Supply Chain Structures, Processes and FrameworksIntroduction and contextA supply chain is not simply a sequence of firms that move products from a factory to a customer. It is a network of organisations, assets, information systems, processes and relationships that jointly create and deliver value. Raw-material suppliers, manufacturers, logistics providers, wholesalers, retailers, financial institutions, regulators and customers may all influence the performance of the same supply chain. The word chain is therefore a useful simplification, but it can also be misleading. Most modern supply chains are networks with multiple tiers, alternative sourcing routes, shared service providers, reverse flows and digital connections. A disruption at a lower-tier supplier may affect an original equipment manufacturer even when the two organisations have no direct contractual relationship. Similarly, a retailer’s promotion may create demand volatility throughout the upstream network. This chapter provides an integrated approach to analysing supply chain structures and processes. It combines systems thinking, value chain analysis, process mapping, the SCOR framework and product-process alignment. The purpose is not merely to describe these tools, but to show how they can be used together to diagnose performance problems and design practical improvements. Learning objectivesBy the end of this chapter, the learner should be able to: - Distinguish supply chain structures, tiers, nodes, links and flows.
- Analyse supply chains as interconnected systems rather than isolated functions.
- Apply value chain analysis to identify activities that create, transfer or destroy value.
- Map processes at appropriate levels of detail and identify waste, risk and control points.
- Explain and apply the major processes and performance perspectives of the SCOR framework.
- Assess product-process alignment and recognise the consequences of misalignment.
- Analyse supply chain relationships, governance arrangements and information flows.
- Recommend improvements while considering resilience, sustainability, ethics and digital capability.
1. Supply chain structure: networks, tiers and relationships1.1 Structural elementsA supply chain structure can be described through four basic elements: - Nodes: organisations, facilities or decision points, such as mines, factories, warehouses, ports, stores and customers.
- Links: physical, informational, financial or contractual connections between nodes.
- Flows: the movement of materials, products, information, money, ownership, risk and returns.
- Governance: the mechanisms used to coordinate activities, allocate responsibility and manage performance.
A focal firm is the organisation from whose perspective the supply chain is being analysed. Its upstream supply chain includes suppliers and their suppliers. Its downstream supply chain includes distributors, retailers, customers and users. Tier 1 suppliers have a direct relationship with the focal firm; tier 2 suppliers supply tier 1 suppliers; tier 3 suppliers are further upstream. Tier numbering is relative to the focal firm and does not necessarily indicate importance. A firm may have thousands of suppliers but limited visibility beyond tier 1. This creates a distinction between the known supply chain and the actual supply network. Effective analysis must identify dependencies that are not immediately visible, including common suppliers, shared ports, specialised tooling and single-source materials. 1.2 Types of supply chain structureSeveral structural patterns are common: | Structure | Main characteristic | Typical implication |
|---|
| Linear chain | A relatively simple upstream-to-downstream sequence | Easy to visualise, but may hide parallel relationships | | Convergent network | Many suppliers feed one product or assembly | High coordination and component availability requirements | | Divergent network | One product is distributed to many markets | Allocation, transport and channel management are important | | Hub-and-spoke | A central facility connects suppliers or customers | Efficient consolidation, but vulnerable to hub disruption | | Platform ecosystem | Multiple firms contribute complementary products or services | Governance, data standards and network effects are critical | | Circular network | Products, components or materials return for reuse, repair or recycling | Requires reverse logistics and clear ownership of recovered value |
Supply chain structures may also be efficient, emphasising cost and asset utilisation, or responsive, emphasising speed, flexibility and service. In practice, a firm may use an efficient structure for stable products and a responsive structure for uncertain or customised products. 1.3 Flows and the bullwhip effectThree flows are traditionally emphasised: material, information and financial flows. In advanced analysis, additional flows include product ownership, risk, regulatory data, carbon information and reverse logistics. The physical flow usually moves downstream, while demand information should move upstream. Payment may move upstream, although credit arrangements can make the timing more complex. Delays, batching, inaccurate forecasts and local optimisation can cause order variability to increase as it moves upstream. This phenomenon is commonly called the bullwhip effect. A simple way to express demand amplification is: A = σ²orders ÷ σ²demand Here, A is the amplification ratio, σ²_orders is the variance of orders received by a supply-chain stage, and σ²_demand is the variance of customer demand. The ratio is dimensionless. An A greater than 1 indicates that order variability exceeds customer-demand variability. This measure is meaningful only when the periods, products and data definitions are comparable and when unusual events have been considered. Information sharing, shorter replenishment lead times, smaller order batches, stable pricing and collaborative planning can reduce amplification. However, information sharing alone does not solve the problem if firms continue to make conflicting decisions or use incompatible planning parameters. 2. Systems thinking and supply chain analysisSystems thinking views the supply chain as a set of interdependent parts whose interactions produce outcomes. It challenges the assumption that improving one function automatically improves the whole system. For example, a purchasing department may reduce unit price by ordering in large batches, while the resulting inventory, obsolescence and handling costs increase total supply chain cost. 2.1 Important systems conceptsInterdependence means that one activity affects others. A production schedule depends on material availability, labour, equipment and customer priorities. Feedback occurs when the output of a system influences future decisions. Inventory levels affect replenishment orders; delivery reliability affects supplier allocation; customer complaints affect product and process design. Delays separate an action from its consequence. A forecast error may not become visible until production, shipping and retail replenishment have occurred. Emergence refers to system-level behaviour that cannot be understood by examining one component alone. Congestion, chronic expediting and unstable schedules can emerge from individually rational decisions. Constraints are resources or conditions that limit throughput. A constrained port, testing machine, skilled technician or regulatory approval may determine total system performance. 2.2 Local and global optimisationLocal optimisation focuses on a department or transaction. Global optimisation considers total cost, service, risk and value across the network. Useful questions include: - What is the effect of this decision on total landed cost rather than purchase price?
- Does a production efficiency create excess inventory or reduce responsiveness?
- Does supplier consolidation improve leverage but increase disruption exposure?
- Does a transport shortcut increase emissions, damage or compliance risk?
A systems perspective does not mean that every decision must be centralised. It means that local decisions should be evaluated against system objectives and boundary conditions. 2.3 Supply chain boundariesEvery analysis has a boundary. A warehouse manager may study inbound and outbound operations; a sustainability team may include raw-material extraction, use and end-of-life; a regulator may focus on legal entities operating within a jurisdiction. Boundary choices influence the conclusions. Analysts should state what is included, what is excluded and why. 3. Value chain analysisValue chain analysis examines how activities contribute to customer value and organisational advantage. In the classic value-chain perspective, primary activities include inbound logistics, operations, outbound logistics, marketing and sales, and service. Support activities include procurement, technology development, human-resource management and firm infrastructure. For supply chain purposes, value should be interpreted broadly. Customers may value availability, reliability, safety, customisation, sustainability, traceability and ease of return—not just a low price. An activity creates value when it contributes to a valued customer outcome at an acceptable resource and risk cost. An activity may be necessary without directly creating value; regulatory inspection is an example. Waste occurs when resources are consumed without improving the product, service or required assurance. A practical value-chain analysis can follow five steps: - Define the customer segment and the value proposition.
- Identify major activities from source through delivery and, where relevant, return or disposal.
- Link each activity to cost, time, quality, risk and customer outcomes.
- Identify capabilities that competitors cannot easily copy.
- Decide which activities should be owned, partnered, automated or redesigned.
Value-chain analysis differs from a simple cost breakdown. A low-cost activity may damage responsiveness or resilience. Conversely, an apparently expensive activity may protect safety, brand reputation or continuity of supply. Value capture and powerValue creation and value capture are not identical. A supplier may create a specialised component that is essential to a product but capture only a small margin because of weak bargaining power. A platform or brand owner may capture substantial value because it controls customer access, data or standards. Supply chain analysis should therefore consider power, dependence, switching costs and the distribution of risk and reward. 4. Process architecture and process mappingA process is a set of connected activities that transforms inputs into outputs for an internal or external customer. Process architecture represents the hierarchy of processes across an organisation or network. A common hierarchy is: - Level 0: end-to-end value stream, such as order fulfilment.
- Level 1: major processes, such as plan, source, make and deliver.
- Level 2: process groups, such as production scheduling or shipment execution.
- Level 3: activities, such as release a production order.
- Level 4: detailed work instructions or system transactions.
Mapping at too high a level hides causes; mapping at too low a level overwhelms users. The appropriate level depends on the decision being made. 4.1 Basic process-mapping methodA disciplined mapping exercise should: - Define the process start and end points.
- Identify the customer, supplier and required output.
- Record activities in sequence, including decision points and loops.
- Assign ownership and identify systems, documents and data.
- Record processing time, waiting time, queues, defects and hand-offs.
- Validate the map through observation and interviews.
- Analyse failure points and design improvements.
A process map should distinguish physical movement from information and decision flows. It should also show exceptions, because many service failures occur outside the nominal process. 4.2 Process performance measuresUseful measures include cycle time, throughput, first-pass yield, schedule adherence, order completeness, inventory accuracy and on-time delivery. Measures must have precise definitions. For example, on-time delivery may be measured against the customer’s requested date, the confirmed date or the promised date; these alternatives are not interchangeable. A general process cycle-time relationship is: Lead time = Processing time + Waiting time + Transport time + Inspection time + Delay time All terms must be measured using the same time unit and boundary. In some processes, activities overlap, so simply adding every activity can overstate elapsed time. A valid map must identify whether activities are sequential, parallel or overlapping. Little’s Law is useful for a stable process over a sufficiently long observation period: L = λW L is average work-in-process, measured in units; λ is average throughput rate, measured in units per time period; and W is average time in the process, measured in the same time unit. The relationship assumes a stable system in which average inflow and outflow are approximately equal. It should not be applied uncritically during start-up, shutdown or rapidly changing demand. 5. The SCOR frameworkThe Supply Chain Operations Reference framework provides a common language for describing, measuring and improving supply chain processes. It is not a software package and does not prescribe one organisational structure. It supports process classification, performance measurement, practice identification and skills analysis. Traditional SCOR structures commonly organise supply chain activities around Plan, Source, Make, Deliver and Return, with Enable activities providing governance and support. ASCM has evolved the framework, including digital and updated process terminology in newer versions. Organisations should therefore confirm the version and definitions used in a particular project. 5.1 Core process categoriesPlan balances aggregate demand, supply, capacity, inventory, resources and financial objectives. It includes demand planning, supply planning, integrated business planning and network decisions. Source involves acquiring goods and services. It includes supplier qualification, purchasing, inbound logistics, receiving, inspection and supplier performance management. Make converts inputs into products or services. It includes scheduling, production, testing, packaging, maintenance and release. Deliver fulfils customer demand. It includes order management, allocation, warehousing, transport, installation and invoicing-related coordination. Return manages the reverse movement of products, packaging, components or materials. It includes authorisation, collection, inspection, disposition, repair, recycling and financial settlement. Enable supports the other processes through data, rules, assets, contracts, compliance, risk management, performance management, technology and workforce capability. 5.2 SCOR performance attributesSCOR commonly groups performance into attributes such as reliability, responsiveness, agility, cost, and asset-management efficiency. Sustainability and resilience are increasingly treated as essential dimensions in supply chain performance systems, whether embedded in the framework or used as complementary lenses. Typical indicators include: - Perfect order fulfilment or equivalent order reliability measure.
- Order fulfilment cycle time.
- Upside and downside supply-chain adaptability.
- Total supply-chain management cost.
- Cash-to-cash cycle time and return on supply-chain assets.
A perfect-order measure should be defined carefully. One possible form is: Perfect order percentage = (Number of orders meeting all defined criteria ÷ Total orders) × 100 The criteria may include correct product, quantity, documentation, condition and agreed delivery timing. The numerator and denominator must use the same order population and period. An organisation should not compare this measure with another organisation unless the definitions are aligned. 5.3 Applying SCOR in improvement projectsAn effective SCOR application proceeds as follows: - Establish the business problem and supply-chain boundary.
- Map the current process using SCOR categories and levels.
- Define performance metrics and establish a baseline.
- Identify gaps between customer requirements and current capability.
- Analyse root causes, practices, technology and skills.
- Design and prioritise improvements.
- Pilot changes, measure results and institutionalise controls.
SCOR improves communication between functions because it provides standard process labels. Its limitation is that classification alone does not solve behavioural, political or strategic problems. A well-labelled process can still be poorly governed. 6. Product-process alignmentProduct-process alignment concerns the fit between product characteristics and the process used to design, source, make and deliver the product. The central principle is that predictable, high-volume products are usually compatible with standardised, efficient processes, whereas uncertain, low-volume or highly customised products require flexible processes. A useful conceptual spectrum is: | Product characteristics | Suitable process tendency |
|---|
| High volume, stable demand, standard design | Continuous or repetitive flow | | Moderate volume and variety | Batch or cellular production | | Low volume, high variety or custom design | Job shop or functional process | | Unique, large or project-based output | Project process |
The product-process matrix should not be treated as a rigid rule. Technology, postponement, modular design and digital configuration can allow a firm to offer variety while retaining efficient upstream operations. 6.1 Consequences of misalignmentIf a stable, high-volume product is produced through a highly customised process, costs, lead times and scheduling complexity may be unnecessarily high. If a volatile, customised product is forced through a rigid high-efficiency process, the result may be stockouts, excess finished inventory, markdowns and poor service. Alignment can be improved through: - Standardisation of components and work methods.
- Modularity so common parts are shared across products.
- Postponement, delaying final configuration until demand is clearer.
- Segmentation, using different supply chains for different demand profiles.
- Strategic capacity, including flexible labour and qualified alternate suppliers.
- Accurate product data, bills of material and configuration rules.
7. Relationships, governance and collaborationSupply chain relationships range from transactional buying to strategic partnerships and ecosystems. The appropriate relationship depends on supply risk, value impact, technological dependence, switching cost and the need for joint innovation. Governance mechanisms include contracts, service-level agreements, standards, audits, forecasts, joint planning, performance reviews, incentives and dispute-resolution processes. Trust is valuable but does not eliminate the need for clear responsibilities and evidence. Collaboration should be designed rather than assumed. Organisations need to decide: - What information will be shared?
- At what frequency and level of detail?
- Who owns the data and who may use it?
- Which decisions will be joint?
- How will benefits and costs be allocated?
- What happens when forecasts are wrong or supply is disrupted?
Ethical governance requires responsible purchasing, fair treatment of suppliers, protection of confidential information, prevention of forced labour and discrimination, and credible environmental claims. Audits alone are insufficient when suppliers face unrealistic prices, deadlines or payment terms that encourage non-compliance. 8. Technology, resilience and contemporary developmentEnterprise resource planning, warehouse-management systems, transport-management systems, electronic data interchange, application programming interfaces, Internet of Things sensors and control towers can improve visibility and coordination. Artificial intelligence can support demand sensing, anomaly detection, supplier-risk analysis and route planning. However, AI outputs depend on data quality, model assumptions and governance. Human review remains necessary for high-impact decisions such as supplier termination, worker monitoring, allocation of scarce medical products and regulatory reporting. Digital integration introduces risks: cyberattack, unauthorised access, data manipulation, algorithmic bias, vendor dependence and loss of operational capability when systems fail. A digitally advanced supply chain therefore needs access controls, data standards, audit trails, backup procedures, incident response and clear accountability. Resilience should be analysed alongside efficiency. Relevant practices include multi-sourcing, regional capacity, strategic inventory, supplier development, scenario planning, substitution design and recovery exercises. Resilience is not the same as holding maximum inventory. It is the capability to anticipate, absorb, adapt to and recover from disruption while maintaining essential service. Sustainability analysis should include emissions, energy, water, waste, packaging, labour conditions and product end-of-life. Organisations should avoid shifting impacts to suppliers or logistics providers merely to improve their own reported performance. Life-cycle boundaries and measurement assumptions must be transparent. Applied case: Northstar Home AppliancesThis is an illustrative case created for educational purposes. BackgroundNorthstar manufactures countertop cooking appliances and sells through retailers and its own website. Its product range includes a stable, high-volume basic model and a rapidly changing smart model with software connectivity. Components are sourced from suppliers in three regions. A contract manufacturer performs final assembly, while a third-party logistics provider operates the distribution centre. ProblemNorthstar reports rising expedited freight, frequent stockouts of smart models and excess inventory of basic models. Customer service complaints indicate late deliveries and incomplete accessory shipments. Management initially proposes a larger warehouse and lower supplier prices. AnalysisA network map reveals that the smart model depends on one supplier for a specialised communications module. The supplier itself relies on a single semiconductor source. Northstar’s purchasing team places large monthly orders to obtain price discounts, while sales frequently changes forecasts. The distribution centre receives incomplete electronic advance-shipping notices, causing manual receiving and delayed put-away. Value-chain analysis identifies customer value in availability, connectivity, reliable delivery and easy returns. The proposed warehouse expansion addresses space but not the underlying information and supply risks. Process mapping of order fulfilment identifies three major delays: manual order changes, incomplete accessory picking and inspection queues for software-enabled units. A SCOR analysis classifies the problems as Plan instability, Source concentration and information-quality weaknesses in Deliver and Enable. Product-process analysis shows that the basic model is suited to repetitive production, while the smart model requires postponement and flexible configuration. Approach and solutionNorthstar adopts separate planning policies. The basic model is forecast-driven with stable production batches and replenishment rules. The smart model uses a common base unit, postponing software activation and final accessory configuration until demand is known. The firm qualifies a second communications-module supplier and conducts a lower-tier risk review for critical semiconductors. The company and its logistics provider implement standard electronic shipment notices and barcode validation. A cross-functional team establishes one definition of on-time delivery and perfect order. Sales, operations and finance conduct a monthly integrated planning review, while a weekly exception process addresses constrained components and major forecast changes. Supplier contracts include quality, continuity, cybersecurity and responsible-business requirements. Northstar also agrees to share a rolling forecast range rather than presenting uncertain forecasts as firm orders. OutcomeAfter the pilot period, stockouts of the smart model decline, accessory errors fall and expedited freight is reduced. The basic model achieves better inventory turnover without reducing availability. The improvement does not result from one isolated technology purchase; it results from aligning product design, planning, sourcing, process controls and relationship governance. Learning points- A warehouse problem may be caused by planning, sourcing or data-quality problems.
- Tier visibility matters when a critical component has a hidden single point of failure.
- Different products may require different supply-chain designs.
- Standard definitions are necessary before performance can be managed.
- Digital tools create value only when processes, responsibilities and data are reliable.
Challenges and limitations of the frameworksNo framework captures every aspect of a supply chain. SCOR can encourage process standardisation but may underrepresent political power, culture and informal work. Value-chain analysis can focus heavily on competitive advantage and overlook social impacts unless sustainability is explicitly included. Process maps may represent the official process rather than the process actually performed. Systems maps can become so broad that decision-makers lose focus. Frameworks also depend on data quality. Missing tier information, inconsistent product codes, unreliable timestamps and disputed metric definitions can produce false precision. Analysts should triangulate system data with observation, interviews, supplier evidence and customer feedback. Finally, supply chains involve trade-offs. Greater resilience may increase cost; increased speed may increase emissions; more supplier competition may reduce collaboration; greater data sharing may increase privacy and cyber risk. Professional judgement is required to make these trade-offs explicit. Best-practice principles- Start with customer and stakeholder requirements, not with an available software tool.
- Map the end-to-end process before optimising individual departments.
- Use a clear focal firm, boundary, time period and unit of analysis.
- Make tier dependencies and critical nodes visible.
- Combine cost, service, risk, sustainability and asset measures.
- Match process design to product volume, variety and uncertainty.
- Use standard definitions for metrics and document assumptions.
- Treat suppliers as sources of capability and risk information, not merely as price points.
- Build data governance, cybersecurity and human accountability into digital initiatives.
- Review frameworks periodically because products, markets, regulations and technologies change.
Chapter SummarySupply chains are interconnected networks of nodes, links, flows and governance arrangements. Tier analysis reveals dependencies that may be hidden from the focal firm, while systems thinking explains how delays, feedback and local decisions create network-level outcomes. Value-chain analysis identifies how activities create, transfer or destroy customer and stakeholder value. Process mapping provides a practical representation of activities, decisions, hand-offs and performance. The SCOR framework supplies a common language through Plan, Source, Make, Deliver, Return and Enable, supported by performance attributes and structured improvement methods. Product-process alignment links demand characteristics and product variety to suitable operating processes; standardisation, modularity and postponement are important mechanisms for improving the fit. Effective supply chain design also requires relationship governance, responsible data use, resilience, sustainability and critical evaluation of frameworks. No model replaces judgement. The strongest analysis combines structural mapping, process evidence, performance measurement and an understanding of commercial, ethical and operational realities. Key TermsSupply chain network: The connected system of organisations, facilities, processes and flows involved in supplying and delivering value. Focal firm: The organisation from whose perspective a supply chain is being analysed. Tier 1 supplier: A supplier with a direct relationship with the focal firm. Node: An organisation, facility or decision point in a supply network. Link: A physical, informational, financial or contractual connection between nodes. Bullwhip effect: Increasing order variability as demand information moves upstream. Systems thinking: Analysis of interdependencies, feedback, delays and outcomes across a whole system. Value chain: The connected activities through which an organisation creates and captures value. Process architecture: A structured hierarchy showing how processes and activities relate. Process map: A visual or textual representation of activities, decisions, flows and responsibilities. SCOR: A reference framework for classifying, measuring and improving supply chain processes. Plan: The process of balancing demand, supply, capacity, inventory and resources. Enable: Governance and support activities that allow supply-chain processes to operate. Perfect order: An order meeting all specified criteria for product, quantity, condition, documentation and timing. Product-process alignment: The fit between product characteristics and the process used to produce and deliver them. Postponement: Delaying final product configuration until demand or customer requirements are clearer. Resilience: The ability to anticipate, absorb, adapt to and recover from disruption. Supply chain governance: Mechanisms used to coordinate relationships, decisions, responsibilities and performance. Review QuestionsShort Answer Questions- Distinguish between a tier 1 supplier and a tier 2 supplier.
- What are the principal material, information and financial flows in a supply chain?
- Explain why process mapping should include exceptions and decision points.
- What is the purpose of the Enable category in SCOR?
- Define postponement and state one situation in which it may be useful.
Long Answer Questions- Explain how systems thinking changes the analysis of supply chain performance compared with functional optimisation.
- Describe the major SCOR process categories and show how they can support an improvement project.
- Compare value-chain analysis with process mapping. What does each reveal, and where do they overlap?
- Discuss the relationship between product variety, demand uncertainty and process choice.
- Evaluate the benefits and limitations of digital visibility in multi-tier supply chains.
Analytical / Application Questions- A retailer experiences stockouts despite holding high total inventory. Design a systems-based investigation using a network map, process map and relevant SCOR categories.
- A company sells a stable high-volume product and a low-volume customised product through the same factory. Recommend a product-process alignment strategy and justify your use of standardisation, modularity or postponement.
- Calculate the amplification ratio when customer-demand variance is 16 units² and order variance is 36 units². Interpret the result and recommend two actions that could reduce amplification.
Multiple Choice Questions with AnswersQuestion 1Which element of a supply-chain structure represents an organisation or facility such as a factory or warehouse? A. Node B. Link C. Flow D. Governance Correct Answer: A. Node Question 2An amplification ratio of 2 means that: A. Orders are half as variable as customer demand B. Order variance is twice customer-demand variance C. Customer demand is twice order variance D. The supply chain has two tiers Correct Answer: B. Order variance is twice customer-demand variance Question 3Which SCOR category primarily concerns acquiring goods and services? A. Plan B. Make C. Source D. Return Correct Answer: C. Source Question 4Which activity is most closely associated with postponement? A. Completing all configurations before receiving demand information B. Delaying final configuration until demand is clearer C. Eliminating all product variety D. Increasing order batch size regardless of demand Correct Answer: B. Delaying final configuration until demand is clearer Question 5What does Little’s Law relate in a stable process? A. Price, cost and margin B. Demand, forecast and safety stock C. Work-in-process, throughput and time in process D. Quality, reliability and warranty cost Correct Answer: C. Work-in-process, throughput and time in process Question 6Which situation is most likely to justify a highly flexible process? A. High-volume production of a stable standard product B. Low-volume production of highly customised products C. Continuous production with predictable demand D. Repetitive production with limited variety Correct Answer: B. Low-volume production of highly customised products Question 7Which statement best describes value-chain analysis? A. It examines only transport costs B. It identifies how activities contribute to customer and organisational value C. It replaces the need for process measurement D. It focuses exclusively on supplier prices Correct Answer: B. It identifies how activities contribute to customer and organisational value Question 8If 900 orders are assessed and 810 meet every defined perfect-order criterion, what is the perfect-order percentage? A. 81% B. 90% C. 91% D. 99% Correct Answer: B. 90% Question 9Which is a limitation of process maps? A. They cannot show activities or decisions B. They always measure financial performance accurately C. They may represent the official process rather than actual work D. They cannot be used across organisational boundaries Correct Answer: C. They may represent the official process rather than actual work Question 10Why is lower-tier supply-chain visibility important? A. It guarantees lower purchase prices B. It can reveal hidden dependencies and single points of failure C. It eliminates the need for supplier governance D. It ensures that all suppliers are local Correct Answer: B. It can reveal hidden dependencies and single points of failure
|