Dem& Forecasting Analytics

Chapter 12
Forecast-Driven Logistics and Inventory Decisions

Post Graduate Program in Logistics
Dem& Forecasting Analytics   •   Post Graduate

Forecast-Driven Logistics and Inventory Decisions

Introduction

Forecasting becomes operationally valuable only when it changes decisions. A forecast of next month’s demand is not itself a logistics plan; it must be translated into inventory targets, replenishment orders, transport bookings, warehouse capacity, labour requirements and financial commitments. The central managerial problem is that forecasts are uncertain. Decisions must therefore balance expected demand against the cost of being too early, too late, too short or too large.

In logistics, a forecast-driven decision system links four elements:

  1. Demand expectation: the most likely quantity, timing and location of demand.
  2. Uncertainty: forecast error, demand variability, supply variability and structural disruption.
  3. Decision policy: rules for ordering, positioning stock, allocating capacity and setting service targets.
  4. Performance consequences: service, cost, resilience, cash utilisation, waste and environmental impact.

This chapter develops that linkage. It distinguishes cycle stock from safety stock, derives reorder points, explains periodic and continuous review, examines capacity and transportation decisions, and evaluates the trade-off between customer service and working capital. It also considers multi-echelon systems, forecast bias, intermittent demand, disruption and the governance of analytics-supported decisions.

Learning Objectives

By the end of this chapter, the reader should be able to:

  • translate a forecast and its uncertainty into safety stock and reorder-point decisions;
  • distinguish demand variability, lead-time variability and forecast error;
  • select appropriate continuous-review or periodic-review replenishment policies;
  • evaluate inventory, capacity, transport, warehousing and workforce implications of a forecast;
  • quantify service, cost, resilience and working-capital trade-offs;
  • diagnose the effects of bias, aggregation and poor data on operational decisions;
  • design governance controls for forecast-driven logistics analytics.

1. From Forecast to Operating Decision

A forecast generally estimates expected demand over a future horizon. Let demand in period t be Dt, and let the forecast made at time t − h for that period be Ft|t-h. Forecast error is:

et = Dt − Ft|t-h

A positive error means that actual demand exceeded the forecast. Forecast accuracy is not the same as forecast usefulness. A highly accurate aggregate forecast may be unsuitable for allocating stock among individual locations, while a less accurate forecast may still be useful if the decision is flexible and replenishment is fast.

Operational decisions require at least five forecast attributes:

AttributeDecision relevance
Expected demandSets the central replenishment or capacity requirement
Forecast horizonMust cover the relevant lead time and planning horizon
Error distributionDetermines safety stock and risk exposure
BiasIndicates systematic over- or under-forecasting
GranularityDetermines whether the forecast supports SKU, location and time decisions

A forecast should therefore be accompanied by an uncertainty estimate, such as the standard deviation of forecast error, a prediction interval or a scenario distribution. Using only a point forecast encourages false precision.

Demand, lead time and inventory position

Inventory decisions are based on inventory position, not merely physical on-hand stock:

IP = OH + OO − BO

where IP is inventory position, OH is on-hand inventory, OO is inventory on order, and BO is backordered or committed demand. All quantities must use the same unit and time reference.

Inventory position captures the stock that is physically available, expected to arrive or already reserved for demand. A replenishment policy that ignores open orders can create systematic overstocking.

2. Inventory Components and Service Measures

Inventory has several economic functions:

  • Cycle stock supports expected demand between replenishments.
  • Safety stock protects against uncertainty in demand, lead time or supply.
  • Pipeline stock is inventory in transit or being processed.
  • Anticipation stock is accumulated before a known peak, promotion, shutdown or seasonal constraint.
  • Decoupling stock separates processes whose rates or schedules differ.
  • Speculative stock is held against expected price increases, scarcity or strategic risk.

Two service measures must be distinguished. The cycle service level is the probability of not stocking out during a replenishment cycle. The fill rate is the proportion of demand units supplied immediately from available stock. A policy may have a high cycle service level but a lower fill rate if, when a stockout occurs, the shortage is large. Managers should state explicitly which service measure is being optimised.

The economic order quantity (EOQ) is a useful benchmark for stable, replenished demand:

Q^* = √(2DS ÷ H)

where D is annual demand in units per year, S is fixed ordering or setup cost per order, and H is annual holding cost per unit. The units of H must be currency per unit per year. The model assumes relatively stable demand, constant lead time, instantaneous replenishment, no quantity discounts and no stockouts. It is not a substitute for a stochastic replenishment model.

Annual relevant cost under the EOQ assumptions is:

TC(Q) = (D ÷ Q)S + (Q ÷ 2)H

The first term is ordering cost and the second is cycle-stock holding cost. In real logistics systems, minimum order quantities, truck utilisation, supplier calendars, shelf life and transport emissions may make a non-EOQ quantity preferable.

3. Safety Stock and Reorder Points

3.1 Basic continuous-review model

In a continuous-review system, inventory is monitored continuously and an order is released when inventory position reaches the reorder point. If demand during lead time is approximately normally distributed, the reorder point is:

ROP = μLT + zσLT

where μLT is mean demand during lead time, σLT is the standard deviation of demand during lead time, and z is the standard normal quantile associated with the chosen cycle service level. Safety stock is:

SS = zσLT

For example, a 95% cycle service level uses approximately z = 1.645, subject to the normality assumption.

If demand per period has mean μd and standard deviation σd, and lead time is constant at L periods, then:

μLT = Lμd

and, assuming independent demand across periods:

σLT = σd√L

Thus:

ROP = Lμd + zσd√L

The square-root relationship is important: expected lead-time demand grows linearly with lead time, but uncertainty grows with the square root of lead time when independent-period assumptions hold.

Worked example 1: constant lead time

A regional distributor sells 100 units per day. Daily demand has a standard deviation of 20 units. Supplier lead time is constant at 6 days. The desired cycle service level is 95%, so z = 1.645.

Mean lead-time demand is:

μLT = 6 × 100 = 600 units.

Lead-time standard deviation is:

σLT = 20√6 ≈ 48.99 units.

Safety stock is:

SS = 1.645 × 48.99 ≈ 80.6 units.

The reorder point is:

ROP = 600 + 80.6 ≈ 681 units.

The result should normally be rounded upward to a practical whole-unit or case quantity. The interpretation is not that demand will be exactly 681 units; rather, an order should be triggered when inventory position falls to approximately 681 units under the model assumptions.

3.2 Variable lead time

When both demand and lead time vary, lead-time demand is the product of two random quantities. A commonly used approximation, assuming demand and lead time are independent, is:

σ²LT ≈ E[L]σ²d + μ²d Var(L)

where E[L] is mean lead time and Var(L) is lead-time variance. Therefore:

ROP = μdE[L] + z√(E[L]σ²d + μ²dVar(L))

This formula includes demand variability during the average lead time and uncertainty caused by lead-time variation. It is an approximation based on the variance of a random sum and is most defensible when demand periods are independent and the relationship between demand and lead time is weak. If high demand causes congestion and longer lead times, the independence assumption is violated and simulation or empirical lead-time-demand distributions are preferable.

3.3 Forecast error rather than historical demand variation

For products with changing demand, the uncertainty relevant to replenishment is often forecast error, not merely historical standard deviation. If the forecast for lead-time demand is FLT and the standard deviation of its error is σe, then a practical policy is:

ROP = FLT + zσe

The forecast-error measure must correspond to the same forecast horizon, SKU-location level and aggregation used by the replenishment decision. Using a monthly aggregate error to set a daily store-level safety stock is statistically inconsistent.

Forecast bias must also be monitored. Mean error may be defined as:

ME = (1 ÷ n)∑(Dt − Ft)

A persistently positive mean error indicates under-forecasting and can cause repeated stockouts even when average absolute error appears acceptable. Bias should generally be corrected in the forecast process rather than hidden inside safety stock, because safety stock is intended to protect random uncertainty, not systematic error.

4. Replenishment Policies and Their Conditions

Continuous review: (Q, R)

Under a (Q,R) policy, an order of quantity Q is placed whenever inventory position falls to or below reorder point R. This policy is responsive and suits high-value, critical or fast-moving items when reliable transaction data and frequent monitoring are available.

Periodic review: (P, S)

Under a periodic-review policy, inventory is reviewed every P periods and replenished to an order-up-to level S. Protection must cover the review period plus lead time. If demand per period is independent and lead time is constant:

S = (P + L)μd + zσd√(P + L)

The order quantity at review is:

q = max(0, S − IP)

This policy is attractive when suppliers visit on fixed schedules, orders are consolidated or administrative effort is important. It generally requires more safety stock than continuous review because the system can wait nearly a full review interval before ordering.

Min–max and order-up-to systems

A min–max system orders enough to raise inventory position to a maximum level when the position reaches the minimum. It is operationally simple and common in warehouses and retail. Its quality depends on how the minimum and maximum are calculated. Static min–max values become dangerous when seasonality, promotions, product life cycles or lead-time changes are ignored.

Intermittent and lumpy demand

For spare parts and slow-moving items, demand may contain many zero periods and occasional large transactions. Normal approximations can then produce poor safety-stock decisions. Suitable approaches include Croston-type methods, bootstrapped empirical demand distributions, Poisson or negative-binomial models, criticality-based stocking and differentiated review intervals. The choice should reflect whether demand is generated by independent requests, installed-base failures, planned maintenance or project activity.

5. Capacity, Transportation and Warehousing Decisions

Forecast-driven logistics extends beyond inventory quantities.

Capacity planning

Capacity decisions include production slots, supplier reservations, cross-dock throughput, storage positions, vehicle capacity and temporary labour. A point forecast can be converted into a capacity requirement, but capacity should be tested against a range of scenarios. If forecast demand is Ds in scenario s, required capacity should account for peak demand, handling-time distributions and operational constraints rather than only average volume.

A useful planning structure is:

  • Base capacity for expected demand;
  • Flexible capacity for forecast upside or short-term volatility;
  • Contingency capacity for disruption or exceptional peaks.

The value of flexibility depends on the cost of reservation, activation time and the consequences of shortage. Capacity that cannot be activated before demand arrives is not genuine flexibility.

Transportation

Forecasts support carrier procurement, lane allocation, fleet positioning and shipment consolidation. A forecast-driven transport plan should examine:

  • expected volume by lane and time window;
  • required delivery service and time windows;
  • full-truckload versus less-than-truckload economics;
  • consolidation opportunities and shipment frequency;
  • fuel, carbon and accessorial-cost exposure;
  • uncertainty in volume and order timing.

Over-forecasting can create empty or underutilised capacity commitments; under-forecasting can force premium freight. A robust policy may reserve a baseline of contracted capacity and retain a spot-market or overflow option. The best choice is not necessarily the lowest freight rate: stockout penalties, customer priority and emissions can change the total economic outcome.

Warehousing and workforce

Forecasts influence storage-slotting, receiving appointments, picking waves, packing stations, dock schedules and labour rosters. Average volume is insufficient when demand is concentrated in narrow peaks. Labour planning should use workload drivers such as order lines, cases, pallets and handling minutes rather than sales value alone.

A warehouse may have sufficient pallet positions but insufficient dock or picking capacity. Consequently, capacity must be modelled by constraint. Forecasts should be translated into resource-specific workloads, with scenario testing for product mix and order profile.

6. Multi-Echelon and Network Inventory Decisions

Inventory held at a factory, regional distribution centre and store is interdependent. Optimising each node independently can increase total inventory and worsen service. In a multi-echelon system, upstream stock may protect several downstream locations, while downstream stock may provide faster customer response.

The key questions are:

  • Where should uncertainty be pooled?
  • Which items require local availability?
  • What is the marginal service benefit of stock at each node?
  • How does postponement affect risk and response time?
  • Are upstream forecasts based on true end demand or distorted orders?

Risk pooling can reduce aggregate variability when demands are not perfectly correlated. However, pooling benefits may disappear when regions experience common shocks, such as weather events, regulation or simultaneous promotions. Network design should therefore examine correlation, not just individual standard deviations.

A practical approach is to segment products and nodes by value, demand volatility, criticality, substitutability and replenishment time. High-criticality items may justify local safety stock even when their financial value is low; low-criticality items may be centralised or supplied on demand.

7. Cost, Service, Resilience and Working Capital

A logistics decision should be assessed using total cost rather than a single metric. A simplified expected-cost structure is:

TC = Cp + Co + Ch + Ct + Cs + Cw

where Cp is purchasing or production cost, Co ordering cost, Ch inventory holding cost, Ct transportation cost, Cs shortage or service-failure cost, and Cw warehousing and handling cost. In a more complete model, carbon, obsolescence, disposal, quality failure and disruption costs may also be included.

Working capital tied up in inventory can be approximated as:

Average inventory value = Average units on hand × Unit cost

The approximation should include cycle stock, safety stock, pipeline stock and relevant in-process inventory. Cash is committed before revenue is realised, so a policy that increases service by adding stock must be compared with its financing and obsolescence consequences.

Resilience is not equivalent to maximum inventory. Resilience may arise from alternate suppliers, postponement, substitute products, flexible transport, visibility, strategic buffers or rapid recovery capability. A resilience investment should be evaluated by the disruption exposure it reduces and the speed at which it can be activated.

Service-cost frontier

There is usually no single optimum independent of management preferences. Increasing the service target raises z and therefore safety stock. The incremental stock requirement becomes particularly expensive as service approaches 100%, because the normal-distribution quantile increases rapidly in the upper tail. Critical products may justify that expense; commoditised products with substitutes may not.

Service targets should be differentiated by customer promise, margin, criticality, contractual penalty, lead time and substitution possibility. Applying a uniform 98% target to every SKU is rarely economically rational.

8. Detailed Applied Case: NorthStar Medical Supplies

This is an illustrative case. NorthStar distributes a temperature-sensitive diagnostic reagent to hospitals. Demand is rising, supplier lead time is variable and emergency shipments are costly. The product has a short shelf life, so excessive safety stock creates expiry risk.

Background and problem

Daily demand averages 80 cartons with a standard deviation of 15 cartons. Supplier lead time averages 5 days with a standard deviation of 1.5 days. Demand and lead time are treated as approximately independent for an initial policy. NorthStar wants a 97.5% cycle service level, for which z ≈ 1.96. Current practice uses five days of average demand as the reorder point and frequently relies on emergency air freight.

Analysis

Using the variable-lead-time approximation:

μd = 80, σd = 15, E[L] = 5, and σL = 1.5.

The mean lead-time demand is:

μdE[L] = 80 × 5 = 400 cartons.

The variance of lead-time demand is:

σ²LT ≈ 5(15²) + 80²(1.5²)

σ²LT ≈ 1,125 + 14,400 = 15,525.

Therefore:

σLT ≈ √15,525 ≈ 124.6 cartons.

Safety stock is:

SS ≈ 1.96 × 124.6 ≈ 244 cartons.

The estimated reorder point is:

ROP ≈ 400 + 244 = 644 cartons.

The current reorder point of 400 cartons protects against average lead-time demand but provides no explicit protection against variability. However, simply adopting 644 cartons may create expiry losses. NorthStar should validate the model using empirical lead-time-demand observations, shelf-life constraints and hospital criticality.

Approach and solution

NorthStar implements a differentiated policy:

  1. The most critical hospitals receive a higher service target and local buffer.
  2. Less critical demand is supplied from a central pool.
  3. Supplier lead-time variability is addressed through a contractual delivery window and a qualified secondary supplier.
  4. Forecasts are reviewed weekly, but replenishment transactions are monitored continuously.
  5. Safety stock is capped by remaining shelf life and expected consumption.
  6. A scenario model tests normal demand, epidemic-related demand surges and supplier disruption.
  7. Emergency freight is retained as a contingency option rather than the primary replenishment mechanism.

The organisation also separates forecast bias from random error. A recent demand increase is incorporated into the baseline forecast; safety stock is not used to conceal a persistent under-forecast.

Outcome

The policy reduces routine emergency freight and makes the service-risk decision explicit. It does not eliminate stockouts, because no finite inventory policy can guarantee service under unlimited disruption. The principal improvement is governance: criticality, shelf life, supplier risk and financial cost are evaluated together.

Learning points

  • Variable lead time can dominate safety-stock requirements.
  • A mathematically calculated buffer must be checked against product-life constraints.
  • A secondary supplier may reduce required inventory as well as disruption risk.
  • Service targets should reflect clinical consequences, not only sales volume.
  • Scenario analysis is more informative than reliance on one average forecast.

9. Technology, AI and Decision Governance

Modern planning systems combine statistical forecasts, machine learning, optimisation and event data. Machine learning may improve nonlinear demand signals, but it does not remove supply uncertainty or guarantee causal validity. A model trained on historical orders may learn allocation constraints or prior stockouts rather than true customer demand.

Responsible implementation requires:

  • clear ownership of forecast, replenishment and override decisions;
  • versioned data and reproducible model outputs;
  • monitoring of forecast bias, error, service and inventory outcomes;
  • explainable drivers for high-impact decisions;
  • controls against automatic amplification of anomalous data;
  • human review for critical products and exceptional events;
  • protection of commercially sensitive and personal data;
  • documented override reasons and post-event learning.

An override is not automatically bad. It may incorporate information unavailable to the model, such as a confirmed customer project or a regulatory change. But unmanaged overrides can create optimism bias, political inventory allocations and poor accountability. Overrides should be logged, classified and evaluated against subsequent outcomes.

Contemporary systems increasingly use probabilistic forecasts, digital twins, control-tower visibility and optimisation under uncertainty. Their value depends on data quality, process integration and decision rights. Analytics cannot compensate for inaccurate inventory records, unrecorded substitutions, unreliable lead times or misaligned incentives.

10. Limitations and Best Practices

Important limitations include:

  • normality assumptions may fail for intermittent, promotional or highly skewed demand;
  • demand and lead time may be correlated;
  • historical errors may not represent structural breaks;
  • service-level calculations may ignore allocation rules and order-size effects;
  • aggregate forecasts may conceal location-specific shortages;
  • holding-cost estimates often omit obsolescence, financing and environmental costs;
  • forecast-driven plans can amplify the bullwhip effect when each tier reacts independently;
  • optimisation models may produce infeasible plans if operational constraints are incomplete.

Best practice is to:

  1. define the decision and service measure before selecting a forecast metric;
  2. match forecast uncertainty to the SKU-location-time horizon of the decision;
  3. separate systematic bias from random error;
  4. use empirical or simulation methods when distributional assumptions are weak;
  5. segment products by value, volatility, criticality and life cycle;
  6. calculate total cost, not only purchase or transport cost;
  7. test normal, upside, downside and disruption scenarios;
  8. coordinate inventory, transport, warehouse and workforce decisions;
  9. review parameters after structural changes and supplier performance shifts;
  10. measure outcomes through service, inventory, cash, waste, premium freight and resilience indicators.

Chapter Summary

Forecast-driven logistics converts expected demand and uncertainty into operational policies. Inventory position, not on-hand stock alone, determines when replenishment is needed. Cycle stock covers expected demand; safety stock protects against uncertainty. Under suitable assumptions, continuous-review reorder points combine mean lead-time demand with a service-factor multiple of lead-time-demand variability. Variable lead times can materially increase safety stock, and forecast-error distributions may be more relevant than historical demand variation.

Continuous-review, periodic-review and min–max policies differ in responsiveness, administrative requirements and protection periods. Forecasts also guide transport capacity, warehouse space, labour, supplier commitments and network positioning. In multi-echelon systems, local optimisation can be inferior to coordinated risk pooling and postponement. Decisions must balance service, total cost, resilience, working capital, shelf life and environmental consequences.

Advanced analytics and AI can support probabilistic forecasting, scenario analysis and optimisation, but governance remains essential. Bias, data quality, structural breaks, correlation and model limitations must be actively managed. The strongest practice is differentiated, scenario-based and empirically validated rather than based on a uniform service target or a single point forecast.

Key Terms

Forecast error: Difference between actual demand and the corresponding forecast.

Forecast bias: Persistent tendency to over-forecast or under-forecast.

Inventory position: On-hand stock plus open orders minus backorders or commitments.

Cycle stock: Inventory used to cover expected demand between replenishments.

Safety stock: Inventory held to protect against demand, lead-time or supply uncertainty.

Pipeline stock: Inventory currently in transit or processing.

Reorder point: Inventory-position level that triggers replenishment.

Cycle service level: Probability of avoiding a stockout during a replenishment cycle.

Fill rate: Proportion of demand supplied immediately from available stock.

EOQ: Order quantity that balances ordering and cycle-stock holding costs under specified assumptions.

Continuous review: Inventory monitoring in which replenishment is triggered whenever a threshold is reached.

Periodic review: Inventory policy in which stock is assessed at fixed time intervals.

Order-up-to level: Target inventory position to which stock is replenished.

Lead-time demand: Demand occurring during the replenishment lead time.

Risk pooling: Reduction of aggregate variability by combining demand or inventory across locations.

Anticipation stock: Inventory accumulated before a predictable peak or constraint.

Working capital: Funds committed to operating assets, including inventory.

Bullwhip effect: Amplification of demand variability as orders move upstream through a supply chain.

Postponement: Delaying final product configuration or allocation until demand information improves.

Review Questions

Short Answer Questions

  1. Why is inventory position more useful than on-hand inventory for replenishment decisions?
  2. Distinguish cycle service level from fill rate.
  3. State the assumptions behind the basic EOQ model.
  4. Why should forecast bias not normally be hidden inside safety stock?
  5. What is the purpose of flexible capacity in a forecast-driven logistics system?

Long Answer Questions

  1. Explain how demand variability and lead-time variability jointly influence reorder points.
  2. Compare continuous-review and periodic-review replenishment policies, including their operational strengths and weaknesses.
  3. Discuss how a logistics manager should balance service, total cost, resilience and working capital.
  4. Explain why independent optimisation of inventory at different supply-chain echelons may produce inferior results.
  5. Evaluate the opportunities and governance risks associated with AI-supported replenishment decisions.

Analytical / Application Questions

  1. Daily demand has a mean of 120 units and a standard deviation of 25 units. Lead time is constant at 4 days, and the desired cycle service level is 95% with z = 1.645. Calculate lead-time demand, safety stock and the reorder point. State the assumptions used.
  2. A firm reviews inventory every 7 days. Mean daily demand is 60 units, daily standard deviation is 10 units, and lead time is 3 days. For a 90% service level, use z = 1.282 to calculate the order-up-to level under the periodic-review model.
  3. A product has high forecast error, short shelf life and a critical customer segment. Propose a differentiated policy covering service targets, inventory positioning, supplier risk, transport capacity and performance measures. Justify each element.

Multiple Choice Questions with Answers

Question 1

Which quantity is used to determine whether a replenishment order should be triggered?

A. On-hand inventory only

B. Inventory position

C. Annual demand only

D. Warehouse capacity only

Correct Answer: B. Inventory position

Question 2

If daily demand has standard deviation 20 units and constant lead time is 6 days, which expression gives lead-time demand standard deviation under independent-demand assumptions?

A. 20 × 6

B. 20 ÷ √6

C. 20√6

D. √(20 × 6)

Correct Answer: C. 20√6

Question 3

In the basic continuous-review model, safety stock is calculated as:

A. Mean lead-time demand ÷ service factor

B. Service factor × standard deviation of lead-time demand

C. Annual demand × ordering cost

D. Cycle stock − pipeline stock

Correct Answer: B. Service factor × standard deviation of lead-time demand

Question 4

Which condition most directly increases safety stock in a variable-lead-time system?

A. Lower lead-time variance

B. Lower service target

C. Higher lead-time variance

D. Lower demand uncertainty

Correct Answer: C. Higher lead-time variance

Question 5

An EOQ model primarily balances which two costs?

A. Shortage cost and transport emissions

B. Ordering cost and cycle-stock holding cost

C. Purchase cost and labour cost only

D. Warehouse rent and customs duty only

Correct Answer: B. Ordering cost and cycle-stock holding cost

Question 6

A periodic-review policy must generally protect against demand during which interval?

A. Lead time only

B. The review period only

C. The review period plus lead time

D. The annual budgeting period only

Correct Answer: C. The review period plus lead time

Question 7

A persistent positive mean forecast error, defined as actual demand minus forecast demand, indicates:

A. Persistent over-forecasting

B. Persistent under-forecasting

C. Zero forecast bias

D. Excessive cycle stock only

Correct Answer: B. Persistent under-forecasting

Question 8

Which is the strongest reason to differentiate service targets across products?

A. All products have identical demand patterns

B. Uniform targets always minimise total cost

C. Products differ in criticality, substitution and shortage consequences

D. Service targets are unrelated to inventory

Correct Answer: C. Products differ in criticality, substitution and shortage consequences

Question 9

What is a principal risk of using historical order data as a direct measure of true customer demand?

A. It always removes bias

B. It may reflect prior stockouts or allocation constraints

C. It guarantees causal forecasts

D. It eliminates the bullwhip effect

Correct Answer: B. It may reflect prior stockouts or allocation constraints

Question 10

Which action best supports responsible AI-enabled replenishment?

A. Remove all human review

B. Ignore model overrides

C. Monitor bias, outcomes and exceptional decisions

D. Use one service target for every SKU

Correct Answer: C. Monitor bias, outcomes and exceptional decisions

Dem& Forecasting Analytics
Chapter 12 of 14