economic or strategic value lost per unit of time when an initiative is postponed. A basic prioritization index is often expressed as:

CD3 = Cost of delay ÷ Job duration

where job duration is the elapsed time required to complete the relevant work, and CD3 is sometimes called cost of delay divided by duration. If CoD is decomposed into user value, time criticality and risk reduction or opportunity enablement, the dimensions must be defined so that they are not double-counted.

For a time-critical initiative, delay cost may be approximated as:

Delay cost = Delay duration × Loss per unit time

This assumes a reasonably stable loss rate. It is inappropriate when value changes discontinuously—for example, a regulatory deadline after which the loss suddenly becomes a penalty—or when dependencies make duration uncertain. In such cases, scenario analysis is preferable to a single average rate.

Evidence-based prioritization

Scoring should be preceded by evidence assessment. A useful evidence ladder is:

  1. opinion or analogy;
  2. reported problem in interviews or support logs;
  3. observed behaviour or repeated qualitative pattern;
  4. prototype or usability evidence;
  5. controlled experiment or credible quasi-experiment;
  6. sustained post-release outcome with guardrail evidence.

Higher levels are not automatically better for every question. Interviews can reveal motivations that analytics cannot, while experiments can estimate causal impact but may miss long-term adoption or vulnerable users.

Estimating expected value under uncertainty

When outcomes have distinct scenarios, expected value can be represented as:

E[V] = ∑ᵢ pᵢVᵢ

where pᵢ is the probability of scenario i, Vᵢ is its value, and the probabilities sum to 1. This is an expectation, not a guarantee. It assumes scenarios are sufficiently defined and that the values are comparable.

Suppose an initiative has a 0.5 probability of producing value 100, a 0.3 probability of value 40 and a 0.2 probability of value −20, measured in thousands of dollars:

E[V] = (0.5 × 100) + (0.3 × 40) + (0.2 × −20) = 58

If implementation cost is 30 thousand dollars, the expected net value is 28 thousand dollars, subject to the assumptions and time horizon. A risk-averse decision maker may reject it despite positive expected value if the downside is unacceptable. Expected value should therefore be accompanied by sensitivity analysis and risk limits.

Value of information

An experiment may be worthwhile even when it does not deliver customer value directly, because it changes a future decision. The value of information is greatest when uncertainty is high, the decision is consequential and the experiment is inexpensive and timely. Teams should ask:

  • What decision will the evidence change?
  • What result would cause us to stop, continue or pivot?
  • How quickly can the evidence be obtained?
  • What biases or false positives could it contain?

A discovery activity with no decision rule is research theatre rather than evidence-based planning.

Portfolio decisions

Feature prioritization asks, “Which item should this team address next?” Portfolio management asks, “How should scarce organisational capacity be distributed across products, markets, horizons and risk types?”

A portfolio may contain:

  • core or run work: reliability, support, compliance and improvements to the existing business;
  • adjacent work: extensions to current customers, channels or capabilities;
  • transformational work: new business models, markets or technologies.

The categories are not inherently superior or inferior. Core work protects current value; adjacent work extends it; transformational work creates options for future value. A portfolio that funds only transformation may neglect the operational base, while one that funds only core improvements may become strategically obsolete.

Portfolio allocation criteria

Portfolio decisions should consider:

  • strategic fit and differentiation;
  • expected customer and financial value;
  • confidence and evidence maturity;
  • risk reduction and resilience;
  • time to learning and time to value;
  • capability building and reuse;
  • dependencies and concentration risk;
  • legal, ethical and reputational exposure;
  • capacity by skill, not merely total headcount.

Capacity allocation can be expressed as a planning constraint:

∑ᵢ xᵢ ≤ C

where xᵢ is the capacity assigned to initiative i and C is total available capacity in the chosen unit. This simple constraint assumes capacity is fungible. In practice, design, data science, security and domain expertise may be bottlenecks, so the constraint should be applied separately by capability where necessary.

Portfolio governance should define investment horizons, review cadence, decision rights and stop criteria. A “kill” decision is not necessarily failure: stopping a weak initiative early can release capacity and prevent sunk-cost escalation.

AI-driven products and prioritization

AI products add distinctive planning concerns. A feature may appear valuable in a prototype but fail under distribution shift, poor data quality, latency constraints or unacceptable error costs. AI prioritization should therefore include:

  • performance by relevant user segment, not only aggregate accuracy;
  • false-positive and false-negative consequences;
  • data provenance, consent and retention;
  • explainability appropriate to the decision context;
  • human escalation and override paths;
  • monitoring for drift, abuse and model degradation;
  • inference, storage and review costs;
  • security threats such as prompt injection or data leakage;
  • model and vendor dependency risk.

For a binary classifier, accuracy is:

Accuracy = (TP + TN) ÷ (TP + TN + FP + FN)

where TP, TN, FP and FN denote true positives, true negatives, false positives and false negatives. Accuracy can be misleading when classes are imbalanced. A medical triage or fraud system may need precision, recall, calibration, subgroup performance and cost-sensitive evaluation instead. The appropriate metric depends on the decision and the harm caused by each error.

An AI initiative should not receive a high priority merely because the technology is novel. Its business case should identify the decision being improved, the human workflow affected, the minimum acceptable performance and the governance mechanism for failure.

Applied case: prioritizing a digital banking assistant

The following is an illustrative case, not a report of an actual company.

Background

A regional digital bank serves 500,000 active customers. Its product strategy is to become the easiest bank for customers to understand and control their everyday finances. The product group has four competing initiatives:

  • A: a spending-insight assistant using machine learning;
  • B: faster dispute submission for card transactions;
  • C: account recovery improvements;
  • D: a new premium visual theme.

The bank has limited capacity: approximately 12 person-months for the next planning increment.

Problem

The leadership team initially favours A because it is visible and strategically fashionable. Customer-support data, however, shows that account recovery and disputes generate high frustration and operational cost. The product manager must recommend a balanced portfolio rather than rank features by enthusiasm.

Analysis and evidence

Research indicates that customers want understandable spending information, but interviews reveal concerns about incorrect categorisation and privacy. A prototype suggests moderate desirability, yet model quality varies across transaction types. Dispute submission is a frequent pain point with clear behavioural evidence. Account recovery is less differentiated but has a high security and access impact. The visual theme has weak evidence and no material strategic contribution.

Illustrative RICE estimates are as follows:

InitiativeReachImpactConfidenceEffort (person-months)RICE
A: spending assistant180,0002.00.55633,000
B: dispute submission70,0002.50.85349,583
C: account recovery120,0002.00.902108,000
D: visual theme200,0000.250.5046,250

The scores are comparative indices, not financial forecasts. C ranks highest because it combines broad reach, strong evidence and low effort. B also ranks above A. D ranks last despite broad reach because its estimated impact is low.

Approach and solution

The team recommends:

  1. Fund C and B in the near term, with explicit security and accessibility acceptance criteria.
  2. Allocate a small discovery budget to A rather than committing the full six person-months. The discovery must test categorisation quality, privacy expectations, subgroup performance and willingness to use recommendations.
  3. Defer D unless new evidence links it to a measurable accessibility or commercial outcome.
  4. Reserve capacity for reliability, compliance and operational work rather than treating all 12 months as discretionary feature capacity.

A corresponding objective is: “Increase customers’ confidence and control in essential banking tasks.” Possible KRs include reducing failed recovery attempts, reducing median dispute-submission time and improving successful completion without increasing fraud or support escalation.

Outcome and learning points

The case demonstrates that a portfolio decision is not simply “choose the highest RICE score.” The bank combines evidence, risk, strategic fit and learning value. It protects essential access, addresses a demonstrated pain point and preserves an option on a promising but uncertain AI capability. The visual theme is not rejected forever; it is deferred because its opportunity cost is high.

Limitations, ethics and governance

Prioritization models can reproduce organisational bias. Senior stakeholders may overstate the reach of their initiatives, teams may understate effort to gain approval, and metrics may privilege highly measurable users over marginalised groups. A product manager should therefore make assumptions inspectable, invite challenge from diverse roles and distinguish “not measured” from “zero value.”

Important governance practices include:

  • documented decision rationale and evidence sources;
  • clear ownership and approval thresholds;
  • privacy, security, accessibility and safety review;
  • impact assessment for high-risk AI or automated decisions;
  • auditability of model versions and data lineage;
  • user communication, appeal and correction mechanisms;
  • monitoring after launch, including unintended effects;
  • periodic retirement reviews for obsolete features.

Regulation varies by jurisdiction and domain. Financial services, healthcare, employment and public-sector products may impose duties concerning consent, explainability, discrimination, record keeping and human oversight. Compliance work should be planned as part of product value, not added as an afterthought.

Best-practice decision process

A robust prioritization session can follow this sequence:

  1. Restate the objective, target users, time horizon and constraints.
  2. Confirm that the opportunity list includes customer, technical, operational, compliance and risk work.
  3. Remove duplicates and clarify the decision unit: opportunity, experiment, feature or initiative.
  4. Record evidence, confidence, dependencies and reversibility.
  5. Select a suitable framework rather than applying every framework mechanically.
  6. Score or classify independently before group discussion to reduce anchoring.
  7. Inspect sensitivity: would modest changes in assumptions alter the ranking?
  8. Identify guardrails, stop criteria and the next learning milestone.
  9. Allocate capacity across near-term delivery, discovery and strategic options.
  10. Communicate what is not being done and why.
  11. Review actual outcomes and update the model.

The strongest product organisations treat prioritization as a learning loop. They do not defend old rankings when evidence changes.

Chapter Summary

Product planning translates strategy into measurable objectives, opportunities, initiatives and outcomes. Objectives describe direction, while key results measure meaningful change; outputs alone are insufficient evidence of success. Roadmaps should communicate intent, confidence, sequencing and uncertainty rather than create false certainty through feature dates.

RICE compares reach, impact, confidence and effort, but its score is a comparative index rather than a precise return forecast. Kano explains how attributes affect satisfaction, MoSCoW supports scope negotiation, value-versus-effort enables rapid comparison, and cost of delay highlights urgency and sequencing. These methods are complementary and must be adapted to the decision context.

Evidence quality, uncertainty, risk and reversibility should accompany every score. Portfolio management distributes capacity across core, adjacent and transformational work while protecting compliance, reliability and organisational capability. AI-driven products require additional attention to data, error costs, subgroup performance, drift, privacy, security and human oversight. Finally, governance, transparency and ethical review are integral to prioritization, especially when product decisions affect access, safety or rights.

Key Terms

Objective: A strategically meaningful direction or desired condition.

Key result: A measurable indicator of progress toward an objective.

Output: A product artefact or activity delivered by a team.

Outcome: A change in user behaviour, experience or condition resulting from product activity.

Impact: Broader organisational, economic or societal value.

Opportunity: A customer problem, unmet need, risk or potential improvement worth investigating.

Roadmap: A communication and planning view of intended product direction over time.

RICE: A prioritization method using reach, impact, confidence and effort.

Reach: The number of users, accounts or transactions affected in a defined period.

Confidence: An estimate of how credible the reach, impact and effort assumptions are.

Kano model: A classification of attributes by their relationship with customer satisfaction.

MoSCoW: A requirement classification consisting of Must, Should, Could and Won’t have this time.

Cost of delay: Value lost when an initiative is postponed.

Portfolio: The collection of products, initiatives or investments managed as a whole.

Guardrail metric: A measure that limits harmful trade-offs while pursuing a primary goal.

Evidence ladder: A way of distinguishing weak opinion from stronger behavioural, experimental and post-release evidence.

Value of information: The benefit obtained by reducing uncertainty before committing resources.

Technical debt: Future cost or constraint created by expedient technical decisions.

Model drift: Deterioration in an AI model’s performance as data or conditions change.

Review Questions

Short Answer Questions

  1. Distinguish an output from an outcome and give one example of each.
  2. What are the four dimensions represented in the RICE framework?
  3. Why should a roadmap distinguish committed work from exploratory work?
  4. State the four MoSCoW categories.
  5. Why can accuracy be misleading when evaluating an AI classifier?

Long Answer Questions

  1. Explain how an organisational strategy can be translated into objectives, key results, opportunities and initiatives. Use an original product example.
  2. Compare RICE, Kano and MoSCoW in terms of purpose, strengths and limitations.
  3. Discuss why portfolio prioritization is different from feature prioritization.
  4. Explain how evidence quality and uncertainty should affect product investment decisions.
  5. Evaluate the ethical and governance issues that arise when prioritizing AI-driven product capabilities.

Analytical / Application Questions

  1. An initiative reaches 25,000 users, has an impact score of 2, confidence of 0.8 and requires 5 person-months. Calculate its RICE score and explain two limitations of the result.
  2. A team must choose between a compliance deadline, a high-confidence usability improvement and an uncertain AI capability. Design a prioritization approach that considers urgency, evidence, risk and learning value.
  3. Create an outcome-oriented roadmap for a digital service using Now–Next–Later. Identify one objective, two key results, one guardrail metric and the evidence required before committing the “Later” item.

Multiple Choice Questions with Answers

Question 1

Which statement best describes an outcome?

A. A feature specification approved by engineering

B. A measurable change in user behaviour or experience

C. A sprint completed by the product team

D. A design document stored in the repository

Correct Answer: B. A measurable change in user behaviour or experience

Question 2

In the standard RICE formula, confidence is represented as:

A. A monetary value

B. A percentage or proportion between 0 and 1

C. The number of users reached

D. The number of dependencies

Correct Answer: B. A percentage or proportion between 0 and 1

Question 3

A Kano attractive attribute is one that:

A. Causes strong dissatisfaction when absent

B. Produces proportional satisfaction as performance increases

C. Delights customers when present but may not dissatisfy when absent

D. Is disliked by every customer

Correct Answer: C. Delights customers when present but may not dissatisfy when absent

Question 4

Which MoSCoW category identifies work explicitly excluded from the current scope?

A. Must have

B. Should have

C. Could have

D. Won’t have this time

Correct Answer: D. Won’t have this time

Question 5

An initiative has Reach 10,000, Impact 2, Confidence 0.8 and Effort 4. Its RICE score is:

A. 400

B. 2,000

C. 4,000

D. 16,000

Correct Answer: C. 4,000

Question 6

Cost of delay divided by job duration is useful primarily for considering:

A. How urgency and duration affect sequencing

B. How many designers are in a team

C. Whether a feature is attractive in Kano terms

D. The accuracy of a classification model

Correct Answer: A. How urgency and duration affect sequencing

Question 7

Which is a guardrail metric?

A. A measure that limits harmful trade-offs while pursuing a primary goal

B. A list of unvalidated feature ideas

C. A project’s colour scheme

D. A contractual job title

Correct Answer: A. A measure that limits harmful trade-offs while pursuing a primary goal

Question 8

Why might a product team fund discovery for an uncertain AI capability?

A. Discovery guarantees the model will succeed

B. It can reduce uncertainty before an expensive commitment

C. It eliminates the need for governance

D. It always has a higher RICE score than delivery

Correct Answer: B. It can reduce uncertainty before an expensive commitment

Question 9

Which portfolio category generally extends current products into adjacent customers, channels or capabilities?

A. Run or core

B. Adjacent

C. Transformational

D. Retired

Correct Answer: B. Adjacent

Question 10

If TP = 80, TN = 90, FP = 10 and FN = 20, classifier accuracy is:

A. 80%

B. 85%

C. 90%

D. 95%

Correct Answer: B. 85%