Building Planning Principles and Regulatory RequirementsIntroductionBuilding planning is the systematic arrangement of spaces, structure, services, circulation and external areas to satisfy the needs of occupants while complying with legal and technical requirements. For a civil draftsman, planning is more than drawing rooms inside a boundary. It involves interpreting a client brief, studying the site, applying planning standards, coordinating with engineers and authorities, and producing drawings that can be understood and approved. A successful plan balances four objectives: - Function: spaces must support the activities for which they are intended.
- Health and comfort: buildings should provide daylight, ventilation, sanitation, thermal comfort and safety.
- Economy and constructability: the arrangement should use land, materials and services efficiently.
- Compliance: the proposal must satisfy applicable building regulations, planning controls, fire requirements and accessibility provisions.
Regulations vary by country, state, municipality and building category. The numerical values used in this chapter are therefore illustrative planning guidance, not substitutes for the current local building code. Before preparing approval drawings, the draftsman must identify the legally applicable code, zoning plan, fire regulations, accessibility standard and authority procedures. Learning ObjectivesAfter studying this chapter, the learner should be able to: - translate a client brief into a room schedule and adjacency plan;
- explain the effects of orientation, climate and site conditions on planning;
- organize rooms, circulation and services efficiently;
- apply dimensional, lighting, ventilation and accessibility principles;
- identify the regulatory information needed before drafting;
- incorporate setbacks, zoning, parking, fire safety and means of escape;
- detect common planning errors during drawing review; and
- prepare a coordinated preliminary layout for professional development.
1. From Client Brief to Planning ProgrammeA client brief states what the building must achieve. It may include the number of occupants, activities, desired rooms, budget, future expansion, preferred appearance, site constraints and statutory requirements. The draftsman should not begin by drawing arbitrary rectangles. The brief must first be converted into a planning programme. A planning programme normally records: - room or space name;
- principal activity;
- number of users;
- furniture and equipment;
- approximate area;
- required relationships with other spaces;
- daylight, ventilation and service requirements;
- privacy and security level; and
- possible future changes.
1.1 Functional classification of spacesSpaces may be classified as: - Public: entrance lobby, reception, visitor toilet and waiting area.
- Semi-private: living room, dining area, classroom or meeting room.
- Private: bedrooms, offices, treatment rooms and staff areas.
- Service: kitchen, store, laundry, plant room and refuse area.
- Circulation: corridors, stairs, ramps, entrance platforms and lobbies.
- External support: parking, loading, waste storage, gardens and service yards.
This classification helps determine access, privacy, supervision and security. For example, a visitor should be able to reach reception without passing through bedrooms or a service yard. 1.2 Adjacency and zoningAn adjacency diagram represents desirable relationships before exact dimensions are selected. A kitchen may need direct connection to dining and service access; a bedroom may need proximity to a bathroom but separation from noisy public areas. Adjacency can be described as: - essential: spaces must be directly connected;
- desirable: spaces should be near each other;
- acceptable: proximity is useful but not necessary; or
- undesirable: spaces should be separated because of noise, privacy, smell or hazard.
A simple bubble diagram converts these relationships into approximate zones. It is a planning tool, not a construction drawing. The final layout must still be tested against dimensions, structure, openings, furniture, services and regulations. 1.3 A practical planning sequenceA reliable sequence is: - collect the brief and confirm assumptions;
- obtain the site survey, title information and orientation;
- identify zoning, land-use and development controls;
- mark boundaries, setbacks, access and services;
- prepare the room schedule;
- develop adjacency and circulation diagrams;
- establish a structural and service grid where appropriate;
- test alternative layouts;
- check dimensions, daylight, ventilation, accessibility and fire escape;
- review constructability and cost implications; and
- produce the preliminary plan for client and authority review.
The draftsman should record decisions and unresolved issues rather than silently assuming them. 2. Site Analysis and OrientationSite analysis is the examination of physical, environmental and legal conditions affecting a building. Important information includes plot dimensions, north direction, levels, road position, neighboring buildings, trees, drainage, soil indications, utility connections, prevailing winds, noise, views, hazards and development restrictions. 2.1 OrientationOrientation is the relationship between the building and the sun, wind and surroundings. The best orientation depends on climate. In hot climates, reducing unwanted solar heat gain and enabling cross-ventilation are major concerns. In cold climates, useful solar exposure may improve passive heating. In mixed climates, seasonal control is required. Planning responses may include: - placing frequently occupied rooms where daylight and desirable views are available;
- locating service spaces as buffers against heat, noise or unattractive boundaries;
- controlling low-angle morning and evening sun with shading;
- using roof overhangs, verandas, louvers or external screens;
- positioning openings to support cross-ventilation; and
- avoiding reliance on orientation alone where local climate, neighboring buildings or urban form dominate.
The compass direction must be verified from a survey or reliable site information. A drawing without a north arrow is incomplete for environmental planning. 2.2 Climate-responsive planningClimate-responsive planning integrates passive design before mechanical systems are selected. Key variables include solar radiation, air temperature, humidity, wind and rainfall. A draftsman may not perform the full environmental simulation, but should provide a layout that allows the building engineer to evaluate these factors. Cross-ventilation is more effective when openings are placed on opposing or adjacent faces and internal doors do not block the airflow path. However, ventilation openings must also satisfy security, acoustic, weatherproofing and fire requirements. Large windows do not automatically provide good ventilation if they face a polluted road or an enclosed courtyard. 2.3 Site utilizationThe proportion of site occupied by the building is often regulated. A common planning measure is the site coverage ratio: Site\ coverage\ ratio = \frac{Building\ footprint\ area}{Plot\ area} × 100\% Building footprint is the area covered by the building at ground level, measured according to the applicable regulation. Plot area and footprint area must use the same units, such as m². The definition may exclude or include projections, covered parking and other elements depending on local rules. For example, if a plot is 240 m² and the permitted footprint is 120 m²: Site\ coverage = \frac{120}{240} × 100\% = 50\% This calculation is only valid if both areas are measured under the same statutory method. 3. Functional Planning and CirculationFunctional planning places spaces according to use, sequence and relationship. It must consider both ordinary movement and emergency movement. 3.1 Entries and movement hierarchyA clear building normally has a recognizable approach, entrance, distribution space and destination. Circulation may be: - horizontal: corridors, galleries and internal routes;
- vertical: stairs, ramps and lifts; and
- service circulation: routes for deliveries, refuse, maintenance and staff.
Public, private and service routes should be separated where their simultaneous use would cause conflict. A service entrance can prevent deliveries from passing through a reception area. In a house, the main entrance, family entrance and service access may be distinct but should remain convenient and secure. 3.2 Corridor and circulation designA corridor must accommodate expected movement, door swings, furniture movement and, where required, wheelchair passing or evacuation. Its width is not selected only by personal preference; it is governed by occupancy, building type and code. Dead-end corridors, abrupt changes in level, poorly located columns and doors opening into narrow routes create safety and usability problems. Circulation area is necessary, but excessive corridor length wastes floor area. A useful planning indicator is the circulation efficiency ratio: Circulation\ ratio = \frac{Circulation\ area}{Gross\ floor\ area} × 100\% The ratio is a diagnostic measure rather than a universal pass/fail criterion. Gross floor area must be defined consistently, and the acceptable value depends on building type. A hospital, hotel and small dwelling naturally have different circulation requirements. 3.3 Furniture and functional clearancesRooms should be tested with furniture, fixtures and equipment drawn to scale. A bedroom that satisfies a nominal area requirement may still fail if the bed blocks the door, a wardrobe prevents window access, or there is no usable route around the furniture. The draftsman should show representative furniture in preliminary planning drawings. Important checks include: - door clear opening and direction of swing;
- access to windows and controls;
- working space at kitchen counters and appliances;
- clearance in front of sanitary fixtures;
- turning and transfer space for wheelchair users;
- movement of large furniture and equipment; and
- maintenance access to services.
4. Room Standards and Environmental RequirementsRoom standards are minimum or recommended conditions for safe and usable spaces. They may be expressed through area, width, height, opening size, occupancy, fixture provision or performance criteria. The draftsman must distinguish between a legal minimum and a good planning standard. 4.1 Room dimensions and areaThe useful dimensions of a room must support its activity. A room should not be designed from area alone. For example, a long narrow room may have the required area but poor furniture arrangement and limited daylight. Proportion, access, ceiling height and opening position are equally important. A room schedule should identify the governing source for each critical requirement. A typical schedule might include an entrance lobby, living space, kitchen, bedrooms, bathrooms, storage, circulation and service areas. The final values should be checked against the relevant residential, educational, commercial or institutional code. 4.2 Daylight and ventilationNatural lighting and ventilation requirements are usually expressed through minimum opening areas, performance criteria or room-specific regulations. The required opening may be measured as a glazed area, openable area or effective ventilation area; these are not interchangeable. For preliminary checking, the draftsman may calculate an opening-to-floor-area ratio: Opening\ ratio = \frac{Relevant\ opening\ area}{Room\ floor\ area} If a room has a floor area of 15 m² and a proposed relevant opening area of 2.25 m², the ratio is 0.15, or 15%. Whether this is adequate depends entirely on the applicable code, the definition of opening area and the room type. Obstructions, shading, external air wells and neighboring buildings may reduce actual performance. Daylight is affected by window orientation, room depth, ceiling reflectance, external obstruction and glazing transmission. Mechanical ventilation may supplement but does not automatically replace statutory natural ventilation requirements. 4.3 Wet areas and servicesKitchens, bathrooms and laundry areas require careful coordination of water supply, drainage, ventilation, waterproofing and maintenance access. Grouping wet areas can reduce pipe length and simplify construction, but privacy and functional relationships must also be maintained. Drainage layouts require adequate gradients, inspection access and coordination with structural members. The draftsman should not route pipes through beams or columns without engineering approval. Floor levels, thresholds and waterproofing details must prevent water from entering dry rooms. 5. Accessibility and Inclusive PlanningAccessibility means that people with varied physical, sensory and cognitive abilities can approach, enter, use and leave a building safely and independently. Inclusive planning benefits older persons, children, injured users, delivery workers and occupants carrying loads, not only wheelchair users. Key principles include: - a continuous accessible route from the site boundary or parking area to required entrances;
- firm, stable and slip-resistant surfaces;
- ramps or lifts where level changes cannot be avoided;
- adequate door clear widths and maneuvering spaces;
- accessible sanitary facilities where required;
- reachable controls, switches and hardware;
- visual and tactile warnings at hazards; and
- clear signage and adequate lighting.
A ramp must be designed using the applicable maximum slope, landing and handrail requirements. If a level difference is 600 mm and the permitted slope is 1:12, the minimum sloping length, excluding landings, is: Run = \frac{Rise}{Slope} = \frac{600\ mm}{1/12} = 7200\ mm This is a geometric calculation. The slope ratio must be interpreted correctly: 1:12 means 1 unit of rise for 12 units of horizontal run. The result does not eliminate requirements for landings, edge protection, handrails, width or drainage. Accessible design should be integrated from the beginning. Adding a ramp after the plan is complete often produces steep slopes, obstructed entrances or loss of required circulation space. 6. Zoning, Setbacks and Regulatory ControlsRegulatory requirements control the relationship between a building and its site, neighboring properties and public infrastructure. The draftsman should obtain current information from the responsible authority rather than rely on an old drawing or informal advice. 6.1 Common controlsTypical controls include: - permitted land use and occupancy;
- plot size and minimum frontage;
- front, side and rear setbacks;
- maximum building height and number of storeys;
- floor area ratio or floor space index;
- site coverage;
- parking and loading requirements;
- access width and fire appliance access;
- boundary walls and projections;
- minimum open space or landscaping;
- heritage, flood, coastal or environmental restrictions; and
- utility and drainage connections.
A setback is the required distance between a specified property or reference line and the permitted building face. Measurement rules vary. Eaves, balconies, bay windows, basements and covered parking may be treated differently. The drawing should show the setback dimension to the correct reference point, not merely a visually approximate gap. 6.2 Floor area ratioWhere used by the local authority, floor area ratio may be expressed as: FAR = \frac{Total\ permitted\ floor\ area}{Plot\ area} If the permitted FAR is 1.5 and the plot area is 240 m², the permitted floor area under that rule is 360 m². The authority’s definition of included floor area must be confirmed because balconies, parking, basements and service spaces may receive special treatment. 6.3 Regulatory drawing informationA submission drawing commonly requires a site plan, location plan, floor plans, elevations, sections, area statements, parking information, north arrow, dimensions, levels, setbacks and signatures or professional certifications. The exact submission set varies by authority and project class. The draftsman must maintain consistency between drawings. A staircase shown in plan must align with the section; floor levels must agree with elevations; openings must correspond across views; and the site plan must show the same footprint as the floor plan. 7. Fire Safety and Means of EscapeFire safety planning aims to prevent ignition where possible, limit fire and smoke spread, provide early warning, enable evacuation and support firefighting. Requirements depend strongly on occupancy, height, area, construction type, travel distance and occupant load. A basic escape strategy includes: - identifying occupied rooms and likely occupant numbers;
- providing usable exits and escape routes;
- limiting travel distance and dead ends as required;
- protecting stairs and corridors where required;
- ensuring doors open and discharge appropriately;
- providing emergency lighting, alarms and signage where required; and
- maintaining fire service access and firefighting provisions.
The number and width of exits cannot be selected from a general rule without knowing the applicable code and occupancy. A small dwelling and a public assembly hall have different risks. Exit doors, stair enclosures, fire doors, compartment walls and service penetrations must be coordinated with the fire strategy. Common planning errors include placing a single exit where two are required, locating an exit through a hazardous room, creating a locked route, allowing storage in corridors, and showing a stair that does not discharge to a safe exterior location. The draftsman should use an evacuation plan or annotated fire-safety plan when required. 8. Structural and Service CoordinationPlanning and structure influence one another. A regular structural grid may reduce cost and simplify construction, but it should not produce unusable room proportions. Columns should be positioned with furniture, openings, circulation and parking in mind. Beams, ducts and pipes require vertical and horizontal space. Early coordination should identify: - likely column and wall positions;
- stair and lift cores;
- plumbing stacks and inspection points;
- electrical and mechanical rooms;
- roof drainage routes;
- ceiling voids and access panels; and
- equipment replacement paths.
Building information modelling (BIM) can support coordination by identifying clashes between architectural, structural and services models. However, software detection does not replace professional judgment. A geometrically clear pipe may still violate fire separation, maintenance access or acoustic requirements. 9. Worked Planning ExampleIllustrative example: small residential plotA client proposes a two-storey dwelling on a rectangular plot measuring 12 m × 20 m. The authority permits a maximum site coverage of 50%, subject to setbacks. The client requests three bedrooms, a living room, kitchen, dining area, two bathrooms, storage, parking and a future upper-floor extension. Step 1: Plot and coveragePlot\ area = 12\ m × 20\ m = 240\ m² At 50% coverage: Maximum\ footprint = 0.50 × 240\ m² = 120\ m² This is a maximum subject to setbacks and other controls; it is not an instruction to cover the entire permitted area. Step 2: Brief translationThe public zone contains the entrance, living and dining spaces. The semi-private zone contains the kitchen and family circulation. Bedrooms are placed in the quieter private zone. The service zone includes storage, bathrooms and a utility area. Parking is positioned near the road, while a service route is kept separate where possible. Step 3: Initial area schedule| Space group | Indicative area |
|---|
| Living and dining | 30 m² | | Kitchen and utility | 14 m² | | Three bedrooms | 36 m² | | Two bathrooms | 8 m² | | Storage | 4 m² | | Internal circulation and stairs | 18 m² | | Indicative total | 110 m² |
The schedule is below the 120 m² footprint, but the arrangement still requires wall thickness, shafts, entrance space and code checks. The upper floor may have a different area and must be tested against FAR and height limits. Step 4: EvaluationThe preliminary layout is tested for direct entrance access, furniture fit, kitchen-dining relationship, bathroom ventilation, stair position, accessible approach, escape routes, daylight, cross-ventilation, structural regularity and drainage. If the stair blocks the living room or the kitchen has no service access, the arrangement is revised before detailed drafting. The example demonstrates that compliance is iterative. A numerical area check alone cannot establish that a plan is workable. 10. Applied Case: Community Health CentreBackgroundThe following is an illustrative case. A local authority commissions a small one-storey community health centre serving approximately 40 visitors at peak periods. It requires reception, waiting, consultation rooms, a treatment room, accessible toilets, staff space, storage, a waste holding area and a protected service entrance. ProblemThe first client sketch places the treatment room behind the public waiting area, locates waste storage beside the main entrance and provides only one narrow route from the consultation rooms. The sketch also shows a step at the entrance and no clear separation between clean and soiled service movement. AnalysisThe planning team identifies four movement systems: visitors, staff, clinical supplies and waste. Privacy is needed between waiting and consultation rooms. The treatment room requires convenient access for patients and staff. The entrance must be accessible, and emergency movement must not depend on furniture being removed from the waiting area. Approach and solutionThe revised plan uses a legible entrance lobby leading to reception and waiting. Consultation rooms are grouped around a controlled staff corridor. The treatment room is close to the accessible entrance but screened from direct public view. Clean storage is placed near staff circulation, while waste storage is moved to a screened external service point with a separate route. Accessible toilets are positioned near the public zone. Door swings, wheelchair maneuvering spaces, handwashing facilities, ventilation and fire exits are checked against the applicable health, accessibility and fire codes. The plan is then coordinated with structural and mechanical consultants. A reflected ceiling and services review identifies the need for exhaust ventilation in wet areas and a protected route for medical equipment. OutcomeThe revised scheme improves privacy, reduces cross-traffic, provides a clearer accessible route and allows deliveries and waste removal without passing through the waiting area. It also gives the authority a coherent basis for reviewing occupancy, fire safety and sanitation provisions. Learning points- The client’s first sketch is a brief input, not a final solution.
- Adjacency must consider people, supplies, waste and emergencies.
- Accessibility and fire safety must be included from the initial concept.
- A room schedule must be supported by circulation and equipment testing.
- Regulatory compliance is coordinated across plans, sections and specifications.
11. Common Errors, Limitations and Professional PracticeFrequent planning errors include: - starting detailed CAD work before confirming the brief and site data;
- omitting the north arrow, levels or property dimensions;
- treating minimum room area as sufficient evidence of quality;
- ignoring furniture and equipment clearances;
- showing inaccessible entrances or abrupt level changes;
- failing to coordinate door swings and escape routes;
- placing columns, ducts or pipes in unusable locations;
- measuring setbacks from the wrong line;
- copying standards from another jurisdiction; and
- allowing inconsistent dimensions between drawings.
CAD improves speed and accuracy, but it can also make an incorrect concept appear polished. Layers, blocks, templates and parametric dimensions should be used systematically. Revision clouds, issue dates and drawing registers help control changes. BIM and AI-assisted design tools may suggest layouts or detect clashes, but the professional remains responsible for verifying inputs, code interpretation, constructability, privacy and safety. AI-generated proposals must not be accepted without checking the current regulations and the actual site. Ethically, the draftsman must not conceal non-compliance, alter dimensions to mislead an authority, or represent unverified work as approved design. Safety-critical decisions must be referred to the responsible architect or engineer. Confidential client information and site security data should also be handled appropriately. 12. A Professional Planning ChecklistBefore issuing a preliminary building plan, verify: - Is the client brief complete and recorded?
- Is the site boundary, orientation, access and level information reliable?
- Has the current zoning and building code been identified?
- Are setbacks, height, coverage, FAR and parking requirements checked?
- Are public, private and service zones logically arranged?
- Do furniture and equipment fit without obstructing movement?
- Are daylight, ventilation, privacy and acoustic needs considered?
- Is there a continuous accessible route?
- Are stairs, ramps, lifts and sanitary facilities compliant in principle?
- Are escape routes, exits and fire-service access considered?
- Are structural grids and building services coordinated?
- Do plans, elevations, sections, schedules and area statements agree?
- Are assumptions, exclusions and unresolved approvals clearly noted?
Chapter SummaryBuilding planning transforms a client brief and site information into a safe, functional and approvable arrangement. The process begins with a room schedule, functional classification and adjacency analysis. Orientation and site analysis respond to climate, access, views, noise, drainage and neighboring conditions. Circulation must support ordinary use, service movement and emergency escape, while furniture and equipment testing confirms that nominal room areas are genuinely usable. Accessibility, daylight, ventilation, sanitation, fire safety, setbacks, zoning, site coverage, FAR, parking and height controls must be considered together. Regulatory values are jurisdiction-specific, so the draftsman must consult current official sources and document assumptions. CAD, BIM and AI tools improve coordination and productivity but do not replace professional verification. A sound plan is therefore the result of iterative testing, multidisciplinary coordination, ethical practice and careful consistency across all drawings. Key TermsAdjacency: Desired relationship or closeness between two spaces. Accessibility: Ability of people with varied abilities to approach, enter, use and leave a building. Building footprint: Ground-level area occupied by a building, as defined by the applicable regulation. Bubble diagram: Diagram showing approximate spatial relationships before detailed dimensions are fixed. Circulation: Movement routes and spaces within and around a building. Cross-ventilation: Air movement through openings on different sides of a space. FAR: Ratio of permitted total floor area to plot area. Functional zoning: Arrangement of spaces according to use, privacy, access and service relationships. Gross floor area: Floor area measured according to a specified statutory or project definition. Means of escape: Continuous route allowing occupants to reach a safe place during an emergency. Occupancy: Use and expected population of a building or space. Orientation: Position of a building relative to the sun, wind, north and surroundings. Planning brief: Statement of the client’s functional, technical and project requirements. Plot coverage: Percentage of plot area occupied by the building footprint. Room schedule: Tabulated list of required spaces, areas, users and performance needs. Setback: Required distance between a building and a property or regulatory reference line. Site analysis: Study of physical, environmental and legal conditions affecting development. Universal design: Design approach intended to be usable by the widest practical range of people. Zoning: Regulatory control of land use and development form. Review QuestionsShort Answer Questions- What is the purpose of converting a client brief into a room schedule?
- Distinguish between public, private and service zones.
- State two factors that influence building orientation.
- Why must furniture be shown during preliminary planning?
- What is the difference between a setback and site coverage?
Long Answer Questions- Explain a complete procedure for developing a building plan from client brief to preliminary approval drawing.
- Discuss how orientation, climate and site conditions influence the arrangement of rooms and openings.
- Explain the role of accessibility in building planning and describe the elements of a continuous accessible route.
- Discuss the relationship between functional planning, fire safety and circulation.
- Explain why structural and building-service coordination should begin during preliminary planning.
Analytical / Application Questions- A proposed dwelling has a plot area of 300 m² and a ground-floor footprint of 135 m². Calculate the site coverage ratio and explain what additional regulatory checks are still required.
- A small clinic has a public entrance, staff entrance and waste collection point all located on one side of the building. Propose a zoning and circulation strategy that reduces conflict between visitors, staff, supplies and waste.
- Review a hypothetical plan containing a narrow entrance, a bathroom opening directly into a kitchen, a dead-end corridor and a stair that discharges into a locked room. Identify the planning and safety problems and recommend corrective actions.
Multiple Choice Questions with AnswersQuestion 1What is the primary purpose of an adjacency diagram? A. To show final construction dimensions B. To represent desired relationships between spaces C. To calculate structural loads D. To specify electrical wiring sizes Correct Answer: B. To represent desired relationships between spaces Question 2A plot measures 240 m² and the building footprint is 120 m². What is the site coverage ratio? A. 25% B. 40% C. 50% D. 60% Correct Answer: C. 50% Question 3Which space is normally classified as a service space? A. Reception B. Bedroom C. Living room D. Laundry Correct Answer: D. Laundry Question 4In a ramp slope of 1:12, what does the ratio mean? A. 12 units of rise for 1 unit of run B. 1 unit of rise for 12 units of horizontal run C. 1 unit of width for 12 units of height D. 12 degrees of slope Correct Answer: B. 1 unit of rise for 12 units of horizontal run Question 5Which drawing feature is essential for environmental orientation analysis? A. North arrow B. Furniture color scheme C. Door hardware schedule only D. Paint specification Correct Answer: A. North arrow Question 6Which planning arrangement best reduces conflict in a healthcare building? A. Routing waste through the public waiting area B. Combining clean storage with refuse storage C. Separating visitor, staff and service circulation where necessary D. Locating all entrances through consultation rooms Correct Answer: C. Separating visitor, staff and service circulation where necessary Question 7If permitted FAR is 1.5 and the plot area is 240 m², what total floor area does the FAR indicate, subject to statutory definitions? A. 160 m² B. 240 m² C. 360 m² D. 480 m² Correct Answer: C. 360 m² Question 8Which statement about building regulations is correct? A. One numerical standard applies to every jurisdiction B. A copied standard is acceptable without verification C. Current local requirements must be checked for the project D. Regulations apply only to elevations Correct Answer: C. Current local requirements must be checked for the project Question 9Why should furniture be included in preliminary plans? A. To decorate the drawing B. To test usability, clearances and movement C. To replace structural drawings D. To determine land ownership Correct Answer: B. To test usability, clearances and movement Question 10Which is a common fire-planning error? A. Providing protected escape routes where required B. Coordinating exit doors with circulation C. Keeping corridors free of storage D. Allowing an escape route to discharge into a locked room Correct Answer: D. Allowing an escape route to discharge into a locked room
|