Digital & AI-Driven Supply Chain Transformation

Chapter 3
Process Architecture, SCOR and Performance Management

Post Graduate Program in Supply Chain Management
Digital & AI-Driven Supply Chain Transformation   •   Post Graduate Diploma

Process Architecture, SCOR and Performance Management

Introduction

Supply chains are not managed effectively by viewing them as a collection of departments. Procurement, production, warehousing, transport, sales and customer service form an interconnected system in which decisions in one process influence cost, service, cash, risk, quality and environmental performance elsewhere. Process architecture provides the structure for understanding these interdependencies.

A process architecture is a hierarchical representation of how work creates value. It identifies the major end-to-end processes, their sub-processes, inputs, outputs, participants, information requirements, controls and performance measures. In supply chain management, process architecture helps managers move from functional descriptions—such as “purchasing” or “distribution”—to customer-centred flows such as “plan-to-fulfil” and “order-to-cash.”

The Supply Chain Operations Reference (SCOR) framework is one of the most widely used reference models for describing, benchmarking and improving supply-chain processes. It gives organisations a common language for mapping activities and associating them with metrics, practices and capabilities. SCOR is not a substitute for detailed operating procedures or enterprise architecture; it is a structured reference model that supports analysis and redesign.

This chapter connects process mapping with bottleneck analysis and performance management. Particular attention is given to the relationship among service, cost, cash, quality, agility and sustainability. Digital technologies and artificial intelligence are considered as enablers of better visibility, prediction and decision-making, rather than as replacements for sound process design.

Learning objectives

By the end of this chapter, the reader should be able to:

  1. Explain the purpose and levels of a supply-chain process architecture.
  2. Map source–make–deliver–return processes using SCOR and related frameworks.
  3. Distinguish process owners, activities, controls, measures and enabling capabilities.
  4. Identify bottlenecks using flow, capacity, inventory and variability concepts.
  5. Design a balanced KPI system covering service, cost, cash, quality, agility and sustainability.
  6. Interpret trade-offs and avoid dysfunctional performance management.
  7. Evaluate how digital platforms and AI can support process transformation.

1. From functional organisation to end-to-end process architecture

A function is an organisational responsibility; a process is a connected set of activities that transforms inputs into outputs for a customer or stakeholder. A functional view may ask, “How efficiently does the warehouse operate?” An end-to-end view asks, “How reliably and economically does the supply chain fulfil the customer promise?” Both questions matter, but the second reveals cross-functional causes of performance.

A useful process architecture has several layers:

LayerPurposeExample
Value streamDescribes the customer-facing outcomeOrder-to-delivery
Level-1 processIdentifies major process familiesPlan, source, make, deliver, return
Level-2 processGroups related process activitiesManage supplier schedule
Level-3 processDescribes a manageable process flowRelease purchase order
Level-4 procedureSpecifies detailed work instructionsValidate quantity, price and delivery date
Controls and measuresEstablishes governance and performanceApproval rule, on-time delivery KPI

A good architecture has clear boundaries. Each process should have a defined trigger, output, customer, owner and completion condition. For example, “source materials” begins when a requirement is authorised and ends when conforming material is available for production or inventory. A process boundary that is too broad becomes difficult to manage; one that is too narrow hides the causes of delay and cost.

The source–make–deliver–return logic

The source–make–deliver–return sequence is a useful basic representation:

  • Source acquires materials, services, information or capacity from suppliers.
  • Make converts materials and information into finished products or services.
  • Deliver receives, allocates, fulfils, transports and hands over the customer order.
  • Return manages reverse flows arising from defects, excess, repairs, recalls, recycling or customer dissatisfaction.

Planning cuts across all four processes. Information flows in both directions: customer demand influences procurement and production, while supplier constraints and production capacity influence available-to-promise commitments. Cash also flows across the chain through payment terms, inventory investment, receivables and payables.

End-to-end supply chain process architecture Sourcesuppliers Makeconversion Delivercustomer fulfilment Returnreverse flow Plan: demand, supply, inventory and capacity alignment material, information, cash and feedback loops
End-to-end supply chain process architecture showing plan, source, make, deliver and return flows
Figure: End-to-end supply chain process architecture showing plan, source, make, deliver and return flows

Figure: A simplified end-to-end process architecture for source–make–deliver–return operations.

2. SCOR as a reference model

SCOR was developed to provide a common description of supply-chain processes and performance. Traditional SCOR applications use the major process categories Plan, Source, Make, Deliver and Return. Contemporary SCOR versions and related digital extensions also emphasise orchestration, which recognises that supply chains must coordinate networks, data, risk and capabilities rather than merely execute linear activities. Organisations should identify the version and scope used in a project because terminology and metric definitions evolve.

SCOR has four especially useful dimensions:

  1. Processes: what the supply chain does.
  2. Performance attributes and metrics: how performance is evaluated.
  3. Practices: methods that can improve process performance.
  4. People and capabilities: skills, roles and organisational conditions required for execution.

SCOR is hierarchical. At a high level, it describes process families; at lower levels, it supports decomposition into process elements and activities. A company may map “Source stocked product” into supplier scheduling, purchase-order transmission, receipt, inspection and payment-authorisation activities. The mapping should preserve the end-to-end outcome while allowing local procedures to differ.

SCOR and related frameworks

SCOR is most effective when combined with other methods rather than treated as a complete management system.

  • SIPOC identifies suppliers, inputs, process, outputs and customers. It is useful at the beginning of a mapping exercise.
  • Value-stream mapping visualises material and information flow, lead time, waiting and work-in-process, especially in lean operations.
  • BPMN provides a formal notation for events, tasks, gateways, messages and responsibilities.
  • APQC Process Classification Framework supports cross-industry process classification and benchmarking.
  • The Supply Chain Operations Reference Digital Standard and digital-twin approaches extend process analysis into data, orchestration and system-enabled execution.
  • ISO management systems, such as quality, environmental and occupational-health standards, provide governance requirements but do not replace a supply-chain process model.

The selection depends on purpose. SCOR is appropriate for supply-chain benchmarking and transformation; BPMN is appropriate for executable workflow design; value-stream mapping is appropriate for lean diagnosis; and SIPOC is appropriate for initial scoping.

3. Mapping a supply-chain process

A rigorous mapping exercise normally follows these steps.

Step 1: Define the business outcome and scope

Specify the customer, product or service, geography, time horizon and start and end points. “Improve delivery” is too vague. “Reduce confirmed-order-to-delivery time for domestic spare parts while maintaining 98% complete-and-on-time delivery” is more useful.

Step 2: Identify the demand and fulfilment trigger

Triggers may include a forecast, a customer order, a replenishment signal, a production schedule, a return authorisation or a regulatory requirement. Different triggers create different process variants and should not be combined carelessly.

Step 3: Map activities, decisions and hand-offs

Record activities in sequence, but also show parallel work, rework loops, approvals, exceptions and information exchanges. A map should make waiting visible. In many organisations, the actual processing time is short compared with time spent waiting for approval, transport, data correction or capacity.

Step 4: Assign ownership and resources

Each process element requires an accountable owner, performers, systems, data and external parties. RACI analysis can clarify who is responsible, accountable, consulted and informed. Accountability should be assigned to an end-to-end owner where possible, not only to departmental supervisors.

Step 5: Attach measures and controls

Every important output should have an acceptance criterion. For example, a delivery output may require the correct item, quantity, destination, documentation and promised date. Measures should be defined with numerator, denominator, time window, data source, exclusions and owner.

Step 6: Validate the map with evidence

Interviews reveal intended work; transaction logs reveal actual work. Compare the two. Process mining can reconstruct paths from event logs and identify variants, rework and waiting. Validation should include operators, customers, suppliers, finance, quality and information-technology representatives.

A compact process record

FieldExample: source material
TriggerApproved material requirement
InputSpecification, quantity, required date, supplier master data
ActivitiesSelect supplier, issue order, confirm, receive, inspect
OutputAccepted material available to production
CustomerProduction or inventory control
OwnerProcurement process owner
RisksLate confirmation, specification error, nonconformance
MeasuresSupplier on-time delivery, acceptance rate, source lead time
SystemsERP, supplier portal, inspection system

4. Bottlenecks, flow and variability

A bottleneck is a resource, policy, information dependency or constraint that limits the rate or reliability of the overall process. A bottleneck may be physical, such as a machine; informational, such as inaccurate inventory data; managerial, such as a slow approval; or commercial, such as a minimum order quantity.

The basic flow relationship is represented by Little’s Law:

L = λW

Here, L is average work-in-process or inventory, measured in units; λ is average throughput rate, measured in units per time; and W is average time in the system, measured in the same time unit. The relationship assumes a stable system over the measurement period, with a meaningful long-run average and no systematic accumulation or depletion of work. For inventory, the law can be applied to a defined pipeline, but units and boundaries must be consistent.

For example, if an order pipeline contains an average of 240 orders and the average throughput is 60 orders per day, average order-flow time is:

W = L ÷ λ = 240 ÷ 60 = 4 days

The calculation does not identify the cause of the four days. Queueing, processing, transport, approval and rework must be analysed separately.

Capacity utilisation for a resource can be expressed as:

u = d ÷ c

where u is utilisation, d is required workload per period and c is available productive capacity per period. The quantities must use the same units, such as machine-hours per week. If utilisation exceeds 1, the plan is infeasible unless backlog, overtime, subcontracting or another capacity change is introduced. High utilisation close to 1 can also produce disproportionate waiting when demand and processing times vary; therefore, nominal capacity is not the same as dependable capacity.

Bottleneck analysis should examine:

  • demand relative to capacity;
  • queue length and waiting time;
  • setup, changeover and batch-size policies;
  • material and information availability;
  • quality losses and rework;
  • labour skills and absenteeism;
  • schedule stability;
  • transport and supplier constraints; and
  • rules that prioritise work.

The Theory of Constraints suggests identifying the constraint, exploiting it, subordinating other activities to it, elevating it when justified and repeating the cycle when the constraint moves. This is useful, but it should be combined with customer, quality, safety and sustainability considerations. Maximising one local resource can increase total inventory or reduce responsiveness.

5. Performance management: from measures to decisions

A KPI is not merely a number. It is a defined measurement linked to a decision, target, owner and review cadence. A strong performance system distinguishes:

  • Outcome measures, such as customer delivery reliability;
  • Process measures, such as picking accuracy and schedule adherence;
  • Driver measures, such as forecast-bias correction or supplier confirmation time;
  • Diagnostic measures, used to explain variation; and
  • Guardrail measures, which prevent improvement in one dimension from damaging another.

Core performance dimensions

#### Service

Service measures whether the customer receives the promised value. Common metrics include on-time delivery, in-full delivery, perfect-order fulfilment, order-cycle time, fill rate and complaint resolution time. Definitions are critical. On-time delivery requires an agreed promise date and tolerance; “on time” cannot be changed after the event to improve the result.

A simple line-level on-time delivery rate is:

OTD = (number of lines delivered on or before the agreed date ÷ total eligible lines) × 100%

The eligible population, date source, partial deliveries and customer-caused delays must be stated. A perfect-order metric may require simultaneous on-time, complete, damage-free and correctly documented fulfilment; its rate is therefore usually lower than any individual component rate.

#### Cost

Supply-chain cost should include relevant end-to-end costs rather than only departmental expense. It may include procurement, production, inventory carrying, warehousing, transport, returns, quality failure, expediting and technology costs. Activity-based costing can help allocate shared resources, but allocations should not be mistaken for causal cost.

#### Cash

Cash performance is strongly connected to inventory, receivables and payables. The cash conversion cycle is commonly expressed as:

CCC = DIO + DSO − DPO

DIO is days inventory outstanding, DSO is days sales outstanding and DPO is days payables outstanding. Under a simple average-balance convention:

DIO = average inventory ÷ cost of goods sold × days
DSO = average trade receivables ÷ net credit sales × days
DPO = average trade payables ÷ cost of goods sold × days

The chosen number of days must be consistent, and accounting definitions must be agreed. A lower CCC is not automatically better if it is achieved by harming supplier viability, service or resilience.

#### Quality

Quality includes conformance, reliability, damage prevention and customer-perceived fitness for use. Useful indicators include first-pass yield, defect rate, return rate, warranty cost and supplier acceptance rate. Quality should be measured at the point where defects are created and detected, not only at final inspection.

#### Agility and resilience

Agility is the ability to respond rapidly to changes in demand, supply or operating conditions. Measures may include response time, time to recover, time to replan, capacity-flexibility percentage and the proportion of orders that can be customised without excessive cost. Resilience also requires exposure analysis, alternative sources, critical-inventory policies and recovery capability.

#### Sustainability

Sustainability measures should cover environmental, social and governance outcomes. Examples include emissions per tonne-kilometre or per unit delivered, energy use, packaging intensity, waste, recycled content, worker safety, supplier labour compliance and traceability. Boundaries and calculation methods must be documented. Emissions accounting, for instance, depends on activity data, emission factors and scope definitions; a reduction claim is not credible without a transparent baseline.

Balanced KPI design

A balanced scorecard for supply chains can link strategic outcomes to process drivers:

OutcomeTypical KPIPossible driver or guardrail
ServicePerfect-order ratePromise-date accuracy; stock availability
CostCost per order or unitExpedite rate; warehouse productivity
CashCash conversion cycleInventory days; payment-term compliance
QualityFirst-pass yieldDefect prevention; supplier capability
AgilityReplan or recovery timeFlexible capacity; alternate source readiness
SustainabilityEmissions per delivered unitLoad factor; route efficiency; safety guardrail

Targets should be segmented by product, customer, channel and geography when operating conditions differ. A single enterprise average can hide poor performance in strategically important segments.

6. Digital and AI-enabled performance management

Digital transformation improves process management when it creates timely, trusted and actionable information. An integrated architecture may connect ERP transactions, warehouse and transport systems, supplier portals, IoT sensors, customer platforms and analytics layers. A process digital twin can represent entities, states, events, constraints and performance, enabling scenario analysis before operational changes are implemented.

AI can support demand sensing, ETA prediction, anomaly detection, supplier-risk monitoring, inventory-positioning recommendations, document extraction and root-cause analysis. However, AI outputs are only as reliable as the process definitions, data quality and governance around them. A model trained on historically biased supplier or customer data may reproduce unfair treatment. Automated recommendations also require controls for explainability, human override, cybersecurity, privacy and model drift.

A practical governance pattern includes:

  1. a named data owner for each critical data object;
  2. common definitions for orders, dates, units and exceptions;
  3. validation rules and lineage for KPI data;
  4. access controls and segregation of duties;
  5. monitoring of model accuracy and adverse outcomes;
  6. documented escalation and override procedures; and
  7. periodic review of whether the KPI still supports the intended behaviour.

Digital visibility does not automatically create transparency. Suppliers may resist sharing data because of commercial sensitivity, and organisations may lack the contractual rights or technical capability to use it. Data-sharing arrangements should specify purpose, access, security, retention, liability and permitted secondary use.

7. Illustrative case: improving fulfilment in a medical-device supply chain

Background

The following is a fictional illustrative case. MedEquip distributes sterile diagnostic kits through regional hospitals. Its stated customer promise is delivery within three working days, with complete quantities and intact, traceable packaging.

Problem

Monthly reporting showed 94% on-time delivery, apparently close to the 95% target. Hospitals nevertheless reported frequent shortages. Investigation showed that the KPI was calculated at shipment level, while hospitals experienced shortages at order-line level. Partial shipments were counted as successful shipments. Expedite freight was rising, and inventory had increased without resolving availability.

Analysis

The team mapped the order-to-delivery process using SCOR categories: Plan for replenishment and allocation, Source for critical components, Make for kit assembly and sterilisation, Deliver for allocation, picking and transport, and Return for damaged or temperature-exposed kits.

The map revealed four problems:

  1. demand planning used orders rather than consumption data for emergency departments;
  2. sterilisation had a weekly batch schedule, creating long queues for urgent replenishment;
  3. the warehouse system showed inventory before quality release, overstating available stock; and
  4. the delivery KPI ignored incomplete lines.

The team also calculated pipeline flow. The order pipeline averaged 360 lines and processed approximately 72 lines per day. By Little’s Law, average order-line flow time was 5 days, already exceeding the three-day promise. The result was consistent with hospital experience, although it did not by itself prove which activity caused the delay.

Approach and solution

The organisation redesigned the architecture around the customer order line and introduced a process owner for order-to-delivery. It separated “physically present” inventory from “quality-released and promiseable” inventory. Sterilisation capacity was protected for urgent medical demand, while a small standard batch was retained for efficiency. The warehouse adopted a shortage-exception queue, and transport planning used delivery priority and clinical criticality.

The KPI set was revised:

  • complete-and-on-time order-line rate;
  • quality-release accuracy;
  • order-cycle time by percentile, not only average;
  • expedite cost per order;
  • inventory days by status;
  • sterilisation queue time;
  • temperature and packaging nonconformance; and
  • emissions per delivered kit.

A rules-based alert system initially identified orders at risk. Later, an AI ETA model was tested using carrier events, route history and weather data. The model was not allowed to promise a new date automatically; planners reviewed high-impact exceptions.

Outcome

After three operating cycles, complete-and-on-time performance improved from 86% to 96%, while average inventory declined by 8%. Expedite shipments fell substantially. The improvement did not result from a single algorithm. It resulted from correcting the process boundary, defining the customer outcome accurately, separating inventory statuses, managing the constraint and aligning measures with decisions.

Learning points

The case demonstrates that:

  • an apparently good KPI can conceal poor customer performance;
  • process architecture must reflect the unit experienced by the customer;
  • inventory visibility requires status accuracy, not merely physical counting;
  • bottleneck improvement should be linked to the customer promise; and
  • AI is most valuable after data, process ownership and exception rules are established.

8. Implementation guidance and limitations

A transformation programme should begin with a limited but important value stream. Establish a baseline before changing targets. Involve process performers, customers and suppliers. Use a common glossary and metric dictionary. Distinguish symptoms from causes through stratification by product, location, customer, supplier and process variant. Test changes in a controlled pilot and monitor both intended outcomes and guardrails.

Common failure modes include excessive mapping detail, ownership gaps at hand-offs, KPI proliferation, inconsistent date definitions, averages that conceal variation, target gaming and technology-first investment. A dashboard with hundreds of measures is not a performance-management system. Most organisations need a small set of enterprise outcomes supported by diagnostic measures at process level.

Performance targets also involve ethical choices. A purchasing target that rewards the lowest price may encourage poor labour conditions or supplier failure. A warehouse productivity target may encourage unsafe work or inaccurate picking. A delivery target may encourage excessive air freight and emissions. Balanced measures, worker consultation, auditability and escalation are therefore part of responsible supply-chain design.

Contemporary supply chains are increasingly networked, multi-tier and exposed to disruption. Process architecture should consequently represent external dependencies, not only internal tasks. Scenario planning, supplier collaboration, digital traceability and modular capacity can improve resilience, but they involve cost and data-sharing trade-offs. The appropriate design is contingent on product criticality, demand uncertainty, regulatory requirements and the organisation’s risk appetite.

Chapter Summary

Process architecture represents how supply-chain activities, information, resources, controls and outcomes fit together. The source–make–deliver–return logic gives a practical end-to-end view, while planning and orchestration coordinate the network. SCOR provides a common language for processes, performance attributes, practices and capabilities; SIPOC, value-stream mapping, BPMN and process mining can complement it.

Effective mapping defines scope, triggers, inputs, activities, outputs, customers, owners, systems, risks and measures. Bottleneck analysis examines capacity, queues, variability, rework and policy constraints. Little’s Law links average flow, throughput and time under stable conditions, while utilisation analysis helps identify capacity pressure.

A mature performance system balances service, cost, cash, quality, agility, resilience and sustainability. KPIs require precise definitions, data governance, owners, targets and decision links. Digital platforms and AI can improve visibility, prediction and exception management, but they cannot compensate for unclear processes or unreliable data. Responsible transformation combines technology with process ownership, human judgement, ethical safeguards and continuous learning.

Key Terms

Process architecture: Hierarchical description of processes, activities, inputs, outputs, owners and controls.

SCOR: A reference model for describing, assessing and improving supply-chain operations.

Source–make–deliver–return: End-to-end representation of procurement, conversion, fulfilment and reverse flows.

Orchestration: Coordination of processes, partners, data and capabilities across a supply network.

Process owner: Person accountable for end-to-end process performance.

Value stream: Connected activities that create and deliver value to a customer.

Bottleneck: Constraint that limits process throughput or reliability.

Throughput: Rate at which a process completes acceptable output.

Work-in-process: Units currently within a process or pipeline.

Little’s Law: Relationship L = λW between average flow, throughput and average time.

Utilisation: Required workload divided by available productive capacity.

Perfect order: Order meeting specified requirements for completeness, timeliness, accuracy and condition.

Cash conversion cycle: Inventory days plus receivable days minus payable days.

Process mining: Analysis of event logs to reconstruct and evaluate actual process paths.

Guardrail metric: Measure that prevents improvement in one outcome from damaging another.

Agility: Ability to respond rapidly to changing demand or supply conditions.

Resilience: Capacity to withstand, recover from and adapt to disruption.

Digital twin: Digital representation of a system used for monitoring, analysis or simulation.

KPI governance: Rules for metric definitions, data ownership, quality, access and review.

Review Questions

Short Answer Questions

  1. What is the difference between a function and an end-to-end process?
  2. Identify the main purposes of the SCOR reference model.
  3. What information should be included in a process record?
  4. State Little’s Law and define its three variables.
  5. Why can a shipment-level delivery KPI misrepresent customer service?

Long Answer Questions

  1. Explain how SCOR can be combined with SIPOC, value-stream mapping and BPMN in a transformation project.
  2. Discuss the relationships among service, cost, cash, quality, agility and sustainability measures.
  3. Describe a systematic method for identifying and managing a supply-chain bottleneck.
  4. Explain the assumptions and managerial uses of the cash conversion cycle.
  5. Evaluate the benefits and governance risks of AI-enabled supply-chain performance management.

Analytical / Application Questions

  1. A process has average work-in-process of 500 units and throughput of 100 units per day. Calculate the average flow time and explain what additional evidence would be needed to identify the bottleneck.
  2. Design a KPI tree for an order-to-delivery process that is experiencing late, incomplete and damaged deliveries. Include outcome, driver and guardrail measures.
  3. Select a product category and map its source–make–deliver–return process. Identify one likely constraint, one data-quality risk and one sustainability trade-off.

Multiple Choice Questions with Answers

Question 1

Which statement best describes the primary purpose of SCOR?

A. To replace all enterprise resource planning systems

B. To provide a common reference language for supply-chain processes and performance

C. To calculate product selling prices

D. To prescribe one organisational structure for every supply chain

Correct Answer: B. To provide a common reference language for supply-chain processes and performance

Question 2

In the relationship L = λW, what does W represent?

A. Average throughput rate

B. Average work-in-process

C. Average time in the system

D. Available capacity

Correct Answer: C. Average time in the system

Question 3

A process has average work-in-process of 240 orders and throughput of 60 orders per day. What is the average flow time?

A. 2 days

B. 4 days

C. 180 days

D. 300 days

Correct Answer: B. 4 days

Question 4

Which is the best example of a guardrail metric?

A. A target for increasing local picking speed without other measures

B. A measure preventing productivity improvement from increasing safety incidents

C. A list of all warehouse activities

D. A supplier master-data field

Correct Answer: B. A measure preventing productivity improvement from increasing safety incidents

Question 5

Which measure is included in the conventional cash conversion cycle?

A. Days inventory outstanding

B. Machine utilisation only

C. First-pass yield only

D. Transport distance only

Correct Answer: A. Days inventory outstanding

Question 6

If required workload is 900 machine-hours per week and available productive capacity is 1,000 machine-hours per week, utilisation is:

A. 9%

B. 10%

C. 90%

D. 190%

Correct Answer: C. 90%

Question 7

Why is process mining useful in supply-chain transformation?

A. It reconstructs actual process paths from event data

B. It eliminates the need for process owners

C. It guarantees that forecasts are accurate

D. It replaces all human judgement

Correct Answer: A. It reconstructs actual process paths from event data

Question 8

Which change most directly improves the validity of a delivery KPI?

A. Changing the promise date after shipment

B. Defining the eligible population, date source and treatment of partial deliveries

C. Reporting only the best-performing region

D. Removing late orders from the denominator

Correct Answer: B. Defining the eligible population, date source and treatment of partial deliveries

Question 9

Which sequence correctly represents the basic source–make–deliver–return logic?

A. Acquire, convert, fulfil, manage reverse flows

B. Sell, advertise, recruit, audit

C. Forecast, finance, insure, legislate

D. Design, price, promote, depreciate

Correct Answer: A. Acquire, convert, fulfil, manage reverse flows

Question 10

What is the most appropriate conclusion from the illustrative MedEquip case?

A. AI alone solved the delivery problem

B. Higher inventory always guarantees better service

C. Correct process boundaries and aligned measures can reveal and address hidden service failures

D. Shipment-level performance is always superior to line-level performance

Correct Answer: C. Correct process boundaries and aligned measures can reveal and address hidden service failures

Digital & AI-Driven Supply Chain Transformation
Chapter 3 of 15