Capacity Requirement Planning

Chapter 14
Strategic Capacity and Network Decisions

Post Graduate Program in Production Management
Capacity Requirement Planning   •   Post Graduate

Strategic Capacity and Network Decisions

Introduction

Capacity Requirement Planning (CRP) is often introduced as a short- and medium-term activity: comparing required workload with available machine, labour, or supplier capacity. At the strategic level, however, capacity becomes a long-lived commitment that shapes competitive advantage, risk exposure, capital intensity, customer responsiveness, and the design of the entire supply network. A factory, distribution centre, technology platform, contract-manufacturing agreement, or regional supplier base may influence performance for a decade or more.

Strategic capacity decisions therefore answer five connected questions:

  1. How much capacity should the organisation possess?
  2. When should capacity be added, reduced, or repositioned?
  3. Where should capacity be located?
  4. How much flexibility and redundancy are economically justified?
  5. Which activities should be performed internally, outsourced, nearshored, or globally distributed?

The central managerial challenge is that capacity decisions are made under uncertain demand, changing technology, evolving product life cycles, geopolitical risk, and imperfect information. A sound decision must therefore combine quantitative analysis with strategic judgement rather than rely on a single forecast or a lowest-cost comparison.

Learning Objectives

After studying this chapter, the reader should be able to:

  • distinguish strategic, tactical, and operational capacity decisions;
  • align capacity choices with competitive priorities and product life cycles;
  • evaluate capacity timing, scale, location, flexibility, and redundancy;
  • compare internal production, outsourcing, and global network alternatives;
  • use financial, scenario, and real-options reasoning in capacity decisions;
  • assess resilience, sustainability, governance, and technology implications; and
  • formulate a coherent strategic capacity recommendation.

1. Capacity as a Strategic Resource

Capacity is the maximum sustainable output or workload that a resource, process, facility, network, or organisation can deliver under specified conditions. It is not a single universal number. Capacity depends on product mix, operating hours, labour skills, maintenance policy, quality standards, material availability, and the definition of output.

A useful distinction is:

  • Design capacity: theoretical maximum under ideal conditions.
  • Effective capacity: realistic maximum after planned maintenance, breaks, setup, product mix, regulatory constraints, and normal operating losses.
  • Actual output: what is delivered during a particular period.
  • Utilisation: actual output relative to design capacity.
  • Efficiency: actual output relative to effective capacity.

The standard relationships are:

Utilisation = Actual output ÷ Design capacity × 100%
Efficiency = Actual output ÷ Effective capacity × 100%

The units in each ratio must be comparable, such as units per year, machine-hours per month, or orders per day. Utilisation above a sustainable level may indicate overtime, deferred maintenance, or excessive queueing rather than superior performance. Conversely, deliberately maintaining spare capacity may be rational when rapid response, resilience, or growth options are strategically important.

Capacity also has several dimensions:

DimensionStrategic question
VolumeHow much output can be produced?
MixWhich products or services can be delivered?
TimeHow rapidly can capacity be activated or changed?
GeographicWhere is capacity located?
CapabilityWhat technologies, skills, and quality levels are available?
FlexibilityHow easily can resources switch among products, markets, or processes?
ResilienceHow well can the network absorb and recover from disruption?

Capacity is therefore better understood as a portfolio of capabilities than as a single number.

2. Competitive Strategy and Capacity Alignment

Strategic capacity must support the organisation’s intended basis of competition. A low-cost strategy may favour large, specialised, highly utilised facilities and stable processes. A responsiveness strategy may justify geographically dispersed capacity, postponement, quick changeovers, and protective buffers. A differentiation strategy may require flexible equipment, advanced skills, small-batch capability, and close customer or engineering interaction.

Misalignment creates predictable problems. A business promising same-day delivery but operating one highly centralised facility may have low unit cost but poor responsiveness. A business competing on low price but maintaining many underutilised plants may offer resilience at an unsustainable cost. Capacity planning must therefore begin with competitive priorities rather than with equipment availability alone.

A practical alignment matrix is shown below.

Competitive priorityCapacity design implicationTypical risk
CostScale, standardisation, high utilisationRigidity and disruption concentration
QualityProcess capability, controlled environments, skilled labourHigh fixed cost
Delivery speedRegional capacity, short lead times, postponementDuplication of resources
FlexibilityModular equipment, cross-training, versatile suppliersLower economies of scale
InnovationPilot lines, engineering proximity, adaptable technologyObsolescence
SustainabilityRenewable energy, circular processes, efficient logisticsTransition investment

The objective is not to maximise one dimension independently. Strategic decisions seek a defensible trade-off among cost, service, risk, speed, sustainability, and future options.

3. Capacity and the Product Life Cycle

Capacity requirements change as products move through introduction, growth, maturity, and decline.

During introduction, demand is uncertain and product specifications may change. Small, flexible capacity, pilot facilities, contract manufacturing, or staged investment may be preferable. During growth, demand becomes more predictable, and the organisation may invest in dedicated equipment, supplier development, and regional expansion. In maturity, the focus often shifts to cost reduction, network rationalisation, automation, and productivity. During decline, capacity may be harvested, repurposed, consolidated, or divested.

The product life cycle is not deterministic. Products may be relaunched, customised, regulated differently, or replaced by disruptive technologies. Consequently, capacity decisions should include trigger points such as cumulative orders, forecast confidence, yield achievement, or competitor entry rather than rely only on calendar dates.

Three classic timing strategies are:

  • Capacity lead: add capacity before demand is fully realised. This protects service and supports market capture but creates the risk of underutilisation.
  • Capacity lag: add capacity after demand has been demonstrated. This reduces overinvestment but may cause lost sales, long lead times, and customer defection.
  • Capacity match or incremental expansion: add capacity in smaller stages as demand evidence accumulates. This reduces exposure but may sacrifice some scale economies.

The appropriate strategy depends on the cost of shortage, the cost of excess capacity, the speed of construction or qualification, and the strategic value of being first.

4. Capacity Timing Under Uncertainty

Let expected demand in period t be Dₜ and available capacity be Kₜ. A basic surplus or shortage measure is:

Sₜ = Kₜ − Dₜ

A positive Sₜ indicates nominal surplus; a negative value indicates nominal shortage. In practice, demand is uncertain, so a service-oriented plan may use a capacity protection level based on a demand percentile rather than the mean. If demand has mean μ and standard deviation σ, and a normal approximation is acceptable, a simple capacity target is:

K = μ + zσ

Here, K is required capacity, μ is expected demand during the relevant planning horizon, σ is the standard deviation of demand, and z is the standard-normal value corresponding to the desired protection percentile. The formula is appropriate only when demand variability is reasonably represented by the assumed distribution and when the capacity measure and demand measure use the same time and output basis. It does not automatically account for lead-time variability, correlated product demand, operational downtime, or supply constraints.

For a multi-period decision, expected cost can be represented conceptually as:

Expected cost = Fixed capacity cost + Expected operating cost + Expected shortage cost + Expected excess-capacity cost

A more explicit scenario model is:

E(C) = F + Σ pₛ [cₛ(K, Dₛ) + h·max(K − Dₛ, 0) + b·max(Dₛ − K, 0)]

where F is the fixed investment cost, pₛ is the probability of demand scenario s, cₛ is the operating cost in that scenario, h is the unit cost of excess capacity, b is the unit cost of shortage, K is capacity, and Dₛ is scenario demand. This is a decision model, not a universal law. Its usefulness depends on credible scenarios and realistic cost estimates.

Worked Example: Staged Expansion

A firm is considering capacity for a new product. Demand next year may be 60,000 units with probability 0.4, 100,000 units with probability 0.4, or 140,000 units with probability 0.2. A first-stage facility provides 80,000 units at a fixed annualised cost of $1.20 million. An expansion adds 60,000 units at an annualised cost of $0.90 million. If demand exceeds available capacity, the firm pays an external supply and service penalty of $18 per unit. If capacity is unused, the relevant carrying and fixed-cost burden is estimated at $6 per unused unit.

With no expansion, available capacity is 80,000 units. The scenario costs associated with mismatch are:

  • 60,000 demand: 20,000 unused units × $6 = $120,000;
  • 100,000 demand: 20,000 shortage units × $18 = $360,000;
  • 140,000 demand: 60,000 shortage units × $18 = $1,080,000.

Expected mismatch cost is:

0.4(120,000) + 0.4(360,000) + 0.2(1,080,000) = $408,000

Adding the first-stage fixed cost gives expected annualised cost of $1.608 million.

With expansion, capacity is 140,000 units and total fixed cost is $2.10 million. Unused capacity is 80,000 units at low demand, 40,000 units at medium demand, and zero at high demand. Expected mismatch cost is:

0.4(80,000 × 6) + 0.4(40,000 × 6) + 0.2(0) = $288,000

Total expected cost is $2.388 million. On these assumptions, immediate expansion is financially inferior by $780,000. However, the staged alternative may be even more attractive than this comparison suggests if expansion can be exercised only after demand information improves. The example demonstrates why timing flexibility has economic value; it also shows that expected cost alone must be supplemented by service, strategic, and risk analysis.

5. Scale, Scope, and Flexibility

Economies of scale occur when average cost declines as capacity or output increases. They may result from spreading fixed costs, purchasing in volume, specialised equipment, automation, or learning. Diseconomies can arise from congestion, coordination complexity, labour relations, long transport distances, or managerial overload.

Economies of scope arise when one facility or network can produce several products more efficiently than separate specialised facilities. Scope is especially valuable when demand is uncertain and products have different seasonal patterns. The benefit depends on genuine resource sharing; merely placing unrelated operations in one building does not guarantee scope economies.

Flexibility may be:

  • Volume flexibility: changing output level.
  • Mix flexibility: switching among products.
  • Routing flexibility: using alternative machines, plants, or suppliers.
  • Delivery flexibility: responding to location or timing changes.
  • Expansion flexibility: adding capacity in stages.
  • Technology flexibility: adopting new processes without complete replacement.

Flexibility has a cost. Versatile equipment may be more expensive, less productive on a single product, or more difficult to operate. Flexibility should therefore be purchased where uncertainty and the cost of being wrong are high.

A useful strategic distinction is between resource flexibility and process flexibility. Resource flexibility comes from cross-trained people, interchangeable machines, and multiple suppliers. Process flexibility comes from modular product design, postponement, common components, standard work, and rapid changeovers. Product architecture is often a less expensive source of flexibility than maintaining excess physical capacity.

6. Location and Network Configuration

Location decisions determine access to markets, labour, suppliers, infrastructure, energy, knowledge, and institutional support. They also determine exposure to tariffs, political instability, natural hazards, water stress, cyber risk, and transport disruption.

A location evaluation should combine quantitative and qualitative criteria. Common quantitative elements include land and construction cost, labour, utilities, taxes, inbound and outbound transport, inventory pipeline, tariffs, and expected disruption cost. Qualitative elements include talent availability, regulatory predictability, supplier ecosystem, community legitimacy, and strategic proximity to customers or innovation centres.

For a single-facility comparison, total annual cost may be expressed as:

TCⱼ = Fⱼ + VⱼQ + Tⱼ(Q) + Iⱼ(Q) + Rⱼ(Q)

where TCⱼ is total cost of location j, Fⱼ is annualised fixed cost, Vⱼ is variable conversion cost per unit, Q is annual volume, Tⱼ is transport cost, Iⱼ is inventory-related cost, and Rⱼ is expected disruption, regulatory, or other risk cost. Every term must be calculated over the same time horizon and currency basis. Expected risk cost can be estimated as probability of an event multiplied by its financial consequence, but rare, systemic events require scenario analysis because historical probabilities may be unreliable.

The centre-of-gravity technique can provide an initial geographic screen. For demand points i with coordinates (xᵢ, yᵢ) and weights wᵢ, the weighted location is:

x* = Σ(wᵢxᵢ) ÷ Σwᵢ
y* = Σ(wᵢyᵢ) ÷ Σwᵢ

This method assumes that distance-related cost is adequately represented by the weights and coordinates. It ignores terrain, road networks, taxes, capacity limits, service constraints, and nonlinear transport rates; it is therefore a screening tool, not a final location decision.

A network may be centralised, regionalised, duplicated, or hybrid. Centralisation supports scale, standardisation, and inventory pooling. Regionalisation improves response time and may reduce trade barriers. Duplication increases resilience but can lower utilisation. Hybrid networks often place high-volume standard production in a small number of efficient plants while using regional postponement, final assembly, or distribution capacity.

7. Outsourcing and Make-or-Buy Strategy

Outsourcing is a strategic decision about boundaries, not simply a purchasing decision. It may provide access to specialised technology, variable capacity, lower labour cost, or geographic presence. It may also create dependence, intellectual-property exposure, quality variation, hidden coordination costs, and reduced learning.

A make-or-buy comparison should distinguish avoidable from unavoidable costs. The relevant internal cost is not necessarily the full accounting cost. Fixed costs that will remain after outsourcing should not be treated as avoidable savings. Conversely, supplier qualification, logistics, monitoring, switching, inventory, and disruption costs must be included.

For internal production quantity Q:

Cmake = Fₘ + vₘQ

For purchasing:

Cbuy = Fb + pbQ

The break-even quantity, when vₘ ≠ p_b, is:

Q* = (Fb − Fₘ) ÷ (vₘ − pb)

The equation assumes linear costs, constant unit costs, comparable quality and service, and a single relevant volume range. It is invalid when significant nonlinear costs, capacity constraints, learning effects, or multiple suppliers are ignored.

Strategic make-or-buy analysis should ask:

  • Is the activity a source of competitive differentiation?
  • Is the capability difficult to imitate or protect contractually?
  • Does outsourcing create single-source or geopolitical dependence?
  • Can the supplier meet quality, delivery, cyber, labour, and environmental requirements?
  • How reversible is the decision?
  • Will internal learning and future innovation be lost?

A dual-source or qualified-secondary arrangement may cost more than single sourcing but preserve an option to respond to disruption. The right comparison is therefore total cost of ownership and risk-adjusted strategic value, not quoted price alone.

8. Resilience, Risk, and Network Design

Resilience is the ability of a system to prepare for, absorb, recover from, and adapt to disruption. It differs from efficiency: an efficient network minimises resources for expected conditions, whereas a resilient network may retain options for unexpected conditions.

Key resilience mechanisms include:

  • multiple qualified suppliers;
  • geographic diversification;
  • strategic inventory and decoupling points;
  • interchangeable components and standard interfaces;
  • alternative transport modes and routes;
  • cross-trained employees;
  • capacity reserves and rapid expansion contracts;
  • real-time visibility and early-warning indicators; and
  • tested business-continuity and recovery procedures.

Redundancy should be targeted. Duplicating every resource is usually uneconomic, while eliminating all slack creates fragility. Criticality, time to recover, substitutability, and concentration should guide investment.

A simple expected-loss measure is:

Expected disruption loss = Σ pₖLₖ

where pₖ is the probability of disruption scenario k and Lₖ is its loss. The loss may include lost contribution, recovery expenditure, penalties, reputation, and customer lifetime value. Probabilities and consequences should be estimated transparently, with sensitivity analysis. A low-probability, high-consequence event may warrant mitigation even when its expected value is modest because financial models may omit irreversible strategic damage.

9. Financial and Strategic Evaluation

Strategic capacity projects should be evaluated using discounted cash flow, scenario analysis, and strategic criteria. Net present value is:

NPV = −I₀ + Σ [CFₜ ÷ (1 + r)ᵗ]

where I₀ is initial investment, CFₜ is net cash flow in period t, r is the discount rate, and t is the period number. NPV is expressed in currency units and assumes that cash flows and the discount rate are defined consistently in nominal or real terms. A positive NPV indicates value creation relative to the chosen discount rate, subject to the quality of assumptions.

Relevant cash flows include incremental revenue, variable cost, fixed operating cost, taxes, working capital, maintenance capital, disposal value, transition cost, and risk mitigation expenditure. Accounting profit is not a substitute for cash flow.

Traditional NPV can undervalue staged capacity because it treats future decisions as fixed. Real-options reasoning recognises that management may defer, expand, contract, abandon, or switch after uncertainty is resolved. An option is valuable when uncertainty is high, downside losses are limited, and the decision can be delayed without losing the opportunity.

Strategic evaluation should combine:

  1. Financial value: NPV, payback, sensitivity, and downside exposure.
  2. Operational value: service, lead time, quality, and flexibility.
  3. Strategic value: market access, learning, capability, and competitive positioning.
  4. Risk value: resilience, compliance, and reversibility.
  5. Stakeholder value: employment, communities, environmental impact, and legitimacy.

A weighted scorecard can structure judgement, but weights should be disclosed and tested. A score is not a substitute for causal analysis.

10. Technology, Data, and Artificial Intelligence

Digital twins, advanced planning systems, IoT sensors, and AI-supported forecasting can improve capacity visibility and scenario evaluation. Predictive maintenance can increase effective capacity by reducing unplanned downtime. Optimisation models can compare plant, supplier, inventory, and transport configurations under constraints.

However, technology does not remove uncertainty. AI forecasts may reproduce historical bias, fail during structural breaks, or encourage false precision. Data governance should address ownership, quality, cybersecurity, explainability, access control, and human accountability. Automated recommendations involving facility closure, workforce reduction, or supplier selection require managerial review and documented assumptions.

Useful digital practices include:

  • separating forecast confidence from forecast point estimates;
  • monitoring forecast error and model drift;
  • stress-testing scenarios outside historical experience;
  • maintaining human override and escalation rules; and
  • integrating operational, financial, sustainability, and risk data.

11. Illustrative Case: Northstar Medical Devices

Background

Northstar Medical Devices produces sterile diagnostic cartridges. Demand is growing in three regions, but the product is approaching a technology transition. The existing plant is efficient but located in one country and depends on a single specialised sterilisation supplier. Customers require high service reliability, and regulatory approval is required for any new production site.

Problem

Management must choose among: expanding the existing plant, building a regional facility, outsourcing part of production, or adopting a staged hybrid network. Demand forecasts vary substantially because a new diagnostic platform may replace the current cartridge within four years.

Analysis

The existing plant offers scale economies, experienced labour, and validated quality systems. Expansion would be fast relative to a new site but would increase geographic concentration. A regional facility would reduce delivery time and trade exposure but require qualification costs, duplicated quality systems, and lower initial utilisation. Outsourcing would provide short-term flexibility but expose Northstar to intellectual-property and supplier-continuity risks.

The team constructs low, base, and high demand scenarios; estimates regulatory approval times; models transport and inventory; and calculates NPV for each alternative. It also scores resilience, transition risk, emissions, and reversibility. A stress test assumes a twelve-week disruption at the sterilisation supplier and a faster-than-expected product substitution.

Approach and Solution

The recommended design is a staged hybrid network. Northstar expands the existing plant only enough to remove the immediate bottleneck, qualifies a second sterilisation supplier in another region, and establishes a small regional final-assembly and postponement capability. A contractual option allows additional regional capacity to be activated if demand exceeds a defined threshold. Product design is modified to use common components across current and next-generation cartridges.

Outcome

The plan requires somewhat higher near-term cost than a single large expansion, but it limits irreversible investment, improves continuity, shortens regional response time, and preserves the ability to scale if the new platform succeeds. Governance includes quarterly trigger reviews, supplier audits, cybersecurity requirements, and a formal exit plan for obsolete capacity.

Learning Points

The case demonstrates that the lowest unit cost is not necessarily the lowest strategic cost. Capacity, sourcing, product architecture, regulatory qualification, and resilience must be designed together. Staging and modularity can create value when demand and technology are uncertain.

12. Implementation Governance and Best Practices

A robust strategic capacity process should:

  1. define the competitive strategy and service promise;
  2. translate demand into capacity by product, region, process, and time;
  3. identify constraints, bottlenecks, lead times, and qualification requirements;
  4. develop multiple network alternatives rather than one preferred answer;
  5. model financial, operational, risk, sustainability, and stakeholder outcomes;
  6. test scenarios, sensitivities, and failure modes;
  7. identify reversible steps, decision triggers, and option contracts;
  8. engage operations, finance, procurement, engineering, commercial, legal, and sustainability functions;
  9. document assumptions, data sources, and accountability; and
  10. review the decision after implementation using actual performance and updated conditions.

Ethical and regulatory responsibilities include fair treatment of affected employees and communities, responsible labour standards in outsourced networks, environmental compliance, product safety, data protection, anti-corruption controls, and truthful disclosure of supply-chain risks. Network optimisation must not externalise unacceptable environmental or social costs merely because they are absent from the immediate financial model.

Challenges and Limitations

Strategic capacity analysis faces several limitations. Demand forecasts may be structurally wrong rather than merely inaccurate. Cost estimates may omit transition, learning, or shutdown costs. Correlated disruptions can invalidate independent-risk assumptions. Models may privilege measurable financial outcomes over capability and legitimacy. Global comparisons can also conceal differences in labour rights, energy reliability, infrastructure quality, and regulatory enforcement.

Another challenge is organisational bias. Managers may favour large visible projects, protect existing assets, or understate the value of flexibility. Cross-functional governance, independent review, explicit scenario assumptions, and post-investment learning reduce these risks. No model can eliminate judgement; the purpose of analysis is to make judgement more disciplined and transparent.

Chapter Summary

Strategic capacity is a long-term configuration of volume, capability, location, flexibility, and resilience. It must be aligned with competitive priorities and with the uncertainty associated with product life cycles and technology transitions. Capacity-lead, capacity-lag, and incremental strategies represent different risk positions rather than universally correct choices.

Effective analysis distinguishes design, effective, and actual capacity; evaluates scale and scope; compares centralised, regional, and hybrid networks; and treats outsourcing as a strategic boundary decision. Location and make-or-buy analysis must include total cost, risk, capability, sustainability, and reversibility. Financial tools such as expected-cost models and NPV are valuable, but scenario analysis and real-options reasoning are essential when uncertainty is high.

Resilience requires deliberate, economically justified redundancy, alternative sources, visibility, modularity, and recovery capability. Digital technologies can improve forecasting and simulation, but governance, cybersecurity, model validation, and human accountability remain essential. The best strategic capacity decisions are staged where possible, trigger-based, cross-functional, transparent, and consistent with the organisation’s competitive and societal responsibilities.

Key Terms

Capacity: The sustainable output or workload capability of a resource or network under specified conditions.

Design capacity: The theoretical maximum capacity under ideal conditions.

Effective capacity: Realistic capacity after normal operational constraints.

Utilisation: Actual output divided by design capacity.

Efficiency: Actual output divided by effective capacity.

Capacity lead: Adding capacity before demand is fully demonstrated.

Capacity lag: Adding capacity after demand has been demonstrated.

Capacity match: Adding capacity incrementally as demand develops.

Economies of scale: Average-cost reductions associated with increased scale.

Economies of scope: Savings from sharing resources across products or services.

Flexibility: The ability to change volume, mix, routing, technology, or timing.

Postponement: Delaying final configuration until demand or location is clearer.

Network resilience: The ability to absorb, recover from, and adapt to disruption.

Outsourcing: Procuring an activity or capability from an external organisation.

Total cost of ownership: Acquisition, operating, coordination, risk, and exit costs over the relevant life.

Real option: The value of preserving a future decision under uncertainty.

Centre of gravity: A weighted geographic estimate used for initial location screening.

Strategic redundancy: Deliberate spare or alternative capacity maintained for risk and responsiveness.

Review Questions

Short Answer Questions

  1. Distinguish design capacity, effective capacity, utilisation, and efficiency.
  2. What are the strategic differences between capacity lead, lag, and match strategies?
  3. Define economies of scale and economies of scope.
  4. Why should outsourcing be treated as a strategic boundary decision?
  5. State two ways in which postponement can improve network flexibility.

Long Answer Questions

  1. Explain how competitive priorities influence facility scale, location, flexibility, and utilisation.
  2. Discuss the relationship between product life cycle stages and strategic capacity decisions.
  3. Explain why resilience may require economically inefficient levels of redundancy.
  4. Compare centralised, regional, and hybrid capacity networks.
  5. Evaluate the strengths and limitations of NPV and real-options reasoning in capacity investment.

Analytical / Application Questions

  1. A firm faces uncertain demand and a four-year technology transition. Design a staged capacity strategy and identify decision triggers, risks, and information requirements.
  2. Compare an internal production option with outsourcing using relevant costs, supplier risk, capability loss, and reversibility. Explain which assumptions would change your recommendation.
  3. Develop a strategic scorecard for selecting among three global plant locations. Justify the criteria, weights, risk treatment, and governance process.

Multiple Choice Questions with Answers

Question 1

Which measure compares actual output with effective capacity?

A. Design capacity

B. Utilisation

C. Efficiency

D. Demand variability

Correct Answer: C. Efficiency

Question 2

A capacity-lead strategy primarily seeks to:

A. Avoid all fixed investment

B. Protect service and capture growth before demand is fully realised

C. Add capacity only after shortages occur

D. Eliminate flexibility

Correct Answer: B. Protect service and capture growth before demand is fully realised

Question 3

If demand has mean μ and standard deviation σ, the expression K = μ + zσ is used to:

A. Calculate a capacity target at a selected protection percentile

B. Calculate depreciation

C. Determine a facility’s coordinates

D. Compute supplier price

Correct Answer: A. Calculate a capacity target at a selected protection percentile

Question 4

Which factor most directly supports economies of scope?

A. Producing only one product on dedicated equipment

B. Sharing resources across several products

C. Increasing transport distance

D. Eliminating common components

Correct Answer: B. Sharing resources across several products

Question 5

The centre-of-gravity method is best described as:

A. A final location decision that includes all regulatory factors

B. A weighted geographic screening technique

C. A method for calculating labour productivity

D. A supplier quality audit

Correct Answer: B. A weighted geographic screening technique

Question 6

In a make-or-buy analysis, an unavoidable fixed cost should generally be:

A. Treated as an avoidable saving from outsourcing

B. Excluded from the relevant incremental comparison

C. Multiplied by supplier volume

D. Counted twice

Correct Answer: B. Excluded from the relevant incremental comparison

Question 7

Which action is an example of strategic redundancy?

A. Using one supplier exclusively to maximise dependence

B. Maintaining a qualified alternative supplier

C. Removing all safety stock

D. Closing every regional facility

Correct Answer: B. Maintaining a qualified alternative supplier

Question 8

A positive NPV indicates that a project:

A. Has no uncertainty

B. Creates value relative to the chosen discount rate and assumptions

C. Has the lowest unit cost in every scenario

D. Requires no working capital

Correct Answer: B. Creates value relative to the chosen discount rate and assumptions

Question 9

Real-options reasoning is especially valuable when:

A. Demand and technology are completely certain

B. Investment is irreversible and uncertainty is high

C. There are no future decisions

D. All costs are sunk

Correct Answer: B. Investment is irreversible and uncertainty is high

Question 10

Which is a principal governance concern when AI supports capacity planning?

A. Removing all human review

B. Ignoring model drift

C. Maintaining data quality, explainability, and accountability

D. Using only historical averages

Correct Answer: C. Maintaining data quality, explainability, and accountability

Capacity Requirement Planning
Chapter 14 of 15